BIM-based green building interior dust purification and decoration construction device

By using a BIM-based green building interior dust purification and decoration construction device, which utilizes components such as air pumps and ultrasonic atomizers, the problem of incomplete dust cleaning during building decoration is solved, achieving efficient purification and humidity control, and ensuring a safe and comfortable construction environment.

CN224949845UActive Publication Date: 2026-11-10WUHAN QIQI ARCHITECTURAL DECORATION DESIGN ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202521713454.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-08-13
Publication Date
2026-11-10
Estimated Expiration
2035-08-13

AI Technical Summary

Technical Problem

In the current building decoration process, dust is not thoroughly cleaned and easily spreads to the external environment, causing pollution and affecting air humidity. Furthermore, traditional methods are harmful to people's health.

Method used

The design incorporates a BIM-based green building interior dust purification and decoration construction device, which includes a sealing panel, a dust removal and purification mechanism, a misting mechanism, and a support mechanism. Utilizing components such as an air pump, ultrasonic atomizer, humidity sensor, and magnetic strip, it achieves dust filtration and humidity control within the enclosed space, while the support mechanism ensures the device's stability.

Benefits of technology

It effectively reduces the harm of dust to the environment and personnel, optimizes dust removal effect, maintains a comfortable construction environment, improves purification efficiency and the applicability and stability of the device, and meets the resource utilization and efficient maintenance requirements of green building.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224949845U_ABST
    Figure CN224949845U_ABST
Patent Text Reader

Abstract

This application relates to the field of building decoration technology and discloses a BIM-based green building indoor dust purification and decoration construction device, including five enclosed panels, a dust removal and purification mechanism, a misting mechanism, and a support mechanism. By setting up the misting mechanism, an ultrasonic atomizer fixed to the side of the enclosed panel with two support blocks atomizes water in the injection box into tiny droplets, which combine with dust to cause it to settle, thus assisting in dust removal. The sealing plug and fixing ring design at the top of the injection box facilitates water addition and prevents liquid spillage, ensuring stable operation of the atomizer. A humidity sensor on another enclosed panel monitors the ambient humidity in real time and feeds the data back to the control system. When the humidity reaches a threshold, the working state of the ultrasonic atomizer is automatically adjusted to avoid over-humidification, achieving precise humidity control, optimizing the dust removal effect while maintaining a comfortable construction environment. The support mechanism enables an electric push rod to move a rubber block to the ground.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of building decoration technology, specifically a BIM-based green building interior dust purification and decoration construction device. Background Technology

[0002] Architectural decoration is short for architectural decoration and renovation engineering. Architectural decoration is the process of treating the interior and exterior surfaces and spaces of a building with decorative materials or ornaments in order to protect the main structure of the building, improve its physical performance, functionality, and beautify it. Architectural decoration is an indispensable part of people's lives and an important friend for people to appreciate life. Due to the fast pace of modern life, people's nerves are tense. After get off work, they want to truly relax and need the warmth of home. Therefore, when decorating a home, warmth must be taken into consideration.

[0003] Then, excessive dust is generated during building decoration work. Currently, the dust problem is mostly solved by using open-air vacuum cleaners. However, this method does not completely remove the dust, and some dust inevitably spreads into the external environment, causing environmental pollution or harming people's mouths and noses. At the same time, excessive dust will also affect the humidity in the air. If humidity data is monitored and the mist is subsequently dispersed into the air, the harm to people's health will be greatly reduced. In order to solve the above problems, a BIM-based green building indoor dust purification decoration construction device is proposed. Utility Model Content

[0004] To address the shortcomings of existing technologies, this application provides a BIM-based green building indoor dust purification and decoration construction device, which has advantages such as closed-loop dust removal and misting to increase air humidity, thus solving the problems mentioned in the background technology.

[0005] To achieve the above objectives, this application provides the following technical solution: a BIM-based green building indoor dust purification and decoration construction device, comprising five enclosed plates, a dust removal and purification mechanism, a misting mechanism, and a support mechanism. The misting mechanism includes two support blocks fixedly connected to the side of one of the enclosed plates. An ultrasonic atomizer is fixedly installed on the side of each of the two support blocks. An injection box is fixedly connected to the top of each ultrasonic atomizer. A humidity sensor is fixedly installed on the side of the other enclosed plate.

[0006] The above solution utilizes a dust removal and purification mechanism. An air pump draws dust from the enclosed space through the hood and delivery pipe into a collection box, where it undergoes a three-stage purification process for thorough filtration before being discharged through the outlet. This reduces the harm of dust to the environment and personnel. A misting mechanism, with two support blocks fixed to the sides of the enclosed panel, atomizes water in the injection box into tiny droplets, which combine with dust to cause it to settle, aiding in dust removal. The sealing plug and fixing ring design at the top of the injection box facilitates water addition and prevents spillage, ensuring stable operation of the atomizer. A humidity sensor on another enclosed panel monitors ambient humidity in real time, feeding data back to the control system. When humidity reaches a threshold, the system automatically adjusts the ultrasonic atomizer's operating state to prevent over-humidification, achieving precise humidity control and optimizing dust removal while maintaining a comfortable working environment. The support mechanism allows an electric push rod to move a rubber block to the ground, stabilizing the entire device and preventing the enclosed panel from shaking.

[0007] Furthermore, each of the five enclosed plates has a magnetic strip inside, and there are several sets of magnetic strips. Each of the two enclosed plates has a handle fixedly connected to its side.

[0008] The above scheme incorporates multiple sets of magnetic strips inside the five enclosed panels. Utilizing the principle of magnetic adsorption, these panels can be quickly and easily spliced ​​together to form a closed construction area. This modular design not only facilitates transportation and installation but also allows for flexible adjustment of the enclosed space according to the shape and size of different construction sites, improving the applicability of the device. The side-fixed handles facilitate the handling and movement of the enclosed panels by construction personnel, enhancing operational convenience.

[0009] Furthermore, the dust removal and purification mechanism includes a collection box fixedly connected to the top of a closed plate. An air pump is fixedly installed on the top of the collection box. A delivery pipe is fixedly connected to the top of the air pump. A cover is fixedly connected to the bottom of the delivery pipe. There are two covers, which are fixedly connected inside a closed plate. Air outlets are provided on all four sides of the collection box. The inside of the collection box has three sets of grooves. A fixing frame is fixedly connected inside each of the three sets of grooves. A filter screen is provided inside the upper fixing frame, an activated carbon plate is provided inside the middle fixing frame, and a photocatalytic decomposition layer is provided inside the lower fixing frame.

[0010] The above solution utilizes a dust removal and purification mechanism centered around a collection box. An air pump draws dust-laden air from the enclosed space into the collection box via a delivery pipe and a housing. Inside the box is a three-stage purification system consisting of a filter, activated carbon plate, and photocatalytic decomposition layer. The filter first intercepts larger dust particles, while the activated carbon plate utilizes its high surface area to adsorb harmful gases and fine dust. Under light, the photocatalytic decomposition layer decomposes volatile organic compounds and other harmful gases into harmless substances (the air outlet reflects external light onto the photocatalytic decomposition layer). The air outlets are evenly distributed on all four sides of the collection box, ensuring that the purified air is discharged uniformly, thus improving the indoor air purification effect. The removable sealing plates on the sides facilitate regular replacement and cleaning of the purification components, ensuring purification efficiency.

[0011] Furthermore, the support mechanism includes four fixing blocks fixedly connected to the sides of the two closed plates. Each of the four fixing blocks has an electric push rod fixedly installed inside, and the bottom end of each of the four electric push rods is fixedly connected to a rubber block.

[0012] With the above solution, four fixing blocks are fixed to the sides of the two closed plates respectively. The internal electric push rod can automatically adjust the height according to the ground conditions. The rubber block at the bottom increases the friction to ensure that the device can be placed stably under different ground conditions and prevent shaking from affecting operation. This adaptive support design ensures the stability of the device during construction and avoids damage to the device due to uneven ground, thereby improving the reliability and safety of the device.

[0013] Furthermore, a sealing plate is fixedly installed on the side of the collection box by studs.

[0014] With the above solution, the sealing plate is fixed by studs, and construction personnel can quickly disassemble it using conventional tools. When it is necessary to clean or replace the purification components such as the filter, activated carbon plate, and photocatalytic decomposition layer inside the collection box, the sealing plate can be easily opened to directly access the internal components. This design greatly reduces the difficulty of maintenance, reduces maintenance time and labor costs, and enables the purification components to be maintained and updated in a timely manner, ensuring the continuous and efficient operation of the dust removal and purification mechanism, thereby extending the service life of the entire device and meeting the requirements of green building construction for long-term stable operation of equipment.

[0015] Furthermore, a sealing plug is snapped onto the top of the injection tank, and a retaining ring is fixedly connected to the top of the sealing plug.

[0016] Through the above solution, the sealing plug is tightly fitted to the top of the injection box using a snap-fit ​​method, which can form a good sealing effect. This snap-fit ​​design can effectively prevent the liquid inside the box from leaking during the operation of the device due to vibration, tilting, etc. When the ultrasonic atomizer is working, it avoids liquid overflow affecting its normal operation, prevents damage to the internal electronic components of the device due to liquid leakage, ensures the stable operation of the atomizing mechanism, and thus ensures that the dust purification function of the entire device is not affected. At the same time, the guarantee of sealing performance also avoids the waste of water resources, which meets the requirements of green building for the rational use of resources.

[0017] Furthermore, a lighting lamp is fixedly installed on the side of one of the enclosure plates.

[0018] The above solution addresses the challenges of complex lighting conditions in construction environments, especially in relatively isolated spaces enclosed by partitions. Traditional lighting methods often fail to meet the lighting requirements for meticulous construction. Side-mounted lights provide directional and focused illumination, precisely lighting the construction area and helping construction workers clearly observe details such as wall decoration splicing and material cutting. This avoids construction errors caused by insufficient light, improves construction precision and quality, and ensures that the high standards of green building interior decoration are met.

[0019] Furthermore, the surfaces of the five sealing plates are coated with a nano-titanium dioxide coating.

[0020] Through the above-mentioned scheme, the nano-titanium dioxide coating has superhydrophilic and photocatalytic properties. Under light conditions, the nano-titanium dioxide on the coating surface can catalytically decompose organic pollutants adsorbed on the surface of the sealing plate, such as dust and oil generated during construction. At the same time, the superhydrophilicity allows water to spread rapidly on the coating surface, forming a uniform water film that washes away the decomposed pollutants. This eliminates the need for frequent manual wiping and cleaning. This self-cleaning function greatly reduces the maintenance cost and manpower input of the sealing plate, reduces the workload of construction personnel, and keeps the surface of the sealing plate clean, improving the overall aesthetics and service life of the device, which meets the requirements of green building construction for efficient maintenance.

[0021] Compared with the prior art, the technical solution of this application has the following beneficial effects: This BIM-based green building indoor dust purification and decoration construction device, through the installation of a dust removal and purification mechanism, uses an air pump to suck dust from the enclosed space into a collection box through a hood and delivery pipe. The dust then undergoes three stages of purification for thorough filtration before being discharged through an air outlet, reducing the harm of dust to the environment and personnel. A misting mechanism, with two support blocks fixed to the sides of the enclosed panel, atomizes water in the injection box into tiny droplets, which combine with the dust and cause it to settle, aiding in dust removal. The sealing plug and fixing ring design at the top of the injection box facilitates water addition and prevents spillage, ensuring stable operation of the atomizer. A humidity sensor on another enclosed panel monitors the ambient humidity in real time, feeding the data back to the control system. When the humidity reaches a threshold, the ultrasonic atomizer's operating status is automatically adjusted to avoid over-humidification, achieving precise humidity control, optimizing dust removal while maintaining a comfortable construction environment. The support mechanism allows an electric push rod to move a rubber block to the ground, stabilizing the entire device and preventing the enclosed panel from shaking. Attached Figure Description

[0022] Figure 1 This is a schematic diagram of the overall front view structure of this application; Figure 2 for Figure 1 Exploded cross-sectional view of the central enclosed plate; Figure 3 This is a partial side view exploded cross-sectional schematic diagram of the dust removal and purification mechanism in this application; Figure 4 This is a front view structural diagram of the fogging mechanism in this application; Figure 5 This is a schematic diagram of the overall frontal cross-sectional structure of this application; Figure 6 for Figure 1 A schematic diagram of the material structure of the central enclosed plate.

[0023] In the picture: 1. Enclosed plate; 2. Dust removal and purification mechanism; 201. Collection box; 202. Air pump; 203. Delivery pipe; 204. Cover; 205. Air outlet; 206. Groove; 207. Fixing frame; 208. Filter screen; 209. Activated carbon plate; 2010. Photocatalytic decomposition layer; 3. Mist mechanism; 301. Support block; 302. Ultrasonic atomizer; 303. Injection box; 304. Humidity sensor; 4. Support mechanism; 401. Fixing block; 402. Electric push rod; 403. Rubber block; 5. Sealing plate; 6. Stud; 7. Magnetic strip; 8. Handle; 9. Sealing plug; 10. Fixing ring; 11. Lighting lamp; 12. Nano titanium dioxide coating. Detailed Implementation

[0024] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0025] Please see Figure 1 , Figure 4 and Figure 5 The BIM-based green building indoor dust purification and decoration construction device in this embodiment includes five enclosed plates 1, a dust removal and purification mechanism 2, a misting mechanism 3, and a support mechanism 4. The misting mechanism 3 includes two support blocks 301 fixedly connected to the side of one of the enclosed plates 1. An ultrasonic atomizer 302 is fixedly installed on the side of the two support blocks 301, and an injection box 303 is fixedly connected to the top of the ultrasonic atomizer 302. A humidity sensor 304 is fixedly installed on the side of the other enclosed plate 1. By setting the misting mechanism 3, the two support blocks 301 can be fixedly connected to the side of the enclosed plate 1. An ultrasonic atomizer 302, fixed to the side of the enclosed plate 1, atomizes the water in the injection box 303 into tiny droplets, which combine with dust and cause it to settle, thus assisting in dust removal. The sealing plug 9 and fixing ring 10 on the top of the injection box 303 are designed to facilitate water addition and prevent liquid spillage, ensuring stable operation of the atomizer. A humidity sensor 304 on another enclosed plate 1 monitors the ambient humidity in real time and feeds the data back to the control system. When the humidity reaches the threshold, the working state of the ultrasonic atomizer 302 is automatically adjusted to avoid over-humidification, achieve precise humidity control, optimize the dust removal effect, and maintain a comfortable construction environment.

[0026] Please see Figure 1 , Figure 2 and Figure 3Each of the five enclosed panels 1 has a magnetic strip 7 inside, with several sets of magnetic strips 7. Handles 8 are fixedly connected to the sides of two of the enclosed panels 1. The five enclosed panels 1, with multiple sets of magnetic strips 7 inside, can be quickly and easily assembled using magnetic adsorption to form a closed construction area. This modular design not only facilitates transportation and installation but also allows for flexible adjustment of the enclosed space according to the shape and size of different construction sites, improving the applicability of the device. The side-fixed handles 8 facilitate the handling and movement of the enclosed panels 1 by construction personnel, enhancing operational convenience. The dust removal and purification mechanism 2 includes a collection box 201 fixedly connected to the top of a closed plate 1. An air pump 202 is fixedly installed on the top of the collection box 201. A delivery pipe 203 is fixedly connected to the top of the air pump 202, and a cover 204 is fixedly connected to the bottom of the delivery pipe 203. There are two covers 204, which are fixedly connected inside the closed plate 1. Air outlets 205 are provided on all four sides of the collection box 201. The inside of the collection box 201 has three sets of grooves 206. The internal components are all fixedly connected to a fixed frame 207. The upper fixed frame 207 contains a filter 208, the middle fixed frame 207 contains an activated carbon plate 209, and the lower fixed frame 207 contains a photocatalytic decomposition layer 2010. The dust removal and purification mechanism 2 is centered around the collection box 201. An air pump 202 draws dust-laden air from the enclosed space into the collection box 201 through a delivery pipe 203 and a cover 204. The box contains a three-stage purification system consisting of a filter 208, an activated carbon plate 209, and a photocatalytic decomposition layer 2010. The filter 208... 08 First, larger dust particles are intercepted. Activated carbon plate 209 uses its high specific surface area to adsorb harmful gases and fine dust. Photocatalytic decomposition layer 2010 decomposes volatile organic compounds and other harmful gases into harmless substances under light (air outlet 205 can reflect external light onto photocatalytic decomposition layer 2010). Air outlets 205 are evenly distributed on all four sides of collection box 201 to ensure that purified air is discharged evenly, improving the indoor air purification effect. The detachable sealing plate 5 on the side facilitates regular replacement and cleaning of purification components to ensure purification efficiency.

[0027] Please see Figure 1The support mechanism 4 includes four fixing blocks 401 fixedly connected to the sides of the two closed plates 1. Each of the four fixing blocks 401 has an electric push rod 402 fixedly installed inside. A rubber block 403 is fixedly connected to the bottom end of each of the four electric push rods 402. The four fixing blocks 401 are respectively fixed to the sides of the two closed plates 1. The internal electric push rods 402 can automatically adjust their height according to the ground conditions. The bottom rubber blocks 403 increase friction, ensuring that the device can be stably placed under different ground conditions and preventing shaking from affecting operation. This adaptive support design ensures the stability of the device during construction and avoids damage to the device due to uneven ground, thus improving the device's performance. For reliability and safety, a sealing plate 5 is fixedly installed on the side of the collection box 201 by studs 6. The sealing plate 5 is fixed by studs 6 and can be quickly disassembled by construction personnel using conventional tools. When it is necessary to clean or replace the purification components such as the filter 208, activated carbon plate 209, and photocatalytic decomposition layer 2010 inside the collection box 201, the sealing plate 5 can be easily opened to directly access the internal components. This design greatly reduces the difficulty of maintenance, reduces maintenance time and labor costs, and enables the purification components to be maintained and updated in a timely manner, ensuring the continuous and efficient operation of the dust removal and purification mechanism 2, thereby extending the service life of the entire device and meeting the requirements of green building construction for long-term stable operation of equipment.

[0028] Please see Figure 4 , Figure 5 and Figure 6A sealing plug 9 is snapped onto the top of the injection box 303, and a fixing ring 10 is fixedly connected to the top of the sealing plug 9. The sealing plug 9 is snapped into the top of the injection box 303 to form a good sealing effect. This snap-fit ​​design can effectively prevent the liquid inside the box from leaking due to vibration, tilting, etc. during the operation of the device. When the ultrasonic atomizer 302 is working, it avoids liquid overflow affecting its normal operation and prevents damage to the internal electronic components of the device due to liquid leakage, ensuring the stable operation of the atomizing mechanism 3, and thus ensuring that the dust purification function of the entire device is not affected. At the same time, the sealing performance also avoids the waste of water resources, which meets the requirements of green building for the rational use of resources. A lighting lamp 11 is fixedly installed on the side of a closed plate 1. The construction environment is often complex in terms of lighting, especially in the relatively independent space enclosed by the closed plate 1. Traditional lighting methods are difficult to meet the lighting needs of fine construction. The side-mounted lighting lamp 11 can provide directional and concentrated lighting, which can improve the precision of the construction process. The system provides precise lighting to the construction area, enabling construction workers to clearly observe construction details such as wall decoration splicing and material cutting. This avoids construction errors caused by insufficient light, improves construction accuracy and quality, and ensures that the high standards of green building interior decoration are met. The surfaces of the five closed panels 1 are coated with a nano-titanium dioxide coating 12. The nano-titanium dioxide coating 12 has superhydrophilic and photocatalytic properties. Under light conditions, the nano-titanium dioxide on the coating surface can catalytically decompose organic pollutants adsorbed on the surface of the closed panel 1, such as dust and oil generated during construction. At the same time, the superhydrophilicity allows water to spread rapidly on the coating surface, forming a uniform water film that washes away the decomposed pollutants. This eliminates the need for frequent manual wiping and cleaning. This self-cleaning function greatly reduces the maintenance cost and manpower input of the closed panels 1, reduces the workload of construction workers, and keeps the surface of the closed panels 1 clean, improving the overall aesthetics and service life of the device, meeting the needs of green building construction for efficient maintenance.

[0029] In this embodiment, the BIM-based green building indoor dust purification and decoration construction device features a dust removal and purification mechanism 2. The pump 202 draws dust from the enclosed space through the cover 204 and delivery pipe 203 into the collection box 201. The dust is then thoroughly filtered through a three-stage purification process before being discharged through the outlet 205, reducing the harm of dust to the environment and personnel. Furthermore, the misting mechanism 3, with two support blocks 301 fixed to the side of the enclosed plate 1, atomizes water injected into the box 303 into tiny droplets, which combine with the dust and cause it to settle. The design of the sealing plug 9 and fixing ring 10 on the top of the injection box 303 facilitates water addition and prevents liquid spillage, ensuring stable operation of the atomizer. The humidity sensor 304 on another sealing plate 1 monitors the ambient humidity in real time and feeds the data back to the control system. When the humidity reaches the threshold, the working state of the ultrasonic atomizer 302 is automatically adjusted to avoid over-humidification and achieve precise humidity control. While optimizing the dust removal effect, it maintains a comfortable construction environment. By setting the support mechanism 4, the electric push rod 402 can be operated to move the rubber block 403 to the ground, thereby stabilizing the entire device and preventing the sealing plate 1 from shaking.

[0030] The working principle of the above embodiment is as follows: First, the construction personnel carry five sealing plates 1 through the handle 8 on the side of the sealing plate 1, and use the magnetic adsorption of the internal magnetic strip 7 to quickly splice them into a closed construction area, forming a relatively independent space, which effectively blocks dust from being blown out. Then, the four electric push rods 402 of the support mechanism 4 automatically adjust the height according to the flatness of the ground, and the rubber block 403 increases the friction to ensure that the device is placed stably, providing a stable foundation for subsequent purification work. Then, construction workers can enter the enclosed space to process the decorative materials. During the processing, the air pump 202 operates to draw dusty air from the enclosed space into the collection box 201 through the double cover 204 and the delivery pipe 203. The dusty air will then be dispersed onto the filter 208, which will intercept larger dust particles. After that, it will be dispersed onto the activated carbon board 209, which will adsorb fine dust and harmful gases such as volatile organic compounds (VOCs) and formaldehyde. Finally, it will be dispersed onto the photocatalytic decomposition layer 2010. External light will be reflected onto the photocatalytic decomposition layer 2010 through the air outlet 205, and the residual harmful gases will be decomposed into harmless carbon dioxide and water. Finally, the purified air will be evenly discharged back to the enclosed outside through the air outlets 205 on all four sides of the collection box 201. Subsequently, during the dust removal process, the humidity sensor 304 can monitor the humidity data in the enclosed space in real time and transmit the information to the control system. When the humidity is lower than the set threshold, the ultrasonic atomizer 302 converts the water injected into the box 303 into 1-5 micron droplets, which are then sprayed into the enclosed space to combine with the dust in the air and cause it to settle, thus assisting in dust removal. When the humidity reaches the set value, the control system automatically adjusts the working state of the ultrasonic atomizer 302 to avoid over-humidification. Finally, the nano-titanium dioxide coating 12 on the surface of the sealing plate 1 decomposes surface pollutants under light, and its super-hydrophilicity causes the pollutants to fall off automatically with the water flow, reducing manual cleaning. The sealing plate 5 on the side of the collection box 201 can be removed by the stud 6, making it easy to replace the filter 208, activated carbon plate 209 and photocatalytic decomposition layer 2010. The sealing plug 9 and fixing ring 10 on the top of the injection box 303 are designed to facilitate the quick addition of water when there is no water. The lighting lamp 11 on the side of the sealing plate 1 provides directional lighting for the construction area, improving the visibility of the construction.

[0031] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.

[0032] Although embodiments of this application have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of this application, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A BIM-based green building indoor dust purification decoration construction device, comprising five closed plates (1), a dust removal and purification mechanism (2), a mist mechanism (3) and a supporting mechanism (4), characterized in that: The misting mechanism (3) includes a support block (301) fixedly connected to the side of a closed plate (1). There are two support blocks (301). An ultrasonic atomizer (302) is fixedly installed on the side of the two support blocks (301). An injection box (303) is fixedly connected to the top of the ultrasonic atomizer (302). A humidity sensor (304) is fixedly installed on the side of the other closed plate (1).

2. The BIM-based green building indoor dust purification decoration construction device according to claim 1, characterized in that: Each of the five enclosed plates (1) is provided with a magnetic strip (7), and the magnetic strip (7) is in several groups. Each of the two enclosed plates (1) is fixedly connected with a handle (8).

3. The BIM-based green building indoor dust purification decoration construction device according to claim 1, characterized in that: The dust removal and purification mechanism (2) includes a collection box (201) fixedly connected to the top of a closed plate (1). A vacuum pump (202) is fixedly installed on the top of the collection box (201). A conveying pipe (203) is fixedly connected to the top of the vacuum pump (202). A cover (204) is fixedly connected to the bottom of the conveying pipe (203). There are two covers (204), and the two covers (204) are fixedly connected inside a closed plate (1). The collection box (201) is fixedly connected to the top of a closed plate (1). 1) All four sides are provided with air outlets (205). The inside of the collection box (201) is provided with grooves (206). There are three sets of grooves (206). The inside of each of the three sets of grooves (206) is fixedly connected with a fixing frame (207). The upper fixing frame (207) is provided with a filter screen (208). The middle fixing frame (207) is provided with an activated carbon plate (209). The lower fixing frame (207) is provided with a photocatalytic decomposition layer (2010).

4. The BIM-based green building indoor dust purification decoration construction device according to claim 1, characterized in that: The support mechanism (4) includes four fixing blocks (401) fixedly connected to the sides of the two closed plates (1). Each of the four fixing blocks (401) has an electric push rod (402) fixedly installed inside, and a rubber block (403) is fixedly connected to the bottom of each of the four electric push rods (402).

5. The BIM-based green building indoor dust purification and decoration construction device according to claim 3, characterized in that: A sealing plate (5) is fixedly installed on the side of the collection box (201) by studs (6).

6. The BIM-based green building indoor dust purification decoration construction device according to claim 1, characterized in that: The top of the injection tank (303) is fitted with a sealing plug (9), and the top of the sealing plug (9) is fixedly connected with a fixing ring (10).

7. The BIM-based green building indoor dust purification and decoration construction device according to claim 1, characterized in that: A lighting lamp (11) is fixedly installed on the side of one of the closed plates (1).

8. The BIM-based green building indoor dust purification decoration construction device according to claim 1, characterized in that: The surfaces of the five enclosure plates (1) are provided with a nano-titanium dioxide coating (12).