Assembled steel bar binding mould
By designing a modular rebar tying jig, the problems of difficult transportation and low construction efficiency of traditional integral jigs are solved, achieving efficient rebar tying and improved construction progress.
Patent Information
- Application Number
- CN202423210164.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-25
- Publication Date
- 2025-12-30
- Estimated Expiration
- 2034-12-25
AI Technical Summary
Traditional monolithic rebar binding jigs are bulky, difficult to transport, and occupy a lot of space, affecting construction efficiency and quality, and making it difficult to meet construction schedule requirements.
It adopts a modular design, including a detachable fixing frame, a load-bearing frame and a support component. By setting limit plates and support rods at equal intervals, the position and spacing of the steel bars are precisely controlled, thus realizing a detachable modular structure.
This reduces the need for transportation space, lowers transportation difficulty, saves construction costs and time, improves the accuracy of rebar tying and construction progress, and meets the project schedule requirements.
Smart Images

Figure CN223735145U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the technical field of steel bar binding mould, especially to a spliced steel bar binding mould. BACKGROUND
[0002] In the field of construction engineering, bridge engineering and various large concrete structure construction, the quality and efficiency of steel bar binding work play a crucial role in the stability and durability of the entire project.
[0003] Traditional steel bar binding mainly relies on manual operation and simple measuring tools. Workers determine and fix the position and spacing of steel bars by experience and tools such as tape measures. However, manual binding is prone to uneven spacing between steel bars, large position deviation and low efficiency. Especially in projects with tight schedules, it is difficult to meet the construction progress requirements. In order to overcome the defects of traditional steel bar binding methods and improve the precision, efficiency and engineering quality of steel bar binding, steel bar binding moulds have emerged. They can accurately position and effectively fix steel bars through specially designed structures and components.
[0004] According to the Chinese patent publication No. CN114193607B, a prefabricated box girder movable steel bar binding mould and its construction method are disclosed. The movable steel bar binding mould includes a movable trolley and an integral binding mould. The integral binding mould is arranged on the movable trolley and moves synchronously with the movable trolley. During construction, the steel bar is unloaded in the steel bar processing and binding workshop and the prefabricated box girder is completed in the integral binding mould in the workshop. The steel bar skeleton is temporarily fixed by the mould. After acceptance, it is moved to the steel bar skeleton hoisting area and hoisted to the beam manufacturing pedestal by the beam manufacturing area gantry crane for installation. The invention improves the working environment by carrying out construction in the steel bar processing and binding workshop. Through the combination of the movable trolley and the integral binding mould, the steel bar processing semi-finished product does not need to be transported over a long distance, realizing the flow line production of prefabricated box girder steel bar processing, binding and installation, improving the work efficiency and ensuring the quality of steel bar binding.
[0005] Traditional steel bar binding moulds often adopt integral structure design. This design has many drawbacks in actual application. Firstly, the integral steel bar binding mould is bulky, which occupies a large amount of transportation space during transportation, increasing the difficulty of transportation. Secondly, due to its non-detachable nature, it needs to occupy a large site for storage at the construction site, and during the beam field construction process, it will occupy the use time of the beam pedestal and the box girder formwork for a long time, seriously affecting the overall work flow and efficiency of box girder prefabrication. UTILITY MODEL CONTENTS
[0006] The utility model discloses a purpose at providing a kind of assembled steel bar binding mould, can effectively reduce the space occupied in transit, reduce transportation difficulty, reduce the time of occupying beam stand and box girder formwork, improve the steel processing and installation construction quality in box girder prefabrication process, speed up engineering construction progress, solve the problems of existing integral steel bar binding mould.
[0007] The utility model provides a kind of assembled steel bar binding mould, including several chassis, several the both ends of chassis are inserted with bearing frame, the bearing frame is inserted with support assembly, the chassis upper surface is longitudinally laid with fixed frame, several limit plates are laid with equidistance on the fixed frame.
[0008] Preferably, the bearing frame is fixedly connected with a plug-in sleeve, and a plurality of second through holes are formed in the upper end of the bearing frame.
[0009] Preferably, the support assembly includes a mounting bracket, a plurality of support rods are equidistantly arranged on the mounting bracket, and the support rods are correspondingly inserted into the plug-in sleeve.
[0010] Preferably, the mounting bracket is fixedly connected with a connecting rod on one side of the upper end, and the connecting rod is fixedly connected with a ball joint at the end away from the mounting bracket.
[0011] Preferably, the ball joint is movably connected in a spherical seat, and the spherical seat is fixedly connected with a limiting rod on one side.
[0012] Preferably, a plurality of first through holes are equidistantly arranged on the limiting rod.
[0013] Preferably, the both ends of the chassis are fixedly connected with clamping sleeves inside.
[0014] Preferably, the clamping sleeve is hollow inside, and a threaded hole is formed in the middle of the clamping sleeve.
[0015] Preferably, a slot is formed in the upper end of the chassis, and the slot is in communication with the inside of the clamping sleeve.
[0016] Preferably, the bearing frame is inserted into the slot and the inside of the clamping sleeve at the bottom.
[0017] Compared with the prior art, the assembled steel bar binding mould provided in the utility model embodiment has the following advantages:
[0018] 1. The utility model adopts an assembled design, and through the detachable fixed frame, bearing frame and support assembly, the construction period can be saved, the beam field construction cost can be effectively saved, the time of occupying beam stand and box girder formwork can be greatly reduced, the steel processing and installation construction quality in box girder prefabrication process are improved, the engineering construction progress is speeded up, it is advanced in technology, reliable, applicable, reasonable in economy, the space occupied can be effectively reduced in the transportation process, and the transportation difficulty is reduced.
[0019] 2、The utility model discloses a limit plate and support rod are set up equidistance, can accurately limit the position and interval of reinforcing steel bar, the position deviation of reinforcing steel bar can be effectively controlled in the binding process, greatly improves the precision of reinforcing steel bar binding. BRIEF DESCRIPTION OF DRAWINGS
[0020] In order to more clearly illustrate the technical scheme of the embodiment of the utility model, the following will be to the embodiment needed to use the drawing briefly introduces, it should be understood, the following drawing only shows some embodiments of the utility model, therefore should not be regarded as the limitation of scope, for the ordinary skilled person in the art, under the premise of not paying creative labor, can also obtain other related drawings according to these drawings.
[0021] Figure 1 It is the whole first visual angle structure stereogram of the embodiment of the utility model,
[0022] Figure 2 It is the whole second visual angle structure schematic diagram of the embodiment of the utility model,
[0023] Figure 3 It is the front view structure schematic diagram of the embodiment of the utility model,
[0024] Figure 4 It is the three-dimensional structure schematic diagram of the support assembly and the carrying frame preliminary connection state in the embodiment of the utility model,
[0025] Figure 5 It is the three-dimensional structure schematic diagram of the support assembly and the carrying frame fixed connection in the embodiment of the utility model,
[0026] Figure 6 It is the structure explosion map of the spherical structure and the spherical seat part in the embodiment of the utility model,
[0027] Figure 7 It is the three-dimensional structure schematic diagram of the carrying frame bottom and the bottom bracket insertion part in the embodiment of the utility model,
[0028] Figure 8 It is the three-dimensional structure schematic diagram of the clamping sleeve in the embodiment of the utility model,
[0029] Figure 9 It is the three-dimensional structure schematic diagram of the bottom bracket and the clamping sleeve part in the embodiment of the utility model.
[0030] Reference signs:
[0031] 1, chassis; 11, slot; 2, support assembly; 21, mounting frame; 22, support rod; 23, limiting rod; 24, first through hole; 25, spherical seat; 26, connecting rod; 27, spherical joint; 3, bearing frame; 31, plug sleeve; 32, second through hole; 4, fixed frame; 5, limiting plate; 6, clamping sleeve. DETAILED DESCRIPTION
[0032] Some embodiments of the present application will be described in detail below with reference to the accompanying drawings. In the case of no conflict, the following examples and features in the examples can be combined with each other.
[0033] Please refer to Figures 1-9 The embodiment of the present application provides a kind of assembled steel bar binding mould, including several chassis 1, several chassis 1 both ends are inserted with bearing frame 3, bearing frame 3 is inserted with support assembly 2, fixed frame 4 is longitudinally arranged on the upper surface of chassis 1, and several limiting plates 5 are equidistantly arranged on fixed frame 4.
[0034] In the present application, fixed frame 4 is detachably installed on chassis 1 by bolt, fixed frame 4 is vertically arranged with chassis 1, when using, according to the length of steel bar, the appropriate number of chassis 1 is selected, fixed frame 4 is installed on chassis 1, steel bar is placed between several limiting plates 5, and steel bar is equidistantly arranged by limiting plate 5, so that subsequent binding is facilitated, by setting detachable fixed frame 4, bearing frame 3 and support assembly 2, construction period can be saved, effectively save beam field construction cost, greatly reduce the time of occupying beam pedestal and box girder formwork, improve the steel bar processing and installation construction quality in the process of box girder prefabrication, speed up the engineering construction progress, it is advanced, reliable, applicable in technology, it is reasonable in economy.
[0035] Bearing frame 3 is fixedly connected with plug sleeve 31, and a plurality of second through holes 32 are formed in the upper end of bearing frame 3.
[0036] In specific setting, bearing frame 3 is obliquely installed on chassis 1, bearing frame 3 is inserted on chassis 1, plug sleeve 31 is fixedly connected with the upper and lower ends of each bearing frame 3, plug sleeve 31 is connected and fixed between bearing frame 3 by welding, plug sleeve 31 is used for the connection of support assembly 2, a plurality of second through holes 32 are the same as the specification of first through hole 24, when second through hole 32 corresponds to first through hole 24, limiting rod 23 is fixed on bearing frame 3 by bolt, so as to realize the fixation of support assembly 2, and more stable support can be provided for steel bar binding.
[0037] The support assembly 2 comprises a mounting frame 21, a plurality of support rods 22 are equidistantly arranged on the mounting frame 21 and are correspondingly inserted into the insertion sleeves 31, a connecting rod 26 is fixedly connected to one side of the upper end of the mounting frame 21, a spherical joint 27 is fixedly connected to the end of the connecting rod 26 away from the mounting frame 21, the spherical joint 27 is movably connected into a spherical seat 25, a limiting rod 23 is fixedly connected to one side of the spherical seat 25, and a plurality of first through holes 24 are equidistantly arranged on the limiting rod 23.
[0038] In the specific arrangement, the insertion positions of the support assembly 2 can be selected according to the lengths of the steel bars to be bound, the support assembly 2 is inserted into the corresponding bearing frame 3, and the steel bars are supported by the plurality of support rods 22, so that the steel bars are conveniently bound.
[0039] Specifically, the corresponding support rod 22 is inserted into the insertion sleeve 31, the length of the support rod 22 extending out of the insertion sleeve 31 is adjusted, then the limiting rod 23 is rotated, the first through hole 24 corresponds to the position of the second through hole 32, then the limiting rod 23 is fixed by inserting the bolt into the first through hole 24 and the second through hole 32, so that the position of the limiting rod 23 is fixed, thereby the support rod 22 is fixed, and the stability of the steel bar binding is improved.
[0040] The bottom frame 1 is fixedly connected with a clamping sleeve 6 at both ends, the clamping sleeve 6 is hollow, a threaded hole is formed in the middle of the clamping sleeve 6, an insertion slot 11 is formed in the upper end of the bottom frame 1, the insertion slot 11 is in communication with the inside of the clamping sleeve 6, and the bearing frame 3 is inserted into the insertion slot 11 and the inside of the clamping sleeve 6.
[0041] In the application, the clamping sleeve 6 corresponds to the specification of the bearing frame 3, when splicing, the bottom of the bearing frame 3 is inserted into the insertion slot 11 and the clamping sleeve 6, so that the bearing frame 3 is fixedly inclined on the bottom frame 1, in order to improve the stability of the bearing frame 3, the threaded hole is arranged on the clamping sleeve 6, after the bearing frame 3 is inserted, the bottom of the bearing frame 3 is tightly fixed by the fastening screw, so as to guarantee the stability and strength of the whole device.
[0042] In summary, the working principle of the splicing type steel bar binding jig is:
[0043] In use, according to the length of the reinforcing steel bars, a proper number of the bottom frames 1 are selected, the bottom frames 1 are arranged equidistantly on a work site, then the fixing frames 4 are arranged longitudinally on the bottom frames 1 and are fixed by bolts, then the bearing frames 3 are inserted into the clamping sleeves 6 at two ends of the bottom frames 1, are fixed by fastening screws, then the corresponding supporting rods 22 are inserted into the insertion sleeves 31, the length of the supporting rods 22 extending out of the insertion sleeves 31 is adjusted, then the limiting rods 23 are rotated to make the first through holes 24 correspond to the positions of the second through holes 32, then the limiting rods 23 are fixed by inserting bolts into the first through holes 24 and the second through holes 32, so that the positions of the limiting rods 23 are fixed, thereby the supporting rods 22 are fixed, the splicing of the reinforcing steel bar binding jig is completed, the reinforcing steel bars are arranged between the limiting plates 5, the spacing of the reinforcing steel bars is accurately controlled by the positioning action of the limiting plates 5, thereby the workers can conveniently perform the binding operation of the reinforcing steel bars, and it is ensured that the reinforcing steel bar structure after binding meets the design specification.
[0044] The preferred embodiments of the utility model are merely used for limiting the utility model, for those skilled in the art, the utility model can have various changes and variations. Any modification, equivalent replacement, improvement, etc. within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A kind of assembled steel bar binding mould, including several chassis (1), it is characterized in that: Several said chassis (1) both ends are inserted with bearing frame (3), the bearing frame (3) is inserted with support assembly (2), the upper surface of the chassis (1) is longitudinally arranged with fixed frame (4), the fixed frame (4) is equidistantly arranged with several limiting plates (5).
2. The assembling type reinforcing banding jig according to claim 1, characterized in that: The bearing frame (3) is fixedly connected with the plug sleeve (31), and the upper end of the bearing frame (3) is provided with a plurality of second through holes (32).
3. The assembling type reinforcing banding jig according to claim 2, characterized in that: The support assembly (2) comprises a mounting frame (21), and a plurality of support rods (22) are equidistantly arranged on the mounting frame (21), and the support rods (22) are correspondingly inserted into the plug sleeve (31).
4. The assembling type reinforcing banding jig according to claim 3, characterized in that: The mounting frame (21) is fixedly connected with a connecting rod (26) on one side of the upper end, and the connecting rod (26) is fixedly connected with a spherical joint (27) away from the mounting frame (21).
5. The assembling type tying jig for reinforcement bars according to claim 4, characterized in that: The spherical joint (27) is movably connected in the spherical seat (25), and the spherical seat (25) is fixedly connected with a limiting rod (23) on one side.
6. The assembling type reinforcing banding jig according to claim 5, wherein: The limiting rod (23) is equidistantly provided with a plurality of first through holes (24).
7. The assembling type tying jig for reinforcement bars according to claim 1, characterized in that: The both ends of the chassis (1) are fixedly connected with the clamping sleeve (6) inside.
8. The assembling type reinforcing banding jig according to claim 7, characterized in that: The clamping sleeve (6) is hollow, and a threaded hole is formed in the middle of the clamping sleeve (6).
9. The assembling type reinforcing banding jig according to claim 8, characterized in that: The upper end of the chassis (1) is provided with a slot (11), and the slot (11) is communicated with the inside of the clamping sleeve (6).
10. The assembling type reinforcing banding jig according to claim 9, characterized in that: The bottom of the bearing frame (3) is inserted into the slot (11) and the inside of the clamping sleeve (6).
Citation Information
Patent Citations
A movable steel reinforcement binding jig for precast box girders
CN114193607B