Operation rack for concrete pouring
By introducing a bottom moving component, a height adjusting component, and a pipe fixing component into the concrete pouring work platform, the problems of non-adjustable platform height and inability to fix the pouring pipes are solved, improving operational convenience and safety.
Patent Information
- Application Number
- CN202520114128.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-17
- Publication Date
- 2026-02-10
- Estimated Expiration
- 2035-01-17
AI Technical Summary
The existing concrete pouring platform has a fixed structure, which cannot be adjusted in height or fixed in the pouring pipes, resulting in inconvenience in operation and insufficient safety.
A bottom moving component, a height adjusting component, and a pipe fixing component were designed to achieve the movement and fixing of the platform, height adjustment, and fixing of the pouring pipes, respectively.
It enables flexible movement and fixation of the platform, meeting the pouring requirements at different heights and improving the accuracy and safety of the operation.
Smart Images

Figure CN223893749U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of construction machinery technology, specifically to a concrete pouring work platform. Background Technology
[0002] The use of concrete pouring work platforms in municipal construction requires multifaceted considerations, including meeting technical requirements, improving operational convenience, enhancing safety, and increasing work efficiency. These factors have collectively driven the design and application of new concrete pouring work platforms, aiming to provide a more efficient and safer working platform for building construction. Conventional work platforms, however, have relatively fixed structures, cannot be height-adjusted as needed, and cannot secure the pouring pipes during use, requiring constant monitoring, which is very cumbersome.
[0003] In publication number CN221219703U, this utility model discloses a concrete pouring work platform, relating to the technical field of work platform technology. This utility model includes a base plate, with a fixing block fixedly installed at one end of the base plate. A movable groove is formed within the fixing block, and a movable component is constructed within the movable groove. By installing the movable component at one end of the base plate, this utility model allows the work platform to be moved without the worker needing to return to the ground. This solves the problem of wasted personnel and inconvenience caused by having to manually move the platform from its base or by having workers push it from the ground. The fixing mechanism in the middle of the base plate ensures the stability of the work platform during concrete pouring. Furthermore, the presence of anti-fall plates around the base plate prevents workers from falling off the platform due to instability, thus protecting personal safety.
[0004] The aforementioned work platform has a relatively fixed structure and cannot be height-adjusted as needed. Furthermore, it cannot secure the pouring pipes during use, requiring constant monitoring, which is very inconvenient. Therefore, there is an urgent need for a concrete pouring work platform that can be height-adjusted and can secure the pouring pipes. Utility Model Content
[0005] The purpose of this utility model is to provide a concrete pouring work platform to solve the problems in the background art.
[0006] To achieve the above objectives, the present invention provides the following technical solution: a concrete pouring work platform, comprising: bottom moving components disposed at the four corners of the bottom of a first support plate for moving; a second support plate connected to the upper end of the first support plate via two sets of height adjusting components; two sets of protective plates connected to the upper sides of the second support plate; a pipe fixing component disposed at the upper end of the left protective plate; and a pouring pipe clamped to the upper end of the pipe fixing component.
[0007] Preferably, the bottom moving component includes a first hinge structure, with a hinge block hinged at the bottom of the first hinge structure. A fixing block is connected to the upper end of the hinge block, and two sets of hinge plates are connected to the bottom of the hinge block through a first connecting plate. The two sets of hinge plates are hinged with moving wheels, and the fixing block is fixed by a fixing plug block. By providing the bottom moving component, the device can move while being fixed at a designated position to prevent pouring errors caused by movement.
[0008] Preferably, the first hinge structure has a groove for cooperating with the fixing block, and the first hinge structure has an insertion groove for cooperating with the fixing insertion block, providing the necessary insertion groove for fixing the bottom moving component.
[0009] Preferably, the height adjustment component includes a plug-in support rod sleeve, and two sets of plug-in support rod sleeves are connected and fixed by four sets of first connecting rods. The upper end of the plug-in support rod sleeve is fixedly sleeved with a plug-in support rod by a fixing bolt. The two sets of plug-in support rods are connected by a second connecting rod. By providing a height adjustment component, the device can be height adjusted as needed to meet different pouring requirements.
[0010] Preferably, the plug-in support rod sleeve and the plug-in support rod have grooves for the fixing bolts to cooperate with, providing a basis for the adjustment of the height adjustment component.
[0011] Preferably, the pipe fixing assembly includes a second connecting plate, with a snap-fit plate connected to the upper end of the second connecting plate. A snap-fit block is elastically connected to the left side of the snap-fit plate via a snap-fit spring. By providing the pipe fixing assembly, the device can be snapped and fixed, increasing the accuracy and safety of the device during the pouring process.
[0012] Preferably, the snap-fit plate has a placement groove for the casting pipe, and the snap-fit plate has an insertion groove for the snap-fit spring and the snap-fit block, providing the necessary grooves for the snap-fit of the pipe fixing assembly.
[0013] Compared with the prior art, the beneficial effects of this utility model are as follows: by setting a bottom moving component, the device can be moved while being fixed at a designated position to prevent pouring errors caused by movement; by setting a height adjustment component, the device can be height adjusted as needed to meet different pouring requirements; by setting a pipe fixing component, the device can be snapped and fixed, increasing the accuracy and safety of the device during the pouring process. Attached Figure Description
[0014] Figure 1 This is a schematic diagram of the overall structure of the left inclined surface of a concrete pouring work platform according to the present invention.
[0015] Figure 2 This is a schematic diagram of the overall structure of the right inclined surface of a concrete pouring work platform according to the present invention.
[0016] Figure 3 This is a schematic diagram of the bottom moving component of a concrete pouring work platform according to the present invention.
[0017] Figure 4 This is a schematic diagram of the height adjustment component for a concrete pouring work platform according to the present invention.
[0018] Figure 5 This is a schematic diagram of a concrete pouring workbench pipe fixing component according to the present invention.
[0019] In the diagram: 1. First support plate; 2. Bottom moving assembly; 21. First hinge structure; 22. Hinge block; 23. Fixing block; 24. First connecting plate; 25. Hinge plate; 26. Moving wheel; 27. Fixing plug-in block; 3. Height adjustment assembly; 31. Plug-in support rod sleeve; 32. First connecting rod; 33. Fixing bolt; 34. Plug-in support rod; 35. Second connecting rod; 4. Second support plate; 5. Protective plate; 6. Pipe fixing assembly; 61. Second connecting plate; 62. Snap-fit plate; 63. Snap-fit spring; 64. Snap-fit block; 7. Casting pipe. Detailed Implementation
[0020] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0021] Please see Figure 1 and Figure 2A concrete pouring work platform includes: bottom moving components 2 set at the four bottom corners of a first support plate 1 for moving; a second support plate 4 connected to the upper end of the first support plate 1 via two sets of height adjusting components 3; two sets of protective plates 5 connected to the upper sides of the second support plate 4; a pipe fixing component 6 set at the upper end of the left protective plate 5; and a pouring pipe 7 clamped at the upper end of the pipe fixing component 6.
[0022] Implementation 1: Please refer to Figures 1 to 4 To increase the adjustability of the device and allow it to move, the bottom moving assembly 2 includes a first hinge structure 21. A hinge block 22 is hinged to the bottom of the first hinge structure 21. A fixing block 23 is connected to the upper end of the hinge block 22. Two sets of hinge plates 25 are connected to the bottom of the hinge block 22 via a first connecting plate 24. Moving wheels 26 are hinged to the two sets of hinge plates 25. The fixing block 23 is fixed by a fixing insertion block 27. By providing the bottom moving assembly 2, the device can move while being fixed in a designated position to prevent casting errors caused by movement. The first hinge structure 21 has a groove for cooperating with the fixing block 23, and the first hinge structure 21 also has a fixing insertion block 27. The insertion groove of the connecting block 27 provides the necessary insertion groove for fixing the bottom moving component 2. The height adjustment component 3 includes an insertion support rod sleeve 31. Two sets of insertion support rod sleeves 31 are connected and fixed by four sets of first connecting rods 32. The upper end of the insertion support rod sleeve 31 is fixedly sleeved with an insertion support rod 34 by a fixing bolt 33. The two sets of insertion support rods 34 are connected by a second connecting rod 35. By setting the height adjustment component 3, the device can be height adjusted as needed to meet different pouring requirements. The insertion support rod sleeve 31 and the insertion support rod 34 have grooves that cooperate with the fixing bolts 33, providing a basis for the adjustment of the height adjustment component 3.
[0023] Implementation 2: Please refer to Figure 2 and Figure 5 To facilitate the fixing of the pouring pipe, the pipe fixing component 6 includes a second connecting plate 61. A snap-fit plate 62 is connected to the upper end of the second connecting plate 61. A snap-fit block 64 is elastically connected to the left side of the snap-fit plate 62 via a snap-fit spring 63. By setting the pipe fixing component 6, the device can snap-fit and fix the 7, increasing the accuracy and safety of the device during the pouring process. The snap-fit plate 62 has a placement groove for the pouring pipe 7, and the snap-fit plate 62 has an insertion groove for the snap-fit spring 63 and the snap-fit block 64, providing the necessary groove for the snap-fit of the pipe fixing component 6. The second support plate 4 has a connection groove hole for the pouring pipe 7.
[0024] Working principle: When the device is needed, move it to the designated position via the bottom moving component 2, remove the fixing plug 27, fix the device, unscrew the four sets of fixing bolts 33, adjust the plug support rod 34 to the appropriate height, and then fix it with the fixing bolts 33. The user moves to the second support plate 4 via the first connecting rod 32, passes the pipe through the groove hole of the second support plate 4, and fixes it with the pipe fixing component 6. Then the pouring can be carried out.
[0025] The standard parts used in this embodiment can be purchased directly from the market, while the non-standard structural parts described in the specification and drawings can be processed without any doubt based on existing technical common sense. At the same time, the connection methods of each component adopt mature conventional methods in the existing technology, and the machinery, parts and equipment all adopt conventional models in the existing technology, so they will not be described in detail here.
[0026] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A concrete pouring work platform, characterized in that, include: Bottom moving components (2) are set at the four bottom corners of the first support plate (1) for movement. The upper end of the first support plate (1) is connected to the second support plate (4) through two sets of height adjustment components (3). Two sets of protective plates (5) are connected to the upper sides of the second support plate (4). A pipe fixing component (6) is set at the upper end of the left protective plate (5). A pouring pipe (7) is snapped into the upper end of the pipe fixing component (6).
2. The concrete pouring work platform according to claim 1, characterized in that: The bottom moving component (2) includes a first hinge structure (21), a hinge block (22) is hinged to the bottom of the first hinge structure (21), a fixing block (23) is connected to the upper end of the hinge block (22), two sets of hinge plates (25) are connected to the bottom of the hinge block (22) through a first connecting plate (24), and the two sets of hinge plates (25) are hinged to a moving wheel (26), and the fixing block (23) is fixed by a fixing plug-in block (27).
3. The concrete pouring work platform according to claim 2, characterized in that: The first hinge structure (21) has a groove that cooperates with the fixing block (23), and the first hinge structure (21) has a plug groove that cooperates with the fixing plug block (27).
4. The concrete pouring work platform according to claim 1, characterized in that: The height adjustment component (3) includes a plug-in support rod sleeve (31), and the two sets of plug-in support rod sleeves (31) are connected and fixed by four sets of first connecting rods (32). The upper end of the plug-in support rod sleeve (31) is fixedly sleeved with a plug-in support rod (34) by a fixing bolt (33), and the two sets of plug-in support rods (34) are connected by a second connecting rod (35).
5. The concrete pouring work platform according to claim 4, characterized in that: The plug-in support sleeve (31) and plug-in support rod (34) are provided with grooves for the fixing bolts (33) to cooperate with.
6. The concrete pouring work platform according to claim 1, characterized in that: The pipe fixing assembly (6) includes a second connecting plate (61), and a snap-fit plate (62) is connected to the upper end of the second connecting plate (61). A snap-fit block (64) is elastically connected to the left side of the snap-fit plate (62) through a snap-fit spring (63).
7. The concrete pouring work platform according to claim 6, characterized in that: The snap-fit plate (62) has a placement groove that matches the casting pipe (7), and the snap-fit plate (62) has an insertion groove that matches the snap-fit spring (63) and the snap-fit block (64).