A multi-channel guide wheel pre-volatilization sintering furnace device

By setting multiple guide wheels and fixing devices inside the sintering furnace, the cable can be wound multiple times, solving the problem of excessive furnace height and improving production efficiency and stability.

CN224957149UActive Publication Date: 2026-11-10SHANGHAI KECHEN WIRE & CABLE MACHINERY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522285103.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-10-29
Publication Date
2026-11-10
Estimated Expiration
2035-10-29

AI Technical Summary

Technical Problem

Traditional sintering furnaces are tall and occupy a large area, making them difficult to arrange effectively in factory workshops and limiting their production efficiency.

Method used

Design a multi-track guide wheel pre-volatilization sintering furnace device, including a winding guide wheel group and an inlet and outlet guide wheel combination. The cable is wound multiple times by winding the guide wheels in the cavity. The winding track position is fixed by a fixing device to avoid swaying and ensure operational stability.

Benefits of technology

Without increasing the height of the sintering furnace, the sintering length of the cable inside the furnace is extended, improving production efficiency, reducing dependence on the height of the plant, and ensuring stable operation of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224957149U_ABST
    Figure CN224957149U_ABST
Patent Text Reader

Abstract

This utility model relates to a multi-stage guide wheel pre-volatilization sintering furnace device, comprising a sintering and volatilization furnace body, a winding guide wheel assembly, and an inlet / outlet guide wheel assembly. The sintering and volatilization furnace body includes a cavity for sintering cables, an inlet and an outlet for cables entering and exiting the cavity, and an operating window for winding operations within the cavity. An insulating door is used to open or close the operating window. The winding guide wheel assembly includes multiple winding guide wheels disposed within the cavity for winding cables, with the rotation planes of the multiple winding guide wheels coplanar. The inlet / outlet guide wheel assembly includes an inlet guide wheel assembly disposed outside the sintering and volatilization furnace body near the inlet, and an outlet guide wheel assembly disposed outside the sintering and volatilization furnace body near the outlet. The inlet guide wheel assembly guides the cable into the cavity, and the outlet guide wheel assembly guides the cable exiting the cavity. This utility model can extend the sintering time of the cable during the volatilization stage without increasing the furnace body height.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of sintering furnaces, and in particular to a multi-channel guide wheel pre-volatilization sintering furnace device. Background Technology

[0002] In the high-temperature extrusion production line for fluoroplastic insulated cables, the sintering furnace is a core component, undertaking the crucial task of sintering and shaping the extruded cables. The furnace's inner cavity is typically constructed of stainless steel, while the outer wall is made of ordinary thin steel plates. The furnace walls are filled with highly insulating aluminum silicate fibers to ensure stable internal temperatures. The sintering furnace employs a segmented, precise temperature control strategy, dividing the process into volatilization, heating, sintering, and cooling sections to meet the needs of different process stages.

[0003] Sintering furnaces typically employ a linear design, where cables sequentially pass through a channel composed of multiple cylindrical furnace chambers to complete the high-temperature sintering process. As a result, the sintering furnace is the longest and largest component in the entire production line. Considering that the cables might touch the furnace walls due to their own weight while traveling through the long furnace chamber, sintering furnaces are usually arranged vertically. Specifically, it consists of two parts: an ascending furnace section where the cable travels upwards from the extruder outlet to the highest volatilization stage; and a descending furnace section where the cable turns back from the highest point and travels downwards to the lowest cooling stage.

[0004] During the sintering process, the volatilization process takes a relatively long time. To ensure the sintering time of the cable while improving production efficiency, the total length of the equipment needs to be set to be quite long, sometimes reaching tens of meters, to meet the process requirements. However, factory workshops usually have limited height, making it difficult to accommodate taller equipment. Utility Model Content

[0005] One objective of this invention is to solve the problem of the high height of traditional sintering and volatilization furnaces.

[0006] Specifically, this application provides a multi-channel guide wheel pre-volatilization sintering furnace apparatus, comprising: The sintering and volatilization furnace body is provided with a cavity for sintering cables. The sintering and volatilization furnace body is also provided with an inlet for the cable to enter the cavity and an outlet for the cable to exit the cavity, as well as an operation window for winding operations in the cavity. The insulation door is used to open or close the operation window. A winding guide wheel assembly includes multiple winding guide wheels disposed within the cavity for winding the cable, wherein the rotation planes of the multiple winding guide wheels are coplanar; and The cable guide assembly includes an inlet guide assembly disposed outside the sintering and volatilization furnace body and near the inlet, and an outlet guide assembly disposed outside the sintering and volatilization furnace body and near the outlet. The inlet guide assembly is used to guide the cable into the cavity, and the outlet guide assembly is used to guide the cable exiting the cavity.

[0007] Furthermore, on the periphery of each of the winding guide wheels, in a direction perpendicular to the rotation plane of the winding guide wheel, a plurality of winding tracks for winding the cable are arranged in parallel in sequence.

[0008] Furthermore, the inlet guide wheel assembly corresponds to any one of the winding tracks of the winding guide wheel near the inlet, and is used to wind the cable on any one of the winding tracks.

[0009] Furthermore, the feed guide wheel assembly includes a fixed frame, a swing frame movably connected to the fixed frame and corresponding to any winding track, and a feed guide wheel connected to the swing frame for winding the cable.

[0010] Furthermore, a fixing device is provided between the fixed frame and the swing frame to fix the relative position of the swing frame and the fixed frame.

[0011] Furthermore, the fixed frame is an L-shaped corner plate, the swing frame is a straight plate, the straight plate is mounted between the two side plates of the L-shaped corner plate, and one end of the straight plate is movably connected to one of the side plates.

[0012] Furthermore, the fixing device comprises a gear plate with a gear slot, a first fixing member, and a second fixing member. One end of the gear plate is movably connected to the fixing frame and can swing horizontally within a preset angle range. The first fixing member is used to fix the angle between the gear plate and the fixing frame. The second fixing member is used to fix the swing frame to the gear plate when the inlet guide wheel corresponds to the winding track of the winding guide wheel near the inlet.

[0013] Furthermore, it also includes a base, the sintering and volatilization furnace body is mounted above the base, and a guide wheel seat for driving the winding guide wheel to rotate is mounted outside the sintering and volatilization furnace body. The guide wheel seat is connected to the winding guide wheel through a rotating shaft.

[0014] Furthermore, the number of the winding guide wheels is two.

[0015] Furthermore, the inlet and outlet are respectively located above and below the sintering volatilization furnace body and correspond to each other, and the inlet guide wheel assembly and the outlet guide wheel assembly are respectively located above and below the sintering volatilization furnace body and correspond to each other.

[0016] The beneficial effects of this utility model are: 1. The multi-guide wheel pre-volatilization sintering furnace device of this utility model achieves simultaneous sintering of long cables in the sintering furnace without increasing the height of the sintering furnace by winding guide wheels in the cavity, extending the length of the cable in the volatilization section, reducing the dependence on the height of the plant and improving the sintering efficiency.

[0017] 2. By setting a fixing device to fix the relative position of the swing frame and the winding track, the position of the swing frame relative to the winding track is prevented from changing during the cable travel, thus ensuring the stability of the sintering furnace device of this utility model during operation. Attached Figure Description

[0018] Figure 1 This is a front view of a multi-channel guide wheel pre-volatilization sintering furnace apparatus according to an embodiment of the present invention; Figure 2 This is a top view of a multi-channel guide wheel pre-volatilization sintering furnace apparatus according to an embodiment of the present invention.

[0019] In the picture: Multi-channel guide wheel pre-volatilization sintering furnace device-100; Sintering and volatilization furnace body-1; Cavity-2; Inlet-3; Outlet-4; Insulation door-5; Winding guide wheel-6; Cable-7; Winding track-8; Fixing frame-9; Swing frame-10; Inlet guide wheel-11; Outlet guide wheel-12; Hinge-13; Gear slot-14; Gear plate-15; First fixing component-16; Second fixing component-17; Guide wheel seat-18; Rotating shaft-19; Base-20 Detailed Implementation

[0020] To make the above-mentioned objectives, features, and advantages of this application more apparent and understandable, the specific embodiments of this application will be described in detail below with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are for illustrative purposes only and are not intended to limit the scope of this application. Furthermore, it should be noted that, for ease of description, only the parts relevant to this application are shown in the accompanying drawings, not the entire structure. Based on the embodiments in this application, all other embodiments obtained by those skilled in the art without inventive effort are within the scope of protection of this application.

[0021] The terms “comprising” and “having”, and any variations thereof, used in this application are intended to cover non-exclusive inclusion. For example, a process, method, system, product, or apparatus that includes a series of steps or units is not limited to the steps or units listed, but may optionally include steps or units not listed, or may optionally include other steps or units inherent to such process, method, product, or apparatus.

[0022] like Figure 1As shown, the multi-channel guide wheel pre-volatilization sintering furnace device 100 of this utility model includes a sintering and volatilization furnace body 1, a winding guide wheel assembly, and an inlet and outlet guide wheel combination. The sintering and volatilization furnace body 1 is provided with a cavity 2 for sintering cables 7. The sintering and volatilization furnace body 1 is also provided with an inlet 3 for introducing the cables 7 into the cavity 2, an outlet 4 for the cables 7 to exit the cavity 2 after sintering, and an operation window for winding operations within the cavity 2. A door insulation 5 is used to open or close the operation window. The winding guide wheel assembly includes multiple winding guide wheels 6 (…) disposed within the cavity 2 for winding the cables 7. Figure 1 (The direction of the middle arrow indicates the winding direction of the cable). The rotation planes of the multiple winding guide wheels 6 are coplanar. The inlet and outlet guide wheel assembly includes an inlet guide wheel assembly located outside the sintering and volatilization furnace body 1 near the inlet 3, and an outlet guide wheel assembly located outside the sintering and volatilization furnace body 1 near the outlet 4. The inlet guide wheel assembly is used to guide the cable 7 into the cavity 2, and the outlet guide wheel assembly is used to guide the cable 7 exiting the cavity 2.

[0023] The multi-channel guide wheel pre-volatilization sintering furnace device 100 of this utility model can be placed between the rising furnace section and the falling furnace section of an existing linear sintering furnace to extend the length of the volatilization section. In specific operation, the operator first winds the cable 7 from the rising furnace section onto the inlet guide wheel 11. The cable 7 enters the cavity 2 through the inlet port 3 of the sintering volatilization furnace body 1. The insulation door 5 is opened, and the operator winds the cable 7 onto the winding guide wheel 6 inside the cavity 2 through the operating port (e.g., ...). Figure 1 As shown in the diagram, after winding, the cable 7 passes through the outlet 4 and exits the cavity 2, then is wound onto the outlet guide wheel 12. The cable 7 is guided into the descending furnace section through the outlet guide wheel 12. The multi-guide wheel pre-volatilization sintering furnace device 100 of this utility model achieves simultaneous sintering of a relatively long cable 7 in the sintering furnace without increasing the height of the sintering furnace by winding the guide wheel 6 inside the cavity 2, extending the length of the cable 7 in the volatilization section, reducing dependence on the height of the plant, and improving sintering efficiency.

[0024] To further extend the time of cable 7 during the evaporation phase, in one embodiment, such as Figure 2 As shown, in the multi-guide wheel pre-volatilization sintering furnace device 100 of this utility model, each winding guide wheel 6 includes multiple winding tracks 8 for winding cables 7. The number of winding tracks 8 can be selected according to actual conditions. By setting multiple winding tracks 8 on the winding guide wheel 6, multiple windings on the same guide wheel can be achieved. When the cable 7 in the volatilization stage is long, multiple winding guide wheels 6 are often required to wind the cable 7, which may also result in a taller furnace body. By setting multiple winding tracks 8 on each winding guide wheel 6, the effect of extending the length of the cable 7 in the volatilization stage can be achieved without increasing the number of winding guide wheels 6.

[0025] Furthermore, the inlet guide wheel assembly corresponds to any one of the winding tracks 8 of the winding guide wheel 6 near the inlet 3, and is used to wind the cable 7 onto any one of the winding tracks 8. In one embodiment, the multi-track guide wheel pre-volatilization sintering furnace device 100 includes an inlet guide wheel assembly comprising a fixed frame 9, a swing frame 10 movably connected to the fixed frame 9 and capable of corresponding to any winding track 8, and an inlet guide wheel connected to the swing frame 10 for winding the cable 7. By adjusting the relative position of the swing frame 10 and the winding guide wheel 6, the inlet guide wheel 11 is aligned with a specific winding track 8. Figure 2 As shown, when the cable 7 is wound on the winding track 8 close to the guide wheel seat 18, the length of the cable 7 in the evaporation section is the longest; when the cable 7 is wound on the winding track 8 far away from the guide wheel seat 18, the length of the cable 7 in the evaporation section is the shortest.

[0026] Regarding the structural form of the infeed guide wheel 11, in one embodiment, such as Figure 2 As shown, the fixed frame 9 is an L-shaped corner plate, and the swing frame 10 is a straight plate. The straight plate is mounted between the two side plates of the L-shaped corner plate. One end of the straight plate is movably connected to one side plate via a hinge 13, allowing the swing frame 10 to swing horizontally. By adjusting the relative position of the swing frame 10 and the winding track 8, the wire guide wheel 11 on the swing frame 10 is aligned with the specific winding track 8, so that the cable 7 is wound on the winding track. Figure 2 As shown, a fixing device is provided between the fixed frame 9 and the swing frame 10 to fix the relative position of the swing frame 10 and the fixed frame 9. In this embodiment, the fixing device is a stop plate 15 with a stop groove 14, a first fixing member 16 and a second fixing member 17. One end of the stop plate 15 is movably connected to the fixed frame 9 through a hinge 13 and can swing horizontally within a preset angle range. The first fixing member 16 is used to fix the angle between the stop plate 15 and the fixed frame 9. The second fixing member 17 is used to fix the swing member and the stop plate 15 when the inlet guide wheel 11 corresponds to the winding guide rail of the winding guide wheel 6 near the inlet 3.

[0027] In another embodiment, the fixing frame 9 is a rod perpendicular to the rotation plane of the winding guide wheel 6, and the swing frame 10 is provided with a through hole. By passing the rod through the through hole, the swing frame 10 is slidably connected to the fixing frame 9. By adjusting the relative position of the swing frame 10 on the rod, the infeed guide wheel 11 is aligned with the winding track 8. Furthermore, the fixing device is a clamp located on both sides of the infeed guide wheel 11 along the length of the rod. The clamp clamps the rod and fix the relative position of the swing frame 10 on the rod.

[0028] By setting a fixing device to fix the relative position of the swing frame 10 and the winding track 8, the position of the swing frame 10 relative to the winding track 8 is prevented from changing during the movement of the cable 7, thus ensuring the stability of the sintering furnace device of this utility model during operation.

[0029] Regarding the number of winding guide wheels 6, in one embodiment, the number of winding guide wheels 6 is two. In other embodiments, the number of winding guide wheels 6 and the number of winding tracks 8 on each winding guide wheel 6 can be adjusted according to actual needs.

[0030] like Figure 1 As shown, the inlet 3 and outlet 4 are respectively located above and below the sintering volatilization furnace body 1 and correspond to each other. The inlet guide wheel assembly and the outlet guide wheel assembly are respectively located above and below the sintering volatilization furnace body 1 and correspond to each other.

[0031] In this document, the term "embodiment" means that a particular feature, structure, or characteristic described in connection with an embodiment may be included in at least one embodiment of this application. The appearance of this phrase in various places throughout the specification does not necessarily refer to the same embodiment, nor is it a separate or alternative embodiment mutually exclusive with other embodiments. It will be explicitly and implicitly understood by those skilled in the art that the embodiments described herein can be combined with other embodiments.

[0032] The embodiments described above are merely illustrative of several implementations of this utility model, and while the descriptions are relatively specific and detailed, they should not be construed as limiting the scope of the utility model patent. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of this utility model, and these all fall within the protection scope of this utility model. Therefore, the protection scope of this utility model patent should be determined by the appended claims.

Claims

1. A multi-channel guide wheel pre-volatilization sintering furnace device, characterized in that, include: The sintering and volatilization furnace body is provided with a cavity for sintering cables. The sintering and volatilization furnace body is also provided with an inlet for the cable to enter the cavity and an outlet for the cable to exit the cavity, as well as an operation window for winding operations in the cavity. The insulation door is used to open or close the operation window. The winding guide wheel assembly includes multiple winding guide wheels disposed within the cavity for winding the cable, wherein the rotation planes of the multiple winding guide wheels are coplanar; and The cable guide assembly includes an inlet guide assembly disposed outside the sintering and volatilization furnace body and near the inlet, and an outlet guide assembly disposed outside the sintering and volatilization furnace body and near the outlet. The inlet guide assembly is used to guide the cable into the cavity, and the outlet guide assembly is used to guide the cable exiting the cavity.

2. The multi-channel guide wheel pre-volatilization sintering furnace apparatus according to claim 1, characterized in that, On the periphery of each of the winding guide wheels, in a direction perpendicular to the rotation plane of the winding guide wheel, a plurality of winding tracks for winding the cable are arranged in parallel in sequence.

3. The multi-channel guide wheel pre-volatilization sintering furnace apparatus according to claim 2, characterized in that, The inlet guide wheel assembly corresponds to any one of the winding tracks of the winding guide wheel near the inlet, and is used to wind the cable on any one of the winding tracks.

4. The multi-channel guide wheel pre-volatilization sintering furnace apparatus according to claim 3, characterized in that, The infeed guide wheel assembly includes a fixed frame, a swing frame movably connected to the fixed frame and corresponding to any winding track, and an infeed guide wheel connected to the swing frame for winding the cable.

5. The multi-channel guide wheel pre-volatilization sintering furnace apparatus according to claim 4, characterized in that, A fixing device is provided between the fixed frame and the swing frame to fix the relative position of the swing frame and the fixed frame.

6. The multi-channel guide wheel pre-volatilization sintering furnace apparatus according to claim 5, characterized in that, The fixed frame is an L-shaped corner plate, and the swing frame is a straight plate. The straight plate is mounted between the two side plates of the L-shaped corner plate, and one end of the straight plate is movably connected to one of the side plates.

7. The multi-channel guide wheel pre-volatilization sintering furnace apparatus according to claim 6, characterized in that, The fixing device consists of a gear plate with a gear slot, a first fixing member, and a second fixing member. One end of the gear plate is movably connected to the fixing frame and can swing horizontally within a preset angle range. The first fixing member is used to fix the angle between the gear plate and the fixing frame. The second fixing member is used to fix the swing frame to the gear plate when the inlet guide wheel corresponds to the winding track of the winding guide wheel near the inlet.

8. The multi-channel guide wheel pre-volatilization sintering furnace apparatus according to claim 1, characterized in that, It also includes a base, the sintering and volatilization furnace body is mounted on the base, and a guide wheel seat for driving the winding guide wheel to rotate is mounted on the outside of the sintering and volatilization furnace body. The guide wheel seat is connected to the winding guide wheel through a rotating shaft.

9. The multi-channel guide wheel pre-volatilization sintering furnace apparatus according to any one of claims 1 to 7, characterized in that, The number of winding guide wheels is 2.

10. The multi-channel guide wheel pre-volatilization sintering furnace apparatus according to claim 1, characterized in that, The inlet and outlet are respectively located above and below the sintering volatilization furnace body and correspond to each other. The inlet guide wheel assembly and the outlet guide wheel assembly are respectively located above and below the sintering volatilization furnace body and correspond to each other.