A lifting tool for installing seismic isolation bearings
By designing lifting tools for seismic isolation bearings and adopting detachable connections between the lifting column, upper crossbeam, lower crossbeam, and connecting plate, the problem of detachment during the seismic isolation bearing lifting process was solved, achieving stable lifting and protecting the threaded holes, thus ensuring construction safety.
Patent Information
- Application Number
- CN202522324397.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-03
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-11-03
AI Technical Summary
Seismic isolation bearings are prone to detachment during hoisting, leading to damage and safety hazards, and affecting construction efficiency.
Design a lifting tool for seismic isolation bearings, comprising multiple lifting components, which are detachably connected to the connecting plate of the seismic isolation bearings via lifting columns, upper crossbeams, and lower crossbeams, and are secured using lifting ropes and pins, with rubber sleeves provided to protect the threaded holes.
This ensures the smooth installation of the seismic isolation bearings, preventing them from falling off or being damaged, reducing safety hazards, and guaranteeing normal installation and use.
Smart Images

Figure CN224981106U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of building engineering technology, and in particular relates to a lifting tool for hoisting seismic isolation bearings. Background Technology
[0002] Seismic isolation bearings are support devices installed on structures to achieve seismic isolation requirements. Seismic isolation bearings are typically large in size and weight, and if tied up during hoisting, they are prone to detachment, causing damage, affecting construction efficiency, and posing safety hazards. Utility Model Content
[0003] To solve the above-mentioned technical problems, this utility model provides a lifting tool for seismic isolation bearings, which effectively solves the technical problem that seismic isolation bearings are prone to falling off during the lifting process and overcomes the shortcomings of the prior art.
[0004] The technical solution adopted by this utility model is: a lifting tool for hoisting a seismic isolation bearing, including a lifting assembly. The lifting assembly is arranged along the circumference of the seismic isolation bearing and is detachably connected to the upper connecting plate and the lower connecting plate of the seismic isolation bearing. A lifting rope is provided on the top of the lifting assembly.
[0005] Furthermore, the hoisting components are arranged at equal intervals along the circumference of the seismic isolation bearing.
[0006] Furthermore, the hoisting assembly includes:
[0007] The hanging column is equipped with the aforementioned hanging rope at the top;
[0008] The upper crossbeam is mounted on the hanging column and is movably connected to the hanging column. The end away from the hanging column is detachably connected to the upper connecting plate.
[0009] The lower crossbeam is mounted on the hanging column, located below the upper crossbeam, and its end away from the hanging column is detachably connected to the lower connecting plate.
[0010] Furthermore, the top of the hanging column is provided with a buckle, and the hanging rope is provided on the buckle.
[0011] Furthermore, a sleeve is provided at one end of the upper crossbeam near the hanging column, and the sleeve is fitted onto the hanging column with a clearance fit.
[0012] Furthermore, an upper pin is provided at the end of the upper crossbeam away from the hanging column, and the upper pin can be inserted into the upper connecting plate.
[0013] Furthermore, a lower pin is provided at the end of the lower crossbeam away from the hanging column, and the lower pin can be inserted into the lower connecting plate.
[0014] Furthermore, both the upper and lower pins are provided with rubber sleeves.
[0015] The advantages and positive effects of this utility model are as follows: by adopting the above technical solution and setting multiple hoisting components, the seismic isolation bearing is hoisted smoothly, ensuring the stability during the hoisting process, avoiding the detachment and damage of the seismic isolation bearing, reducing safety hazards, ensuring the normal installation and use of the seismic isolation bearing, and having a simple structure and convenient operation. Attached Figure Description
[0016] Figure 1 This is a schematic diagram of the overall lifting tool for hoisting a seismic isolation bearing according to an embodiment of this utility model.
[0017] Figure 2 This is a schematic diagram of a hoisting assembly for hoisting a seismic isolation bearing according to an embodiment of this utility model.
[0018] In the diagram: 1. Hanging column; 2. Upper crossbeam; 3. Lower crossbeam; 4. Buckle; 5. Sleeve; 6. Upper pin; 7. Lower pin; 8. Rubber sleeve; 9. Lifting rope; 10. Seismic isolation bearing; 11. Upper connecting plate; 12. Lower connecting plate. Detailed Implementation
[0019] This utility model provides a lifting tool for hoisting seismic isolation bearings. The embodiments of this utility model will be described below with reference to the accompanying drawings.
[0020] In the description of the embodiments of this utility model, it should be understood that the terms "top," "bottom," etc., indicating the orientation or positional relationship are based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this utility model. In the description of this utility model, it should be noted that unless otherwise expressly specified and limited, the terms "set" and "connected" should be interpreted broadly. For example, it can refer to a fixed connection, a detachable connection, or an integral connection; it can refer to a direct connection or an indirect connection through an intermediate medium; it can refer to the internal communication of two elements. Those skilled in the art can understand the specific meaning of the above terms in this utility model through specific circumstances.
[0021] like Figure 1As shown in the figure, an embodiment of this utility model provides a lifting tool for hoisting a seismic isolation bearing, including multiple lifting components, the specific number of which is not limited. Multiple lifting components are arranged circumferentially around the seismic isolation bearing 10 and are detachably connected to the upper connecting plate 11 and lower connecting plate 12 of the seismic isolation bearing 10. The simultaneous connection of the lifting components to both the upper connecting plate 11 and lower connecting plate 12 of the seismic isolation bearing 10 ensures the stability of the hoisting and prevents detachment. A lifting rope 9 is provided at the top of the lifting components. One end of the lifting rope 9 is connected to the lifting component, and the other end is connected to a lifting device. Preferably, to ensure uniform force on the seismic isolation bearing 10 and prevent tilting during hoisting, the lifting components are evenly distributed at equal intervals along the circumference of the seismic isolation bearing 10.
[0022] Specifically, such as Figure 2 As shown, the hoisting assembly includes a hoisting column 1, an upper crossbeam 2, and a lower crossbeam 3. The hoisting column 1 is vertically mounted around the seismic isolation bearing 10. The top of the hoisting column 1 is connected to the end of the hoisting rope 9. The upper crossbeam 2 is perpendicular to the hoisting column 1 and is movably connected to the hoisting column 1. The end of the upper crossbeam 2 away from the hoisting column 1 is detachably connected to the upper connecting plate 11. The lower crossbeam 3 is perpendicular to the hoisting column 1 and is fixedly connected to the hoisting column 1. It is located below the upper crossbeam 2, and the end of the lower crossbeam 3 away from the hoisting column 1 is detachably connected to the lower connecting plate 12.
[0023] Specifically, the top of the lifting column 1 has a through hole, and a clip 4 is installed thereon. The clip 4 is connected to the end of the lifting device. The specific form of the clip 4 is not limited.
[0024] Specifically, a sleeve 5 is fixed at one end of the upper crossbeam 2 near the hanging column 1. The sleeve 5 is vertically set and fitted onto the hanging column 1 with a clearance fit, and can move up and down along the hanging column 1.
[0025] Specifically, for ease of connection, a vertically arranged upper pin 6 is fixed to the end of the upper crossbeam 2 away from the hanging column 1. The upper pin 6 can be inserted into the connecting plate 11. In some embodiments, the upper pin 6 is located at the lower part of the upper crossbeam 2 and is fixedly connected to the upper crossbeam 2. The upper pin 6 is clearance-fitted with the threaded hole on the upper connecting plate 11 and can be inserted into the threaded hole on the upper connecting plate 11. Specifically, for ease of connection, a vertically arranged lower pin 7 is fixed to the end of the lower crossbeam 3 away from the hanging column 1. The lower pin 7 can be inserted into the lower connecting plate 12. In some embodiments, the lower pin 7 is located at the upper part of the lower crossbeam 3 and is fixedly connected to the lower crossbeam 3. The lower pin 7 is clearance-fitted with the threaded hole on the lower connecting plate 12 and can be inserted into the threaded hole on the lower connecting plate 12. By setting the upper pin 6 and the lower pin 7, the seismic isolation support 10 and the hanging column 1 can be detachably connected.
[0026] Preferably, to prevent the seismic isolation bearing 10 from shaking during hoisting, and to prevent collisions between the upper pin 6 or lower pin 7 and the threaded holes, which could damage the threaded holes and affect the normal use of the seismic isolation bearing 10, a rubber sleeve 8 is fitted onto both the upper pin 6 and the lower pin 7. The length of the rubber sleeve 8 is set to the length of the threaded hole. During connection, the rubber sleeve 8 is placed between the threaded hole of the upper pin 6 and the upper connecting plate 11, and between the threaded hole of the lower pin 7 and the lower connecting plate 12, to buffer the forces generated between them, avoid damage to the threaded holes, and ensure the normal installation and use of the seismic isolation bearing 10.
[0027] Construction method for lifting equipment used in the installation of seismic isolation bearings:
[0028] 1. Fabricate hoisting components according to the dimensions of the seismic isolation bearing 10 to be hoisted.
[0029] 2. Insert the lower pin 7 into the threaded hole on the lower connecting plate 12 of the seismic isolation bearing 10, so that the rubber sleeve 8 is positioned between the lower pin 7 and the threaded hole.
[0030] 3. Move the sleeve 5 to insert the upper pin 6 into the threaded hole on the connecting plate 11 of the vibration isolation support 10, so that the rubber sleeve 8 is positioned between the upper pin 6 and the threaded hole.
[0031] 4. Install the buckle 4 and the suspension rope 9 on the top of the suspension column 1.
[0032] 5. Connect the lifting rope 9 to the lifting device and carry out the lifting operation.
[0033] 6. After hoisting is completed, remove the hoisting rope 9, the buckle 4 and the hoisting components in sequence, and put them back into storage for future use.
[0034] Example: A lifting device for hoisting a seismic isolation bearing 10 includes three lifting assemblies. The three lifting assemblies are evenly spaced along the circumference of the seismic isolation bearing 10 and are detachably connected to the upper connecting plate 11 and lower connecting plate 12 of the seismic isolation bearing 10. A lifting rope 9 is provided at the top of each lifting assembly. One end of the lifting rope 9 is connected to the lifting assembly, and the other end is connected to a lifting device. Each lifting assembly includes a lifting column 1, an upper crossbeam 2, and a lower crossbeam 3. The lifting column 1 is vertically positioned along the circumference of the seismic isolation bearing 10. A U-shaped buckle 4 is installed at the top of the lifting column 1 and connected to the end of the lifting rope 9. The upper crossbeam 2 is perpendicular to the lifting column 1, and a sleeve 5 is welded to one end near the lifting column 1. The sleeve 5 is vertically positioned and fitted onto the lifting column 1 with a clearance fit, allowing it to move up and down along the lifting column 1. A vertical upper pin 6 is welded to the lower end of the upper crossbeam 2 away from the hanging column 1. The upper pin 6 is clearance-fitted with a threaded hole on the upper connecting plate 11 and can be inserted into the threaded hole on the upper connecting plate 11. The lower crossbeam 3 is perpendicular to the hanging column 1 and is welded and fixed to the bottom of the hanging column 1, located below the upper crossbeam 2. A vertical lower pin 7 is welded to the upper end of the lower crossbeam 3 away from the hanging column 1. The lower pin 7 is clearance-fitted with a threaded hole on the lower connecting plate 12 and can be inserted into the threaded hole on the lower connecting plate 12. Both the upper pin 6 and the lower pin 7 are fitted with rubber sleeves 8. When connected, the rubber sleeves 8 are positioned between the threaded holes of the upper pin 6 and the upper connecting plate 11, and between the threaded holes of the lower pin 7 and the lower connecting plate 12.
[0035] The advantages and positive effects of this utility model are:
[0036] 1. By setting multiple hoisting components in the circumferential direction, the stability of hoisting can be ensured in multiple directions, ensuring that the seismic isolation bearing can be hoisted horizontally;
[0037] 2. By setting upper and lower pins, the hoisting components and seismic isolation bearings have multiple connection points, which further ensures the stability of the hoisting, avoids the seismic isolation bearings from falling off and being damaged, and reduces safety hazards;
[0038] 3. By installing a rubber sleeve, damage to the threaded holes is avoided, ensuring the normal installation and use of the seismic isolation bearing.
[0039] The embodiments of this utility model have been described in detail above, but the content described is only a preferred embodiment of this utility model and should not be considered as limiting the scope of implementation of this utility model. All equivalent changes and improvements made in accordance with the claims of this utility model should still fall within the patent coverage of this utility model.
Claims
1. A lifting tool for installing seismic isolation bearings, characterized in that: It includes a hoisting assembly, which is arranged along the circumference of the seismic isolation bearing and is detachably connected to the upper and lower connecting plates of the seismic isolation bearing. The top of the hoisting assembly is provided with a hoisting rope. The hoisting assembly includes: The hanging column is equipped with the aforementioned hanging rope at the top; The upper crossbeam is mounted on the hanging column and is movably connected to the hanging column. The end away from the hanging column is detachably connected to the upper connecting plate. The lower crossbeam is mounted on the hanging column, located below the upper crossbeam, and its end away from the hanging column is detachably connected to the lower connecting plate.
2. The lifting tool for installing a seismic isolation bearing according to claim 1, characterized in that: The hoisting components are arranged at equal intervals along the circumference of the seismic isolation bearing.
3. The lifting tool for installing a seismic isolation bearing according to claim 1, characterized in that: The top of the hanging column is provided with a buckle, and the hanging rope is attached to the buckle.
4. The lifting tool for installing a seismic isolation bearing according to claim 1, characterized in that: A sleeve is provided at one end of the upper crossbeam near the hanging column, and the sleeve is fitted onto the hanging column with a clearance fit.
5. A lifting tool for installing a seismic isolation bearing according to any one of claims 1-4, characterized in that: The upper crossbeam is provided with an upper pin at the end away from the hanging column, and the upper pin can be inserted into the upper connecting plate.
6. The lifting tool for installing a seismic isolation bearing according to claim 5, characterized in that: The lower crossbeam is provided with a lower pin at the end away from the hanging column, and the lower pin can be inserted into the lower connecting plate.
7. The lifting tool for installing a seismic isolation bearing according to claim 6, characterized in that: Both the upper and lower pins are equipped with rubber sleeves.
