Dispensing equipment for loudspeaker

By introducing a heating box and air supply pipe system into the speaker dispensing equipment, hot air is used to accelerate the solidification of the adhesive, solving the problem of slow adhesive solidification in cold environments and achieving a highly efficient process and quality assurance in speaker production.

CN223717586UActive Publication Date: 2025-12-26DONGGUAN XIANGFU ELECTRONICS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202423247169.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-27
Publication Date
2025-12-26
Estimated Expiration
2034-12-27

AI Technical Summary

Technical Problem

In cold environments, the glue solidifies too slowly during the speaker production process, leading to production delays and speaker quality issues, affecting sealing performance and service life.

Method used

Design a dispensing device for speakers, which uses a heating box and a circular air supply pipe system to accelerate glue solidification by directly blowing hot air, and combines the built-in motor to drive the placement plate to rotate to achieve all-round dispensing.

Benefits of technology

It effectively accelerates the curing speed of adhesive, reduces production waiting time, ensures the sealing performance and service life of the horn, and adapts to production needs under cold weather conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223717586U_ABST
    Figure CN223717586U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of dispensing equipment, and discloses dispensing equipment for horns, which comprises a workbench, a guide groove is formed in the surface of the workbench, a sliding block is slidably connected in the guide groove, and a dispensing machine body is fixedly connected to the surface of the sliding block. Through the design of the heating box, the air pump and the air supply round pipe, hot air is supplied to a horn dispensing area in the dispensing process or after dispensing is completed, the solidification speed of glue can be effectively increased through direct blowing of the hot air, the waiting time is greatly shortened, and particularly in cold weather, the glue can be effectively solidified. The solidification speed of the glue is often influenced by the temperature and becomes slow, at the moment, the situation of production delay and the like caused by slow solidification of the glue due to cold weather can be avoided through heat supply, a built-in motor drives a placing disc to rotate, at the moment, a movable rod rotates in a circular sliding groove, and stable rotation of the placing disc is guaranteed; and the loudspeaker can rotate to different angles, so that all-directional dispensing of the dispensing machine body is facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to a point gum equipment technical field especially relates to a kind of for horn's point gum equipment. BACKGROUND

[0002] In the production and manufacturing process of horn, the point gum link occupies extremely key position, and the quality of point gum operation is directly and significantly influenced to the various performance indexes, sealing condition and service life length etc. many quality elements of horn.

[0003] In some special production environment, for example, outdoor work scene under cold weather condition, or indoor production workshop with lower temperature, the glue solidification speed can appear significant slowing phenomenon, since glue solidification speed is too slow, production process cannot be advanced according to normal rhythm, so that each production cycle is lengthened, and this slow solidification speed can cause glue to enter next production procedure in the state of not completely solidified, in this case, the quality of horn will be greatly threatened, for example, the problem of incomplete sealing can occur, thereby affecting the acoustic performance of horn;Glue can also be unstable, so that the connection between horn internal parts is not firm enough, and then shorten the service life of horn. SUMMARY

[0004] To solve the above technical problem, the utility model provides a kind of for horn's point gum equipment.

[0005] The utility model adopts following technical scheme realization: a kind of for horn's point gum equipment, including workbench, the surface of the workbench is equipped with guide slot, the inside of the guide slot is slidably connected with sliding block, the surface of the sliding block is fixedly connected with point gum machine body, the upper surface of the workbench is fixedly connected with heating box, the upper surface of the heating box is fixedly installed with air pump by bolt, the output of the air pump is fixedly connected with air supply round pipe.

[0006] Through the above technical scheme, the cooperation of sliding block and guide slot makes point gum position flexible adjustment, and the direct blowing of hot air can effectively accelerate the solidification speed of glue, greatly reduces the waiting time in production process, especially in cold weather, the solidification speed of glue is often greatly influenced and becomes slow problem, avoids the production delay etc. situation caused by slow glue solidification due to cold weather.

[0007] As the further improvement of the above scheme, the outer surface of the air supply round pipe is fixedly connected with pipeline bracket, the pipeline bracket is fixedly connected on the surface of workbench, the surface of the workbench is fixedly connected with control panel.

[0008] Through the technical scheme, the pipeline bracket ensures the position stability of the air supply round pipe, and avoids the shaking influence on the hot air delivery position during the air supply process.

[0009] As a further improvement of the above scheme, the inner wall of the heating box is fixedly installed with an auxiliary fan through bolts, and the inner wall of the heating box is fixedly connected with a heating wire group, and the outer surface of the heating box is provided with an air inlet for the auxiliary fan.

[0010] Through the technical scheme, the air is uniformly heated, the temperature of the hot air sent out from the air supply round pipe is uniform, and the glue is uniformly solidified.

[0011] As a further improvement of the above scheme, the upper surface of the workbench is provided with a circular sliding groove, and the inside of the workbench is provided with a built-in motor.

[0012] Through the technical scheme, the circular sliding groove provides guidance for the movement of related components, and the built-in motor provides power source for the rotation of the subsequent placement disc.

[0013] As a further improvement of the above scheme, the output end of the built-in motor is fixedly connected with a placement disc, and the placement disc is located below the body of the glue dispensing machine.

[0014] Through the technical scheme, the built-in motor drives the placement disc to rotate, so that the loudspeaker placed on the placement disc can be rotated to different angles, and the glue dispensing machine body is convenient for all-around glue dispensing.

[0015] As a further improvement of the above scheme, the lower surface of the placement disc is fixedly connected with a movable rod at four corners, and the movable rod is rotatably connected to the inside of the circular sliding groove.

[0016] Through the technical scheme, the movable rod rotates in the circular sliding groove, and the stable rotation of the placement disc is ensured.

[0017] As a further improvement of the above scheme, the air supply round pipe is located above the placement disc.

[0018] Through the technical scheme, the air supply round pipe is located above the placement disc, and the hot air can be directly blown to the loudspeaker after glue dispensing, so that the glue solidification speed is efficiently accelerated.

[0019] Compared with the prior art, the beneficial effects of the utility model lie in:

[0020] The utility model discloses a heating box, air pump and the design of air supply round pipe, in the process of dispensing or dispensing after completion, hot air is sent to the horn dispensing area, and the solidification speed of glue can be effectively accelerated through the direct blowing of hot air, and the waiting time is greatly reduced, especially under cold weather, the solidification speed of glue often will be affected by temperature and become tardy, at this moment, through sending heat, the production delay etc. of the situation that the solidification of glue is slow due to cold weather can be avoided, the built-in motor drives the placement disc rotation, the movable rod rotates in the circular slide groove at this moment, guarantee the stable rotation of placement disc, make the horn can rotate to different angle, be convenient for the omnibearing dispensing of dispensing machine body. BRIEF DESCRIPTION OF DRAWINGS

[0021] Figure 1 It is whole structure schematic diagram of the utility model;

[0022] Figure 2 It is structure schematic diagram of the placement disc of the utility model;

[0023] Figure 3 It is structure schematic diagram of the air supply round pipe of the utility model;

[0024] Figure 4 It is plane structure schematic diagram of the heating wire group of the utility model;

[0025] Figure 5 It is structure schematic diagram of the dispensing machine body of the utility model.

[0026] Main symbol explanation:

[0027] 1, workbench;2, guide slot;3, sliding block;4, dispensing machine body;5, heating box;6, air pump;7, air supply round pipe;8, pipe bracket;9, control panel;10, auxiliary fan;11, heating wire group;12, air port;13, circular slide groove;14, built-in motor;15, placement disc;16, movable rod. DETAILED DESCRIPTION

[0028] Below, combining the drawings and specific implementation, the utility model is described further, need explaining, under the premise of not conflict, the following description each embodiment between or each technical feature between can be arbitrary combination and form new embodiment.

[0029] Embodiment:

[0030] Please combine Figures 1-5This embodiment of a dispensing device for a speaker includes a workbench 1. A guide groove 2 is provided on the surface of the workbench 1. A sliding block 3 is slidably connected inside the guide groove 2. A dispensing machine body 4 is fixedly connected to the surface of the sliding block 3. A heating box 5 is fixedly connected to the upper surface of the workbench 1. An air pump 6 is fixedly installed on the upper surface of the heating box 5 by bolts. An air supply pipe 7 is fixedly connected to the output end of the air pump 6. The workbench 1 provides basic support. The guide groove 2 guides the sliding block 3 to slide, so that the dispensing machine body 4 can move to a suitable position as needed to perform the dispensing operation. The heating wire group 11 in the heating box 5 heats the air. The air pump 6 sends the heated air out through the air supply pipe 7 and sends the hot air to the speaker dispensing area, thereby accelerating the curing of the glue.

[0031] A pipe bracket 8 is fixedly connected to the outer surface of the air supply pipe 7. The pipe bracket 8 is fixedly connected to the surface of the workbench 1. A control panel 9 is fixedly connected to the surface of the workbench 1. The pipe bracket 8 fixes the air supply pipe 7 to make its position stable.

[0032] An auxiliary fan 10 is fixedly installed on the inner wall of the heating box 5 by bolts. A heating wire assembly 11 is fixedly connected to the inner wall of the heating box 5. An air vent 12 is opened on the outer surface of the heating box 5 to allow air to enter the auxiliary fan 10. The rotation of the auxiliary fan 10 causes the air inside the heating box 5 to circulate, so that the air heated by the heating wire assembly 11 is evenly distributed. The air vent 12 provides an air source for the auxiliary fan 10.

[0033] The upper surface of the worktable 1 is provided with a circular slide groove 13, and the worktable 1 is equipped with a built-in motor 14. The built-in motor 14 is located inside the worktable 1, and the circular slide groove 13 provides a track for the movement of subsequent structures.

[0034] The output end of the built-in motor 14 is fixedly connected to the placement plate 15. The placement plate 15 is located below the dispensing machine body 4. The built-in motor 14 drives the placement plate 15 to rotate, so that the speaker placed on the placement plate 15 can rotate to different angles, which facilitates the dispensing machine body 4 to dispense glue from all directions.

[0035] Movable rods 16 are fixedly connected to the four corners of the lower surface of the placement tray 15. The movable rods 16 are rotatably connected to the inside of the circular slide groove 13. The movable rods 16 connect the placement tray 15 and the circular slide groove 13. When the placement tray 15 rotates, the movable rods 16 rotate within the circular slide groove 13 to ensure the stable rotation of the placement tray 15.

[0036] The air supply pipe 7 is located above the placement tray 15. It can blow hot air directly onto the speaker after the glue has been applied, thus accelerating the curing of the glue.

[0037] The implementation principle of the dispensing equipment for the loudspeaker in the embodiment of the application is as follows: personnel first place the loudspeaker to be dispensed on the placing disc 15, ensure that the loudspeaker is placed stably, start the built-in motor 14 to make the placing disc 15 rotate, stabilize the rotation of the placing disc 15 by using the movable rods 16 at the four corners of the lower surface of the placing disc 15 to rotate in the circular sliding groove 13, adjust the loudspeaker to the initial dispensing position, according to the dispensing requirement, the personnel can also operate the sliding block 3 to slide in the guide groove 2 to drive the dispensing machine body 4 to move to the appropriate dispensing position, after the dispensing machine body 4 is adjusted to the appropriate position, the personnel start the dispensing machine body 4 to perform the dispensing operation through the control panel 9, and the specified position on the loudspeaker is dispensed, in the dispensing process or after the dispensing is completed, the personnel start the heating wire group 11 in the heating box 5, and simultaneously start the auxiliary fan 10, the auxiliary fan 10 takes in air from the air inlet 12 and promotes the air circulation in the heating box 5, so that the air heated by the heating wire group 11 is uniformly distributed, then the air pump 6 is started, the air pump 6 sends out the heated air through the air supply round pipe 7, since the air supply round pipe 7 is located above the placing disc 15, the hot air can be directly sent to the loudspeaker after the dispensing to accelerate the solidification of the glue. In this process, the pipe bracket 8 fixes the position of the air supply round pipe 7 to ensure that the hot air is stably sent.

[0038] The above embodiment is only a preferred embodiment of the application, and cannot be used to limit the range of protection of the application, and any non-substantial change and replacement made by the person skilled in the art on the basis of the application belongs to the range of protection of the application.

Claims

1. A dispensing apparatus for a horn, comprising: Including work platform (1), the surface of work platform (1) is provided with guide slot (2), the inside of guide slot (2) is slidably connected with sliding block (3), the surface of sliding block (3) is fixedly connected with point glue machine body (4), the upper surface of work platform (1) is fixedly connected with heating box (5), the upper surface of heating box (5) is fixedly installed with air pump (6) by bolt, the output of air pump (6) is fixedly connected with air supply round pipe (7).

2. The dispensing apparatus for a horn of claim 1, wherein: The outer surface of air supply round pipe (7) is fixedly connected with pipeline bracket (8), the pipeline bracket (8) is fixedly connected on the surface of work platform (1), the surface of work platform (1) is fixedly connected with control panel (9).

3. The dispensing apparatus for a horn of claim 1, wherein: The inner wall of heating box (5) is fixedly installed with auxiliary fan (10) by bolt, the inner wall of heating box (5) is fixedly connected with heating wire group (11), the outer surface of heating box (5) is provided with air inlet (12) for auxiliary fan (10) to take in air.

4. The dispensing apparatus for a horn of claim 1, wherein: The upper surface of work platform (1) is provided with circular slide groove (13), the inside of work platform (1) is provided with built-in motor (14).

5. A dispensing apparatus for a horn as claimed in claim 4, wherein: The output of built-in motor (14) is fixedly connected with placing disc (15), and placing disc (15) is located below point glue machine body (4).

6. A dispensing apparatus for a horn as claimed in claim 5, wherein: The lower surface of placing disc (15) is fixedly connected with movable rod (16) at four corners, and movable rod (16) is rotatably connected in the inside of circular slide groove (13).

7. The dispensing apparatus for a horn of claim 1, wherein: Air supply round pipe (7) is located above placing disc (15).