A support structure for a cut and fill mine

By combining anchor bolt support structures with polyurethane foam filling layers, the mechanization and safety issues of traditional down-entry mining methods in thin, steeply inclined, and fractured ore bodies have been solved, achieving efficient and low-cost resource recovery, breaking through the time bottleneck of traditional processes, and expanding the range of mineable resources.

CN224955750UActive Publication Date: 2026-11-10HUNAN RES INST FOR NONFERROUS METALS CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202522676485.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-17
Publication Date
2026-11-10
Estimated Expiration
2035-12-17

AI Technical Summary

Technical Problem

Traditional down-entry backfilling mining methods have problems such as the contradiction between mechanization and safety in thin, steeply inclined, and fractured ore bodies, high cost of false roof construction, long operation cycles, and poor adaptability to complex ore bodies. Moreover, the existing technology has a high ore dilution rate when applied to thin ore bodies.

Method used

An anchor bolt support structure combined with a polyurethane foam filling layer is used to form a lightweight temporary false roof and a highly efficient disaster isolation layer, providing a safe space for mechanized operations, and achieving efficient resource recovery through drilling and blasting.

Benefits of technology

It has enabled safe mechanized mining in thin, steeply inclined, and fractured ore bodies, improved resource recovery rate, reduced operating time costs, and expanded the range of recoverable resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224955750U_ABST
    Figure CN224955750U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of downward filling support structure, including the anchor rod support structure of being arranged in the upper surface of ore body access roof and side part, the polyurethane foam filling layer is filled in the lower side space of ore body access roof, the lower side space of polyurethane foam filling layer is operation space, the lower side of the operation space is blasting layer;The anchor rod support structure includes the reinforcement net in bottom layer, the upper surface of the reinforcement net is equipped with shotcrete layer, multiple anchor ropes and anchor rods are vertically fixed in the shotcrete layer;The blasting layer includes multiple drill holes opened in bottom surface.The utility model solves the industry problem that mechanical equipment cannot be safely and efficiently used in the "thin, steeply inclined, broken" complex and difficult-to-mine ore body, so as to fundamentally improve mining efficiency, operation safety and economy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of mining, and in particular to a downward filling support structure. Background Technology

[0002] The traditional down-entry backfilling mining method relies on layered mining under the protection of an artificial false roof. Specifically, the first entry is excavated within the ore block. After mining, reinforcing steel is laid at the bottom of this entry, a truss is erected, and high-strength concrete is poured to form an artificial false roof. Once the false roof has cured to sufficient strength, the next layer of entry is mined below it, and this process is repeated. However, this traditional method reveals the following systemic problems that urgently need to be addressed when dealing with thin, steeply dipping, and fractured ore bodies: 1. A prominent conflict between mechanization and safety: Traditional downward approach routes, designed to meet the requirements of false roof construction and control the exposed area of ​​the roof, typically have small cross-sections and require frequent turns, making it impossible to effectively utilize large, efficient mining equipment. Production heavily relies on manual labor, which is not only labor-intensive but also inefficient.

[0003] 2. The construction cost of the false roof is high and the operation cycle is lengthy: Each layer requires the construction of a reinforced concrete false roof, which consumes a large amount of steel and cement, resulting in huge material costs. At the same time, the processes of rebar tying, formwork support, concrete pouring and curing are cumbersome and time-consuming, resulting in an excessively high proportion of non-mining operation time, which seriously restricts the mine's production capacity and economic benefits.

[0004] 3. Poor adaptability to complex ore bodies: In thin, small, and fractured ore bodies, regular access routes are extremely difficult to arrange, resulting in low resource recovery rates. Furthermore, the artificial false roof has poor synergistic deformation capacity with the fractured surrounding rock, easily leading to stress concentration and potential safety hazards.

[0005] Chinese patent CN 113202473B proposes a downward mining method for fractured rock. However, this method has at least the following drawbacks: the "medium-deep hole ore extraction" technology has a limited scope of application, only applicable to medium-thick to thick large ore bodies, and its application in thin small ore bodies leads to a significant increase in ore dilution rate. Summary of the Invention

[0006] This utility model aims to provide a downward filling support structure that can systematically solve the problem of safe mechanized mining in "thin, steeply inclined, and broken" ore bodies.

[0007] To achieve the above objectives, the technical solution adopted by this utility model is as follows: A downward filling support structure includes an anchor bolt support structure installed on the upper surface of the ore body access roof and sidewall. The space below the ore body access roof is filled with a polyurethane foam filling layer. The space below the polyurethane foam filling layer is a working space. The space below the working space is a blasting layer. The anchor support structure includes a steel mesh at the bottom layer, a shotcrete layer on the upper surface of the steel mesh, and multiple anchor cables and anchor bolts vertically fixed in the shotcrete layer; The blasting layer includes multiple drill holes drilled in the bottom surface.

[0008] The space beneath the roof of the ore body access road described in this invention is filled with a polyurethane foam filling layer to ensure safety. This polyurethane foam filling layer serves a dual purpose: firstly, as a lightweight, structural temporary false roof, its strength is sufficient to prevent small pieces of rock from falling from the roof, ensuring the safety of personnel and equipment below; secondly, as a highly efficient disaster isolation layer, its dense foam structure effectively isolates the surrounding rock in the goaf from contact with air and moisture, preventing the surrounding rock from softening and weathering due to water contact, thus maintaining the long-term stability of the mining area. This temporary filling requires no curing and can be used immediately after filling, providing immediate safety assurance for the next cycle of operations.

[0009] The anchor support structure forms a robust active load-bearing structure, providing an initial safety space for all subsequent mechanized operations.

[0010] In one preferred embodiment, 3 to 5 boreholes are arranged in each row, the row spacing between each row of boreholes is 0.6 to 1 meter, and the spacing between adjacent boreholes is 0.6 to 1 meter.

[0011] In one preferred embodiment, the drilling depth is 1 to 2 meters.

[0012] In one preferred embodiment, the angle between the borehole and the ground is 70-80°.

[0013] In one preferred embodiment, the angle between the borehole and the ground is 75-80°.

[0014] In one preferred embodiment, the polyurethane foam filling layer comprises multiple layers.

[0015] In one preferred embodiment, the thickness of each polyurethane foam filling layer is 2.5 to 3.2 meters.

[0016] In one preferred embodiment, the thickness of the sprayed layer is not less than 100 mm.

[0017] In one preferred embodiment, multiple anchor cables and anchor rods are fixed to the top plate of the ore body access road, and are spaced apart from each other.

[0018] In one preferred embodiment, the ore body access ramp is secured with a plurality of said anchor bolts.

[0019] Compared with the prior art, the beneficial effects of this utility model are: Compared with the prior art, the advantages of this utility model are that it systematically integrates: anchor support structure, temporary filling and disaster isolation module of polyurethane foam filling layer, working space, and trench-type high-efficiency blasting layer.

[0020] (1) "Anchor support structure" is the foundation: it provides an initial and safe space for all subsequent mechanized operations. Without this stable starting point, subsequent mechanized equipment cannot enter safely and operate efficiently.

[0021] (2) The “polyurethane foam filling layer” is the key link between the previous and subsequent steps: the reason why polyurethane foam filling can effectively replace the traditional false roof is precisely because of the safety space and high efficiency created by the aforementioned mechanized operation. Conversely, the safety roof plate it generates immediately provides the preconditions for the next cycle of “active support” operation, thereby breaking the bottleneck of “waiting for false roof curing” in the traditional process and making continuous cycle possible.

[0022] (3) The entire system achieves ultimate optimization of "time cost": by eliminating the curing period with temporary filling, the biggest time bottleneck in the entire cycle is eliminated. This systematic acceleration brings about a leap in the work cycle from several weeks to several days, which cannot be achieved by a single technological improvement.

[0023] (4) This efficient and low-cost downward filling support structure makes it possible to mine previously uneconomical "thin, small, steeply inclined and broken" ore bodies, greatly expanding the range of mineable resources. Attached Figure Description

[0024] Figure 1 A schematic diagram of the mechanized downward filling mining method provided by this utility model.

[0025] Figure 2 This is a schematic diagram of the active combined support system of this utility model.

[0026] Among them, 21-anchor cable, 22-shotcrete layer, 23-anchor rod, 24-polyurethane foam filling layer, 25-drill hole, 26-bottom surface, 27-working space. Detailed Implementation

[0027] The present invention will be described in detail below with reference to the accompanying drawings and embodiments. It should be noted that, unless otherwise specified, the embodiments and features described in the embodiments of the present invention can be combined with each other. For ease of description, the terms "upper," "lower," "left," and "right" appearing below only indicate that they correspond to the upper, lower, left, and right directions in the accompanying drawings and do not limit the structure.

[0028] like Figure 1-2 As shown, a downward filling support structure includes an anchor bolt support structure installed on the upper surface of the ore body access roof and sidewall. The space below the ore body access roof is filled with a polyurethane foam filling layer 24. The space below the polyurethane foam filling layer 24 is a working space 27, and the space below the working space 27 is a blasting layer. The anchor bolt support structure includes a steel mesh at the bottom layer. A shotcrete layer 22 is provided on the upper surface of the steel mesh. Multiple anchor cables 21 and anchor bolts 23 are vertically fixed in the shotcrete layer 22. The blasting layer includes multiple drill holes 25 drilled in the bottom surface 26. There are 3 to 5 drill holes 25 arranged in each row, with a row spacing of 0.6 to 1 meter and a spacing of 0.6 to 1 meter between adjacent drill holes 25. The depth of each drill hole 25 is 1 to 2 meters. The angle between each drill hole 25 and the ground is 70 to 80°. The polyurethane foam filling layer 24 comprises multiple layers. The thickness of each polyurethane foam filling layer 24 is 2.5 to 3.2 meters. The thickness of the shotcrete layer 22 is not less than 100 mm. Multiple anchor cables 21 and anchor rods 23 are fixed on the top plate of the ore body access road, and are arranged at intervals. Multiple anchor rods 23 are fixed on the side wall of the ore body access road.

Claims

1. A downward filling support structure, characterized by It includes an anchor bolt support structure installed on the top plate and upper surface of the ore body access road. The space under the top plate of the ore body access road is filled with a polyurethane foam filling layer (24). The space under the polyurethane foam filling layer (24) is a working space (27). The space under the working space (27) is a blasting layer. The anchor support structure includes a steel mesh at the bottom layer, and a shotcrete layer (22) is provided on the upper surface of the steel mesh. Multiple anchor cables (21) and anchor rods (23) are vertically fixed in the shotcrete layer (22). The blasting layer includes a plurality of boreholes (25) drilled in the bottom surface (26).

2. A blind fill support structure according to claim 1, characterised in that, The drill holes (25) are arranged in rows of 3 to 5, with a row spacing of 0.6 to 1 meter between each row of drill holes (25) and a spacing of 0.6 to 1 meter between adjacent drill holes (25).

3. The undercut support structure of claim 1, wherein, The depth of the borehole (25) is 1 to 2 meters.

4. The undercut support structure of claim 1, wherein, The angle between the borehole (25) and the ground is 70~80°.

5. The undercut support structure of claim 1, wherein, The angle between the borehole (25) and the ground is 75~80°.

6. The undercut support structure of claim 1, wherein, The polyurethane foam filling layer (24) comprises multiple layers.

7. A blind support structure according to claim 5, wherein The thickness of each polyurethane foam filling layer (24) is 2.5 to 3.2 meters.

8. A blind fill support structure according to any one of claims 1 to 7, wherein, The thickness of the sprayed layer (22) is not less than 100 mm.

9. A blind support structure according to any one of claims 1-7, characterized in that Multiple anchor cables (21) and anchor rods (23) are fixed on the top plate of the ore body access road, and are set at intervals.

10. A blind fill support structure according to any one of claims 1 to 7, wherein The ore body access slope is fixed with multiple anchor bolts (23).

Citation Information

Patent Citations

  • A method for downward mining of fractured rock in underground mines

    CN113202473B