Steel structure pipeline support
By designing a detachable steel pipe support, the problem of existing supports being unable to adjust height and direction was solved, enabling flexible installation and expanding the scope of use, and simplifying the construction process.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-05-30
- Publication Date
- 2026-04-07
AI Technical Summary
Existing steel pipe supports have a simple structure and cannot be adjusted in height, quantity, or direction. During installation, the supports must be held by hand, and their position is prone to shifting, affecting the neatness of the pipe layout.
A detachable steel pipe support was designed, including a fixing sleeve, a combined connecting block, a balancing connecting plate, and a height adjusting sleeve. The height and direction can be adjusted through threaded connection and welding structure, which is convenient for single-person installation.
It enables flexible installation and adjustment of pipe supports, expands the scope of application, simplifies the installation process, and improves construction efficiency.
Smart Images

Figure CN224093978U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of building pipelines, specifically a steel structure pipeline support. Background Technology
[0002] Steel pipe supports are structural components used to support and fix pipes. They are also called pipe supports or pipe sections. As a support structure for pipes, pipe supports are divided into fixed and movable types according to the operating performance and layout requirements of the pipes. Fixed supports are used where fixed points are set. There should be no relative displacement between the fixed pipe support and the pipe bracket. Moreover, the deformation of the fixed pipe support after being subjected to force should be very small compared with the deformation value of the pipe compensator, because the pipe support must have sufficient rigidity. Movable pipe supports are used where intermediate supports are set. Relative displacement between the pipe and the pipe support is allowed, and the thermal deformation of the pipe is not constrained.
[0003] Existing technologies for steel structure pipe supports still have certain drawbacks in installation. Commonly used steel structure pipe supports have relatively simple structures and usually cannot be adjusted according to the height, quantity, and direction of the pipe installation, which limits the scope of application of the pipe supports. Moreover, during installation, the entire support needs to be held by hand, which is inconvenient for construction workers to drill holes for installation. The installation position is prone to deviation, affecting the neatness of the pipe layout. Utility Model Content
[0004] The purpose of this utility model is to provide a steel structure pipe support to solve the problems mentioned in the background art. The structure of commonly used steel structure pipe supports is relatively simple, and they usually cannot be adjusted according to the height, quantity and direction of the pipe installation, which limits the scope of use of the pipe support. Moreover, during installation, the entire support needs to be held by hand, which is inconvenient for construction workers to drill holes for installation. The installation position is prone to deviation, which affects the neatness of the pipe layout.
[0005] To achieve the above objectives, this utility model provides the following technical solution: a steel structure pipe support, comprising a steel structure pipe support body, wherein a fixing sleeve is provided inside the steel structure pipe support body, the steel structure pipe support body is connected to both ends below a balance connecting plate via a combined connecting block and a combined connecting groove, both sides of the combined connecting groove are provided with lower triangular reinforcing plates, the balance connecting plate is located below a fixed seat, and each of the four lower corners inside the fixed seat is provided with a hanger rod, a positioning plate is provided below the hanger rod, a height adjusting sleeve is provided at the middle position of the top surface of the fixed seat, a fixing threaded column is provided inside the height adjusting sleeve, a mounting top plate is provided at the top of the fixing threaded column, and the mounting top plate and the fixing threaded column are fixedly connected via a fixing insert head and a fixing insert opening, and reinforcing struts are provided on both sides above the fixed seat.
[0006] In a further embodiment, a locking bolt is provided on the upper side of one side of the height adjusting sleeve, and the front and rear ends of the height adjusting sleeve are welded to the fixing seat through an upper triangular reinforcing plate.
[0007] In a further embodiment, the positioning plate and the lifting rod are fixedly connected by a first fastening nut, and the lifting rod and the fixing seat are fixedly connected by threads.
[0008] In a further embodiment, the combined connecting block and the combined connecting groove are connected to the limiting buckle and the limiting buckle post through the limiting buckle, and the limiting buckle and the limiting buckle post are fixedly connected by the second fixing bolt.
[0009] In a further embodiment, the lower triangular reinforcing plate is welded to the combined connecting groove, and the lower triangular reinforcing plate is fixedly connected to the main body of the steel structure pipe support by the first fixing bolt.
[0010] In a further embodiment, the bottom end of the fixing sleeve is fixedly connected to the main body of the steel structure pipe support by a second fastening nut.
[0011] Compared with the prior art, the beneficial effects of this utility model are:
[0012] 1. In this utility model, the fixed threaded column and the mounting top plate are designed as a detachable structure. During installation, only the position of the mounting top plate needs to be positioned. The positioning method is simple, requires no special tools or skills, and can be operated by a single person. Moreover, the mounting top plate can be reused, which facilitates the adjustment and modification of the installation position of the pipe support. The fixed threaded column is set inside the height adjustment sleeve. This structure can adjust the height of the pipe support according to the required installation height of the pipeline, meeting the pipeline installation requirements at various stages. At the same time, the installation direction of the steel structure pipe support can also be adjusted, thereby increasing the flexibility of pipeline installation.
[0013] 2. In this utility model, the main body of the steel structure pipe support and the balance connecting plate are designed as a detachable structure. This structure makes it easier to install or disassemble the main body of the steel structure pipe support. Different sizes of supports can be replaced according to the number of pipes that need to be installed, thereby expanding the scope of application. Attached Figure Description
[0014] Figure 1 This is a structural schematic diagram of a steel structure pipe support according to the present invention;
[0015] Figure 2 This is a front view of the combined connecting block of this utility model;
[0016] Figure 3 This is a side view of a steel structure pipe support according to the present invention;
[0017] Figure 4This is a schematic cross-sectional view of the combined connecting groove of this utility model;
[0018] Figure 5 This is a top view of the fixing base of this utility model;
[0019] Figure 6 This is a schematic diagram of the bottom structure of the fixed inlay opening of this utility model.
[0020] In the diagram: 1. Mounting top plate; 2. Fixing inlay; 3. Fixing inlay head; 4. Fixing threaded post; 5. Locking bolt; 6. Height adjusting sleeve; 7. Reinforcing strut; 8. Fixing seat; 9. Balance connecting plate; 10. Hanging rod; 11. Positioning plate; 12. First fastening nut; 13. First fixing bolt; 14. Combined connecting groove; 15. Lower triangular reinforcing plate; 16. Main body of steel structure pipe support; 17. Fixing clamp; 18. Second fastening nut; 19. Combined connecting block; 20. Limiting slot; 21. Second fixing bolt; 22. Upper triangular reinforcing plate; 23. Limiting post. Detailed Implementation
[0021] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present utility model. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments.
[0022] Please see Figure 1-6This utility model provides an embodiment of a steel structure pipe support, including a steel structure pipe support body 16. A fixing sleeve 17 is provided inside the steel structure pipe support body 16. The steel structure pipe support body 16 is connected to both ends below a balance connecting plate 9 via a combined connecting block 19 and a combined connecting groove 14. Lower triangular reinforcing plates 15 are provided on both sides of the combined connecting groove 14. The balance connecting plate 9 is located below a fixed seat 8. Hanging rods 10 are provided at the four corners of the lower part of the interior of the fixed seat 8. A positioning plate 11 is provided below the hanging rods 10. A height adjusting sleeve 6 is provided at the middle position of the top surface of the fixed seat 8. A fixing threaded post 4 is provided inside the height adjusting sleeve 6. A mounting top plate 1 is provided at the top of the fixing threaded post 4, and the mounting top plate 1 and the fixing threaded post 4 are connected by a fixing... The inlay head 3 is fixedly connected to the fixed inlay opening 2. Reinforcing struts 7 are provided on both sides above the fixed seat 8. The fixed clamp 17 is used to clamp and fix the position of the pipe installation. The balance connecting plate 9 is used to suspend the steel structure pipe support body 16 to make it balanced and stable. The lower triangular reinforcing plate 15 is used to increase the stability of the steel structure pipe support body 16 installation. The fixed seat 8 is used to increase the center of gravity of the balance connecting plate 9 installation. The hanging rod 10 is used to install and fix the positioning plate 11. The positioning plate 11 is used to fix the installation position of the balance connecting plate 9. The height adjusting sleeve 6 is used to install the fixed threaded column 4. The fixed threaded column 4 is used to adjust the installation height of the fixed seat 8. The reinforcing struts 7 are used to increase the firmness of the fixed seat 8 installation.
[0023] A locking bolt 5 is provided on the upper side of one side of the height adjusting sleeve 6, and the front and rear ends of the height adjusting sleeve 6 are welded to the fixed base 8 through the upper triangular reinforcing plate 22. The locking bolt 5 is used to fix the position of the height adjusting sleeve 6 after adjustment, and the welding connection is used to increase the firmness of the installation of the height adjusting sleeve 6.
[0024] The positioning plate 11 and the lifting rod 10 are fixedly connected by the first fastening nut 12, and the lifting rod 10 and the fixing seat 8 are fixedly connected by threads. The first fastening nut 12 is used to fix the position of the positioning plate 11 and the lifting rod 10.
[0025] The combined connecting block 19 and the combined connecting groove 14 are connected to the limiting pin 23 through the limiting slot 20, and the limiting slot 20 and the limiting pin 23 are fixedly connected by the second fixing bolt 21. The connection between the limiting slot 20 and the limiting pin 23 facilitates the restriction and positioning of the installation position of the combined connecting block 19, and the second fixing bolt 21 is used to fix the combined position of the limiting slot 20 and the limiting pin 23.
[0026] The lower triangular reinforcing plate 15 is welded to the combined connecting groove 14, and the lower triangular reinforcing plate 15 is fixedly connected to the main body 16 of the steel structure pipe support by the first fixing bolt 13. The welding connection increases the firmness of the installation of the lower triangular reinforcing plate 15. The bottom end of the fixing sleeve 17 is fixedly connected to the main body 16 of the steel structure pipe support by the second fastening nut 18. The second fastening nut 18 is used to tighten and adjust the installation position of the fixing sleeve 17.
[0027] Working principle: In use, the mounting plate 1 is installed on the wall at the required position using bolts. The fixing head 3 is installed in the fixing socket 2, and the fixing head 3 is rotated 90 degrees clockwise to fix the connection between the fixing head 3 and the fixing socket 2. The installation position of the fixing seat 8 is fixed. According to the required installation height of the pipe, the height adjusting sleeve 6 is rotated clockwise or counterclockwise to adjust the fixing seat 8 to the required height or direction. The top of the reinforcing strut 7 is installed to the wall using bolts to reinforce the installation position of the fixing seat 8. The pipe is installed in the steel structure pipe support body 16 and fixed by the fixing sleeve 17.
[0028] It will be apparent to those skilled in the art that this invention is not limited to the details of the exemplary embodiments described above, and that it can be implemented in other specific forms without departing from the spirit or essential characteristics of this invention. Therefore, the embodiments should be considered illustrative and non-limiting in all respects, and the scope of this invention is defined by the appended claims rather than the foregoing description. Thus, it is intended that all variations falling within the meaning and scope of equivalents of the claims be included within this invention. No reference numerals in the claims should be construed as limiting the scope of the claims.
Claims
1. A steel structure pipe support, comprising a steel structure pipe support body (16), characterized in that: The steel structure pipe support body (16) is provided with a fixing sleeve (17) inside. The steel structure pipe support body (16) is connected to the two ends below the balance connecting plate (9) by the combination connecting block (19) and the combination connecting groove (14). The combination connecting groove (14) is provided with lower triangular reinforcing plates (15) on both sides. The balance connecting plate (9) is located below the fixed seat (8). The four corners of the lower part of the fixed seat (8) are provided with a hanger (10). The lower part of the hanger (10) is provided with a positioning plate (11). The middle position of the top surface of the fixed seat (8) is provided with a height adjusting sleeve (6). The inside of the height adjusting sleeve (6) is provided with a fixed threaded column (4). The top of the fixed threaded column (4) is provided with an installation top plate (1). The installation top plate (1) and the fixed threaded column (4) are fixedly connected by a fixed inlay head (3) and a fixed inlay opening (2). The two sides above the fixed seat (8) are provided with reinforcing support rods (7).
2. A steel structure pipe support according to claim 1, characterized in that: The height adjusting sleeve (6) is provided with a locking bolt (5) on one side above, and the front and rear ends of the height adjusting sleeve (6) are welded to the fixed seat (8) by the upper triangular reinforcing plate (22).
3. A steel structure pipe support according to claim 1, characterized in that: The positioning plate (11) and the lifting rod (10) are fixedly connected by the first fastening nut (12), and the lifting rod (10) and the fixed seat (8) are fixedly connected by threads.
4. A steel structure pipe support according to claim 1, characterized in that: The combined connecting block (19) and the combined connecting groove (14) are connected to the limiting post (23) through the limiting slot (20), and the limiting slot (20) and the limiting post (23) are fixedly connected by the second fixing bolt (21).
5. A steel structure pipe support according to claim 1, characterized in that: The lower triangular reinforcing plate (15) is connected to the combined connecting groove (14) by welding, and the lower triangular reinforcing plate (15) is fixedly connected to the main body of the steel structure pipe support (16) by the first fixing bolt (13).