Novel construction device for preventing pile core from being polluted

By using a device that fixes the base and annular airbag inside the pile core, the problems of displacement and damage of the sealing material are solved, achieving efficient prevention of pile core contamination, improving construction quality and reducing material waste.

CN224016385UActive Publication Date: 2026-03-20THE SECOND CONSTR OF CHINA CONSTR EIGHTH ENG DIV +1
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-03-26
Publication Date
2026-03-20

AI Technical Summary

Technical Problem

Traditional methods of preventing pile core contamination can easily lead to displacement and damage of the sealing material, causing mud and garbage to enter the pile core, affecting construction quality and efficiency, and resulting in serious material waste.

Method used

A device comprising a base, vertical steel bars, and an annular airbag is used. The base is fixed inside the pile core by a fixing device, and the airbag surrounds the outside of the vertical steel bars to seal the pile core. The sealing effect of the airbag is controlled by an inflation and deflation tube to prevent the sealing material from shifting or breaking.

Benefits of technology

It effectively prevents pile core contamination, improves construction efficiency and quality, reduces material waste, achieves civilized construction, and lowers costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224016385U_ABST
    Figure CN224016385U_ABST
Patent Text Reader

Abstract

The utility model relates to a novel construction device for preventing a pile core from being polluted, which relates to the technical field of pile foundation construction and comprises a base, a vertical reinforcing steel bar is connected to the center of the base, a fixing device is connected to the top end of the vertical reinforcing steel bar and comprises a transverse sleeve, two transverse reinforcing steel bars are sleeved on two sides of the sleeve, and the outer ends of the transverse reinforcing steel bars extend out of the sleeve. The base is fixed in the pile core through the fixing device, the vertical steel bar surrounds the air bag and blocks the pile core through the air bag, the annular air bag is filled in a gap between the outer side of the vertical steel bar and the inner side of the pile core, the blocking effect is better, slurry or garbage is prevented from falling into the pile core due to displacement and damage of the blocking baffle, and the possibility of pile core cleaning and water pumping is reduced; the construction efficiency and the construction quality of pile core grouting are improved; and the base and the air bag can be taken out when the pile core is grouted, so that the base and the air bag can be recycled.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the technical field of pile foundation construction, especially to a novel pile core pollution prevention construction device. BACKGROUND

[0002] In pile foundation construction, prefabricated pipe piles are usually installed at construction positions, and the pile core is poured with concrete to improve the bearing capacity and stability of the pile foundation. Before pouring, the pile core needs to be plugged to prevent pollution.

[0003] Currently, the traditional way to prevent pile core pollution is to place a plugging material on the top of the pile core. However, displacement and damage may occur during construction, causing mud, garbage, and other materials to enter the pile core. The interior of the pile core needs to be cleaned, pumped, and other work, which seriously affects the pile core pouring construction quality and construction efficiency, and also causes material waste during excavation. SUMMARY

[0004] To improve the problems in the above background technology, the utility model provides a novel pile core pollution prevention construction device.

[0005] The utility model provides a novel pile core pollution prevention construction device adopts the following technical scheme:

[0006] A novel pile core pollution prevention construction device comprises a base, a vertical steel bar is connected to the center of the base, a fixing device is connected to the top end of the vertical steel bar, the base is fixed in the pile core through the fixing device, and the vertical steel bar is surrounded by an air bag and blocks the pile core through the air bag.

[0007] Preferably, the fixing device comprises a horizontal sleeve, two horizontal steel bars are sleeved on both sides of the sleeve, and the outer ends of the horizontal steel bars extend out of the sleeve.

[0008] Preferably, external threads are formed on the inner end surface of the horizontal steel bar and are threadedly connected with the sleeve, and a screw rod is screwed to the side surface of the sleeve and fastens the horizontal steel bar.

[0009] Preferably, the air bag is connected with a gas charging and discharging pipe, the gas charging and discharging pipe extends to the outside of the pile core, and a valve is installed at the end of the gas charging and discharging pipe.

[0010] Preferably, the base is cut into a circular shape from a 1.8mm-thick patterned steel plate.

[0011] Preferably, the air bag uses a ring structure, and the air bag is a rubber air bag.

[0012] In summary, the utility model has the following beneficial technical effects:

[0013] 1. This utility model has a simple structure and can be used to seal the pile core to prevent pile core contamination. The base is fixed inside the pile core by a fixing device, and an annular airbag is used to seal the pile core to prevent mud or garbage from falling into the pile core due to displacement or damage of the sealing material. This reduces the possibility of cleaning the pile core and pumping water, improves the construction efficiency and quality of pile core grouting, and reduces the loss rate during earthwork excavation, thus achieving the purpose of civilized construction, cost reduction and efficiency improvement.

[0014] 2. The annular airbag fills the gap between the outside of the vertical reinforcement and the inside of the pile core. It is supported and fixed by the base and the fixing device, which has a better sealing effect. The fixing device is located above the airbag, which makes it easy to put in and take out the device and adjust its position. When put in, the airbag is not inflated, which makes it easy to lower. After the airbag is put in, it is inflated to ensure the sealing effect. At the same time, the base and airbag can be removed when the pile core is poured, so that the base and airbag can be reused. Compared with the traditional sealing baffle, it can save a lot of materials. Attached Figure Description

[0015] Figure 1 This is a cross-sectional structural schematic diagram of a novel construction device for preventing pile core contamination, according to Embodiment 1 of the utility model;

[0016] Figure 2 This is a structural schematic diagram of the base and fixing device of embodiment 1 of the utility model;

[0017] Figure 3 This is a cross-sectional structural schematic diagram of the airbag in Embodiment 1 of the utility model;

[0018] Figure 4 This is a cross-sectional structural schematic diagram of a novel construction device for preventing pile core contamination, according to Embodiment 2 of the utility model;

[0019] Figure 5 This is a structural schematic diagram of the fixing device in embodiment 2 of the utility model.

[0020] Explanation of reference numerals in the attached diagram: 1. Base; 2. Airbag; 3. Vertical reinforcing bar; 4. Fixing device; 5. Pile core; 6. Sleeve; 7. Horizontal reinforcing bar; 8. External thread; 9. Screw; 10. Inflation / depression pipe. Detailed Implementation

[0021] The following combination Figures 1-5 The present invention will be described in further detail below.

[0022] Utility Model Embodiment 1 discloses a novel construction device for preventing pile core contamination.

[0023] Reference Figure 1 , Figure 2A new type of construction device for preventing pile core pollution, comprising a base 1, a vertical steel bar 3 connected at the center of the base 1, a fixing device 4 connected to the top end of the vertical steel bar 3, the base 1 being fixed in the pile core 5 through the fixing device 4, and the vertical steel bar 3 being surrounded by an air bag 2 and blocking the pile core 5 through the air bag 2.

[0024] Referring to Figure 1 , Figure 2 , the fixing device 4 comprises a horizontal sleeve 6, two horizontal steel bars 7 being sleeved on both sides of the sleeve 6, the outer ends of the horizontal steel bars 7 extending out of the sleeve, the outer ends of the horizontal steel bars 7 abutting against the side wall of the pile core 5, external threads 8 being formed on the inner end surface of the horizontal steel bars 7 and being threadedly connected with the sleeve 6, the horizontal steel bars 7 being twisted to make the outer ends of the horizontal steel bars 7 abutting against the side wall of the pile core 5 to serve as end fixing, a screw rod 9 being screwed on the side surface of the sleeve 6 and fastening the horizontal steel bars 7, and the screwed screw rod 9 fastening the extending length of the horizontal steel bars 7.

[0025] Referring to Figure 2 , the top end of the vertical steel bar 3 is welded at the middle position of the sleeve 6.

[0026] Referring to Figure 1 , Figure 2 , the air bag 2 is connected with a gas charging and discharging pipe 10, the gas charging and discharging pipe 10 extending to the outside of the pile core 5 and being provided with a valve at the end thereof, the air bag 2 being inflated and deflated through the gas charging and discharging pipe 10, the air bag 2 being deflated when being put into the pile core 5 to facilitate the lowering, and the air bag 2 being inflated after being put in to ensure the sealing effect.

[0027] Referring to Figure 2 , the base 1 is cut into a circular shape from a 1.8 mm thick patterned steel plate to match the shape of the pile core 5.

[0028] Referring to Figure 1 , Figure 2 , Figure 3 , the air bag 2 uses a ring structure, the air bag 2 being filled in the outer side of the vertical steel bar 3 and the inner side of the pile core 5, a through hole being formed in the middle position of the air bag 2 to accommodate the vertical steel bar 3, and the air bag 2 being a rubber air bag.

[0029] The implementation principle of the new type of construction device for preventing pile core pollution in the utility model embodiment 1 is as follows: during installation and construction, firstly, the integrated structure of the base 1, the vertical steel bar 3 and the sleeve 6 is placed in the pile core 5, the horizontal steel bars 7 on both sides of the sleeve 6 are twisted to make the outer ends of the horizontal steel bars 7 abutting against the side wall of the pile core 5 to serve as end fixing, the screwed screw rod 9 fastens the extending length of the horizontal steel bars 7, the position of the base 1 is fixed, the air bag 2 is inflated, and the air bag 2 is filled in the outer side of the vertical steel bar 3 and the inner side of the pile core 5.

[0030] The utility model embodiment 2 discloses a new type of construction device for preventing pile core pollution.

[0031] Referring toFigure 4 、 Figure 5 The utility model provides a new type prevents pile core pollution construction device, including base 1, the central position of base 1 is connected with vertical reinforcement 3, vertical reinforcement 3 top end connects fixed device 4, and base 1 is fixed in pile core 5 through fixed device 4, and vertical reinforcement 3 outside surrounds air bag 2 and is sealed up pile core 5 through air bag 2.

[0032] Referring to Figure 4 、 Figure 5 Fixed device 4 includes horizontal sleeve 6, and vertical reinforcement 3 top end is screwed in the middle position in sleeve 6, and two horizontal reinforcements 7 are sleeved on the both sides of sleeve 6, and the outer end of horizontal reinforcement 7 is stretched out of sleeve, and fixed device 4 is stretched out of the top of pile core 5, and horizontal reinforcement 7 is hung in the outer edge of pile core 5, and the inner end surface of horizontal reinforcement 7 is provided with external thread 8 and is connected with sleeve 6 threadedly, and horizontal reinforcement 7 is hung in the outer edge of pile core 5 by twisting the horizontal reinforcement 7 on the both sides of sleeve 6, and screw rod 9 is screwed on the side of sleeve 6 and fastens horizontal reinforcement 7, and the length of horizontal reinforcement 7 that is stretched out is fastened by screwing screw rod 9.

[0033] The implementation principle of the new type prevents pile core pollution construction device of the utility model embodiment 2 is as follows: when installing construction, first, the integrated structure of base 1 and vertical reinforcement 3 is placed in pile core 5, air bag 2 is filled in the outside of vertical reinforcement 3 and the inside of pile core 5 and is inflated, fixed device 4 is connected in vertical reinforcement 3 top end, horizontal reinforcement 7 on the both sides of sleeve 6 is twisted, so that horizontal reinforcement 7 is hung in the outer edge of pile core 5, and the length of horizontal reinforcement 7 that is stretched out is fastened by screwing screw rod 9, and the position of base 1 is fixed.

[0034] The above are preferable embodiments of the utility model, and not limit the protection scope of the utility model, so: all equivalent changes made according to the structure, shape, principle of the utility model should be covered in the protection scope of the utility model.

Claims

1. A novel construction device for preventing pile core contamination, characterized in that: Includes a base (1), with a vertical steel bar (3) connected to the center of the base (1), and a fixing device (4) connected to the top of the vertical steel bar (3). The base (1) is fixed inside the pile core (5) by the fixing device (4), and the vertical steel bar (3) surrounds the airbag (2) and seals the pile core (5) through the airbag (2).

2. The novel construction device for preventing pile core contamination according to claim 1, characterized in that: The fixing device (4) includes a transverse sleeve (6), on both sides of the sleeve (6) are two transverse steel bars (7), the outer ends of the transverse steel bars (7) extend out of the sleeve (6).

3. The novel construction device for preventing pile core contamination according to claim 2, characterized in that: The inner end surface of the transverse steel bar (7) is provided with external thread (8) and is threadedly connected to the sleeve (6). The sleeve (6) is screwed with a screw rod (9) on its side and fastens the transverse steel bar (7).

4. The novel construction device for preventing pile core contamination according to claim 2, characterized in that: The airbag (2) is connected to the inflation / deflation pipe (10), which extends to the outside of the pile core (5) and has a valve installed at the end of the inflation / deflation pipe (10).

5. A novel construction device for preventing pile core contamination according to claim 1, characterized in that: The base (1) is cut into a circle using a 1.8mm thick patterned steel plate.

6. A novel construction device for preventing pile core contamination according to claim 1, characterized in that: The airbag (2) uses a ring structure.

7. A novel construction device for preventing pile core contamination according to claim 6, characterized in that: The airbag (2) is a rubber airbag.