By designing a dredging device that combines a mobile frame and extraction components, the problems of low efficiency and high cost of traditional dredging methods are solved, achieving efficient and safe sludge treatment, which is suitable for the dredging needs of water conservancy projects.
Patent Information
- Application Number
- CN202520276637.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-20
- Publication Date
- 2026-02-17
- Estimated Expiration
- 2035-02-20
AI Technical Summary
Traditional dredging methods are inefficient, costly, and cause significant damage to the aquatic ecosystem. Furthermore, the transportation of silt is inconvenient, making it difficult to meet the needs of large-scale dredging.
Design a dredging device that includes a mobile frame, an extraction component, and a control component. The extraction component extracts and filters silt from underwater, while the control component monitors and adjusts parameters to achieve flexible dredging and safe operation.
It has improved dredging efficiency, reduced labor intensity and equipment costs, minimized damage to the aquatic ecosystem, and achieved efficient sludge treatment and safe operation.
Smart Images

Figure CN223922280U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model belongs to the technical field of hydraulic engineering, especially relates to a dredging device for hydraulic engineering maintenance. BACKGROUND
[0002] Among numerous hydraulic engineering maintenance work, dredging is a basic and key task. With the sediment carried by the water flow depositing, thick silt layer is gradually formed on the water bottom, which not only reduces the effective volume of the water body and hinders the smooth flow of the water, but also can become a gathering place of pollutants, causing negative impact on the water environment. In severe cases, silt accumulation can cause slow or stagnant flow of the water body, affecting the survival of aquatic organisms, and even causing flood disasters. Therefore, regularly removing the silt on the water bottom and keeping the water body unobstructed and the water quality clean are crucial for maintaining the normal operation of the hydraulic engineering.
[0003] The traditional dredging methods mainly include manual excavation and mechanical excavation. Manual excavation is suitable for small-scale and shallow silt removal, but it is inefficient, labor-intensive, and costly, and cannot meet the demand of large-scale dredging. Mechanical excavation usually uses heavy equipment such as dredging ships or large excavators, which has high dredging efficiency, but has problems such as high equipment investment cost, complex operation, and great damage to the ecological environment of the water body. In addition, no matter which method is used, there are problems such as inconvenient silt transportation and difficult treatment.
[0004] Therefore, we provide a dredging device for hydraulic engineering maintenance to solve the above problems. CONTENT OF THE UTILITY MODEL
[0005] The utility model aims to provide a dredging device for hydraulic engineering maintenance, which solves the problem of low efficiency or insufficient practicality of the existing dredging method through the combination of the extraction assembly and the mobile frame.
[0006] To solve the above technical problems, the utility model is implemented by the following technical solutions:
[0007] The utility model is a dredging device for hydraulic engineering maintenance, which comprises a mobile frame, an extraction assembly mounted on the upper part of the mobile frame, and a control assembly matched with the extraction assembly.
[0008] The mobile frame comprises a chassis, a handle fixed to the upper side end of the chassis, and a silt tank fixed to the upper side of the chassis.
[0009] The extraction assembly comprises a machine base fixed to the upper part of the chassis, a pump body fixed to the upper part of the machine base, an extraction pipe connected with the pump body, a distribution seat one connected with the extraction pipe, a plurality of control valves one connected with the distribution seat one, an extension pipe connected with the control valves one, and a filter screen cylinder installed at the end of the extension pipe.
[0010] The control assembly comprises a power box fixed to the upper portion of the chassis, a control seat fixed to the upper portion of the power box, and an alarm fixed to the upper portion of the control seat.
[0011] The utility model further sets up, mobile wheel is fixed in the corner of chassis bottom, and the mobile wheel is equipped with locking structure.
[0012] The utility model further sets up, the mud tank top is provided with box cover, its box cover side is provided with air pressure balance hole, the one side of mud tank is provided with transparent observation strip.
[0013] The utility model further sets up, the other side bottom of mud tank is provided with distribution seat no.
[0014] The utility model further sets up, the pump body is connected with the mud tank between the conveying pipe, the conveying pipe is equipped with the backflow prevention valve.
[0015] The utility model further sets up, the built -in rechargeable power supply of power box, its rechargeable power supply is connected with pump body, control seat and alarm, the front of power box is fixed with the cover plate through fastener, its side is provided with the heat dissipation groove.
[0016] The utility model has the following beneficial effects:
[0017] 1, the utility model discloses a draw component can be effectively drawn from the underwater silt, and the preliminary filtration is carried out through filter screen cylinder, removes the large particle impurity, improves the processing efficiency of silt, and the combination application of draw component and movable frame makes the whole device can be easily pushed to different operation sites, and simultaneously, the on-off of each extension pipe can be adjusted through control valve, and the dredging area can be flexibly adjusted according to actual needs.
[0018] 2, the utility model discloses a control assembly, not only realizes the real -time monitoring of the working state of pump body and other key components, but also provides user interface to view and adjust parameters, in addition, the alarm can remind operating personnel in time when equipment fails, and the safety of operation is improved.
[0019] Of course, any product implementing the utility model does not necessarily need to achieve all the advantages mentioned above. DRAWINGS
[0020] In order to more clearly illustrate the technical scheme of the embodiments of the utility model, the following will briefly introduce the drawings needed to be used in the embodiment description, and obviously, the drawings in the following description are only some embodiments of the utility model, and for those skilled in the art, other drawings can also be obtained according to these drawings without paying creative labor.
[0021] Fig. 1 It is one end schematic view of the overall structure of the dredging device for water conservancy maintenance.
[0022] Fig. 2 It is another end schematic view of the overall structure of the dredging device for water conservancy maintenance.
[0023] Fig. 3 It is the second installation schematic view of the distribution seat in the dredging device for water conservancy maintenance.
[0024] In the drawings, the components represented by each reference numeral are listed as follows:
[0025] 100 - moving frame, 101 - chassis, 102 - moving wheel, 103 - handle, 104 - sludge tank, 104a - tank cover, 104b - clear observation strip, 104c - distribution seat two, 104d - control valve two, 200 - extraction assembly, 201 - machine base, 202 - pump body, 203 - extraction pipe, 204 - delivery pipe, 205 - distribution seat one, 206 - control valve one, 207 - extension pipe, 208 - filter screen cylinder, 300 - control assembly, 301 - power supply box, 302 - control seat, 303 - alarm. DETAILED DESCRIPTION
[0026] The technical solutions in the embodiments of the present application will be described clearly and completely below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all the other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the present application.
[0027] Embodiment one
[0028] Please refer to Figs. 1-3 The present application is a dredging device for water conservancy maintenance, which comprises a moving frame 100 and an extraction assembly 200 mounted and fixed on the upper part of the moving frame 100.
[0029] The moving frame 100 comprises a chassis 101, a handle 103 fixed on the upper side end of the chassis 101, and a sludge tank 104 fixed on the upper side of the chassis 101. The moving frame 100 is used for collecting and transferring sludge.
[0030] The extraction assembly 200 includes a base 201 fixed to the upper part of the chassis 101, a pump body 202 fixed to the upper part of the base 201, an extraction pipe 203 connected with the pump body 202, a distribution seat I 205 connected with the extraction pipe 203, a plurality of control valves I 206 connected with the distribution seat I 205, an extension pipe 207 connected with the control valves I 206, and a filter screen cylinder 208 installed at the end of the extension pipe 207. The extraction assembly 200 is responsible for extracting the sludge from the water to the sludge tank 104.
[0031] Specifically, the sludge tank 104 is provided with a tank cover 104a at the top, and the tank cover 104a is provided with an air pressure balance hole at the edge to ensure the internal pressure balance of the sludge tank 104. One side of the sludge tank 104 is provided with a transparent observation strip 104b to facilitate the operator to observe the accumulation of the sludge in the sludge tank 104. The other side of the sludge tank 104 is provided with a distribution seat II 104c at the bottom, and a plurality of control valves II 104d are connected with the distribution seat II 104c. The control valves II 104d are used to control the subsequent sludge discharge speed.
[0032] Further, the mobile wheels 102 are fixed at the bottom corners of the chassis 101, and the mobile wheels 102 are provided with locking structures to assist the overall movement of the device, and the locking structures are provided to fix the position of the device during operation.
[0033] The pump body 202 is connected with the sludge tank 104 through a conveying pipe 204 to convey the filtered sludge to the sludge tank 104. The conveying pipe 204 is provided with an anti-backflow valve to prevent the sludge from flowing back.
[0034] The operation process of the embodiment is as follows:
[0035] I. Check whether the locking structure of the mobile wheel 102 is normal to ensure that the device will not slide during operation. Check whether the pump body 202, the extraction pipe 203, the control valve I 206, the extension pipe 207 and the filter screen cylinder 208 are connected firmly without leakage. Open the tank cover 104a of the sludge tank 104 and check whether there is any residue inside. If necessary, clean it up.
[0036] II. Push the device to the position where dredging is needed, lock the mobile wheel 102, arrange the extension pipe 207, extend the filter screen cylinder 208 into the lower part of the sludge layer, start the pump body 202, and begin to extract the sludge. After the pump body 202 is started, the negative pressure generated by the extraction pipe 203 sucks the underwater sludge into the filter screen cylinder 208. The filter screen cylinder 208 preliminarily filters the sludge to remove large particles. The filtered sludge enters the distribution seat I 205 through the extension pipe 207 and the control valve I 206, and then is conveyed to the sludge tank 104 through the conveying pipe 204.
[0037] Three, through the transparent observation strip 104b observation silt box 104 in the silt accumulation, ensure that not overfull, according to the need to adjust the control valve 206, control different extension pipe 207 on-off;
[0038] Four, when the silt box 104 near full load, close the pump body 202, stop pumping silt, the device is moved to the silt discharge position, through the control valve two 104d discharge silt, finally clean the silt box 104, ready for the next operation.
[0039] Example two
[0040] Please refer to Figs. 1-3 , on the basis of the specific embodiment one, a device for water conservancy maintenance of dredging device further includes with the extraction assembly 200 matching control assembly 300, the control assembly 300 includes fixed on the power box 301 of the upper portion of the chassis 101, fixed on the control seat 302 of the upper portion of the power box 301, and fixed on the alarm 303 of the upper portion of the control seat 302, the control seat 302 is integrated with control system, for monitoring and control pump 202 and other components of the working state, control seat 302 is equipped with display screen and operation button, convenient for operator to view and adjust parameters, alarm 303 for when the equipment failure alarm, to ensure the safety of the operator.
[0041] Specifically, the power box 301 built-in rechargeable power supply, its rechargeable power supply and pump 202, control seat 302 and alarm 303 connected, realize the power supply of the device, the power box 301 front fixed with cover plate by fastener, its side is provided with heat dissipation groove.
[0042] The operation process of this embodiment is:
[0043] I, check the charging state of the power box 301, to ensure that the power is sufficient, open the display screen of the control seat 302, check whether the system is normal start, whether the sensor is working properly;
[0044] Two, start the pump 202 through the operation button on the control seat 302, start pumping silt, monitor the parameters on the display screen, to ensure the normal operation of the equipment;
[0045] Three, regularly check the alarm prompt on the display screen, if there is an abnormal timely processing, when the silt box 104 near full load, through the operation button on the control seat 302 close the pump 202, stop pumping silt.
[0046] In the description of the specification, the description of the terms "one embodiment", "an example", "a specific example" and the like means that the specific features, structures, materials or characteristics described in connection with the embodiment or example are included in at least one embodiment or example of the utility model. In the specification, the illustrative description of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0047] The preferred embodiments of the utility model disclosed above are only used for helping to set forth the utility model. The preferred embodiments do not describe all the details exhaustively, and also do not limit the utility model to only the specific implementation manners described. Obviously, according to the content of the specification, many modifications and changes can be made. The specification selects and specifically describes these embodiments, in order to better explain the principles and practical applications of the utility model, so that the persons skilled in the art can well understand and utilize the utility model. The utility model is limited only by the claims and the whole scope and equivalents thereof.
Claims
1. A dredging device for water conservancy maintenance, comprising a mobile frame (100), an extraction assembly (200) fixed on the upper part of the mobile frame (100), and a control assembly (300) matched with the extraction assembly (200); characterized in that: the mobile frame (100) comprises a chassis (101), a handle (103) fixed on the upper side end of the chassis (101), and a silt tank (104) fixed on the upper side of the chassis (101); the extraction assembly (200) comprises a machine base (201) fixed on the upper part of the chassis (101), a pump body (202) fixed on the upper part of the machine base (201), an extraction pipe (203) connected with the pump body (202), a distribution seat I (205) connected with the extraction pipe (203), a plurality of control valves I (206) connected with the distribution seat I (205), an extension pipe (207) connected with the control valves I (206), and a filter screen cylinder (208) installed at the end of the extension pipe (207); the control assembly (300) comprises a power box (301) fixed on the upper part of the chassis (101), a control seat (302) fixed on the upper part of the power box (301), and an alarm (303) fixed on the upper part of the control seat (302).
2. The device for dredging according to claim 1, wherein The mobile wheels (102) are fixed at the bottom corners of the chassis (101), and the mobile wheels (102) are provided with locking structures.
3. The device for dredging according to claim 1, characterized in that, The silt tank (104) is provided with a tank cover (104a) at the top, the tank cover (104a) is provided with air pressure balance holes at the edges, and one side of the silt tank (104) is provided with a transparent observation strip (104b).
4. The device for dredging according to claim 1, wherein The other side of the silt tank (104) is provided with a distribution seat II (104c) at the bottom, and a plurality of control valves II (104d) are connected with the distribution seat II (104c).
5. The device for dredging according to claim 1, characterized in that, The pump body (202) is connected with the silt tank (104) through a conveying pipe (204), and the conveying pipe (204) is provided with an anti-backflow valve.
6. The device for dredging according to claim 1, wherein The power box (301) is internally provided with a rechargeable power supply, the rechargeable power supply is connected with the pump body (202), the control seat (302), and the alarm (303), the front of the power box (301) is fixed with a cover plate through fasteners, and the side is provided with a heat dissipation groove.