A construction column top pouring funnel device
Patent Information
- Application Number
- CN202521289296.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-06-23
- Publication Date
- 2026-09-11
- Estimated Expiration
- 2035-06-23
AI Technical Summary
[0003]针对木模板制作的喇叭口,待混凝土凝结硬化后,需将喇叭口处的混凝土剔凿,由于砌筑工程中构造柱为常用抗震构件,剔凿工作量大,且剔除的混凝土不能重复利用,易造成材料浪费并产生大量建筑垃圾
(1)可采用施工现场废旧钢板、钢筒、钢筋等常见建筑材料制作而成,安装简单,使用方便;
Smart Images

Figure CN224742022U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of building construction, and in particular to a funnel device for pouring concrete at the top of a structural column. Background Technology
[0002] In current construction technology, cast-in-place concrete is commonly used for the construction of secondary structural columns in building buildings. As a critical component of the seismic-resistant structure, the quality of the structural column's construction directly affects the seismic resistance of the masonry structure. Currently, wooden formwork is often used on construction sites to support the structural columns, with a notch pre-reserved at the top. A wooden flared opening is installed at the notch for the concrete pouring inlet.
[0003] For the flared openings created with wooden formwork, the concrete needs to be chipped away after it has hardened. Since structural columns are commonly used seismic-resistant components in masonry projects, this chipping work is extensive, and the removed concrete cannot be reused, leading to material waste and generating a large amount of construction debris. It also increases labor costs. Chipping can easily damage the structural column, reducing its overall seismic performance and thus affecting its usability.
[0004] Therefore, developing a one-time molding device for pouring concrete at the top of structural columns has become an urgent problem for construction professionals. Utility Model Content
[0005] The purpose of this utility model is to provide a funnel device for pouring concrete at the top of a structural column, which can avoid secondary chiseling, simplify the construction process, improve construction efficiency, reduce material waste, and lower construction costs.
[0006] To achieve the above objectives, this utility model provides a casting funnel device for the top of a structural column, comprising an L-shaped side plate and a front panel disposed inside the L-shaped side plate. The L-shaped side plate and the front panel are connected by a rotating shaft. The L-shaped side plate is fixedly connected to the rotating shaft, and the front panel is rotatably connected to the rotating shaft. A first angle steel is welded to the outer side of the top corner of the two L-shaped side plates near the template position, and a second angle steel is welded to the outer side of the bottom corner of the two L-shaped side plates near the template position. Two L-shaped handles are welded to the front panel.
[0007] Preferably, a hollow steel cylinder is welded to the top of the first angle steel, the hollow steel cylinder is tangentially arranged with the first angle steel, a detachable L-shaped screw is provided inside the hollow steel cylinder, the L-shaped screw is made of plain round steel bar, and the hollow steel cylinder and the rotating shaft are arranged on the same vertical plane.
[0008] Preferably, the rotating shaft is fixedly disposed between the two L-shaped side plates, and the front panel rotates around the L-shaped side plates by rotating it with the rotating shaft. The side of the L-shaped side plate is an isosceles right triangle.
[0009] Preferably, the front panel has a sealed position and an open position during rotation. When the front panel is rotated to the open position, the front panel is away from the outlet of the funnel. When the front panel is rotated to the sealed position, the front panel closes the outlet.
[0010] Preferably, the edge of the L-shaped side panel is provided with a protrusion to fix the position of the front panel when it is open.
[0011] Preferably, the L-shaped handle is made of threaded steel to increase friction when rotating the front panel and improve the operability for construction workers.
[0012] The beneficial effects of this utility model are as follows: (1) It can be made from common building materials such as scrap steel plates, steel cylinders and steel bars on the construction site. It is easy to install and convenient to use. (2) Improve the quality of one-time casting of concrete at the top of structural columns, improve work efficiency, and speed up construction progress; (3) Eliminate the waste of materials caused by using flared construction, reduce labor costs for chiseling and construction waste cleaning, achieve green construction, and reduce environmental pollution.
[0013] The technical solution of this utility model will be further described in detail below with reference to the accompanying drawings and embodiments. Attached Figure Description
[0014] Figure 1 This is a side view of the concrete pouring device at the top of the structural column in an embodiment of this utility model; Figure 2 This is a schematic diagram of the structure of a casting funnel device for the top of a structural column according to the present invention; Figure 3 This is a schematic diagram showing the relative positions of the front panel and side panels of this utility model.
[0015] Among them, 1. hollow steel cylinder; 2. L-shaped side plate; 3. L-shaped handle; 4. rotating shaft; 5. front panel; 6. second angle steel; 7. first angle steel; 8. L-shaped screw; 9. protrusion. Detailed Implementation
[0016] The technical solution of this utility model will be further described below with reference to the accompanying drawings and embodiments.
[0017] Unless otherwise defined, the technical or scientific terms used in this utility model shall have the ordinary meaning understood by one of ordinary skill in the art to which this utility model pertains. The terms "first," "second," and similar terms used in this utility model do not indicate any order, quantity, or importance, but are merely used to distinguish different components. Terms such as "comprising" or "including" mean that the element or object preceding the word encompasses the elements or objects listed following the word and their equivalents, without excluding other elements or objects. Terms such as "connected" or "linked" are not limited to physical or mechanical connections, but can include electrical connections, whether direct or indirect. Terms such as "upper," "lower," "left," and "right" are used only to indicate relative positional relationships; when the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0018] Example like Figure 1-3 As shown, a funnel device for pouring concrete at the top of a structural column includes an L-shaped side plate 2 and a front panel 5 disposed inside the L-shaped side plate 2. The L-shaped side plate 2 and the front panel 5 are connected by a rotating shaft 4. The L-shaped side plate 2 is fixedly connected to the rotating shaft 4, and the front panel 5 is rotatably connected to the rotating shaft 4. A first angle steel 7 is welded to the outer side of the top corner of the two L-shaped side plates 2 near the template position, and a second angle steel 6 is welded to the outer side of the bottom corner of the two L-shaped side plates 2 near the template position. Two L-shaped handles 3 are welded on the front panel 5. Three threaded holes are provided on the first angle steel 7 and the second angle steel 6 for fixing the funnel device so that the device does not move during the concrete pouring process.
[0019] A hollow steel cylinder 1 is welded to the top of the first angle steel 7. The hollow steel cylinder 1 is tangential to the first angle steel 7. A detachable L-shaped screw 8 is installed inside the hollow steel cylinder 1. The L-shaped screw 8 is made of plain round steel bar. The hollow steel cylinder 1 and the rotating shaft 4 are set on the same vertical plane.
[0020] The rotating shaft 4 is fixedly set between the two L-shaped side plates 2. The front panel 5 rotates around the L-shaped side plate 2 through the rotating connection with the rotating shaft 4. The side of the L-shaped side plate 2 is an isosceles right triangle. The front panel 5 is in close contact with the L-shaped side plate 2, and the two sides of the front panel 5 that are in contact with the side plate are smooth, which facilitates the rotation of the front panel 5 later.
[0021] The front panel 5 has a sealed position and an open position during rotation. When the front panel 5 rotates to the open position, the front panel 5 moves away from the outlet of the funnel. When the front panel 5 rotates to the sealed position, the front panel 5 closes the outlet. The rotation range of the front panel 5 is between the position close to the inclined side of the L-shaped side plate 2 and the position parallel to the support template.
[0022] The edge of the L-shaped side plate 2 is provided with protrusions 9 to fix the position of the front panel 5 when it is open. The L-shaped handle 3 is made of threaded steel to increase friction when rotating the front panel 5 and improve the operability of the construction personnel. The L-shaped screw 8 is made of plain round steel bar to reduce friction when moving the L-shaped screw 8 and make it easier for the construction personnel to operate.
[0023] Working principle: When using this device to pour concrete, first firmly fix the device to the formwork, then open the front panel 5 to its maximum angle using the L-shaped handle 3. Next, apply a release agent to the inside of the device. Before pouring concrete, calculate the concrete volume in advance, then pour the concrete. When the concrete volume reaches the target value, rotate the front panel 5 using the L-shaped handle 3 to close the pouring opening. At this point, the height of the front panel 5 exceeds the height of the hollow steel cylinder 1. Then, pass the L-shaped screw 8 through the two hollow steel cylinders 1 to lock the front panel 5 in place, preventing it from opening freely and ensuring the concrete fills the top of the structural column. After the concrete reaches a certain strength, open the front panel 5. Due to the design of the front panel 5, no corbel phenomenon will occur after the concrete has solidified, eliminating the need for secondary chiseling after pouring. This simplifies the construction process, improves construction efficiency, reduces material waste, and saves construction costs.
[0024] Therefore, the present invention provides a casting funnel device for the top of a structural column with the above-mentioned structure, which can avoid secondary chiseling, simplify the construction process, improve construction efficiency, reduce material waste, and lower construction costs.
[0025] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of this utility model and not to limit it. Although the utility model has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can still be made to the technical solution of this utility model, and these modifications or equivalent substitutions cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of this utility model.
Claims
1. A construction column top pour hopper apparatus, characterized by: It includes an L-shaped side panel and a front panel disposed inside the L-shaped side panel. The L-shaped side panel and the front panel are connected by a rotating shaft. The L-shaped side panel is fixedly connected to the rotating shaft, and the front panel is rotatably connected to the rotating shaft. A first angle steel is welded to the outer side of the top corner of the two L-shaped side panels near the template position, and a second angle steel is welded to the outer side of the bottom corner of the two L-shaped side panels near the template position. Two L-shaped handles are welded to the front panel.
2. The casting funnel device for the top of a structural column according to claim 1, characterized in that: A hollow steel cylinder is welded to the top of the first angle steel. The hollow steel cylinder is tangential to the first angle steel. A detachable L-shaped screw is installed inside the hollow steel cylinder. The L-shaped screw is made of plain round steel bar. The hollow steel cylinder and the rotating shaft are arranged on the same vertical plane.
3. The casting funnel device for the top of a structural column according to claim 2, characterized in that: The rotating shaft is fixedly disposed between the two L-shaped side plates. The front panel rotates around the L-shaped side plates by rotating it with the rotating shaft. The side of the L-shaped side plate is an isosceles right triangle.
4. The casting funnel device for the top of a structural column according to claim 3, characterized in that: The front panel has a sealed position and an open position during rotation. When the front panel is rotated to the open position, the front panel moves away from the outlet of the funnel. When the front panel is rotated to the sealed position, the front panel closes the outlet.
5. A construction column top pouring hopper device according to claim 4, characterized in that: The edge of the L-shaped side panel is provided with protrusions to fix the position of the front panel when it is open.
6. A construction column top pouring hopper device according to claim 5, characterized in that: The L-shaped handle is made of threaded steel to increase friction when rotating the front panel, thereby improving the operability for construction workers.