PU mounting seat positioning and welding tool of battery clamping platform
By designing a PU mounting base positioning welding fixture for the battery clamping platform, and using a rectangular frame and positioning opening to limit the PU mounting base, the problem of insufficient welding accuracy of the PU mounting base was solved, achieving high-precision welding and production stability.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- YIBIN YUECHEN INTELLIGENT EQUIPMENT CO LTD
- Filing Date
- 2025-05-26
- Publication Date
- 2026-04-21
AI Technical Summary
The welding precision of the PU mounting base of the battery clamping platform is difficult to guarantee, resulting in unstable overall welding quality and affecting subsequent assembly processes.
A PU mounting base positioning and welding fixture for a battery clamping platform is designed. It consists of a rectangular frame composed of two first connectors and two second connectors. The PU mounting base is positioned and limited by the positioning opening of the positioning plate to ensure welding accuracy.
The use of positioning fixtures significantly improved the welding accuracy of PU mounting bases, avoiding repeated welding or platform scrapping, and improving production efficiency and quality stability.
Smart Images

Figure CN224145395U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of welding technology, specifically to a PU mounting base positioning welding fixture for a battery clamping platform. Background Technology
[0002] With the continuous development of new energy vehicles, battery upgrades are becoming more frequent, and the types of batteries are becoming increasingly diverse. During battery production, battery clamping platforms are needed as transport vehicles.
[0003] Due to the frequent updates and variety of battery types, the layout of battery clamping platform production lines often needs to be adjusted, resulting in high costs for automated production of battery clamping platforms. Therefore, most manufacturers choose to use manual welding.
[0004] During the welding process of the battery clamping platform, after the frame is welded, a PU (Polyurethane) mounting bracket needs to be welded onto the frame. Please refer to [reference needed] for the specific location of the PU mounting bracket on the frame. Figure 1 Currently, PU mounting brackets are typically installed manually according to the dimensions shown in the drawings, measured in the actual locations, and then manually welded in place. If a PU mounting bracket is placed incorrectly, it will affect the overall welding accuracy and subsequent assembly processes. If the welding accuracy is insufficient, at best the PU mounting bracket will need to be removed and re-welded; at worst, the entire mounting platform will be scrapped. Utility Model Content
[0005] The technical problem to be solved by this utility model is to provide a PU mounting base positioning welding fixture for a battery clamping platform, which can position the PU mounting base during the welding process and effectively improve the welding accuracy of the PU mounting base.
[0006] To solve the above-mentioned technical problems, this utility model provides the following technical solution:
[0007] This utility model provides a PU mounting base positioning and welding fixture for a battery clamping platform, comprising: two first connectors, two second connectors, and two positioning plates; one end of one of the first connectors is disposed at one end of one of the second connectors, and the other end is disposed at one end of the other second connector; one end of the other first connector is disposed at the other end of one of the second connectors, and the other end is disposed at the other end of the other second connector; the two first connectors are parallel to each other, and the two second connectors are parallel to each other; the two positioning plates are horizontally disposed on opposite sides of the two second connectors, and a positioning opening is provided on the end of the positioning plate near one of the first connectors.
[0008] By adopting the above technical solution, before welding the PU mounting base, this fixture is first fixed to the frame, ensuring the second connector aligns with the third short support bar. Then, the PU mounting base is positioned using the positioning opening. Finally, after confirming the PU mounting base is correctly positioned, it is welded onto the third short support bar. In this process, because the PU mounting base is positioned using the positioning opening, the welding accuracy of the PU mounting base is effectively improved.
[0009] Optionally, the positioning plate is fixedly connected to the first connecting member.
[0010] By adopting the above technical solution, the stability of the positioning plate can be improved, and the first connecting member can also position the positioning plate, thereby improving the positioning accuracy of the positioning plate.
[0011] Optionally, both the first connector and the second connector are made of square tubing.
[0012] By adopting the above technical solution, the cross-section of the square tube is rectangular, which can better achieve a precise connection between the two.
[0013] In summary, this utility model has at least the following beneficial technical effects:
[0014] By using the PU mounting base positioning welding fixture of this battery clamping platform, the PU mounting base can be positioned during the welding process, thereby effectively improving the welding accuracy of the PU mounting base. Attached image description:
[0015] Figure 1 This is a frame structure diagram of the battery clamping platform.
[0016] Figure 2 This is a structural diagram of a PU mounting base positioning welding fixture for a battery clamping platform.
[0017] Figure 3 This is a schematic diagram illustrating the implementation of a PU mounting base positioning and welding fixture for a battery clamping platform.
[0018] Explanation of reference numerals in the attached drawings: 1. Long side outer frame; 2. Short side outer frame; 3. Stand; 4. Long support bar; 5. First short support bar; 6. Second short support bar; 7. Third short support bar; 8. PU mounting base; 9. First connector; 10. Second connector; 11. Positioning plate; 12. Positioning opening. Detailed Implementation
[0019] To make the objectives, technical solutions, and advantages of this utility model clearer, the present utility model will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain this utility model and are not intended to limit this utility model.
[0020] The terminology used in the following embodiments of this utility model is for the purpose of describing particular embodiments only and is not intended to be limiting of the utility model. As used in the specification and appended claims of this utility model, the singular expressions “a,” “an,” “the,” “the,” “the,” and “this” are intended to include the plural expressions as well, unless the context clearly indicates otherwise. It should also be understood that the term “and / or” as used in this utility model refers to and includes any or all possible combinations of one or more of the listed items. The term “exemplary” means “serving as an example, embodiment, or illustration,” and any embodiment illustrated herein as “exemplary” is not necessarily to be construed as superior to or better than other embodiments. The terms “first” and “second” are used for descriptive purposes only and should not be construed as implying or suggesting relative importance or implicitly indicating the number of indicated technical features. Thus, a feature defined as “first” or “second” may explicitly or implicitly include one or more of that feature, and in the description of embodiments of this utility model, unless otherwise stated, “a plurality” means two or more.
[0021] refer to Figure 1 The frame of the battery clamping platform, where the PU mounting base 8 to be welded is located, using the PU mounting base positioning welding fixture of this battery clamping platform includes: two long side frames 1, two short side frames 2, four uprights 3, three long support bars 4, twelve first short support bars 5, eight second short support bars 6, and four third short support bars 7.
[0022] Two long-side outer frames 1 and two short-side outer frames 2 are welded end-to-end to form a rectangular outer frame, and four uprights 3 are welded to the corners of the rectangular outer frame. The two ends of the long support bars 4 are welded to the two short-side outer frames 2, and the three long support bars 4 and the two long-side outer frames 1 are arranged side by side with equal spacing.
[0023] The twelve first short support bars 5 are divided into three groups, with four first short support bars 5 in each group. One end of the first short support bar 5 is welded to the first long support bar 4, and the other end is welded to the adjacent long support bar 4 or the long side of the outer frame 1. The four first short support bars 5 in a single group are located in a straight line, and the three groups of first short support bars 5 are arranged side by side with equal spacing. The first short support bar 5 located between two groups of first short support bars 5 is located in the middle of the rectangular outer frame.
[0024] The eight second short support bars 6 are divided into two groups, with four second short support bars 6 in each group. Each group of second short support bars 6 is located between two adjacent groups of first short support bars 5. One end of the second short support bar 6 is welded to the first long support bar 4, and the other end is welded to the adjacent long support bar 4 or the long side outer frame 1.
[0025] The four third short support bars 7 are divided into two groups, with two third short support bars 7 in each group. Each group of third short support bars 7 is located between the first short support bar 5 and the second short support bar 6. One end of the third short support bar 7 is welded to the first long support bar 4, and the other end is welded to the long side outer frame 1.
[0026] The bottoms of the long outer frame 1, the two short outer frames 2, the support leg 3, the long support bar 4, the first short support bar 5, and the second short support bar 6 are all on the same horizontal plane. The tops of the long outer frame 1, the two short outer frames 2, the long support bar 4, the first short support bar 5, the second short support bar 6, and the third short support bar 7 are all on the same horizontal plane. The top of the support leg 3 extends vertically upwards, and the bottom of the third short support bar 7 is higher than the bottom of the long outer frame 1, the two short outer frames 2, the support leg 3, the long support bar 4, the first short support bar 5, and the second short support bar 6.
[0027] Specifically, there are four PU mounting bases 8, which are welded one-to-one to the four third short support bars 7.
[0028] This embodiment provides a PU mounting base positioning and welding fixture for a battery clamping platform.
[0029] refer to Figure 1 A PU mounting base 8 positioning welding fixture for a battery clamping platform includes: two first connectors 9, two second connectors 10 and two positioning plates 11.
[0030] The length of the second connector 10 is the same as the length of the third support bar. One end of one of the first connectors 9 is fixedly connected to one end of one of the second connectors 10, and the other end is fixedly connected to one end of the other second connector 10. One end of the other first connector 9 is fixedly connected to the other end of one of the second connectors 10, and the other end is fixedly connected to the other end of the other second connector 10. The two first connectors 9 and the two second connectors 10 are parallel to each other. The two first connectors 9 and the two second connectors 10 form a rectangular frame.
[0031] Two positioning plates 11 are horizontally fixedly connected to the two second connecting pieces 10 on opposite sides, and the positioning plates 11 are fixedly connected to the first connecting pieces 9. A positioning opening 12 is provided at one end of the positioning plate 11 near one of the first connecting pieces 9.
[0032] Both the first connector 9 and the second connector 10 are made of square tubing.
[0033] The implementation principle of the PU mounting base positioning and welding fixture for a battery clamping platform according to an embodiment of this application is as follows: Before welding the PU mounting base 8, this fixture is first fixed on the frame, so that the second connecting piece 10 is in contact with the third short support bar 7. Then, the PU mounting base 8 is limited by the positioning opening 12, thereby achieving the positioning of the PU mounting base 8. Finally, after confirming that the position of the PU mounting base 8 is correct, the PU mounting base 8 is welded to the third short support bar 7.
[0034] The above description of the embodiments is only used to provide a detailed introduction to the technical solution of this utility model. However, the description of the above embodiments is only for the purpose of helping to understand this utility model and should not be construed as a limitation of this utility model. Any changes or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this utility model should be included within the protection scope of this utility model.
Claims
1. A PU mounting seat positioning welding tool for a battery clamping platform, characterized in that, include: Two first connectors (9), two second connectors (10), and two positioning plates (11); one end of one of the first connectors (9) is disposed at one end of one of the second connectors (10), and the other end is disposed at one end of the other second connector (10); one end of the other first connector (9) is disposed at the other end of one of the second connectors (10), and the other end is disposed at the other end of the other second connector (10); the two first connectors (9) are parallel to each other, and the two second connectors (10) are parallel to each other; the two positioning plates (11) are horizontally disposed on opposite sides of the two second connectors (10), and a positioning opening (12) is provided on the end of the positioning plate (11) near one of the first connectors (9).
2. The PU mount positioning welding tool for a battery clamping platform of claim 1, wherein, The positioning plate (11) is fixedly connected to the first connecting member (9).
3. The PU mount positioning welding tool for a battery clamping platform of claim 1, wherein, Both the first connector (9) and the second connector (10) are made of square tubing.