Building cable embedded pipe based on assembly
By designing integrated cable pre-embedded pipes in prefabricated buildings and utilizing fiber-reinforced plastic isolation pipes and connecting components, the conflict between cable pre-embedded pipes and other components is resolved, improving the stability and practicality of the pre-embedded pipes.
Patent Information
- Application Number
- CN202422709889.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-06
- Publication Date
- 2025-12-09
- Estimated Expiration
- 2034-11-06
AI Technical Summary
In prefabricated buildings, the on-site construction of cable pre-buried pipes is prone to conflicts with other building components, making it difficult to guarantee quality, affecting the safety of cable laying and use, and resulting in poor stability of the pre-buried pipes.
Design a cable pre-embedded pipe that is integrated with prefabricated building components. By precisely embedding the pre-embedded pipe during the production of prefabricated components and using fiber-reinforced plastic to isolate the pipe and connecting components, conflict with other components can be prevented, thereby improving stability.
This enables stable connection between pre-buried cable conduits and other components in prefabricated buildings, enhancing the practicality and safety of the conduits and ensuring the quality and stability of cable laying.
Smart Images

Figure CN223651919U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the technical field of prefabricated building auxiliary devices, and in particular to a cable pre-embedded pipe for prefabricated buildings. Background Technology
[0002] As is well known, prefabricated construction refers to a construction method in which various parts of a building are prefabricated in a factory and then transported to the construction site for assembly. This method can greatly improve construction efficiency and help reduce on-site construction time and costs.
[0003] In prefabricated buildings, cable laying needs to be planned in advance; traditional cable pre-embedded pipe construction is carried out on site, which can easily cause conflicts with the installation of other building components; the quality of on-site pre-embedded pipes is difficult to guarantee, such as the accuracy of pipe diameter and the sealing of pipes, which affects the safety of cable laying and subsequent use, thereby reducing the stability of pre-embedded pipes and resulting in poor practicality. Utility Model Content
[0004] To solve the above-mentioned technical problems, this utility model provides a cable pre-embedded pipe integrated with prefabricated building components. During the production of prefabricated components, the pre-embedded pipe is precisely embedded to prevent conflict with other building components, thereby improving the stability of the pre-embedded pipe and thus enhancing its practicality as a cable pre-embedded pipe for prefabricated buildings.
[0005] This utility model discloses a pre-embedded cable conduit for prefabricated buildings, comprising a main component, a pre-embedded pipe, an isolation pipe, and connecting components. The main component has a reserved hole, and the outside of the reserved hole is connected to the outside of the pre-embedded pipe. An isolation pipe is provided inside the pre-embedded pipe, and connecting components are provided at both ends of the reserved hole.
[0006] Preferably, the insulation tubing comprises fiber-reinforced plastic, and the insulation tubing is composed of fiber-reinforced plastic.
[0007] Preferably, the connecting component includes a mounting ring and two sets of first locking blocks. The left end of the pre-drilled hole in the main body of the component is connected to the right end of the mounting ring. The top and bottom of the outer side of the mounting ring are respectively connected to one end of a set of first locking blocks. A locking hole is provided at the right end of the pre-drilled hole in the main body of the component, and a set of locking grooves are provided at the top and bottom of the right end of the locking hole. The left end of the locking block in the main body of the component is connected to the pre-drilled hole in the main body of the component.
[0008] Preferably, it also includes an auxiliary sleeve, with the inner side of the mounting ring and the outer side of the auxiliary sleeve connected.
[0009] Preferably, it also includes an annular sealing gasket, with the left end of the component body's locking hole and the left end of the annular sealing gasket connected.
[0010] Compared with the prior art, the advantages of this utility model for cable pre-embedded pipes for prefabricated buildings are as follows: after the main bodies of two sets of components are merged, the pre-embedded pipes inside their reserved holes are connected by connecting components, and then the workers can insert the cable into the inside of the pre-embedded pipe for laying; a cable pre-embedded pipe integrated with prefabricated building components can be precisely embedded during the production of prefabricated components to prevent conflicts with other building components, thereby improving the stability of the pre-embedded pipe and thus enhancing its practicality. Attached Figure Description
[0011] Figure 1 This is a three-dimensional schematic diagram of the right-side structure of this utility model;
[0012] Figure 2 This is a three-dimensional schematic diagram of the left-side structure of this utility model;
[0013] Figure 3 This is a front view structural cross-sectional schematic diagram of this utility model;
[0014] Figure 4 This is an enlarged structural diagram of point A in this utility model;
[0015] The following are labels in the attached diagram: 1. Main component; 2. Embedded pipe; 3. Isolation pipe; 4. Fiber reinforced plastic; 5. Mounting ring; 6. First locking block; 7. Auxiliary sleeve; 8. Annular sealing gasket. Detailed Implementation
[0016] The specific embodiments of this utility model will be described in further detail below with reference to the accompanying drawings and examples. The following examples are used to illustrate this utility model, but are not intended to limit its scope.
[0017] like Figures 1 to 4 As shown, this utility model discloses a cable pre-embedded pipe for prefabricated buildings, comprising a main component 1, a pre-embedded pipe 2, an isolation pipe 3, and connecting components. The main component 1 has a reserved hole, and the outside of the reserved hole is connected to the outside of the pre-embedded pipe 2. The isolation pipe 3 is provided inside the pre-embedded pipe 2, and connecting components are provided at both ends of the reserved hole. When the two main components are combined, the pre-embedded pipes inside the reserved holes are connected by the connecting components. Then, the workers can insert the cable into the inside of the pre-embedded pipe for laying. This cable pre-embedded pipe, integrated with prefabricated building components, precisely embeds the pre-embedded pipe during the production of prefabricated components, preventing conflicts with other building components, thereby improving the stability of the pre-embedded pipe and enhancing its practicality.
[0018] As a preferred embodiment of the above, the isolation pipe 3 includes fiber-reinforced plastic 4, which is composed of fiber-reinforced plastic 4; it has good corrosion resistance and can resist the erosion of various chemicals, and also has certain flame-retardant properties, thus enhancing its practicality.
[0019] As a preferred embodiment of the above, the connecting component includes an mounting ring 5 and two sets of first locking blocks 6. The left end of the reserved hole of the component body 1 is connected to the right end of the mounting ring 5. The top and bottom of the outer side of the mounting ring 5 are respectively connected to one end of a set of first locking blocks 6. A locking hole is provided at the right end of the reserved hole of the component body 1, and a set of locking grooves are provided at the top and bottom of the right end of the locking hole. The left end of the locking block of the component body 1 is connected to the reserved hole of the component body 1. When the two sets of component bodies are merged, the mounting ring at one end of one set of component bodies is simultaneously engaged with the locking hole of the other set of component bodies, and the two sets of first locking blocks are engaged with the locking hole and locking groove respectively. The installation is then completed, which allows workers to quickly connect the embedded pipe, thereby improving the stability of the embedded pipe and enhancing its practicality.
[0020] As a preferred embodiment of the above, an auxiliary sleeve 7 is also included, with the inner side of the mounting ring 5 and the outer side of the auxiliary sleeve 7 connected; this allows workers to quickly thread and guide the cable, thus enhancing its practicality.
[0021] As a preferred embodiment of the above, it also includes an annular sealing gasket 8, with the left end of the card hole of the component body 1 connected to the left end of the annular sealing gasket 8; this can improve the sealing effect and reduce wear caused by compression, thus enhancing practicality.
[0022] This utility model discloses a cable pre-embedded pipe for prefabricated buildings. During operation, after the two main components are combined, the mounting ring at one end of one main component is engaged with the locking hole of the other main component, and the two sets of first locking blocks are engaged with the locking hole and slot respectively. Then, the workers insert the cable into the inside of the pre-embedded pipe for laying. Before completing the above actions, the pipe is first moved to the position required by the user.
[0023] The terms “vertical,” “horizontal,” “left,” “right,” and similar expressions used in this article are for illustrative purposes only.
[0024] In this utility model, the terms "first," "second," and "third" do not represent a specific quantity or order, but are merely used to distinguish names.
[0025] The above description is only a preferred embodiment of the present utility model. It should be noted that for those skilled in the art, several improvements and modifications can be made without departing from the technical principles of the present utility model, and these improvements and modifications should also be considered within the protection scope of the present utility model.
Claims
1. A pre-embedded cable conduit for prefabricated buildings, comprising a main component (1), characterized in that, It also includes a pre-embedded pipe (2), an isolation pipe (3) and a connecting component. The main body (1) of the component is provided with a reserved hole, and the outside of the reserved hole is connected to the outside of the pre-embedded pipe (2). An isolation pipe (3) is provided inside the pre-embedded pipe (2), and connecting components are provided at both ends of the reserved hole.
2. The cable pre-embedded pipe for prefabricated buildings as described in claim 1, characterized in that, The isolation pipe (3) includes fiber-reinforced plastic (4), and the isolation pipe (3) is composed of fiber-reinforced plastic (4).
3. The cable pre-embedded pipe for prefabricated buildings as described in claim 2, characterized in that, The connecting component includes an installation ring (5) and two sets of first locking blocks (6). The left end of the reserved hole of the component body (1) is connected to the right end of the installation ring (5). The top and bottom of the outer side of the installation ring (5) are respectively connected to one end of a set of first locking blocks (6). A locking hole is provided at the right end of the reserved hole of the component body (1), and a set of locking grooves are provided at the top and bottom of the right end of the locking hole. The left end of the locking block of the component body (1) is connected to the reserved hole of the component body (1).
4. The cable pre-embedded pipe for prefabricated buildings as described in claim 3, characterized in that, It also includes an auxiliary sleeve (7), which connects the inner side of the mounting ring (5) and the outer side of the auxiliary sleeve (7).
5. A cable pre-embedded pipe for prefabricated buildings as described in claim 4, characterized in that, It also includes an annular sealing gasket (8), and the left end of the card hole of the component body (1) is connected to the left end of the annular sealing gasket (8).