New energy test pile
By introducing shock-absorbing devices and rubber layers into the new energy test piles, the impact problem during equipment movement was solved, achieving safe transportation and cost control, and improving the equipment's performance and economic benefits.
Patent Information
- Application Number
- CN202520083859.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-14
- Publication Date
- 2025-12-26
- Estimated Expiration
- 2035-01-14
AI Technical Summary
The existing new energy test piles lack protective structures, which means that the impacts they receive during movement cannot be mitigated, affecting normal use and increasing maintenance costs.
A new energy test pile, including a shock-absorbing device and a rubber layer, was designed. The shock-absorbing spring and connecting block dissipate energy during vibration, protect the testing device, reduce vibration transmission, and achieve safe transportation of the equipment.
It effectively protects the safety of new energy test piles during transportation, reduces equipment damage and maintenance frequency, lowers usage costs, and improves production efficiency.
Smart Images

Figure CN223721651U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to test pile equipment technical field, concretely is a new energy test pile. BACKGROUND
[0002] The new energy charging pile is a device for providing electric energy for electric vehicles, similar to the oil dispenser of the gas station, when producing and processing, in order to ensure the quality of product output, generally uses the new energy test pile to detect, the new energy test pile is a kind of equipment for monitoring and testing the performance and safety of new energy charging pile.
[0003] The authorized patent with publication number CN218839225U discloses a new energy automobile charging test pile, relates to the automobile detection technical field, including box, power box and test column, it is convenient to adjust the height of test pile according to the height of charging pile, effectively solve the problem that test pile cannot adjust its height and affect the work, but lack protection structure when actually using, cause new energy test pile to be impacted when moving and cannot be reduced, cause new energy test pile to be unable to use normally, affect the effect of new energy test pile when actually using, simultaneously, the new energy test pile needs to be maintained when being damaged, increase the cost of new energy test pile when actually using, it is not conducive to the economic benefits in production and processing, for this, we propose a kind of new energy test pile. UTILITY MODEL CONTENT
[0004] The utility model aims at providing a kind of new energy test pile to solve the problem of lacking protection structure of existing new energy test pile in the above background art.
[0005] To achieve the above object, the utility model provides the following technical scheme: a kind of new energy test pile, including box, support plate, drive box, movable plate, support and operation panel, the support plate is fixedly connected between the inner chamber left and right side walls of the box lower side, the drive box is fixedly connected in the inner chamber bottom left side of the box, the movable plate is located in the inner chamber of the box, the support is fixedly connected in the top middle of the movable plate, the operation panel is embedded in the left upper side of the front side wall of the box, the top of the support is fixedly connected with cover plate, support rod is fixedly connected between the inner chamber left and right side walls of the support, the outer side wall of the support rod is sleeved with shock absorber spring, the end of the shock absorber spring is fixedly connected with connecting block, the inner side wall of the connecting block is fixedly connected with shock absorber device, the inner side wall of the shock absorber device is fixedly connected with detection device, the inner chamber left and right side walls of the support are fixedly connected with rubber layer.
[0006] Further describe the above scheme as follows:
[0007] The bottom four corners of the box are fixedly connected with universal wheels.
[0008] As a further description of the above scheme:
[0009] The top and left and right sides of the support plate are rotationally connected with a lead screw, the movable plate is threadedly connected between the outer side walls of the lead screw, and a transmission belt is sleeved on the lower side of the outer side walls of the lead screw.
[0010] As a further description of the above scheme:
[0011] The bottom of the inner cavity of the drive box is fixedly connected with a variable frequency motor, and the output end of the variable frequency motor penetrates the middle of the top of the inner cavity of the drive box and is inserted into the bottom end of the lead screw.
[0012] As a further description of the above scheme:
[0013] The left and right side walls of the movable plate are fixedly connected with a movable block, the outer side wall of the movable block is slidingly connected with a limiting plate, and the limiting plate is fixedly connected to the upper side of the left and right side walls of the inner cavity of the box body.
[0014] As a further description of the above scheme:
[0015] The operation panel is electrically connected with the variable frequency motor and the detection device.
[0016] Compared with the prior art, the utility model has the advantages that:
[0017] The new energy test pile is convenient to use, and the protection function of the new energy test pile during actual use is realized, the safety of the new energy test pile during movement and transportation is ensured, the effect of the new energy test pile during actual use is improved, the frequency of maintenance of the new energy test pile is reduced, the cost of the new energy test pile during actual use is controlled, and the economic benefits in production and processing are improved. BRIEF DESCRIPTION OF DRAWINGS
[0018] Figure 1 A perspective structural schematic view of the new energy test pile is provided for the utility model;
[0019] Figure 2 A front view and sectional view structural schematic view of the new energy test pile is provided for the utility model;
[0020] Figure 3 A perspective structural schematic view of the new energy test pile is provided for the utility model;Figure 2 Amplification structure schematic view of middle A part;
[0021] Figure 4 The utility model provides a new energy test pile Figure 2 Amplification structure schematic view of middle B part.
[0022] In the figure: 100, box body; 110, universal wheel; 200, support plate; 210, screw rod; 220, transmission belt; 300, drive box; 310, frequency conversion motor; 400, movable plate; 410, movable block; 420, limiting plate; 500, support; 510, cover plate; 520, support rod; 530, shock absorbing spring; 540, connecting block; 550, shock absorbing device; 560, detection device; 570, rubber layer; 600, operation panel. DETAILED DESCRIPTION
[0023] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the utility model.
[0024] In the description of the utility model, it needs to be understood that the orientation or positional relationship indicated by the terms "center", "longitudinal", "transverse", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential" are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the utility model and simplifying the description, and therefore cannot be understood as indicating or implying that the indicated device or element must have a particular orientation, be constructed and operated in a particular orientation, and therefore cannot be understood as limiting the utility model. In addition, the features limited as "first" and "second" can explicitly or implicitly include one or more of the features. In the description of the utility model, unless otherwise specified, the meaning of "multiple" is two or more.
[0025] In the description of the utility model, it needs to be explained that, unless otherwise explicitly specified and limited, the terms "mounting", "connection", "connection" should be understood broadly, for example, it can be fixed connection, or detachable connection, or integrally connected; it can be mechanical connection, or electrical connection; it can be directly connected, or indirectly connected through an intermediate medium; it can be the communication inside two elements. For those skilled in the art, the specific meaning of the above terms in the utility model can be understood according to the specific circumstances.
[0026] The utility model provides a new energy test pile is favorable to the effect of new energy test pile actual use, please refer to Figures 1-4 Including box 100, support board 200, drive box 300, movable plate 400, support 500 and operation panel 600,
[0027] Please refer to again Figures 1-4 Box 100 is used for connecting installation support board 200, drive box 300, movable plate 400, support 500 and operation panel 600,
[0028] Please refer to again Figures 1-4 Support board 200 is fixedly connected between the lower side of the left and right side walls of the inner chamber of box 100, and support board 200 is used for rotatingly connecting lead screw 210,
[0029] Please refer to again Figures 1-4 Drive box 300 is fixedly connected to the bottom left side of the inner chamber of box 100, and drive box 300 is used for connecting installation variable frequency motor 310,
[0030] Please refer to again Figures 1-4 Movable plate 400 is screw-connected between the outer side walls of lead screw 210, and movable plate 400 is used for supporting support 500,
[0031] Please refer to again Figures 1-4 The top of support 500 is fixedly connected with cover plate 510, support 500 is fixedly connected with support rod 520 between the left and right side walls of the inner chamber, support rod 520 is sleeved with shock absorbing spring 530, the tail end of shock absorbing spring 530 is fixedly connected with connecting block 540, the inner side wall of connecting block 540 is fixedly connected with shock absorbing device 550, shock absorbing device 550 is fixedly connected with detection device 560 between the inner side walls, support 500 is fixedly connected with rubber layer 570 between the left and right side walls of the inner chamber, and support 500 is fixedly connected to the top middle of movable plate 400, cover plate 510 is used for closing box 100, support rod 520 is used for connecting installation shock absorbing spring 530 and connecting block 540, shock absorbing spring 530 is used for reducing impact, connecting block 540 is used for connecting installation shock absorbing device 550, shock absorbing device 550 is used for reducing impact, detection device 560 is used for detecting new energy charging pile, and rubber layer 570 is used for protecting shock absorbing device 550,
[0032] Please refer to again Figures 1-4 Operation panel 600 is inlaid in the left upper side of the front side wall of box 100, and operation panel 600 is used for electrically connecting variable frequency motor 310 and detection device 560.
[0033] In summary, when the device is moved for transportation, the support 500 is stored in the inside of the box body 100. When the outside of the box body 100 is impacted, the vibration energy enters the inside of the box body 100. Before being transmitted to the detection device 560, the connecting block 540 moves left and right on the outside wall of the supporting rod 520. The connecting block 540 pushes the shock-absorbing spring 530 to shrink and deform, and consumes the impact. At this time, the shock-absorbing device 550 is blocked after contacting the rubber layer 570 when the connecting block 540 moves, and the shock-absorbing device 550 is protected. At the same time, the energy transmitted to the shock-absorbing device 550 through the connecting block 540 pushes the shock-absorbing device 550 to shrink and further consume, realizing the protection function of the new energy test pile in actual use, ensuring the safety of the new energy test pile in the process of moving and transporting, being conducive to the effect of the new energy test pile in actual use, reducing the number of times of maintaining the new energy test pile, controlling the cost of the new energy test pile in actual use, and improving the economic benefits in production and processing.
[0034] Please refer again to Figures 1-4 The bottom corners of the box body 100 are fixedly connected with universal wheels 110, and the universal wheels 110 are used to move the box body 100.
[0035] Please refer again to Figures 1-4 The top left and right sides of the supporting plate 200 are rotatably connected with lead screws 210, and the movable plate 400 is threadedly connected between the outer side walls of the lead screws 210. The outer side walls of the lead screws 210 are telescopically connected with transmission belts 220, and the lead screws 210 are used to push the movable plate 400 to move. The transmission belts 220 are used to rotate the lead screws 210 at the same time.
[0036] Please refer again to Figures 1-4 The inner cavity bottom middle of the drive box 300 is fixedly connected with a variable frequency motor 310, and the output end of the variable frequency motor 310 penetrates the inner cavity top middle of the drive box 300 and is inserted into the bottom end of the lead screw 210. The variable frequency motor 310 is used to drive the lead screw 210 to rotate.
[0037] Please refer again to Figures 1-4 The left and right side walls of the movable plate 400 are fixedly connected with movable blocks 410, and the outer side walls of the movable blocks 410 are slidably connected with limit plates 420. The limit plates 420 are fixedly connected to the inner cavity left and right side walls of the box body 100. The movable blocks 410 are used to support the movable plate 400 to move, and the limit plates 420 are used to limit the movement of the movable blocks 410.
[0038] Please refer again to The operation panel 600 is electrically connected with the variable frequency motor 310 and the detection device 560. The operation panel 600 is used to control the variable frequency motor 310 and the detection device 560.
[0039] In specific use, the person skilled in the art controls the variable frequency motor 310 to operate through the operation panel 600 when operating, the variable frequency motor 310 drives the screw rod 210 to rotate when operating, the screw rod 210 drives the transmission belt 220 to rotate when rotating, the transmission belt 220 drives the screw rod 210 on the other side to rotate, the screw rod 210 pushes the movable plate 400 to move up when rotating, the movable block 410 moves in the inner cavity of the limiting plate 420 when the movable plate 400 moves up, the movement of the movable plate 400 is supported, the detection device 560 is separated from the inside of the box body 100, and simultaneously the height of the support 500 can be adjusted through the movable plate 400, the operator tests the new energy charging column through the detection device 560, the support 500 is reset through the screw rod 210 after the test is completed, and the box body 100 can be moved through the universal wheel 110, in the moving process, the box body 100 is impacted outside, the vibration energy enters the inside of the box body 100, the connecting block 540 moves left and right on the outer side wall of the supporting rod 520 before being transmitted to the detection device 560, the connecting block 540 drives the shock-absorbing spring 530 to shrink and deform, and the impact is consumed, at this time, the shock-absorbing device 550 is blocked after contacting the rubber layer 570 when the connecting block 540 moves, and simultaneously the energy transmitted to the shock-absorbing device 550 through the connecting block 540 drives the shock-absorbing device 550 to shrink and further consume.
[0040] In the description of the present specification, the description of the terms "one embodiment", "some embodiments", "exemplary embodiment", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in combination with the embodiment or example are included in at least one embodiment or example of the present application. In the present specification, the exemplary description of the above terms does not necessarily mean the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0041] Although the embodiments of the present application have been shown and described, those skilled in the art can understand that various changes, modifications, replacements and variations can be made to the embodiments without departing from the principles and purposes of the present application, and the scope of the present application is defined by the claims and their equivalents.
Claims
1. A new energy test pile, characterized in that: The utility model relates to a kind of box, including box (100), support plate (200), drive box (300), movable plate (400), support (500) and operation panel (600), the support plate (200) is fixedly connected between the inner chamber left and right side wall of the box (100) lower side, the drive box (300) is fixedly connected in the inner chamber bottom left of the box (100), the movable plate (400) is located in the inner chamber of the box (100), the support (500) is fixedly connected in the top middle of the movable plate (400), the operation panel (600) is embedded in the front sidewall left upper side of the box (100), the top of the support (500) is fixedly connected with cover plate (510), support rod (520) is fixedly connected between the inner chamber left and right side wall of the support (500), shock-absorbing spring (530) is sleeved on the outer sidewall of the support rod (520), the end of the shock-absorbing spring (530) is fixedly connected with connecting block (540), the inner sidewall of the connecting block (540) is fixedly connected with shock-absorbing device (550), detection device (560) is fixedly connected between the inner sidewall of the shock-absorbing device (550), the inner chamber left and right side wall of the support (500) is fixedly connected with rubber layer (570).
2. The new energy test pile according to claim 1, characterized in that: The bottom four corners of the box (100) are fixedly connected with universal wheels (110).
3. The new energy test pile according to claim 1, characterized in that: The top left and right sides of the support plate (200) are rotatably connected with lead screws (210), and the movable plate (400) is threadedly connected between the outer sidewalls of the lead screws (210), the outer sidewalls of the lead screws (210) are sleeved with transmission belts (220) on the lower side.
4. The new energy test pile according to claim 1, characterized in that: The inner chamber bottom middle of the drive box (300) is fixedly connected with variable frequency motor (310), and the output end of the variable frequency motor (310) penetrates the inner chamber top middle of the drive box (300), and is inserted into the bottom end of lead screw (210).
5. The new energy test pile according to claim 1, characterized in that: The left and right side walls of the movable plate (400) are fixedly connected with movable blocks (410), the outer sidewalls of the movable blocks (410) are slidably connected with limit plates (420), and the limit plates (420) are fixedly connected on the inner chamber left and right side wall upper side of the box (100).
6. The new energy test pile according to claim 1, characterized in that: The operation panel (600) is electrically connected with variable frequency motor (310) and the detection device (560).
Citation Information
Patent Citations
A new energy vehicle charging test pile
CN218839225U