Bridge combined guardrail construction mark placing and fixing support
By combining concrete U-shaped fasteners and movable fasteners, the problem of unstable installation of bridge composite guardrail signs was solved, achieving firm fixation of the signs and providing safety warnings, thus improving construction efficiency and safety.
Patent Information
- Application Number
- CN202520481598.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-18
- Publication Date
- 2026-02-06
- Estimated Expiration
- 2035-03-18
AI Technical Summary
The existing bridge railings have unstable sign installation methods, which can easily cause the outer edge of the sign to extend beyond the preset position, creating a safety hazard and occupying road space.
The signboard is fastened quickly and securely to the bridge crash barrier by using a dual fixing method of concrete U-shaped buckles and movable fasteners, combined with diagonal tie rods and locking bolts, ensuring that the signboard is within the safety boundary.
It improves the stability and safety of the signs, reduces their encroachment on the road surface, ensures the effectiveness of construction warnings, reduces the risk of traffic accidents, and improves construction efficiency.
Smart Images

Figure CN223880238U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The application belongs to the technical field of construction sign fixing support, and particularly relates to a bridge combined guardrail construction sign placing and fixing support. BACKGROUND
[0002] When a road is occupied for construction in a bridge combined guardrail section, a conventional construction process needs to prioritize the arrangement of traffic signboards. In the prior art, there are significant deficiencies in the fixing support for the signboards of the bridge combined guardrail. The traditional method is to use a temporary fixing method of iron wire binding, which not only has the defect of stability, but also is more likely to cause the outer edge of the signboard to exceed the preset position and occupy the emergency lane, forming a safety hazard. In view of this, it is urgent to develop a special fixing device adapted to the structure of the bridge combined guardrail, which realizes the quick installation and accurate positioning of the traffic signboard through the special support integrated with the fixing clamp, so as to ensure that the signboard not only meets the construction warning requirement, but also is strictly controlled within the safety boundary range. SUMMARY
[0003] The purpose of the application is to overcome the defects of the prior art and provide a bridge combined guardrail construction sign placing and fixing support, which can quickly, firmly and normatively fix the traffic signboard on the reinforced steel guardrail of the bridge crash barrier, is convenient to install, adjust and use, does not occupy the road surface space, and further ensures the safety of vehicle passing.
[0004] To achieve the above purpose, the application adopts the following technical scheme:
[0005] A bridge combined guardrail construction sign placing and fixing support, comprising a signboard support pipe, a concrete U-shaped buckle fixedly connected with the signboard support pipe, an inclined pull rod connected with the concrete U-shaped buckle, and a movable fastener connected with the inclined pull rod; a plurality of locking bolts for fixing the signboard are arranged on the upper part of the signboard support pipe, and a T-shaped nut is connected with the locking bolt; the concrete U-shaped buckle is located at the lower part of the signboard support pipe; the movable fastener comprises a spring buckle; one end of the inclined pull rod is fixedly connected with the concrete U-shaped buckle through a hinge, and the other end of the inclined pull rod is welded with the movable fastener; the inclined pull rod is a telescopic rod.
[0006] In one scheme, the concrete U-shaped buckle is fixedly connected with the signboard support pipe through a transverse pipe, and the transverse pipe is welded with the concrete U-shaped buckle and the signboard support pipe respectively.
[0007] In one scheme, the concrete U-shaped buckle comprises a U-shaped main body and a locking bolt connected with the U-shaped main body, and a T-shaped nut is connected with the locking bolt.
[0008] In one scheme, the inclined pull rod is welded with the U-shaped main body.
[0009] In one design, two locking bolts are symmetrically arranged on the U-shaped body, with the two locking bolts located on both sides of the sign support tube.
[0010] Positive effects:
[0011] (1) The double fixing method of “concrete U-shaped buckle + movable fastener” is adopted to directly fix the bracket to the bridge combination guardrail, which improves the safety and stability of the entire bracket and reduces the encroachment of construction signs on the road surface.
[0012] (2) The movable fasteners are adjustable, which can ensure the safety, stability and flexibility of the entire support and improve construction efficiency. Attached Figure Description
[0013] Appendix Figure 1 This is a schematic diagram of the structure of this utility model;
[0014] Appendix Figure 2 This is a schematic diagram of the connection structure between the concrete U-shaped buckle and the sign support tube of this utility model (attached). Figure 2 For the appendix Figure 1 (Left-view perspective);
[0015] 1. Sign support tube; 2. Concrete U-shaped buckle; 3. Diagonal tie rod; 4. Movable fastener; 5. Spring clip; 6. Hinge; 7. Horizontal tube; 8. U-shaped body; 9. Locking bolt. Detailed Implementation
[0016] The specific implementation of this application is further described below with reference to the accompanying drawings. This application is not limited to the description of the following embodiments.
[0017] Example 1
[0018] like Figure 1 and 2 As shown, a bridge composite guardrail construction sign placement and fixing bracket includes a sign support tube 1, a concrete U-shaped buckle 2 fixedly connected to the sign support tube 1, a diagonal tie rod 3 connected to the concrete U-shaped buckle 2, and a movable fastener 4 connected to the diagonal tie rod 3. The upper part of the sign support tube 1 is provided with multiple locking bolts 8 for fixing the sign, and T-nuts are connected to the locking bolts 8. The concrete U-shaped buckle 2 is located at the lower part of the sign support tube 1. The movable fastener 4 includes a spring clip 41. One end of the diagonal tie rod 3 is fixedly connected to the concrete U-shaped buckle 2 via a hinge 5, and the other end of the diagonal tie rod 3 is welded to the movable fastener 4. The diagonal tie rod 3 is a telescopic rod. Preferably, the spring clip is a car tailgate spring clip.
[0019] In use, after the fixing support is taken to the site, firstly, the U-shaped buckle is sleeved on the concrete guardrail, the locking bolt 8 and the T-shaped nut are tightened, then the inclined pull rod 3 is adjusted, thereby the angle and length of the movable buckle are adjusted, the spring buckle 41 is opened and buckled to the heightened guardrail part, finally, the signboard is placed into the signboard supporting pipe 1, the locking bolt 8 and the T-shaped nut are tightened, thereby the direction of the signboard is fixed. In the process, the double fixing form of the "concrete U-shaped buckle 2 + movable buckle 4" is adopted, the support is directly fixed on the bridge combined guardrail, the safety and stability of the support are improved, and the construction signboard reduces the occupation of the road surface. Meanwhile, the movable buckle 4 is adjustable, can adapt to the change of the fixed position, can ensure the safety and stability, flexibility of the whole support, and can improve the construction efficiency.
[0020] Further, the concrete U-shaped buckle 2 is fixedly connected with the signboard supporting pipe 1 through the transverse pipe 6, the transverse pipe 6 is welded with the concrete U-shaped buckle 2 and the signboard supporting pipe 1 respectively. Further, the concrete U-shaped buckle 2 comprises a U-shaped body 7 and a locking bolt 8 connected with the U-shaped body 7, and the locking bolt 8 is connected with a T-shaped nut. Further, two locking bolts 8 are symmetrically arranged on the U-shaped body 7, and the two locking bolts 8 are located on the two sides of the signboard supporting pipe 1 respectively. Further, the inclined pull rod 3 is welded with the U-shaped body 7.
[0021] The bridge combined guardrail construction sign placing fixing support disclosed by the utility model has the advantages that stability is enhanced: the support for fixing the signboard can better resist strong wind and other bad weather, the supporting force on the signboard is increased, and traffic accidents caused by the collapse of the support or the inclination of the signboard are reduced. Visibility is improved: the height of the signboard is reasonably adjusted, the driver can clearly read the information, and the safety hidden danger is reduced. Installation is flexible and changeable: the movable buckle 4 of the support can swing up and down and stretch forward and backward, the design is flexible and convenient, the signboard placing time is greatly shortened, and the working efficiency is improved. Green and environmental protection and maintenance cost reduction: during manufacturing, sustainable and durable materials are selected, the service life of the support is prolonged, the replacement frequency and maintenance cost are reduced, and the sustainable development concept is met.
[0022] The above content is a further detailed description of the present application in combination with the specific preferred embodiments, and the specific implementation of the present application cannot be limited to these descriptions. For ordinary skilled persons in the technical field to which the present application belongs, some simple deductions or replacements can be made without departing from the concept of the present application, and all of them shall be regarded as belonging to the protection scope of the present application.
Claims
1. A bracket for placing and fixing construction signs on a bridge composite guardrail, characterized in that: The signboard support pipe is provided with a plurality of locking bolts for fixing the signboard on the upper portion of the signboard support pipe, and a T-shaped nut is connected to the locking bolts; the concrete U-shaped buckle is located at the lower portion of the signboard support pipe; the movable fastener comprises a spring buckle; one end of the diagonal pull rod is fixedly connected to the concrete U-shaped buckle through a hinge, and the other end of the diagonal pull rod is welded to the movable fastener; and the diagonal pull rod is a telescopic rod.
2. The construction sign placing and fixing support for bridge composite guardrail according to claim 1, characterized in that: The concrete U-shaped buckle is fixedly connected to the signboard support pipe through a transverse pipe, and the transverse pipe is welded to the concrete U-shaped buckle and the signboard support pipe respectively.
3. The construction sign placing and fixing support for bridge composite guardrail according to claim 1, characterized in that: The concrete U-shaped buckle comprises a U-shaped main body and locking bolts connected to the U-shaped main body, and a T-shaped nut is connected to the locking bolts.
4. The construction sign placing and fixing support for bridge composite guardrail according to claim 3, characterized in that: The diagonal pull rod is welded to the U-shaped main body.
5. The construction sign placing and fixing support for bridge composite guardrail according to claim 3, characterized in that: Two locking bolts are symmetrically arranged on the U-shaped main body, and the two locking bolts are located on the two sides of the signboard support pipe respectively.