Integrated embedded wall connecting piece for fixing formwork and scaffold
By designing an integrated fixed template and scaffolding with embedded wall ties, and utilizing high-strength bolts and chuck locking structures, the problem of easily damaged end bolts was solved, achieving stable template fixing and rapid scaffolding erection, thus reducing construction risks and costs.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-05
- Publication Date
- 2026-04-07
AI Technical Summary
Existing pre-embedded wall ties have the problem of easily damaged end bolts during construction, which leads to safety hazards and increased construction costs during high-altitude demolition operations, and also affects the reliability of subsequent scaffold fixing bolts.
An integrated fixed template and scaffold embedded wall tie was designed, using high-strength M16 bolts as embedded threaded rods. Combined with chucks and locking bolts, it enables template fixing and rapid scaffolding erection. After demolding, it can be locked and removed simultaneously through a single lock, avoiding multiple lock operations.
This method ensures the stability of the formwork during the concrete pouring process, guarantees the rapid erection of subsequent scaffolding, reduces the cumbersome operation and self-weight of the locking mechanism, and improves construction safety and economic efficiency.
Smart Images

Figure CN224092956U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model belongs to the technical field of building construction, and particularly relates to an integrated fixed formwork and embedded wall connecting piece of scaffold. BACKGROUND
[0002] In the construction process of building engineering, a scaffold is connected with a building main body (a wall body or a beam component) through an embedded wall connecting piece, and the connection must have sufficient connection strength to ensure the safety of building construction. The existing embedded wall connecting piece and its construction method are as follows: while embedding the embedded wall connecting piece, a plug bolt for fixing the main body component formwork during the formwork stage must be installed at the same time; after pouring concrete, the formwork is removed, then the plug bolt is removed, and finally the scaffold fixing bolt is installed to fix the scaffold. However, in actual site construction, since the material of the plug bolt is engineering plastic and part of the plug bolt protrudes out of the formwork, the plug bolt is damaged and remains in the embedded wall connecting piece when the formwork is removed, so that the installation of the scaffold fixing bolt in the next process cannot be performed, at this time, destructive removal by manpower is required, the high-altitude removal operation not only has safety hazards and increases construction cost, but more importantly, if the destructive removal is improper, the reliability of the subsequent installation of the scaffold fixing bolt is directly affected, and safety hazards exist. SUMMARY
[0003] The utility model discloses a kind of integrated fixed formwork and embedded wall connecting piece of scaffold, which is simple in structure, convenient to install and remove, and the embedded part connecting screw rod and scaffold connecting fastener can be recycled.
[0004] The technical solutions adopted by the utility model are as follows:
[0005] The integrated fixed formwork and embedded wall connecting piece of scaffold includes an embedded connecting piece arranged in a building main body, an embedded part screw rod connected with the embedded connecting piece through a reserved hole of a formwork, a scaffold connecting fastener and a scaffold cross bar.
[0006] Further, the front end of the embedded part screw rod is provided with a thread, the middle part is provided with a chuck, and the rear end is provided with a nut.
[0007] Further, the scaffold connecting fastener includes a fastener base, an embedded part screw rod lock and a scaffold cross bar lock connected to the fastener base and sharing a same fastener edge, a locking bolt arranged on the embedded part screw rod lock, a gasket and a nut arranged at one end of the locking bolt, and the locking bolt simultaneously locks the embedded part screw rod lock and the scaffold cross bar lock.
[0008] Further, the pre-embedded connecting piece comprises a threaded sleeve with a nut arranged in the building body, a nut plug sleeved on the nut, and a baffle sleeved and fixed at the end of the threaded sleeve, and the threaded sleeve is threadedly connected with the pre-embedded screw rod.
[0009] Further, the pre-embedded screw rod is a high-strength bolt M16.
[0010] The utility model discloses the beneficial effect that:
[0011] The utility model discloses simple structure, and the chuck fixed on the pre-embedded screw rod is tightened with the pre-embedded connecting piece to constitute the formwork clamp and fix the formwork, the position of the pre-embedded connecting piece and the formwork is avoided to change in the concrete pouring process, and the subsequent fast erection of scaffold is guaranteed, after the formwork is removed, and the scaffold connecting fastener is fixed pre-embedded screw rod and scaffold cross bar simultaneously, and adopts one lock catch to lock simultaneously, and removes simultaneously, avoids the complicated operation of multiple lock catches, and reduces the weight of lock catch. BRIEF DESCRIPTION OF DRAWINGS
[0012] Fig. 1 It is the structural schematic diagram of the utility model;
[0013] Fig. 2 It is the structural schematic diagram of the utility model scaffold connecting fastener locking;
[0014] Fig. 3 It is the structural schematic diagram of the utility model scaffold connecting fastener opening;
[0015] Fig. 4 It is the schematic diagram of the utility model pre-embedded connecting piece fixed completion;
[0016] Fig. 5 It is the sectional view of the utility model pre-embedded piece fixed completion;
[0017] Fig. 6 It is the split drawing of each component of the utility model construction;
[0018] Fig. 7 It is the schematic diagram of the utility model construction use. DETAILED DESCRIPTION
[0019] The following further elaborated content in conjunction with the drawings and examples of the specification.
[0020] As Figs. 1-3As shown, the embedded wall connecting piece of the integral fixed formwork and scaffold includes an embedded connecting piece 1 arranged in the building body, an embedded screw rod 3 connected with the embedded connecting piece through a reserved hole of the formwork 5, the embedded screw rod can be a high-strength bolt M16, a scaffold connecting fastener 6, and a scaffold cross bar 7, the scaffold connecting fastener integrally fixes the embedded screw rod and the scaffold cross bar, the front end of the embedded screw rod is provided with a thread 31, the middle part is provided with a chuck 32, and the rear end is provided with a nut 33, the embedded connecting piece includes a threaded sleeve 12 provided with a nut 11 in the building body, a nut plug 13 sleeved on the nut, and a baffle 14 sleeved and fixed at the end of the threaded sleeve, and the threaded sleeve is threadedly connected with the embedded screw rod, the embedded screw rod and the embedded connecting piece are screwed to form a formwork clamp and fix the formwork, the position of the embedded connecting piece and the formwork is prevented from being changed during the concrete pouring process, and the subsequent scaffold is quickly built;
[0021] In order to facilitate construction, the scaffold connecting fastener includes a fastener base 63, an embedded screw rod lock 61 and a scaffold cross bar lock 62 which are connected to the fastener base and share a lock edge, a locking bolt 64 arranged on the embedded screw rod lock, and a gasket 65 and a nut 66 arranged at one end of the locking bolt, the locking bolt simultaneously locks the embedded screw rod lock and the scaffold cross bar lock, after the formwork is removed, the scaffold connecting fastener simultaneously fixes the embedded screw rod and the scaffold cross bar, and one lock is simultaneously locked and removed, thereby avoiding complicated operation of multiple locks and reducing the self weight of the lock.
[0022] The embedded connecting piece includes a threaded sleeve 12 provided with a nut 11 in the building body, a nut plug 13 sleeved on the nut, and a baffle 14 sleeved and fixed at the end of the threaded sleeve, and the threaded sleeve is threadedly connected with the embedded screw rod.
[0023] As shown in the drawings, Figs. 4-7 The operation of the utility model is as follows:
[0024] (1) After the construction of the formwork is completed, the reserved holes are positioned and drilled on the formwork according to the design distance of the scaffold;
[0025] (2) The embedded screw rod is connected with the embedded connecting piece by penetrating the reserved hole of the formwork;
[0026] (3) The concrete is poured on the side of the formwork where the embedded connecting piece is arranged;
[0027] (4) When the concrete strength reaches the design strength of the formwork removal, the embedded screw rod is screwed out and then the formwork is removed;
[0028] (5) After the formwork is removed, the embedded screw rod is screwed into the embedded connecting piece again;
[0029] (6) Unlock the locking bolts, open the screw lock and the scaffold crossbar lock, then fasten the scaffold connecting fasteners onto the embedded screw, and connect the scaffold crossbars at the same time. Adjust the scaffold crossbars to the appropriate position, then close the locking bolts and tighten the locking nuts to fix the position of the scaffold crossbars, thus completing the scaffold connecting fastener operation.
[0030] The embodiments described above are merely preferred embodiments and are not intended to limit the scope of the invention. Any modifications and improvements made to the technical solution by those skilled in the art without departing from the spirit of the design should fall within the scope of protection defined by the claims.
Claims
1. An integrated fixed formwork and scaffolding embedded wall tie, characterized in that, It includes a pre-embedded connector (1) set in the main body of the building, a pre-embedded threaded rod (3) that passes through the reserved hole of the template (5) and connects to the pre-embedded connector, a scaffolding connecting fastener (6), and a scaffolding crossbar (7). The scaffolding connecting fastener is used to fix the pre-embedded threaded rod and the scaffolding crossbar in one piece.
2. The embedded wall tie of the integrated fixed formwork and scaffolding according to claim 1, characterized in that, The pre-embedded screw has a threaded front end (31), a chuck (32) in the middle, and a first nut (33) at the rear end.
3. The embedded wall tie of the integrated fixed formwork and scaffolding according to claim 1, characterized in that, The scaffolding connecting fastener includes a fastener base (63), a pre-embedded screw lock (61) and a scaffolding crossbar lock (62) connected to the fastener base and sharing a common fastening edge, a locking bolt (64) set on the pre-embedded screw lock, a washer (65) and a second nut (66) set on one end of the locking bolt, and the locking bolt simultaneously locks the pre-embedded screw lock and the scaffolding crossbar lock.
4. The embedded wall tie of the integrated fixed formwork and scaffolding according to claim 1, characterized in that, The pre-embedded connector includes a threaded sleeve (12) with a third nut (11) installed inside the building body, a nut plug (13) fitted on the third nut, and a baffle (14) fitted and fixed to the end of the threaded sleeve. The threaded sleeve is threadedly connected to the pre-embedded component screw.
5. The embedded wall tie of the integrated fixed formwork and scaffolding according to any one of claims 1 to 4, characterized in that, The embedded bolt is a high-strength M16 bolt.