Hanging basket for house building construction
By installing a collection hopper under the fixed beam of the hanging basket and fixing it with a threaded connection, the problem of concrete splashing was solved, the collection of concrete was achieved, the stability of the lifting frame was enhanced, and the amount of cleaning work for the staff was reduced.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-14
- Publication Date
- 2026-04-03
AI Technical Summary
When the existing hanging basket is used for pouring concrete, the splashed concrete falls directly to the ground, increasing the workload of the workers in cleaning up.
A hanging basket comprising a guide rail, a lifting frame, steel cables, a fixed beam, a counterweight mechanism, and a receiving mechanism was designed. By setting a receiving hopper under the fixed beam and fixing the receiving hopper with a threaded connection, the splashed concrete is collected, reducing the ground cleaning work.
It effectively collects the concrete splashed during the pouring process, reducing the amount of ground cleaning work for workers. At the same time, the counterweight increases the stability of the lifting frame and prevents it from tipping over.
Smart Images

Figure CN224078640U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of building construction technology, and specifically relates to a hanging basket for building construction. Background Technology
[0002] In existing housing and bridge construction, hanging baskets are required to assist in pouring concrete. Hanging baskets are the main equipment in cantilever construction and can be classified into four types according to their structural form: truss type, cable-stayed type, steel type, and hybrid type. Based on the requirements of concrete cantilever construction technology and design drawings for hanging baskets, this paper comprehensively compares the characteristics, weight, type of steel used, and construction technology of various types of hanging baskets. The design principles of hanging baskets are: light weight, simple structure, sturdy and stable, easy to move forward and disassemble, strong reusability, and small deformation under stress. Furthermore, the space under the hanging basket provides a large working surface, which is beneficial for the construction of reinforcing steel and formwork.
[0003] However, when using existing hanging baskets for pouring concrete, the concrete splashed out at the pouring point falls directly onto the ground below, requiring the concrete on the ground to be cleaned up after the work is completed, which increases the workload of the workers. Utility Model Content
[0004] (1) Technical problems to be solved
[0005] In view of the shortcomings of the existing technology, the purpose of this utility model is to provide a hanging basket for house construction, which aims to solve the problem that when the hanging basket is used in conjunction with the pouring work, the concrete splashed at the pouring point will fall directly onto the ground below, which requires cleaning of the concrete on the ground after the work is completed, thus increasing the workload of the workers.
[0006] (2) Technical solution
[0007] To solve the above-mentioned technical problems, this utility model provides a hanging basket for house construction, including a guide rail, a lifting frame connected to the upper end of the guide rail, a steel cable installed at the right end of the lifting frame, a fixed beam fixedly connected to the lower end of the steel cable, a counterweight mechanism inside the lifting frame, a material receiving mechanism below the fixed beam, and the material receiving mechanism including a receiving hopper located below the fixed beam, connecting rods fixedly connected to the four upper corners of the receiving hopper, and connecting rings connected to the outer upper end of the connecting rods.
[0008] Furthermore, the counterweight mechanism includes a placement plate fixedly connected inside the lifting frame, and a counterweight block is placed on the upper end of the placement plate.
[0009] Furthermore, the lower end of the lifting frame is slidably connected to the outer side of the guide rail.
[0010] Furthermore, the upper outer side of the connecting rod is provided with an external thread, the inner side of the connecting ring is provided with an internal thread, and the upper outer side of the connecting rod is threadedly connected to the inner side of the connecting ring.
[0011] Furthermore, vertical circular holes are provided at the four corners of the fixed beam, the outer side of the upper end of the connecting rod is slidably connected to the inner side of the circular holes, and the lower side of the connecting ring abuts against the upper side of the fixed beam.
[0012] Furthermore, the material used to construct the receiving hopper is a polyethylene sandwich panel.
[0013] Furthermore, the outer side of the counterweight is provided with anti-slip texture.
[0014] (3) Beneficial effects
[0015] Compared with the prior art, the beneficial effects of this utility model are as follows:
[0016] This invention moves the receiving hopper below the fixed beam, and after the connecting rod passes through the round hole inside the fixed beam, the connecting ring is threaded to the upper outer side of the connecting rod. This fixes the receiving hopper below the fixed beam, so that when concrete is poured in the casting mold placed above the fixed beam, the splashed concrete is caught by the receiving hopper during its fall and will not fall to the ground, eliminating the need for workers to clean the ground and reducing the workload of workers.
[0017] In this invention, when the weight of the concrete poured above the fixed beam is too heavy, the total weight of the lifting frame can be increased by moving the required number of counterweights onto the placement plate, thus preventing the lifting frame from tipping over due to excessive weight above the fixed beam. Attached Figure Description
[0018] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0019] Figure 1 This is a schematic diagram of the main structure of this utility model;
[0020] Figure 2 This is a schematic diagram of the counterweight mechanism of this utility model;
[0021] Figure 3 This is a schematic diagram of the structure of the receiving hopper of this utility model;
[0022] Figure 4 for Figure 3 Enlarged view of point A.
[0023] The markings in the attached diagram are as follows: 1. Guide rail; 2. Lifting frame; 3. Steel cable; 4. Fixed beam; 501. Placement plate; 502. Counterweight block; 601. Receiving hopper; 602. Connecting rod; 603. Connecting ring. Detailed Implementation
[0024] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0025] This specific embodiment is a hanging basket for building construction, and its structural diagram is shown below. Figure 1 and Figure 2 As shown, it includes a guide rail 1, with a lifting frame 2 connected to the upper end of the guide rail 1. The lower end of the lifting frame 2 is slidably connected to the outer side of the guide rail 1. By sliding the lifting frame 2 along the outer side of the guide rail 1, the position of the fixed beam 4 can be changed, and after the pouring is completed at one position, the continuous pouring construction can be carried out.
[0026] The lifting frame 2 is equipped with a steel cable 3 at its right end, and a fixed beam 4 is fixedly connected to the lower end of the steel cable 3. The lifting frame 2 is equipped with a counterweight mechanism, and a material receiving mechanism is provided below the fixed beam 4. The counterweight mechanism includes a placement plate 501 fixedly connected to the inside of the lifting frame 2, and a counterweight block 502 is placed on the upper end of the placement plate 501. Thus, when the weight of the concrete poured above the fixed beam 4 is too heavy, the total weight of the lifting frame 2 can be increased by moving the required number of counterweight blocks 502 onto the placement plate 501, thereby preventing the lifting frame 2 from tipping over due to excessive weight above the fixed beam 4.
[0027] In addition, the outer side of the counterweight 502 is provided with anti-slip texture, so that when the worker moves the counterweight 502 above the placement plate 501 to increase the overall weight of the placement plate 501, the worker can grip it more firmly.
[0028] Cooperate Figure 3 and Figure 4The receiving mechanism includes a receiving hopper 601 located below the fixed beam 4. Connecting rods 602 are fixedly connected to the four upper corners of the receiving hopper 601. Connecting rings 603 are connected to the outer upper ends of the connecting rods 602. External threads are provided on the outer upper ends of the connecting rods 602, and internal threads are provided on the inner side of the connecting rings 603. The outer upper end of the connecting rods 602 is threaded into the inner side of the connecting rings 603. Vertical circular holes are provided at the four inner corners of the fixed beam 4. The outer upper end of the connecting rods 602 is slidably connected to the inner side of the circular holes. The connecting rings 603... The lower side abuts against the upper side of the fixed beam 4. By moving the receiving hopper 601 to the lower side of the fixed beam 4 and passing the connecting rod 602 through the round hole inside the fixed beam 4, and then threading the connecting ring 603 to the upper outer side of the connecting rod 602, the receiving hopper 601 can be fixed to the lower side of the fixed beam 4. Thus, when concrete is poured in the casting mold placed above the fixed beam 4, the splashed concrete is caught by the receiving hopper 601 during the falling process and will not fall to the ground, eliminating the need for workers to clean the ground and reducing the workload of workers.
[0029] The material receiving hopper 601 is made of polyethylene sandwich panel, which consists of two layers of high-hardness surface material sandwiching a lightweight polyethylene core. This reduces the overall weight of the polyethylene sandwich panel, thereby reducing the overall weight of the material receiving hopper 601 and thus reducing the weight borne by the lifting frame 2.
[0030] Working principle: During the pouring work of house construction, the pouring mold is installed on the fixed beam 4. Then, the receiving hopper 601 is moved to the bottom of the fixed beam 4, and the connecting rod 602 passes through the round hole inside the fixed beam 4. Then, the connecting ring 603 is threaded to the outer side of the upper end of the connecting rod 602, so that the receiving hopper 601 is fixed to the bottom of the fixed beam 4. Then, the fixed beam 4 is suspended to the pouring position through the hanging basket device, and then the pouring work is carried out. At the same time, the concrete splashed during the pouring work will fall into the receiving hopper 601 at the bottom and be collected.
[0031] All technical features in this embodiment can be freely combined according to actual needs.
[0032] Finally, it should be noted that the above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Although the present utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.
Claims
1. A hanging basket for housing construction work comprising a guide rail (1), characterized in that, The upper end of the guide rail (1) is connected with a lifting frame (2), the right end of the lifting frame (2) is provided with a steel cable (3), the lower end of the steel cable (3) is fixedly connected with a fixed beam (4), the inside of the lifting frame (2) is provided with a counterweight mechanism, the lower side of the fixed beam (4) is provided with a material receiving mechanism, and the material receiving mechanism comprises a material receiving hopper (601) arranged below the fixed beam (4), the upper side of the material receiving hopper (601) is fixedly connected with a connecting rod (602), and the upper end of the connecting rod (602) is connected with a connecting ring (603) outside.
2. The hanging basket for housing construction work according to claim 1, wherein The counterweight mechanism comprises a placing plate (501) fixedly connected to the inside of the lifting frame (2), and the upper end of the placing plate (501) is placed with a counterweight block (502).
3. The hanging basket for housing construction work according to claim 2, wherein The lower end of the lifting frame (2) is slidably connected with the outside of the guide rail (1).
4. The hanging basket for housing construction work according to claim 1, wherein The upper end of the connecting rod (602) is provided with external threads outside, the inside of the connecting ring (603) is provided with internal threads, and the upper end of the connecting rod (602) is threadedly connected with the inside of the connecting ring (603).
5. The hanging basket for housing construction work according to claim 1, wherein The inside of the fixed beam (4) is provided with vertical circular holes at the four corners, the upper end of the connecting rod (602) is slidably connected with the inside of the circular holes, and the lower side of the connecting ring (603) is abutted with the upper side of the fixed beam (4).
6. The hanging basket for housing construction work according to claim 1, wherein The component plate of the material receiving hopper (601) is a polyethylene sandwich board.
7. The hanging basket for housing construction work according to claim 2, wherein The outside of the counterweight block (502) is provided with anti-skid lines.