A stretch-gradual hybrid forming apparatus for sheet metal parts
By using a stretching-progressive composite forming equipment, combined with a stretching cylinder and a flexible array mold, the problems of high cost and low forming efficiency in existing technologies have been solved, enabling rapid and high-precision forming of double-curvature sheet metal parts, which is suitable for small-batch, multi-specification production.
Patent Information
- Application Number
- CN202522359841.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-06
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2035-11-06
AI Technical Summary
In existing technologies, stamping costs are higher than producing small batches of multi-specification parts, stretch forming can only form sheet metal parts with single curvature, and CNC incremental forming takes too long, making it difficult to efficiently form sheet metal parts with double curvature.
By employing a stretching-progressive composite forming equipment, which combines a horizontal stretching cylinder, a vertical stretching cylinder, a six-axis industrial robot, and a flexible array mold, the double curvature forming of sheet metal parts is achieved through a combination of stretching and progressive forming. The reconfigurable characteristics of the flexible array mold are used to replace the solid mold.
It enables rapid prototyping of double-curvature sheet metal parts, shortens the processing cycle, improves forming accuracy, reduces costs, and is suitable for small-batch, multi-specification production.
Smart Images

Figure CN224950795U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of sheet metal forming technology; in particular, it relates to a stretching-progressive composite forming device for sheet metal parts. Background Technology
[0002] Sheet metal forming commonly employs two methods: stamping and stretching. Stamping is a process that requires die design and manufacturing. The initial preparation and investment for stamping are substantial, making it suitable for mass production. However, for small-batch, multi-specification parts, the cost is quite high. Stretching, on the other hand, uses a stretching machine to pull and wrap the sheet metal around the die, ensuring it fits perfectly to achieve the final part shape. However, stretching can only form single-curvature sheet metal parts that bend in one direction.
[0003] Another newer technology is CNC progressive forming. On a CNC progressive forming machine, the forming tool head extrudes the sheet metal layer by layer according to CNC forming codes, achieving the desired shape through the continuous "accumulation" of localized deformation. However, because it is a step-by-step forming process, the single forming time is too long for large sheet metal parts.
[0004] Based on the shortcomings of the existing technology, there is an urgent need for a stretching-progressive composite forming equipment and method for sheet metal parts. Utility Model Content
[0005] The purpose of this invention is to provide a stretching-progressive composite forming device for sheet metal parts.
[0006] This utility model is achieved through the following technical solution:
[0007] This utility model relates to a sheet metal stretching-progressive composite forming equipment, including a base 1, a horizontal stretching cylinder 2, a vertical stretching cylinder 3, a clamp, a six-axis industrial robot 5, a flexible array mold 6, a distance detection sensor 7, and a tool head 8.
[0008] The horizontal tension cylinder 2 and the vertical tension cylinder 3 are both mounted on the base 1 and are connected by a clamp hinge.
[0009] The six-axis industrial robot 5 is mounted on the base 1 and is located close to the flexible array mold 6;
[0010] The tool head 8 is positioned directly above the sheet metal part 9 when it is in operation;
[0011] The distance detection sensor 7 is mounted on the six-axis industrial robot 5 and is located directly above the tool head 8.
[0012] Preferably, the clamps include a left clamp 4 and a right clamp 10; wherein the left clamp 4 and the right clamp 10 respectively clamp the left and right ends of the sheet metal part 9, and stretch the sheet metal part 9 under the drive of the stretching cylinder assembly.
[0013] Preferably, there are two sets of horizontal tension cylinders 2 and vertical tension cylinders 3; one set consists of one horizontal tension cylinder 2 and one vertical tension cylinder 3 connected by a left clamp 4 and is located on one side of the flexible array mold 6; the other set consists of one horizontal tension cylinder 2 and one vertical tension cylinder 3 connected by a right clamp 10 and is located on the other side of the flexible array mold 6; the left clamp 4 and the right clamp 10 are connected by sheet metal parts 9.
[0014] Preferably, the flexible array mold 6 is located in the middle of the base 1 and directly below the sheet metal part 9.
[0015] Preferably, the flexible array mold 6 is composed of 40×40 vertically arranged lead screws.
[0016] Preferably, each lead screw is instructed by the control system to perform independent lifting and lowering movements.
[0017] The present invention relates to a sheet metal forming method for preparing sheet metal parts using a stretching-progressive composite forming equipment, comprising the following steps:
[0018] Step 1: Unify the coordinate systems of the horizontal stretching cylinder 2, the vertical stretching cylinder 3, the six-axis industrial robot 5, and the flexible array mold 6 in the control system; wherein, each lead screw in the flexible array mold 6 rises and falls independently under the command of the control system to form a discrete mold shape.
[0019] Step 2: Under the action of the horizontal stretching cylinder 2 and the vertical stretching cylinder 3, the sheet metal part 9 to be formed is stretched flat to the initial processing position;
[0020] Step 3: The sheet metal part 9 is stretched and wrapped diagonally downward by the horizontal stretching cylinders 2 and vertical stretching cylinders 3 on both sides of the flexible array mold 6, so that the sheet metal is completely attached to the flexible array mold 6; then the stretching continues, so that the sheet metal part 9 undergoes plastic deformation, and the stretching pre-forming of the sheet metal part 9 is completed.
[0021] Step 3: The six-axis industrial robot 5 drives its end tool head 8 to extrude the sheet metal part 9 layer by layer according to the designed shape in the recessed part of the sheet metal part 9, and finally accumulates to form the part of the required shape.
[0022] Step 4: The six-axis industrial robot 5 drives the distance detection sensor 7 to scan the surface of the part with the required shape obtained in step 3, calculates the forming error, and then performs progressive forming on the part that exceeds the error range, finally completing the sheet material that meets the accuracy requirements.
[0023] This utility model has the following advantages:
[0024] (1) The equipment involved in this utility model is based on the principle of combining stretch forming and progressive forming to realize the one-time clamping and forming of double curvature sheet metal parts; the processing cycle of the equipment is greatly shortened, the forming accuracy is high, the quality is good and the cost is low, and it is very suitable for forming and processing double curvature sheet metal parts with many specifications and small batches.
[0025] (2) The flexible array mold added in this utility model replaces the solid mold with a discrete screw group. The reconfigurable characteristics of the flexible array mold are used to realize the forming of various shapes of plates, which greatly saves mold design and manufacturing costs and time. Attached Figure Description
[0026] Figure 1 This is a schematic diagram of the structure of this utility model;
[0027] Figure 2 This is a schematic diagram of the initial stretching and covering of the sheet metal part according to the present invention;
[0028] Figure 3 This is a schematic diagram of a partial progressive forming process of this utility model;
[0029] Figure 4 This is a schematic diagram of the flexible array mold.
[0030] Attached figures: 1-Base, 2-Horizontal tension cylinder, 3-Vertical tension cylinder, 4-Left clamp, 5-Six-axis industrial robot, 6-Flexible array mold, 7-Distance detection sensor, 8-Tool head, 9-Sheet metal part, 10-Right clamp. Detailed Implementation
[0031] The present invention will now be described in detail with reference to specific embodiments. It should be noted that the following embodiments are merely further illustrations of the present invention, but the scope of protection of the present invention is not limited to the following embodiments.
[0032] Example
[0033] The sheet metal stretching-progressive composite forming equipment of this embodiment includes a base 1, a horizontal stretching cylinder 2, a vertical stretching cylinder 3, a clamp, a six-axis industrial robot 5, a flexible array mold 6, a distance detection sensor 7, and a tool head 8.
[0034] The horizontal tension cylinder 2 and the vertical tension cylinder 3 are both mounted on the base 1 and are connected by a clamp hinge.
[0035] The six-axis industrial robot 5 is mounted on the base 1 and is located close to the flexible array mold 6;
[0036] The tool head 8 is positioned directly above the sheet metal part 9 when it is in operation;
[0037] The distance detection sensor 7 is mounted on the six-axis industrial robot 5 and is located directly above the tool head 8.
[0038] Furthermore, the clamps include a left clamp 4 and a right clamp 10; wherein the left clamp 4 and the right clamp 10 respectively clamp the left and right ends of the sheet metal part 9, and stretch the sheet metal part 9 under the drive of the stretching cylinder assembly.
[0039] Furthermore, there are two sets of horizontal stretching cylinders 2 and vertical stretching cylinders 3; one set consists of one horizontal stretching cylinder 2 and one vertical stretching cylinder 3 connected by a left clamp 4 and is located on one side of the flexible array mold 6; the other set consists of one horizontal stretching cylinder 2 and one vertical stretching cylinder 3 connected by a right clamp 10 and is located on the other side of the flexible array mold 6; the left clamp 4 and the right clamp 10 are connected by sheet metal parts 9.
[0040] Furthermore, the flexible array mold 6 is located in the middle of the base 1 and directly below the sheet metal part 9.
[0041] Furthermore, the flexible array mold 6 is composed of 40×40 vertically arranged lead screws, see... Figure 4 As shown.
[0042] Furthermore, each lead screw is instructed by the control system to perform independent lifting and lowering movements.
[0043] This embodiment also relates to a forming method for preparing sheet metal parts using the aforementioned sheet metal stretching-progressive composite forming equipment, including the following steps:
[0044] Step 1: Unify the coordinate systems of the horizontal stretching cylinder 2, the vertical stretching cylinder 3, the six-axis industrial robot 5, and the flexible array mold 6 in the control system; wherein, each lead screw in the flexible array mold 6 rises and falls independently under the command of the control system to form a discrete mold shape.
[0045] Step 2: Under the action of the horizontal stretching cylinder 2 and the vertical stretching cylinder 3, the sheet metal part 9 to be formed is stretched flat to the initial processing position, such as... Figure 1 As shown;
[0046] Step 3: The horizontal stretching cylinders 2 and vertical stretching cylinders 3 on both sides of the flexible array mold 6 stretch and wrap the sheet metal part 9 diagonally downwards, so that the sheet metal is completely attached to the flexible array mold 6; then the stretching continues, causing the sheet metal part 9 to undergo plastic deformation, completing the stretching pre-forming of the sheet metal part 9, such as... Figure 2 As shown;
[0047] Step 3: The six-axis industrial robot 5 drives its end-mounted tool head 8 to extrude the sheet metal part 9 layer by layer according to the designed shape in the recessed area, finally accumulating to form the initial shape of the desired part, such as... Figure 3 As shown;
[0048] Step 4: The six-axis industrial robot 5 drives the distance detection sensor 7 to scan the surface of the part with the required shape obtained in step 3, calculates the forming error, and then performs progressive forming on the part that exceeds the error range, finally completing the sheet material that meets the accuracy requirements.
[0049] The equipment involved in this invention achieves one-time clamping and forming of double-curvature sheet metal parts through a design principle combining stretch forming and progressive forming. This equipment has the following advantages: significantly shortened processing cycle, high forming accuracy, good quality, and low cost, making it very suitable for forming double-curvature sheet metal parts with many specifications and small batches. The flexible array mold added in this invention replaces the solid mold with a discrete screw assembly, utilizing the reconfigurable characteristics of the flexible array mold to achieve the forming of various shaped sheet metals, greatly saving mold design and manufacturing costs and time.
[0050] The specific embodiments of this utility model have been described above. It should be understood that this utility model is not limited to the specific embodiments described above, and those skilled in the art can make various modifications or variations within the scope of the claims, which do not affect the essence of this utility model.
Claims
1. A stretching-progressive composite forming device for sheet metal parts, characterized in that, Includes base (1), horizontal tension cylinder (2), vertical tension cylinder (3), clamp, six-axis industrial robot (5), flexible array mold (6), distance detection sensor (7), tool head (8); The horizontal tension cylinder (2) and the vertical tension cylinder (3) are both mounted on the base (1) and are connected by a clamp hinge. The six-axis industrial robot (5) is mounted on the base (1) and is located close to the flexible array mold (6); The tool head (8) is positioned directly above the sheet metal part (9) when it is in operation; The distance detection sensor (7) is mounted on the six-axis industrial robot (5) and is located directly above the tool head (8).
2. The sheet metal stretching-progressive composite forming equipment as described in claim 1, characterized in that, The clamps include a left clamp (4) and a right clamp (10); wherein the left clamp (4) and the right clamp (10) clamp the left and right ends of the sheet metal part (9) respectively, and stretch the sheet metal part (9) under the drive of the stretching cylinder group.
3. The sheet metal stretching-progressive composite forming equipment as described in claim 1, characterized in that, The horizontal stretching cylinder (2) and the vertical stretching cylinder (3) are both in two sets; one set consists of one horizontal stretching cylinder (2) and one vertical stretching cylinder (3) connected by a left clamp (4) and is located on one side of the flexible array mold (6); the other set consists of one horizontal stretching cylinder (2) and one vertical stretching cylinder (3) connected by a right clamp (10) and is located on the other side of the flexible array mold (6); the left clamp (4) and the right clamp (10) are connected by sheet metal parts (9).
4. The sheet metal stretching-progressive composite forming equipment as described in claim 1, characterized in that, The flexible array mold (6) is located in the middle of the base (1) and directly below the sheet metal part (9).
5. The sheet metal stretching-progressive composite forming equipment as described in claim 1, characterized in that, The flexible array mold (6) consists of 40×40 vertically arranged lead screws.
6. The sheet metal stretching-progressive composite forming equipment as described in claim 5, characterized in that, Each lead screw is controlled by the control system to perform independent lifting and lowering movements.