A wire saw cutting forced landing system

By setting an auxiliary fixing mechanism on the outer wall of the channel steel and using a self-locking structure with spring-driven sliding blocks, the problem of difficult wire rope positioning in the wire saw cutting and forced landing system was solved, achieving rapid and stable reinforcement and repair, and improving construction efficiency and safety.

CN224982636UActive Publication Date: 2026-11-17ZHONGKE (JIANGSU) CONSTR TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522727125.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-23
Publication Date
2026-11-17
Estimated Expiration
2035-12-23

AI Technical Summary

Technical Problem

When using existing wire saw cutting and forced landing systems to reinforce and repair tall structures, the smooth surfaces and vertical arrangement of profiles such as channel steel make it difficult to quickly position and securely install the circumferential restraint wire ropes, resulting in low construction efficiency, requiring multiple people to work together, and posing safety risks.

Method used

An auxiliary fixing mechanism is adopted, including a combination design of mounting blocks, clamping blocks, springs and limiting columns. The self-locking structure of the clamping blocks driven by the springs enables the rapid clamping and pre-positioning of the annular steel wire rope on the surface of the channel steel. The cutting component works in conjunction with the main reinforcement mechanism, and the external stabilizing piles and connecting cables form a diagonal fixation to ensure construction safety.

Benefits of technology

It enables rapid and accurate positioning of the ring-shaped steel wire rope, freeing up the hands of construction workers, greatly improving construction efficiency, ensuring construction safety, and preventing the tower structure from cracking or collapsing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224982636U_ABST
    Figure CN224982636U_ABST
Patent Text Reader

Abstract

This application relates to a wire saw cutting and forced descent system, belonging to the technical field of building construction technology. It includes an operating ground, a repair tower, a reinforced main structure, and a cutting assembly. The reinforced main structure includes square timber and channel steel attached to the outer wall of the repair tower. An auxiliary fixing mechanism is fixed to the outer wall of the channel steel, internally engaging a ring-shaped steel wire rope. The auxiliary fixing mechanism includes an mounting block, a sliding block, and a spring, with the spring driving the block to clamp the steel wire rope. The cutting assembly includes a pulley system and a diamond rope. This application features a spring-locking structure through the auxiliary fixing mechanism, solving the problem of difficulty in quickly and stably installing the ring-shaped steel wire rope on a smooth, vertical channel steel surface. This achieves rapid pre-positioning of the steel wire rope, freeing up the workers' hands and significantly improving construction efficiency. Simultaneously, in conjunction with the cutting assembly and the reinforced mechanism, it ensures a smooth and controlled forced descent of the repair tower, guaranteeing construction safety and structural integrity.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of construction engineering technology, and in particular to a wire saw cutting and forced landing system. Background Technology

[0002] In the field of construction engineering, tall structures such as towers, chimneys, or bridge piers may tilt over time due to uneven foundation settlement, earthquakes, or other external forces. To correct this tilt, or to reduce the structural height during demolition, a "forced descent" technique is often used. This involves removing some of the supporting material at the bottom of the structure, allowing gravity to control the downward movement of the structure. Currently, wire sawing technology is widely used in such projects due to its smooth cut surface and minimal construction vibration.

[0003] However, before performing wire saw cutting for forced landing, the tower structure must be rigorously reinforced to prevent cracking or collapse due to stress redistribution during the cutting process. A common reinforcement method is to wrap the outer wall of the tower with vertical timber and horizontal steel sections (such as channel steel), and then tighten them by circumferentially wrapped steel wire ropes.

[0004] However, during actual construction, workers encountered significant operational difficulties. Because the channel steel is typically smooth and installed vertically on the tower, the wire ropes easily slipped off the channel steel surface under gravity when workers attempted to install them. Current construction methods often require multiple people working together, sometimes even requiring manual labor to hold the wire ropes in place for extended periods until welding is complete. This method is not only labor-intensive and inefficient, but also poses significant safety hazards in high-altitude environments, making it difficult to meet the requirements of modern, efficient, and safe construction.

[0005] Therefore, this utility model proposes a wire saw cutting forced landing system to overcome the shortcomings of the prior art. Utility Model Content

[0006] To overcome the above shortcomings, this utility model provides a wire saw cutting forced landing system, which aims to improve the problems of existing wire saw cutting forced landing systems when reinforcing and repairing tall structures. Due to the smooth surface and vertical arrangement of profiles such as channel steel, it is difficult to quickly position and securely install the circumferential binding steel wire rope, resulting in low construction efficiency, the need for multiple people to cooperate, and the difficulty and high safety risks of manual hand-held fixing operation.

[0007] This utility model provides a wire saw cutting forced landing system, including: an operating ground, a repair tower erected on the upper surface of the operating ground, a reinforcement main body mechanism disposed on the outer wall surface of the repair tower, and a cutting assembly disposed at the bottom of the repair tower; the cutting assembly includes a pulley group fixed to the bottom of the repair tower, and a diamond rope passing through the pulley group and surrounding the bottom of the repair tower.

[0008] The reinforcement main structure includes multiple square timbers vertically attached to the outer wall of the repair tower, and multiple channel steels horizontally surrounding the square timbers on the side facing away from the repair tower. An auxiliary fixing mechanism is fixedly connected to the outer wall of the channel steel, and a ring-shaped steel wire rope is clamped inside the auxiliary fixing mechanism. The auxiliary fixing mechanism includes a mounting block fixedly connected to the outer wall of the channel steel, a locking block slidably connected inside the mounting block, and a spring disposed inside the mounting block. The mounting block has a cavity for the locking block to slide inside. One end of the spring abuts against the inner wall of the mounting block, and the other end abuts against the end of the locking block near the inside of the mounting block. The spring is in a compressed state to use its elastic force to push the locking block to clamp the ring-shaped steel wire rope.

[0009] Furthermore, the auxiliary fixing mechanism, through the snap-fit ​​structure formed by the internal snap-fit ​​block and the mounting block, achieves rapid clamping and pre-positioning of the annular steel wire rope, so that the annular steel wire rope can be stably installed on the vertically arranged channel steel surface without the need for continuous manual handling.

[0010] Preferably, a limiting post is fixedly connected to the inner wall of the mounting block, the limiting post extending along the sliding direction of the locking block, and the spring sleeved on the outer peripheral surface of the limiting post. By setting the limiting post, the bending or lateral displacement of the spring during extension and contraction can be prevented, ensuring the linear transmission of elastic force and improving the smoothness of the sliding of the locking block.

[0011] Preferably, a baffle is fixedly connected to one end of the locking block inside the mounting block, the end of the spring away from the inner wall of the mounting block abuts against the surface of the baffle, and the end of the limiting post away from the inner wall of the mounting block passes through the baffle and extends into the locking block. The baffle increases the contact area between the spring and the locking block, making the force more even, preventing the spring end from slipping, and further improving the reliability of the mechanism's operation.

[0012] Preferably, limit blocks are fixedly connected to both side walls of the card block extending outside the mounting block. These limit blocks abut against the outer wall of the mounting block and limit its movement when the card block slides inward. The limit blocks effectively restrict the card block's retraction limit, preventing it from retracting excessively into the mounting block, thus preventing further operation or complete closure of the card slot.

[0013] Preferably, the cutting assembly further includes a hydraulic pump station placed on the operating ground and a drive wheel rotatably connected to the side wall of the hydraulic pump station. One end of the diamond rope is wrapped around the outer circumference of the drive wheel, and the other end passes through the pulley system. The hydraulic pump station provides power to the drive wheel, and in conjunction with the guiding effect of the pulley system, drives the diamond rope to perform efficient and stable cutting operations on the bottom of the repair tower.

[0014] Preferably, the reinforcement main structure further includes a connecting rod fixedly connected to the corner of the top of the repair tower, and a stabilizing pile fixedly installed on the operating ground. The connecting rod and the stabilizing pile are connected by a tensioned connecting cable. The structure forms a diagonally tensioned external stabilization system, which can effectively prevent the repair tower from accidentally tipping over during the cutting and forced descent process, ensuring construction safety.

[0015] Preferably, the side wall of the mounting block has a notch, and an L-shaped or U-shaped groove is formed between the locking block and the inner wall of the mounting block, with the annular steel wire rope embedded in the groove. The groove's specific shape better adapts to the cross-sectional shape of the annular steel wire rope, improving the stability of the clamping and fixing.

[0016] Preferably, after the annular steel wire rope is positioned by the auxiliary fixing mechanism, the annular steel wire rope is fixed to the auxiliary fixing mechanism and the channel steel by welding. This process of positioning before welding ensures the high strength and durability of the final connection, making the reinforced structure more robust.

[0017] This utility model has the following beneficial effects:

[0018] 1. This utility model solves the problem of low construction efficiency and safety risks associated with manual hand-held fixing when reinforcing and repairing towers by setting an auxiliary fixing mechanism on the outer wall of the channel steel and using the self-locking structure of the locking block driven by the internal spring of the mounting block, combined with the slot design of the mounting block. This is achieved by setting an auxiliary fixing mechanism on the outer wall of the channel steel and using the self-locking structure of the locking block driven by the internal spring of the mounting block, combined with the slot design of the mounting block. This solves the problem of low construction efficiency and safety risks associated with manual hand-held fixing when reinforcing and repairing towers. This invention achieves the technical effect of quickly and accurately positioning the annular steel wire rope, freeing up the hands of construction workers, greatly improving construction efficiency and ensuring construction safety.

[0019] 2. This utility model solves the problem of springs easily bending and deforming or getting stuck due to uneven force during the extension and retraction process by setting a limiting post inside the mounting block and sleeved the spring on the outer periphery of the limiting post, and at the same time cooperating with the baffle design at the end of the clamping block. It achieves the technical effect of ensuring stable output of spring force, guiding the clamping block to slide smoothly, and thus ensuring reliable and stable clamping force on the annular steel wire rope.

[0020] 3. This utility model adopts a scheme of coordinated operation of cutting components and reinforcement main body mechanism, and uses external stabilizing piles and connecting cables for diagonal fixation, combined with the longitudinal and transverse reinforcement frame composed of square timber and channel steel, to solve the problem of structural cracking or uncontrolled tilting of the repair tower due to the removal of bottom support during the wire saw cutting process. It achieves the technical effect of stable and controlled forced landing and correction of the repair tower while ensuring the integrity of the tower structure. Attached Figure Description

[0021] Figure 1 This is a three-dimensional schematic diagram of a wire saw cutting forced landing system proposed in this utility model;

[0022] Figure 2 This is a schematic diagram of the pulley block of a wire saw cutting forced landing system proposed in this utility model;

[0023] Figure 3 This is a schematic diagram of the drive wheel of a wire saw cutting forced landing system proposed in this utility model;

[0024] Figure 4 This is a schematic diagram of the structure of a wire saw cutting forced landing system for square timber proposed in this utility model;

[0025] Figure 5 This is a schematic diagram of the connecting rod of a wire saw cutting forced landing system proposed in this utility model.

[0026] Figure 6 This is a schematic diagram of the structure of the annular steel wire rope in the wire saw cutting forced landing system proposed in this utility model.

[0027] Figure 7 for Figure 6 Enlarged view of point A in the middle.

[0028] Legend:

[0029] 1. Ground operations; 2. Tower repair;

[0030] 3. Reinforced main structure; 31. Stabilizing piles; 32. Connecting cables; 33. Connecting rods; 34. Square timber; 35. Channel steel; 36. Ring steel wire rope;

[0031] 37. Cutting assembly; 371. Hydraulic pump station; 372. Drive wheel; 373. Pulley block; 374. Diamond rope;

[0032] 4. Auxiliary fixing mechanism; 41. Mounting block; 42. Locking block; 43. Limiting block; 44. Baffle; 45. Limiting post; 46. Spring. Detailed Implementation

[0033] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0034] Example:

[0035] Reference Figures 1 to 7 This utility model provides a wire saw cutting forced landing system, which aims to solve the problem in the prior art that it is difficult to quickly and stably position and install circumferential binding steel wire ropes on smooth or vertical profile surfaces when reinforcing and repairing tower structures, resulting in low construction efficiency and difficulty in controlling the stability of the tower during the cutting process.

[0036] like Figure 1 , Figure 2 and Figure 5 As shown, the system includes an operating ground 1 and a repair tower 2 erected on the upper surface of the operating ground 1. The operating ground 1 serves as the construction base plane for the overall wire saw cutting forced landing system. The repair tower 2 is the target building structure to be corrected or repaired. A reinforcing main structure 3 is installed on the outer wall surface of the repair tower 2, and a cutting assembly 37 is installed at the bottom area of ​​the repair tower 2. The reinforcing main structure 3 is used to maintain the structural strength and overall stability of the repair tower 2 during construction, preventing the tower from cracking or tipping over. The cutting assembly 37 is used to perform horizontal cutting operations on the bottom of the repair tower 2 to achieve controlled forced landing. The reinforcing main structure 3 includes multiple vertically aligned... The square timbers 34 are attached to the outer wall surface of the repair tower 2, and multiple channel steels 35 are wrapped around the square timbers 34 in the horizontal direction and attached to the side of the square timbers 34 away from the repair tower 2. The square timbers 34 and channel steels 35 cooperate to form a crisscrossing external frame to increase the bending and shear stiffness of the repair tower 2. An auxiliary fixing mechanism 4 is fixedly connected to the outer wall of the channel steel 35. A ring steel wire rope 36 is clamped inside the auxiliary fixing mechanism 4. The ring steel wire rope 36 is arranged around the circumference of the repair tower 2 and embedded in the auxiliary fixing mechanism 4 to provide circumferential binding force to the main reinforcement mechanism 3, and to tightly press the square timbers 34 and channel steels 35 onto the surface of the repair tower 2.

[0037] like Figure 3As shown, the cutting assembly 37 includes a hydraulic pump station 371 placed on the operating ground 1. The hydraulic pump station 371 provides hydraulic power as a power source. A drive wheel 372 is rotatably connected to the side wall of the hydraulic pump station 371. The drive wheel 372 is used to output rotational torque. A pulley block 373 is fixedly installed at the bottom of the repair tower 2. The pulley block 373 is used to guide the direction of the cutting line. One end of the diamond rope 374 is wrapped around the outer circumferential surface of the drive wheel 372. The other end of the diamond rope 374 passes through the pulley block 373 and surrounds the cutting part of the repair tower 2. The drive wheel 372 drives the diamond rope 374 to circulate at high speed to grind and cut the bottom of the repair tower 2.

[0038] like Figure 6 and Figure 7 As shown, the auxiliary fixing mechanism 4 includes a mounting block 41 fixedly connected to the outer wall of the channel steel 35. The mounting block 41 has a receiving cavity inside, and a locking block 42 is slidably connected inside the receiving cavity of the mounting block 41. A spring 46 is also provided inside the mounting block 41. The spring 46 is in a compressed and energy-storing state. The elastic force released by the spring 46 continuously drives the locking block 42 to slide into the mounting block 41, thereby cooperating with the inner wall structure of the mounting block 41 to clamp and fix the inserted annular steel wire rope 36, realizing the pre-positioning of the steel wire rope and preventing it from slipping on the surface of the channel steel 35.

[0039] like Figure 1 As shown, the main reinforcement structure 3 also includes a connecting rod 33 fixedly connected to the top corner of the repair tower 2, and a stabilizing pile 31 fixedly installed on the operating ground 1 around the repair tower 2. The connecting rod 33 and the stabilizing pile 31 are connected by a connecting cable 32 to form a diagonal external stabilization system.

[0040] Reference Figure 5 , Figure 6 and Figure 7The auxiliary fixing mechanism 4 includes components such as a mounting block 41, a locking block 42, and a spring 46. The mounting block 41 is fixedly connected to the outer wall surface of the channel steel 35 by welding or bolting. The side wall of the mounting block 41 has a notch, making the mounting block 41 have an L-shaped or U-shaped structure. It has a horizontally extending receiving cavity inside, which provides space for the locking block 42 to move. The locking block 42 is slidably connected to the receiving cavity inside the mounting block 41. One end of the locking block 42 is located inside the receiving cavity, and the other end extends to the outside of the mounting block 41. The side wall of the locking block 42 extending outside the mounting block 41 is connected to the inner side wall of the mounting block 41. A groove is formed between the mounting block 42 and the mounting block 41 to accommodate the annular wire rope 36. The width of the groove can vary as the mounting block 42 slides to accommodate wire ropes of different diameters or to perform clamping operations. A spring 46 is disposed in the receiving cavity inside the mounting block 41 to provide a reset clamping force for the mounting block 42. One end of the spring 46 abuts against the inner wall of the mounting block 41, and the other end abuts against the end of the mounting block 42 located inside the receiving cavity or its connector. In its natural state, the spring 46 is in a compressed or pre-tightened state, and its elastic force continuously pushes the mounting block 42 to retract into the mounting block 41, thereby reducing the width of the groove to clamp the annular wire rope 36 placed therein.

[0041] Meanwhile, to limit the movement range of the locking block 42 and prevent it from dislodging, a limiting post 45 is fixedly connected to the inner wall of the mounting block 41. The limiting post 45 extends horizontally along the sliding direction of the locking block 42, and the spring 46 is sleeved on the outer circumferential surface of the limiting post 45. The limiting post 45 not only serves as a guide to prevent the spring 46 from bending and deforming, but also provides axial support for the extension and retraction of the spring 46, ensuring stable output of the elastic force. In the assembled state, when it is necessary to install the ring steel wire rope 36, the operator pulls the locking block 42 outward. This causes the cable to slide outward along the receiving cavity and further compress the spring 46. At this time, the width of the slot increases. After the annular steel wire rope 36 is placed into the slot, the locking block 42 is released. Under the restoring torque of the spring 46, the locking block 42 rebounds inward, pressing the annular steel wire rope 36 tightly against the inner wall of the slot or the side wall of the mounting block 41. This elastically driven self-locking mating structure ensures that the annular steel wire rope 36 can be quickly and accurately positioned on the channel steel 35 before subsequent welding and fixing, effectively solving the problem of difficulty in manual hand-held fixing.

[0042] like Figure 7As shown, a baffle 44 is fixedly connected to one end of the locking block 42 inside the mounting block 41. The baffle 44 serves as a force-bearing surface, and its surface area is larger than the cross-sectional area of ​​the spring 46. The end of the spring 46 away from the inner wall of the mounting block 41 directly abuts against the surface of the baffle 44. By setting the baffle 44, it can be ensured that the thrust of the spring 46 is evenly transmitted to the locking block 42, preventing the end of the spring 46 from slipping or uneven force causing jamming. At the same time, the end of the limiting post 45 away from the inner wall of the mounting block 41 passes through the baffle 44 and extends into the hole opened inside the locking block 42, further enhancing the guiding stability.

[0043] like Figure 6 and Figure 7 As shown, the two side walls of the locking block 42 extending out of the mounting block 41 are fixedly connected to limiting blocks 43. The limiting blocks 43 have a lug-shaped structure. The limiting blocks 43 are used to abut against the outer wall surface of the mounting block 41 when the locking block 42 slides back into the mounting block 41, thereby limiting the extreme position of the locking block 42 sliding inward. Through this limiting design, the minimum gap of the locking groove can be reserved, or the situation where the locking block 42 is completely retracted into the mounting block 41 and cannot be pulled out again can be prevented.

[0044] like Figure 1 and Figure 3 As shown, the cutting assembly 37 also includes a hydraulic pump station 371 placed on the operating ground 1. A drive wheel 372 is rotatably connected to the side wall of the hydraulic pump station 371. One end of the diamond rope 374 is wrapped around the outer circumference of the drive wheel 372, and the other end passes through the pulley group 373 fixed to the bottom of the repair tower 2. The hydraulic pump station 371 integrates a hydraulic motor and control structure, which can precisely control the rotation speed of the drive wheel 372 and the tension of the diamond rope 374. With the guiding effect of the pulley group 373, the diamond rope 374 can smoothly and continuously cut the bottom of the repair tower 2 along a preset horizontal trajectory.

[0045] like Figure 2 As shown, multiple channel steels 35 are spaced apart along the height direction of the repair tower 2 to form a multi-layer horizontal clamping structure. The annular steel wire ropes 36 are correspondingly installed in the auxiliary fixing mechanism 4 on each layer of channel steel 35. After the annular steel wire ropes 36 are positioned by the auxiliary fixing mechanism 4, they are fixed to the auxiliary fixing mechanism 4 and the channel steel 35 by welding. Through the combination of multiple layers of channel steel 35 and multiple annular steel wire ropes 36, and the permanent connection method of welding, the deformation resistance of the repair tower 2 during the forced landing process is greatly improved.

[0046] The implementation principle of this application embodiment is as follows: When it is confirmed that construction is needed on the tilted or demolished repair tower 2, the construction personnel first install stabilizing piles 31 on the operating ground 1 around the repair tower 2, and fix one end of the connecting cable 32 to the stabilizing pile 31, and pull up and fix the other end to the connecting rod 33 at the top of the repair tower 2, and complete the initial stabilization by tying the four corners. Then, square timber 34 is vertically attached to the outer wall of the repair tower 2, and channel steel 35 is horizontally installed on the outside of the square timber 34 to build a reinforced frame.

[0047] When it is necessary to install the annular steel wire rope 36 for circumferential restraint, the operator manually pulls the locking block 42 of the auxiliary fixing mechanism 4 mounted on the channel steel 35 outward. At this time, the locking block 42 slides outward within the receiving cavity of the mounting block 41, causing the baffle 44 at its end to move along the limiting post 45 and further compress the spring 46, thereby increasing the gap between the protruding part of the locking block 42 and the inner wall of the mounting block 41. After the annular steel wire rope 36 is placed into the slot, the locking block 42 is released. Due to the release of the elastic potential energy accumulated in the spring 46, the locking block 42 is pushed inward, tightly clamping the annular steel wire rope 36 within the auxiliary fixing mechanism 4, achieving rapid pre-positioning. After positioning is completed, the construction personnel weld the connection between the annular steel wire rope 36 and the channel steel 35 to form a permanently fixed high-strength restraint structure.

[0048] Finally, the hydraulic pump station 371 is activated, driving the drive wheel 372 on the side wall to rotate, which in turn drives the diamond rope 374 to circulate at high speed. Guided by the pulley block 373 at the bottom of the repair tower 2, the diamond rope 374 horizontally cuts the bottom concrete or structural components of the repair tower 2. As the bottom support structure is cut or removed, the repair tower 2, under its own weight and restricted and protected by the reinforcing main structure 3 and the connecting cable 32, descends smoothly and in a controlled manner until it reaches the predetermined vertical posture or dismantling requirements, thus solving the problems of low construction efficiency and insufficient safety caused by unstable connections or difficulties in fixing in the prior art.

[0049] The embodiments described in this specific implementation are preferred embodiments of this application and are not intended to limit the scope of protection of this application. Identical components are represented by the same reference numerals. Therefore, all equivalent changes made to the structure, shape, and principle of this application should be covered within the scope of protection of this application.

Claims

1. A wire saw cutting forced landing system, comprising: Operating ground (1); Repair tower (2) erected on the operating ground (1); The main reinforcement structure (3) is located on the outer wall of the repair tower (2); and the cutting assembly (37) located at the bottom of the repair tower (2); The main reinforcement structure (3) includes a square timber (34) attached to the outer wall of the repair tower (2) and a channel steel (35) attached to the outside of the square timber (34). The cutting assembly (37) includes a pulley assembly (373) located at the bottom of the repair tower (2) and a diamond rope (374) passing through the pulley assembly (373). Its features are, An auxiliary fixing mechanism (4) is fixedly connected to the outer wall of the channel steel (35). A ring-shaped steel wire rope (36) is clamped inside the auxiliary fixing mechanism (4). The auxiliary fixing mechanism (4) includes a mounting block (41) fixed on the channel steel (35), a clamping block (42) slidably connected inside the mounting block (41), and a spring (46) provided inside the mounting block (41). The clamping block (42) is driven by the elastic force of the spring (46) to slide inside the mounting block (41) to cooperate with the mounting block (41) to clamp the ring-shaped steel wire rope (36).

2. A wire saw cutting system according to claim 1, wherein, The inner wall of the mounting block (41) is fixedly connected to a limiting post (45), and the spring (46) is sleeved on the outer wall of the limiting post (45).

3. A wire saw cutting system according to claim 2, wherein, A baffle (44) is fixedly connected to the side wall of the card block (42). One end of the spring (46) abuts against the inner wall of the mounting block (41), and the other end abuts against the baffle (44).

4. A wire saw cutting system according to claim 3, wherein, The two side walls of the card block (42) extending out of the mounting block (41) are fixedly connected to limit blocks (43), which are used to limit the extreme position of the card block (42) sliding inward.

5. A wire saw cutting system according to claim 1, wherein, The cutting assembly (37) also includes a hydraulic pump station (371) placed on the operating ground (1), a drive wheel (372) is rotatably connected to the side wall of the hydraulic pump station (371), and the diamond rope (374) is wound between the drive wheel (372) and the pulley block (373).

6. The wire saw cutting forced landing system according to claim 1, characterized in that, The reinforcement main structure (3) also includes a connecting rod (33) fixed to the top corner of the repair tower (2) and a stabilizing pile (31) fixed to the operating ground (1). A connecting cable (32) is connected between the connecting rod (33) and the stabilizing pile (31).

7. The wire saw cutting forced landing system according to claim 1, characterized in that, The channel steel (35) is spaced apart along the height direction of the repair tower (2), and the annular steel wire rope (36) is embedded in the auxiliary fixing mechanism (4) and surrounds the reinforcing main body mechanism (3).

8. A wire saw cutting forced landing system according to claim 1, characterized in that, The annular steel wire rope (36) is fixed to the channel steel (35) by welding.