A roof formwork support structure for a large tunnel and the large tunnel itself.
By using steel arch frames and crossbeams to form a stable support system in the high-rise chamber, the problem that traditional coupler-type steel pipe scaffolding cannot ensure the stability of the arch top formwork is solved, and safe support of the arch top formwork is achieved, avoiding the risk of support instability and concrete collapse.
Patent Information
- Application Number
- CN202522717920.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-22
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-12-22
AI Technical Summary
In tall tunnels, traditional coupler-type steel pipe scaffolding cannot ensure the stability of the arch formwork, which can easily lead to safety accidents such as support instability and concrete collapse.
A support structure is formed by steel arch frames and beams. The vertical component of the gravity of the arch top formwork is transferred to the side walls through the steel arch frames, and the horizontal component is resisted by the beams. Combined with full-span scaffolding, a stable support system is formed.
This avoids safety hazards during the pouring of the arch concrete, ensures the stability of the formwork, and reduces the risk of support instability and concrete collapse.
Smart Images

Figure CN224982908U_ABST
Abstract
Description
Technical Field
[0001] This disclosure relates to the field of mining engineering technology, and in particular to a top formwork support structure for a large tunnel and the large tunnel itself. Background Technology
[0002] In underground mine construction, tall chambers (such as those in waste rock crushing and transfer stations) present extremely high construction difficulties and safety risks due to their large cross-sectional dimensions and complex geological conditions. In particular, over-excavation is prone to occur during chamber excavation and blasting, resulting in large thickness and quality of the arch concrete pour. Traditional coupler-type steel pipe scaffolding alone cannot ensure the stability of the arch formwork support during the arch concrete pouring, which can easily lead to safety accidents such as support instability and concrete collapse.
[0003] Based on the above, ensuring the stability of the arch formwork in high-rise tunnels to avoid safety accidents such as arch formwork instability and concrete collapse is a problem that those skilled in the art need to consider. Utility Model Content
[0004] One of the technical problems this disclosure aims to solve is how to ensure the stability of the arch formwork during the pouring of the concrete for the arch of the aforementioned high-rise tunnel, so as to avoid safety accidents such as instability of the arch formwork support and concrete collapse.
[0005] To address the aforementioned technical problems, this disclosure provides a top formwork support structure for a large tunnel, comprising: multiple steel arch frames arranged parallel to each other along the length of the large tunnel to form a support structure, with the two ends of each steel arch frame connected to the top of two side walls of the large tunnel; multiple crossbeams, with the two ends of each crossbeam connected to the two ends of a steel arch frame; and a full-span scaffold, which is positioned below the support structure and has its top connected to the formwork on the support structure.
[0006] In some embodiments, the support structure further includes two embedded steel beams, which are respectively set on the top of the two side walls of the main chamber, and the two ends of the steel arch frame and the two ends of the crossbeam are respectively connected to the two steel beams.
[0007] In some embodiments, the steel arch frame is connected to the embedded steel beam by a first high-strength bolt.
[0008] In some embodiments, the crossbeam is connected to the embedded steel beam by a second high-strength bolt.
[0009] In some embodiments, pads are provided at the bottom of the full-span scaffolding.
[0010] In some embodiments, the steel arch frame is formed by splicing together multiple curved I-beams.
[0011] In some embodiments, the crossbeam is formed by splicing together multiple linear I-beams.
[0012] In some embodiments, the steel arch frame is coated with an anti-corrosion coating.
[0013] In some embodiments, the crossbeam is provided with an anti-corrosion layer.
[0014] This disclosure also provides a large tunnel, including the aforementioned top template support structure for the large tunnel.
[0015] The above technical solution has at least the following beneficial effects: This disclosure provides a top formwork support structure for a large tunnel and the large tunnel itself. The top formwork support structure uses steel arch frames to transfer the vertical component of the gravity of the concrete of the arch formwork to the two side walls and to the full-span scaffolding. The horizontal component is resisted by the crossbeams, thus forming a stable support system. This avoids the safety hazards caused by relying solely on traditional coupler-type steel pipe scaffolding to support the arch formwork during the pouring of the arch concrete. Attached Figure Description
[0016] To more clearly illustrate the technical solutions in the embodiments of this disclosure or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this disclosure. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0017] Figure 1 This is a schematic diagram of a top template support structure according to an embodiment of the present disclosure; Figure 2 This is a front view of a top template support structure according to an embodiment of the present disclosure.
[0018] Explanation of reference numerals in the attached figures: 1. Steel arch frame; 2. Side walls; 3. Horizontal beams; 4. Full-span scaffolding; 5. Embedded steel beams. Detailed Implementation
[0019] The embodiments of this disclosure will be further described in detail below with reference to the accompanying drawings and examples. The detailed description of the embodiments and the accompanying drawings are used to illustrate the principles of this disclosure by way of example, but should not be used to limit the scope of this disclosure. This disclosure can be implemented in many different forms and is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.
[0020] These embodiments are provided to make the disclosure thorough and complete, and to fully express the scope of the disclosure to those skilled in the art. It should be noted that, unless otherwise specifically stated, the relative arrangement of components and steps, material composition, numerical expressions, and values set forth in these embodiments should be interpreted as exemplary only and not as limiting.
[0021] It should be noted that, in the description of this disclosure, unless otherwise stated, "a plurality of" means two or more; the terms "upper," "lower," "left," "right," "inner," and "outer," etc., indicating orientation or positional relationship, are only for the convenience of describing this disclosure and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this disclosure. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0022] Furthermore, the terms "first," "second," and similar terms used in this disclosure do not indicate any order, quantity, or importance, but are merely used to distinguish different parts. "Vertical" is not strictly vertical, but within the permissible margin of error. "Parallel" is not strictly parallel, but within the permissible margin of error. Terms such as "including" or "contains" mean that the element preceding the word encompasses the element listed after the word, and do not exclude the possibility of encompassing other elements as well.
[0023] It should also be noted that, in the description of this disclosure, unless otherwise expressly specified and limited, the terms "installed," "connected," and "linked" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a direct connection or an indirect connection through an intermediate medium. Those skilled in the art can understand the specific meaning of the above terms in this disclosure depending on the specific circumstances. When a particular device is described as being located between a first device and a second device, an intermediary device may or may not be present between the particular device and the first or second device.
[0024] All terms used in this disclosure have the same meaning as understood by one of ordinary skill in the art to which this disclosure pertains, unless otherwise specifically defined. It should also be understood that terms defined in general dictionaries should be interpreted as having meanings consistent with their meanings in the context of the relevant art, and not as having idealized or highly formalized meanings, unless expressly defined herein.
[0025] Techniques, methods, and equipment known to those skilled in the art may not be discussed in detail, but where appropriate, they should be considered part of the specification.
[0026] As mentioned in the background section above, in underground mine construction, large chambers (such as those in waste rock crushing and transfer stations) present extremely high construction difficulties and safety risks due to their large cross-sectional dimensions and complex geological conditions. In particular, over-excavation is prone to occur during chamber excavation and blasting, resulting in large thickness and mass of the arch concrete pour. Traditional steel pipe scaffolding with couplers alone cannot ensure the stability of the arch formwork support during concrete pouring, easily leading to safety accidents such as support instability and concrete collapse. Based on the above, the inventors of this application provide a top formwork support structure and a large chamber in one or more embodiments. The top formwork support structure uses steel arch frames to transfer the vertical component of the gravity of the concrete in the arch formwork to the two side walls and to the full-span scaffolding, while the horizontal component is resisted by beams, thus forming a stable support system. This avoids the safety hazards caused by relying solely on traditional steel pipe scaffolding with couplers to support the arch formwork during concrete pouring. This solves one or more problems in the prior art.
[0027] To address the aforementioned technical problems, this utility model provides a top template support structure for a large tunnel, such as... Figure 1 and Figure 2 As shown, it includes: multiple steel arch frames 1, which are arranged parallel to each other along the length of the main chamber to form a support structure, with the two ends of the steel arch frames 1 connected to the top of the two side walls 2 of the main chamber respectively; multiple crossbeams 3, with the two ends of a crossbeam 3 connected to the two ends of a steel arch frame 1 respectively; and full-span scaffolding 4, which is set below the support structure and whose top is connected to the formwork on the support structure.
[0028] Specifically, the earthwork in the main tunnel can be carried out through layered excavation. Simultaneously, layered rock support (including sidewalls and the arch) can be implemented using anchor bolts, steel mesh, and shotcrete (this is existing technology and will not be elaborated upon here). Reinforced concrete sidewalls 2 are constructed. After sidewalls 2 have cured to their design strength, steel arch frames 1 and crossbeams 3 are installed. After the support structure is installed, full-span scaffolding 4 is erected, with the step distance determined by the design. Arch formwork is installed on the support structure, and concrete is poured in layers on the formwork to form the arch. After the arch concrete has cured to its design strength, the steel arch frames 1, crossbeams 3, and full-span scaffolding 4 are removed. Furthermore, structural columns can be added to sidewalls 2. The steel arch frames 1 and crossbeams 3 are connected to the top of these structural columns. These structural columns can be made of steel or reinforced concrete and can be integrally cast with sidewalls 2. Ear plates can be welded to the top of the structural columns for connection to the steel arch frames 1; the connection method can be welding or bolting. The steel arch frame 1 and crossbeam 3 can be prefabricated in the factory and transported to the site for installation.
[0029] Compared with the prior art, the top formwork support structure of the large tunnel in this application transfers the vertical component of the gravity of the concrete of the arch formwork to the two side walls 2 and to the full-span scaffolding 4 through the steel arch frame 1, while the horizontal component is resisted by the crossbeam 3, thereby forming a stable support system and avoiding the safety hazards caused by relying solely on traditional coupler-type steel pipe scaffolding to support the arch formwork during the pouring of arch concrete.
[0030] In some embodiments, such as Figure 1 and Figure 2 As shown, the support structure also includes two embedded steel beams 5, which are respectively set on the top of the two side walls 2 of the main chamber. The two ends of the steel arch frame 1 and the two ends of the crossbeam 3 are respectively connected to the two steel beams. The two embedded steel beams 5 can connect multiple steel arch frames 1 and multiple crossbeams 3 into a whole, further increasing the stability of the support structure. Specifically, the embedded steel beams 5 are welded to the reinforcing bars of the side walls 2 to ensure the connection strength between the embedded steel beams 5 and the side walls 2. Ear plates for connecting the steel arch frames 1 are welded to the top of the embedded steel beams 5.
[0031] In some embodiments, the steel arch frame 1 is connected to the embedded steel beam 5 (not shown in the figure) by a first high-strength bolt. The connection between the steel arch frame 1 and the embedded steel beam 5 is achieved by the first high-strength bolt. At the same time, the high-strength bolt has a strong load-bearing capacity, and its tensile and shear strengths are much higher than those of ordinary bolts. It can effectively resist heavy loads such as horizontal thrust at the end of the arch frame, reducing the risk of connection failure. The connection has good stability. The pre-tightening force generates strong friction on the connection surface, and the load is transferred by friction, avoiding the weld cracking and stress concentration problems that are prone to occur in welding. It is also less affected by the environment (such as underground humidity and vibration). The installation is convenient and efficient, without the need for on-site welding. It can be quickly assembled and disassembled, which is suitable for scenarios with limited construction space in the chamber. The quality is highly controllable, avoiding the problems of welding relying on welder skills and easily producing defects such as slag inclusions and porosity. The pre-tightening force is controlled by a torque wrench, resulting in strong quality consistency and convenient inspection. The fatigue resistance is excellent. Under the action of cyclic loads (such as concrete pouring impact and slight deformation of rock mass), the fatigue life is much higher than that of welded connections, which can improve the stability of the support structure.
[0032] In some embodiments, the crossbeam 3 is connected to the embedded steel beam 5 (not shown in the figure) by a second high-strength bolt. The connection between the crossbeam 3 and the embedded steel beam 5 is achieved by the second high-strength bolt.
[0033] In some embodiments, a pad (not shown in the figure) is provided at the bottom of the full-span scaffold 4. The pad can distribute concentrated loads. Since the bottom area of the uprights of the full-span scaffold 4 is small, the pad can significantly increase the contact area between the uprights and the support surface, and evenly distribute the concentrated load transmitted by the uprights to the support surface, avoiding instability caused by excessive local pressure; it also reduces the risk of settlement. The floor slab of the underground chamber may have loose rock or local insufficient strength of the floor slab concrete. The pad can reduce local settlement at the bottom of the uprights, ensure the overall verticality and support height stability of the full-span scaffold 4, and avoid problems such as arch support displacement and arch top formwork deformation caused by settlement.
[0034] In some embodiments, the steel arch frame 1 is formed by splicing multiple curved I-beams. The segmented splicing of the steel arch frame 1 can control the weight of a single segment within a certain range, which facilitates transportation, hoisting and installation, and reduces the dependence on construction machinery; it also improves the processing accuracy, as the curved I-beams can be precisely prefabricated in the processing plant according to the design curvature, and spliced on site after segmented processing, avoiding curvature deviations caused by large spans in the overall processing.
[0035] In some embodiments, the crossbeam 3 is constructed by splicing multiple linear I-beams. The segmented splicing of the crossbeam 3 facilitates transportation, hoisting, and installation.
[0036] In some embodiments, the steel arch frame 1 is coated with an anti-corrosion paint (not shown in the figure). The anti-corrosion paint prevents the steel arch frame 1 from rusting.
[0037] In some embodiments, the crossbeam 3 is provided with an anti-corrosion layer (not shown in the figure). The anti-corrosion layer prevents the crossbeam 3 from rusting.
[0038] On the other hand, this utility model also provides a large tunnel, including the above-mentioned top template support structure of the large tunnel.
[0039] In summary, compared with the prior art, this disclosure provides a top formwork support structure and a large chamber. The top formwork support structure uses a steel arch frame 1 to transfer the vertical component of the gravity of the concrete of the arch formwork to the two side walls 2 and to the full-span scaffold 4. The horizontal component is resisted by the crossbeams 3, thus forming a stable support system. This avoids the safety hazards caused by relying solely on traditional coupler-type steel pipe scaffolding to support the arch formwork during the pouring of the arch concrete.
[0040] The embodiments of this disclosure have now been described in detail. To avoid obscuring the concept of this disclosure, some details known in the art have not been described. Those skilled in the art can fully understand how to implement the technical solutions disclosed herein based on the above description.
[0041] While specific embodiments of this disclosure have been described in detail by way of examples, those skilled in the art should understand that the examples are for illustrative purposes only and not intended to limit the scope of this disclosure. Those skilled in the art should understand that modifications can be made to the above embodiments or equivalent substitutions can be made to some technical features without departing from the scope and spirit of this disclosure. In particular, as long as there is no structural conflict, the technical features mentioned in the various embodiments can be combined in any manner.
Claims
1. A roof formwork support structure for a large tunnel, characterized in that, include: Multiple steel arch frames (1) are arranged parallel to each other along the length of the main chamber to form a support structure. The two ends of the steel arch frames (1) are respectively connected to the top of the two side walls (2) of the main chamber. Multiple crossbeams (3), with the two ends of one of the crossbeams (3) respectively connected to the two ends of one of the steel arch frames (1); Full-span scaffolding (4) is set below the supporting structure, and its top is connected to the template on the supporting structure.
2. The top template support structure of the large tunnel according to claim 1, characterized in that, The support structure also includes two embedded steel beams (5), which are respectively set on the top of the two side walls (2) of the main chamber. The two ends of the steel arch frame (1) and the two ends of the crossbeam (3) are respectively connected to the two steel beams.
3. The top template support structure of the large tunnel according to claim 2, characterized in that, The steel arch frame (1) is connected to the embedded steel beam (5) by a first high-strength bolt.
4. The top template support structure of the large tunnel according to claim 3, characterized in that, The crossbeam (3) is connected to the embedded steel beam (5) by a second high-strength bolt.
5. The top template support structure of the large tunnel according to claim 4, characterized in that, The bottom of the full-span scaffold (4) is provided with pads.
6. The top template support structure of the large tunnel according to claim 5, characterized in that, The steel arch frame (1) is formed by splicing together multiple arc-shaped I-beams.
7. The top template support structure of the large tunnel according to claim 6, characterized in that, The crossbeam (3) is made up of multiple linear I-beams.
8. The top template support structure of the large tunnel according to claim 7, characterized in that, The steel arch frame (1) is coated with anti-corrosion paint.
9. The top template support structure of the large tunnel according to claim 7, characterized in that, The crossbeam (3) is provided with an anti-corrosion layer.
10. A large chamber, characterized in that, Includes the top template support structure of the large tunnel as described in any one of claims 1-9.