A high-efficiency RTO and zeolite rotary device for treating waste organic gas
By simplifying filter replacement through the structure of magnets and metal sealing plates, and combining the uniform rotation of the zeolite molecular sieve wheel driven by the motor with the heat conduction of the hood, the problems of cumbersome filter disassembly, uneven heating and poor connection of high-concentration waste gas in traditional equipment are solved. This achieves efficient and stable treatment of organic waste gas from coating, and meets the continuous operation requirements of coating production lines.
Patent Information
- Application Number
- CN202522509413.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-26
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2035-11-26
AI Technical Summary
In traditional coating organic waste gas treatment equipment, filter screen disassembly is cumbersome, uneven heating of zeolite rotors leads to incomplete desorption of impurities, and the connection between high-concentration waste gas and RTO is not smooth, affecting the stability and efficiency of the equipment and making it difficult to meet the continuous operation requirements of coating production lines.
The use of magnets and metal sealing plates simplifies filter replacement. The motor drives the zeolite molecular sieve rotor to rotate at a constant speed, which, combined with the hood, guides heat for uniform heating and desorption. The air pump and connecting pipes form an efficient channel to achieve uniform filtration, adsorption and combustion of waste gas.
It improves the efficiency and stability of exhaust gas treatment, reduces maintenance costs, ensures stable continuous operation of equipment on the coating production line, and meets emission standards.
Smart Images

Figure CN224949865U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to waste gas treatment technical field, concretely is a kind of RTO and zeolite runner equipment of high-efficiency treatment coating organic waste gas. BACKGROUND
[0002] Coating waste gas uses zeolite runner RTO equipment, and it is the key equipment of governance coating VOCs, can efficiently handle benzene series, ester etc.
[0003] 1, filter unit, intercepts paint mist and dust in waste gas;
[0004] 2, zeolite runner unit, adsorbs and concentrates low-concentration waste gas;
[0005] 3, RTO oxidation unit, decomposes high-concentration waste gas into harmless substance;
[0006] 4, power and control unit, drives airflow and equipment operation.
[0007] But traditional equipment has obvious deficiency: the filter screen of filter unit is fixed by bolt, and it is tedious to disassemble, and maintenance time-consuming;Zeolite runner relies on single heating desorption, and uneven heat distribution leads to incomplete impurity desorption, affects adsorption precision;High-concentration waste gas after desorption and RTO are not smooth, and it is easy to reduce processing efficiency. These problems not only lead to poor equipment running stability, but also increase maintenance cost, difficult to adapt to the continuous operation demand of coating production line. UTILITY MODEL CONTENTS
[0008] In view of the deficiency of prior art, the utility model provides a kind of RTO and zeolite runner equipment of high-efficiency treatment coating organic waste gas, solve the filter screen of filter unit of traditional equipment and be fixed by bolt, and it is tedious to disassemble, and maintenance time-consuming;Zeolite runner relies on single heating desorption, and uneven heat distribution leads to incomplete impurity desorption, affects adsorption precision;High-concentration waste gas after desorption and RTO are not smooth, and it is easy to reduce processing efficiency;These problems not only lead to poor equipment running stability, but also increase maintenance cost, difficult to adapt to the continuous operation demand of coating production line.
[0009] To achieve the above-mentioned objectives, this utility model provides the following technical solution: an RTO and zeolite rotor device for efficiently treating organic waste gas from coating processes, comprising a filter box; a purification box, wherein the purification box is disposed on one side of the filter box, and a connecting pipe is provided between the filter box and the purification box; a zeolite molecular sieve rotor is rotatably connected to the inner wall of the purification box, a motor is fixedly connected to the outer wall of the purification box, the zeolite molecular sieve rotor is fixedly connected to the output end of the motor, a filter screen is provided on the inner wall of the filter screen, a heating block is provided on the side wall of the zeolite molecular sieve rotor, a fan is provided on the outer wall of the purification box, and a fan hood is provided at the air outlet of the fan, the fan hood being located inside the purification box; an air inlet pipe is provided on the side wall of the filter box, and a flow equalization plate is installed inside the air inlet pipe; a magnet is fixedly connected to the outer wall of the filter box, a sealing plate is fixedly connected to the side wall of the filter screen, and an installation block is provided on the outer wall of the sealing plate.
[0010] Preferably, the sealing plate is made of metal and contacts the outer wall of the filter box; an air pump is fixedly connected to the top of the purification box, a combustion box is provided on the outer wall of the purification box, and a connecting pipe is provided between the air pump and the combustion box; an exhaust pipe is provided at the top of the combustion box, a drain pipe is provided at the bottom of the combustion box, a valve is installed on the connecting pipe, and a discharge pipe is provided on the side wall of the purification box.
[0011] Compared with the prior art, this utility model provides an RTO and zeolite rotor device for efficiently treating organic waste gas from coating processes, which has the following beneficial effects:
[0012] 1. This equipment improves the efficiency and stability of waste gas treatment through structural optimization. The flow equalization plate ensures that waste gas enters the filter box evenly, guaranteeing a balanced filtration load on the filter screen; the motor drives the zeolite molecular sieve rotor to rotate at a uniform speed, and the combined force of the airflow guided by the hood and the heat from the heating block achieves complete desorption of organic impurities; the suction pump and connecting pipes form an efficient channel, allowing high-concentration gas to quickly enter the combustion chamber for decomposition. Through the synergistic effect of adsorption and RTO combustion, the waste gas is efficiently purified, meeting emission standards.
[0013] 2. The magnetic adsorption structure of the metal sealing plate, combined with the mounting block, eliminates the need for tool-free filter replacement, solving the cumbersome problem of traditional bolt fixing. The sealing plate and connecting pipe valves ensure airtightness, while the drainage and exhaust pipes of the combustion chamber allow for the orderly discharge of products. The regenerable design of the zeolite molecular sieve rotor extends its lifespan, reduces costs, and provides a guarantee for environmentally friendly production in coating enterprises. Attached Figure Description
[0014] Figure 1 This is a schematic diagram of the overall structure of this utility model;
[0015] Figure 2 This is a side view of the structure of this utility model;
[0016] Figure 3 This is a schematic diagram of the internal structure of this utility model;
[0017] Figure 4 This is a schematic diagram of the internal structure of this utility model;
[0018] Figure 5 This is a side view of the structure of this utility model.
[0019] In the diagram: 1. Filter box; 2. Purification box; 3. Air inlet pipe; 4. Flow equalization plate; 5. Mounting block; 6. Sealing plate; 7. Connecting pipe; 8. Motor; 9. Air pump; 10. Connecting pipe; 11. Fan; 12. Combustion box; 13. Exhaust pipe; 14. Drain pipe; 15. Zeolite molecular sieve rotor; 16. Heating block; 17. Air hood; 18. Discharge pipe; 61. Magnet; 62. Filter screen. Detailed Implementation
[0020] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0021] Example
[0022] like Figures 1 to 5 As shown, the technical solution in this application effectively solves the problems of traditional equipment filter units where the filter screen is mostly fixed by bolts, resulting in cumbersome disassembly and time-consuming maintenance; zeolite rotors rely on single heating for desorption, and uneven heat distribution leads to incomplete desorption of impurities, affecting adsorption accuracy; and the high-concentration waste gas after desorption is not well connected with the RTO, easily reducing treatment efficiency. These problems not only lead to poor equipment operation stability but also increase maintenance costs, making it difficult to adapt to the continuous operation requirements of coating production lines. The overall approach is as follows:
[0023] To address the problems existing in the prior art, this utility model provides an RTO and zeolite rotor device for efficiently treating organic waste gas from coating processes, including a filter box 1; a purification box 2, which is located on one side of the filter box 1, and a connecting pipe 7 between the filter box 1 and the purification box 2; a zeolite molecular sieve rotor 15 is rotatably connected to the inner wall of the purification box 2, and a motor 8 is fixedly connected to the outer wall of the purification box 2, with the zeolite molecular sieve rotor 15 fixedly connected to the output end of the motor 8; a filter screen 62 is provided on the inner wall of the filter screen 62, and a heating block 16 is provided on the side wall of the zeolite molecular sieve rotor 15; a fan 11 is provided on the outer wall of the purification box 2, and a fan hood 17 is provided at the outlet of the fan 11, located inside the purification box 2; an air inlet pipe 3 is provided on the side wall of the filter box 1, and a flow equalization plate 4 is installed inside the air inlet pipe 3; a magnet 61 is fixedly connected to the outer wall of the filter box 1, and the filter screen 62 is fixed on the side wall. A sealing plate 6 is connected, and an installation block 5 is provided on the outer wall of the sealing plate 6. The operator introduces the organic waste gas generated during painting into the equipment through the air inlet pipe 3 on the side wall of the filter box 1. After entering the air inlet pipe 3, the waste gas first passes through the internally installed flow equalization plate 4. The flow equalization plate 4 can break the turbulent flow of the waste gas, so that the gas is evenly dispersed and enters the filter box 1 smoothly, providing stable airflow conditions for subsequent filtration. After the flow equalization, the waste gas passes through the filter screen 62 in the filter box 1. The filter screen 62 intercepts and filters solid impurities such as paint mist and dust in the waste gas, realizing the primary purification of the waste gas. At this time, the filter screen 62 is attracted and fixed to the magnet 61 on the outer wall of the filter box 1 by the sealing plate 6 fixedly connected to the side wall. The sealing plate 6 is made of metal and is in close contact with the outer wall of the filter box 1, effectively ensuring the airtightness of the filter box 1 and preventing unfiltered waste gas from leaking from the gaps. The mounting block 5 on the outer wall of the sealing plate 6 provides a convenient force point for the subsequent disassembly of the filter screen 62. After the primary filtration is completed, the operator opens the valve on the connecting pipe 7, and the purified exhaust gas enters the interior of the purification box 2 through the connecting pipe 7 between the filter box 1 and the purification box 2. At the same time, the motor 8 fixedly connected to the outer wall of the purification box 2 is started. The output end of the motor 8 drives the zeolite molecular sieve rotor 15 connected to the inner wall of the purification box 2 to rotate at a uniform speed. When the exhaust gas passes through the rotating zeolite molecular sieve rotor 15, the organic pollutants inside are efficiently adsorbed by the zeolite molecular sieve, realizing the concentration treatment of the exhaust gas. The treated clean gas is discharged from the discharge pipe 18 on the side wall of the purification box 2 in compliance with the standards. When the zeolite molecular sieve rotor 15 reaches saturation, it needs to be desorbed and regenerated to restore its adsorption capacity. At this time, the heating block 16 on the side wall of the zeolite molecular sieve rotor 15 is activated, and the fan 11 on the outer wall of the purification box 2 is turned on. The air hood 17 at the air outlet of the fan 11 concentrates the air force and directs it to the zeolite molecular sieve rotor 15 and the heating block 16, so that the heat generated by the heating block 16 is evenly distributed on the surface and inside of the zeolite molecular sieve rotor 15 under the action of the air hood 17, avoiding the problem of local overheating or uneven heat distribution. The equipment improves the efficiency and stability of waste gas treatment through structural optimization.The flow equalization plate 4 ensures that the exhaust gas enters the filter box 1 evenly, guaranteeing a balanced filtration load on the filter screen 62; the motor 8 drives the zeolite molecular sieve rotor 15 to rotate at a uniform speed, which, together with the air force guided by the hood 17 and the heat from the heating block 16, achieves complete desorption of organic impurities; the suction pump 9 and the connecting pipe 10 form an efficient channel, allowing high-concentration gas to quickly enter the combustion box 12 for decomposition. Through the synergistic effect of adsorption and RTO combustion, the exhaust gas is efficiently purified, meeting emission standards.
[0024] The sealing plate 6 is made of metal and is in contact with the outer wall of the filter box 1. A vacuum pump 9 is fixedly connected to the top of the purification box 2. A combustion box 12 is provided on the outer wall of the purification box 2. A connecting pipe 10 is provided between the vacuum pump 9 and the combustion box 12. An exhaust pipe 13 is provided at the top of the combustion box 12, and a drain pipe 14 is provided at the bottom of the combustion box 12. A valve is installed on the connecting pipe 7, and a discharge pipe 18 is provided on the side wall of the purification box 2. The organic impurities adsorbed on the zeolite molecular sieve rotor 15 are desorbed and converted into high-concentration organic gas under uniform heat. The vacuum pump 9 fixedly connected to the top of the purification box 2 is started. The vacuum pump 9 pumps the high-concentration organic gas generated by desorption to the combustion box 12 on the outer wall of the purification box 2 through the connecting pipe 10. In the combustion box 12, the high-concentration organic gas is completely decomposed into harmless water and carbon dioxide through a high-temperature oxidation reaction. The water produced by the reaction is discharged from the drain pipe 14 at the bottom of the combustion chamber 12, and the purified exhaust gas is discharged from the exhaust pipe 13 at the top of the combustion chamber 12, completing the entire waste gas treatment and equipment regeneration process. When the filter screen 62 reduces its filtration efficiency due to excessive interception of impurities, the operator can pull the mounting block 5 on the sealing plate 6 to disengage the sealing plate 6 from the magnet 61 on the filter box 1, and then quickly remove the filter screen 62 from the filter box 1 for replacement. After replacement, it can be re-attached and fixed by the magnet 61 to restore its use.
[0025] Structural Description: Filter Box 1: As the core carrier for primary waste gas treatment, it provides a stable installation space for filter screen 62. Relying on filter screen 62, it intercepts and filters solid impurities such as paint mist and dust in the waste gas. At the same time, through close cooperation with sealing plate 6, it constructs a closed filtration environment, ensures the sealing of the filtration process, and prevents untreated waste gas from leaking out.
[0026] Purification box 2: It undertakes the core functions of waste gas adsorption concentration and desorption regeneration. It integrates key components such as zeolite molecular sieve rotor 15, heating block 16, and fan hood 17. It provides a stable and controllable space environment for the adsorption reaction of organic pollutants with zeolite molecular sieve rotor 15 and the desorption heating of heating block 16. It is the core guarantee area for the purification efficiency of the equipment.
[0027] Inlet pipe 3: As a dedicated channel for organic waste gas from coating to enter the equipment, one end is connected to the external waste gas collection system, and the other end is precisely connected to the filter box 1, forming the initial link for waste gas transportation, ensuring that the waste gas enters the subsequent treatment stage in a directional manner, and avoiding airflow turbulence.
[0028] Flow equalization plate 4: It is installed horizontally at the end of the air intake pipe 3 near the filter box 1. Through the special structure of the plate, it breaks up the vortex and uneven airflow of the exhaust gas, so that the exhaust gas enters the filter box 1 with a uniform flow rate and distribution, ensuring that the filtration load of each area of the filter screen 62 is consistent, improving the filtration efficiency and extending the life of the filter screen 62.
[0029] Mounting block 5: It adopts a raised structure and is fixed in the center of the outer side of the sealing plate 6, providing operators with a convenient point of force application. When the filter screen 62 needs to be replaced, the sealing plate 6 and the filter screen 62 can be moved synchronously by pulling the mounting block 5, which simplifies the disassembly process and reduces maintenance time.
[0030] Sealing plate 6: Made of corrosion-resistant metal material, one side is fixedly connected to the edge of filter screen 62, and the other side is attached to the outer wall of filter box 1. It achieves a tight seal through the adsorption force of magnet 61, blocking the path of exhaust gas inside filter box 1 from the installation gap and ensuring the primary filtration effect.
[0031] Connecting pipe 7: Made of high temperature resistant and corrosion resistant pipe, with both ends sealed to the air outlet of filter box 1 and the air inlet of purification box 2 respectively, to form a conveying channel for the exhaust gas after primary filtration. The valves on the pipeline can flexibly control the air flow, which is convenient for equipment maintenance or operating condition adjustment.
[0032] Motor 8: A speed-regulating motor 8 is selected and fixed on the outside of the purification box 2 at the position corresponding to the axis of the zeolite molecular sieve rotor 15. The output shaft of the motor 8 penetrates the wall of the purification box 2 and is rigidly connected to the zeolite molecular sieve rotor 15 to provide stable power to the rotor. By adjusting the speed, the adsorption and desorption of the rotor are ensured to be synchronous and efficient.
[0033] Air pump 9: A high negative pressure air pump 9 is installed on the top of the purification box 2. The air inlet is connected to the desorption area inside the purification box 2, and the air outlet is connected to the combustion box 12 through the connecting pipe 10. The high concentration of organic waste gas generated by desorption is quickly extracted from the purification box 2 by using negative pressure to avoid gas retention and affect the adsorption effect.
[0034] Connecting pipe 10: It uses heat-insulated pipe to connect the air pump 9 and the combustion chamber 12. It serves as a dedicated transport channel for high-concentration organic waste gas. Its sealing structure can prevent the leakage of flammable and explosive gases. At the same time, the heat-insulating design reduces the temperature loss of gas during the transport process and improves the reaction efficiency in the combustion chamber 12.
[0035] Fan 11: A centrifugal fan 11 is fixed to the outer wall of the purification box 2. The air outlet extends into the interior of the purification box 2 and is connected to the hood 17. The airflow generated by the fan 11 is guided by the hood 17 and merges with the heat generated by the heating block 16 to form a uniform hot air that acts on the zeolite molecular sieve rotor 15, ensuring the uniformity of desorption.
[0036] Combustion chamber 12: It is equipped with a high-temperature combustion chamber and ignition device. It is connected to high-concentration organic waste gas through connecting pipe 10. Under high temperature environment, it oxidizes and decomposes organic pollutants into water and carbon dioxide. It is the core device for the ultimate purification of waste gas. Its high-temperature resistant shell can prevent heat from leaking out.
[0037] Exhaust pipe 13: Installed at the top of combustion chamber 12 and extending to the outside or exhaust gas monitoring system, serving as the emission channel for exhaust gas that meets the standards after combustion purification. Monitoring sensors can be installed on the pipe to monitor exhaust gas emission indicators in real time and ensure compliance with environmental protection standards.
[0038] Drain pipe 14: Connects to the condensate collection tank at the bottom of the combustion chamber 12, and discharges the liquid water formed by the condensation of water vapor generated by the combustion reaction to the equipment. The valve on the pipeline can be opened periodically to drain the water and prevent condensate from accumulating in the combustion chamber 12 and affecting the operation of the equipment.
[0039] Zeolite molecular sieve rotor 15: Made of honeycomb structure zeolite molecular sieve material, it is horizontally installed inside the purification box 2 and connected to the output shaft of motor 8. During the rotation of the rotor, it continuously adsorbs organic pollutants in the exhaust gas. After desorption, it can quickly restore the adsorption performance and realize continuous operation.
[0040] Heating block 16: Using electric heating, multiple sets of heating blocks 16 are arranged around the side wall of the desorption area of the zeolite molecular sieve rotor 15. After being powered on, they quickly generate high temperature to provide the heat required for the desorption of organic impurities adsorbed on the zeolite molecular sieve rotor 15. The temperature can be precisely controlled.
[0041] Wind shroud 17: It adopts a conical wind-gathering structure, is installed at the end of the air outlet of the fan 11 and directly opposite the zeolite molecular sieve rotor 15, and concentrates the dispersed airflow generated by the fan 11 to guide the rotor surface, while making the airflow fully mix with the heat generated by the heating block 16, so as to ensure that the rotor is heated evenly in all areas.
[0042] Discharge pipe 18: Located on the side wall of the purification chamber 2, corresponding to the adsorption area of the zeolite molecular sieve rotor 15, it serves as the discharge channel for the purified gas after adsorption treatment. It can be directly connected to the workshop return air vent or outdoor emission system to achieve proper disposal of the purified gas.
[0043] Instructions for use
[0044] The operator introduces the organic waste gas generated during painting into the equipment through the air inlet pipe 3 on the side wall of the filter box 1. After entering the air inlet pipe 3, the waste gas first passes through the internally installed flow equalization plate 4. The flow equalization plate 4 can break the turbulent flow of the waste gas, so that the gas is evenly dispersed and enters the filter box 1 smoothly, providing stable airflow conditions for subsequent filtration. After the flow equalization, the waste gas passes through the filter screen 62 in the filter box 1. The filter screen 62 intercepts and filters solid impurities such as paint mist and dust in the waste gas, achieving primary purification of the waste gas. At this time, the filter screen 62 is attracted and fixed to the magnet 61 on the outer wall of the filter box 1 by the sealing plate 6 fixedly connected to the side wall. The sealing plate 6 is made of metal and is in close contact with the outer wall of the filter box 1, effectively ensuring the airtightness of the filter box 1 and preventing unfiltered waste gas from leaking from the gaps. The mounting block 5 on the outer wall of the sealing plate 6 provides a convenient force point for the subsequent disassembly of the filter screen 62. After the primary filtration is completed, the operator opens the valve on the connecting pipe 7, and the purified exhaust gas enters the interior of the purification box 2 through the connecting pipe 7 between the filter box 1 and the purification box 2. At the same time, the motor 8 fixedly connected to the outer wall of the purification box 2 is started. The output end of the motor 8 drives the zeolite molecular sieve rotor 15 connected to the inner wall of the purification box 2 to rotate at a uniform speed. When the exhaust gas passes through the rotating zeolite molecular sieve rotor 15, the organic pollutants inside are efficiently adsorbed by the zeolite molecular sieve, realizing the concentration treatment of the exhaust gas. The treated clean gas is discharged from the discharge pipe 18 on the side wall of the purification box 2 in compliance with the standards. When the zeolite molecular sieve rotor 15 reaches saturation, it needs to be desorbed and regenerated to restore its adsorption capacity. At this time, the heating block 16 on the side wall of the zeolite molecular sieve rotor 15 is activated, and the fan 11 on the outer wall of the purification chamber 2 is turned on. The air hood 17 at the air outlet of the fan 11 concentrates the air force and directs it to the zeolite molecular sieve rotor 15 and the heating block 16, so that the heat generated by the heating block 16 is evenly distributed on the surface and inside of the zeolite molecular sieve rotor 15 under the action of the air hood 17, avoiding the problem of local overheating or uneven heat distribution. The organic impurities adsorbed on the zeolite molecular sieve rotor 15 are desorbed and converted into high-concentration organic gas under the action of uniform heat. The vacuum pump 9 fixedly connected to the top of the purification chamber 2 is activated. The vacuum pump 9 pumps the high-concentration organic gas generated by desorption to the combustion chamber 12 on the outer wall of the purification chamber 2 through the connecting pipe 10. In the combustion chamber 12, the high-concentration organic gas is completely decomposed into harmless water and carbon dioxide through a high-temperature oxidation reaction. The water produced by the reaction is discharged from the drain pipe 14 at the bottom of the combustion chamber 12, and the purified exhaust gas is discharged from the exhaust pipe 13 at the top of the combustion chamber 12, completing the entire waste gas treatment and equipment regeneration process. When the filter screen 62 reduces its filtration efficiency due to excessive interception of impurities, the operator can pull the mounting block 5 on the sealing plate 6 to disengage the sealing plate 6 from the magnet 61 on the filter box 1, and then quickly remove the filter screen 62 from the filter box 1 for replacement. After replacement, it can be re-attached and fixed by the magnet 61 to restore its use.
[0045] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. An RTO and zeolite rotor device for efficiently treating organic waste gas from painting, comprising a filter box (1); Purification box (2), the purification box (2) is set on one side of filter box (1), and a connecting pipe (7) is provided between filter box (1) and purification box (2). Its features are: Also includes: The inner wall of the purification box (2) is rotatably connected to a zeolite molecular sieve rotor (15), the outer wall of the purification box (2) is fixedly connected to a motor (8), the zeolite molecular sieve rotor (15) is fixedly connected to the output end of the motor (8), the inner wall of the filter box (1) is provided with a filter screen (62), the side wall of the zeolite molecular sieve rotor (15) is provided with a heating block (16), the outer wall of the purification box (2) is provided with a fan (11), the air outlet of the fan (11) is provided with a hood (17), and the hood (17) is located inside the purification box (2).
2. The RTO and zeolite rotor equipment for efficiently treating organic waste gas from coating processes according to claim 1, characterized in that: The filter box (1) has an air inlet pipe (3) on its side wall, and a flow equalization plate (4) is installed inside the air inlet pipe (3).
3. The RTO and zeolite rotor equipment for efficiently treating organic waste gas from coating processes according to claim 1, characterized in that: A magnet (61) is fixedly connected to the outer wall of the filter box (1), and a sealing plate (6) is fixedly connected to the side wall of the filter screen (62). An installation block (5) is provided on the outer wall of the sealing plate (6).
4. The RTO and zeolite rotor equipment for efficiently treating organic waste gas from coating processes according to claim 3, characterized in that: The sealing plate (6) is made of metal and is in contact with the outer wall of the filter box (1).
5. The RTO and zeolite rotor equipment for efficiently treating organic waste gas from coating processes according to claim 1, characterized in that: The top of the purification box (2) is fixedly connected to an air pump (9), and the outer wall of the purification box (2) is provided with a combustion box (12). A connecting pipe (10) is provided between the air pump (9) and the combustion box (12).
6. The RTO and zeolite rotor equipment for efficiently treating organic waste gas from coating as described in claim 5, characterized in that: The combustion chamber (12) is provided with an exhaust pipe (13) at the top and a drain pipe (14) at the bottom. A valve is installed on the connecting pipe (7) and a discharge pipe (18) is provided on the side wall of the purification chamber (2).
