A self-propelled tracked vehicle-type high-voltage transformer integrated testing device
The self-propelled tracked vehicle-type high-voltage transformer integrated testing device, through integrated design and automated control, solves the problems of long testing time and safety risks associated with existing equipment, and achieves efficient and safe integrated transformer testing.
Patent Information
- Application Number
- CN202522514302.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-27
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-11-27
AI Technical Summary
Existing high-voltage transformer integrated testing equipment is decentralized, which takes a long time to transport and connect the equipment, requires multiple people to cooperate, poses safety risks, and results in poor accuracy and traceability of test data.
Design a self-propelled tracked vehicle-type comprehensive testing device for high-voltage transformers. The device integrates power frequency withstand voltage test module, insulation resistance test module, turns ratio test module, and DC resistance test module on the tracked vehicle. It adopts PLC automatic control, combined with flexible chain links and towing wheels design to adapt to complex terrain, and is equipped with electronic fences and temperature monitoring instruments to achieve automated testing and safety protection.
It reduces equipment preparation time and manpower investment, improves testing efficiency and safety, ensures the accuracy and traceability of test data, adapts to complex terrain, and reduces enterprise labor costs.
Smart Images

Figure CN224985532U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of high-voltage transformer testing technology, specifically a self-propelled tracked vehicle-type comprehensive testing device for high-voltage transformers. Background Technology
[0002] Transformer testing is a crucial means of checking product performance and an important step before a transformer leaves the factory. Many routine and type tests of transformers require bringing out the transformer's output terminals. For gas-insulated transformers with cable plug-in outputs, conventional testing methods cannot be used to directly connect the wires from the bushings, posing difficulties for the test wiring.
[0003] In the current technology, the comprehensive test of high-voltage transformers (covering power frequency withstand voltage, insulation resistance, turns ratio and DC resistance tests) adopts the "distributed equipment combination" mode, which requires the separate equipment of 4 to 5 independent devices such as power frequency withstand voltage tester, insulation resistance tester, turns ratio tester and DC resistance tester. At the same time, additional auxiliary tools such as cable reels, wiring tools and mobile carts are required.
[0004] However, the handling of multiple independent devices (a single power frequency withstand voltage tester can weigh 50-80kg, requiring two people to move it), on-site placement (requiring space and safety distance for equipment operation, and time-consuming adjustments), and repeated wiring (requiring disconnection and reconnection after each test, with each wiring and debugging session taking 15-20 minutes, and the total wiring time for four tests exceeding one hour) results in a total preparation and testing time of 2-3 hours, extending the overall testing time. This is especially true in remote distribution network areas and other locations with inconvenient transportation, where equipment transportation and handling take even longer. On the other hand, the entire testing process requires 3-4 people working together, and wiring and operation must be performed by personnel with professional skills (e.g., high-voltage wiring requires certified electricians). This not only increases the company's labor costs but also poses safety risks such as inaccurate test data, equipment damage, or even electric shock due to personnel errors (e.g., wiring errors, parameter adjustment deviations). Furthermore, manual data recording and report compilation are prone to errors, affecting the traceability and compliance of test results.
[0005] In view of this, we have developed a self-propelled tracked vehicle-type comprehensive testing device for high-voltage transformers. Utility Model Content
[0006] The purpose of this invention is to provide a self-propelled tracked vehicle-type high-voltage transformer comprehensive testing device to solve the problems mentioned in the background art.
[0007] To achieve the above objectives, this utility model provides the following technical solution: a self-propelled tracked vehicle type high-voltage transformer comprehensive testing device, comprising: a tracked vehicle and a comprehensive testing unit; The tracked vehicle includes a protective frame, a motor is installed inside the protective frame, a reducer is connected to the output end of the motor, a rotating shaft is connected to one end of the reducer, a wheel hub gear ring is connected to one end of the rotating shaft after passing through the protective frame, and a top plate is connected to the top of the protective frame. The integrated test unit is located at the top of the top plate. Through the coordinated use of the power frequency withstand voltage test module, insulation resistance test module, turns ratio test module and DC resistance test module of the integrated test unit, the comprehensive test of the high voltage transformer is integrated together.
[0008] Preferably, the integrated test unit further includes a PLC, the output of which is connected to a communication module, and the output of the communication module is connected to a control terminal. The power frequency withstand voltage test module, the insulation resistance test module, the turns ratio test module, and the DC resistance test module are respectively connected to the output of the PLC. The output of the power frequency withstand voltage test module is connected to a transformer. The outputs of the insulation resistance test module, the turns ratio test module, and the DC resistance test module are respectively connected to a test junction box, and the test junction box is connected to the transformer.
[0009] Power frequency withstand voltage test module: Rated capacity: 10KVA, Input voltage: 200V, Input current: 50.0A, Output voltage: AC50KV; Output current: 100mA, Transformation ratio: 250, Measurement transformation ratio: 500, Connection group: I, I0; Insulation resistance test module: Insulation resistance measurement voltage: 500V, 1000V, 2500V, 5000V. Measurement range: 0.0-1000GΩ. Measured current: 1-1.2mA. Short circuit current: 1.3mA.
[0010] Transformer ratio test module; Range: 0.9~6000, Accuracy: ±0.1%+2 digits (0.9~500), ±0.2%+2 digits (501~2000), ±0.3%+2 digits (2001~6000); DC resistance testing module; Output current: High voltage CH1: 5A, 1A, 0.1A, 0.01A; Low voltage CH2: 20A, 10A, 5A, 2A; Measuring range (high pressure CH1---0.01A, 0.1A, 1A, 5A): 0Ω——2000Ω; Measuring range (low pressure CH2---2A, 5A, 10A, 20A): 0Ω——0.1Ω; Accuracy: (High pressure CH1): 0.2% ± 1 μΩ; (Low pressure CH2): 0.2% ± 0.2 μΩ; Minimum resolution: 0.1μΩ.
[0011] Preferably, the input terminal of the PLC is connected to a temperature monitoring instrument, and the output terminal of the temperature monitoring instrument is connected to a power analyzer, a frequency converter, and a support chassis.
[0012] Preferably, the input terminal of the frequency converter is connected to a battery, the output terminal of the battery is connected to a voltage transformer and a current transformer respectively, and the output terminals of the voltage transformer and the current transformer are connected to the input terminal of the power analyzer.
[0013] Preferably, the output terminal of the frequency converter is connected to the input terminal of the insulation resistance test module.
[0014] Preferably, the output of the communication module is connected to the input of the supporting chassis.
[0015] Preferably, the input terminals of the PLC are connected to an electronic fence and an experimental report, respectively.
[0016] Preferably, the surfaces of the wheel hub gear rings are respectively engaged with flexible chain links, and the surfaces of the flexible chain links are connected to tracks by bolts.
[0017] Preferably, the protective frame is connected to a towing shaft at equal intervals on its side, and one end of the towing shaft is connected to a towing wheel, with the towing wheel in contact with the surface of the track.
[0018] Preferably, a locking element is connected between the rotating shaft and the hub gear ring.
[0019] Compared with the prior art, the beneficial effects of this utility model are: (1) By integrating all test modules onto the tracked vehicle, there is no need to disassemble and assemble the equipment on site. The test can be started simply by selecting the module through the control terminal. The equipment preparation time is shortened, and the total test time for a single transformer is also shortened. At the same time, the tracked vehicle moves automatically (no need for manual pushing), the test junction box is connected once (no need for repeated wiring), and the test process is automatically controlled by PLC. Only 1 to 2 people are needed to complete all operations, reducing manpower input and lowering the company's labor costs. (2) The tracked vehicle adopts a flexible chain link and towing wheel design, which can adapt to the uneven road surface, grass, and small slope (≤15°) terrain of the distribution network site, improving the passability. Each test module adopts a standardized interface, and modules can be selected or replaced according to actual needs (such as adding a dielectric loss test module). At the same time, the PLC has reserved expansion interface to support the future access of new sensors or communication protocols, meet the functional upgrade requirements after the update of the distribution network test standard, and extend the service life of the device. (3) Through the inductive electronic fence and automatic discharge mechanism, when personnel accidentally enter the test area, the device can stop the test and complete the discharge within 0.5 seconds to avoid high voltage electric shock accidents; at the same time, the remote control terminal can realize "operation by personnel away from the test area", reducing the probability of personnel directly contacting high voltage equipment, while the temperature monitoring instrument monitors the equipment temperature in real time to avoid the risk of burnout due to overheating of the equipment; test data is automatically stored and backed up to prevent data loss due to human recording errors, while the automatic report generation function reduces human filling errors and ensures the accuracy and traceability of test results. Attached Figure Description
[0020] Figure 1 This is a schematic diagram of the tracked vehicle and integrated test unit of this utility model; Figure 2 This is a first-view structural schematic diagram of the tracked vehicle of this utility model; Figure 3 This is a structural schematic diagram of the tracked vehicle of this utility model from a second perspective; Figure 4 This is a structural schematic diagram of the tracked vehicle of this utility model from a third-person perspective; Figure 5 This is a flowchart of the internal modules of the comprehensive test unit of this utility model.
[0021] In the diagram: 1. Tracked vehicle; 11. Protective frame; 12. Track; 13. Wheel hub gear ring; 14. Flexible chain link; 15. Trailer wheel; 16. Trailer shaft; 17. Locking element; 18. Top plate; 19. Motor; 100. Reducer; 101. Rotating shaft; 2. Comprehensive test unit. Detailed Implementation
[0022] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0023] In the description of this utility model, it should be noted that, unless otherwise explicitly specified and limited, the terms "installed", "equipped with", "sleeved with", "connected", etc., should be interpreted broadly. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be a connection within two components. For those skilled in the art, the specific meaning of the above terms in this utility model can be understood according to the specific circumstances.
[0024] Please see Figure 1-5 This utility model provides a technical solution: a self-propelled tracked vehicle type high voltage transformer comprehensive test device, including: a tracked vehicle 1, the tracked vehicle 1 includes a protective frame 11, a motor 19 is arranged inside the protective frame 11, the output end of the motor 19 is connected to a reducer 100, one end of the reducer 100 is connected to a rotating shaft 101, one end of the rotating shaft 101 passes through the protective frame 11 and is connected to a hub gear ring 13, and the top of the protective frame 11 is connected to a top plate 18; The integrated test unit 2 is located on the top of the top plate 18. Through the coordinated use of the power frequency withstand voltage test module, insulation resistance test module, turns ratio test module and DC resistance test module of the integrated test unit 2, the comprehensive test of the high voltage transformer is integrated together.
[0025] The integrated test unit 2 also includes a PLC. The output terminal of the PLC is connected to a communication module, and the output terminal of the communication module is connected to a control terminal. The power frequency withstand voltage test module, insulation resistance test module, turns ratio test module, and DC resistance test module are respectively connected to the output terminal of the PLC. The output terminal of the power frequency withstand voltage test module is connected to a transformer. The output terminals of the insulation resistance test module, turns ratio test module, and DC resistance test module are respectively connected to a test junction box, and the test junction box is connected to the transformer.
[0026] The input terminal of the PLC is connected to a temperature monitoring instrument (model AI-7024, with 4 temperature acquisition channels, measurement range -50℃-150℃, accuracy ±0.5℃) via signal lines. The output terminal of the temperature monitoring instrument is connected to a power analyzer (model PA6000, which can measure parameters such as voltage, current, and power factor, with an accuracy of 0.1 grade), a frequency converter (model VP1100, output voltage 0-300V, frequency 0-500Hz, power 10kVA, providing adjustable power for the test module) and a support chassis (integrated with the tracked vehicle 1, made of Q345 steel, used to distribute the weight of the device and prevent it from sinking into soft ground) via thermocouples (model K, graduation number K, measurement range 0℃-1200℃).
[0027] The input terminal of the frequency converter is connected to a battery (a lead-acid battery pack, 24V, 100Ah capacity, which can meet the mobile and testing needs of the device when there is no external power supply and supports solar charging expansion) via a copper core cable. The output terminal of the battery is connected to a voltage transformer (model JDZ10-10, ratio 10kV / 0.1kV, accuracy class 0.5, used to collect the output voltage of the frequency converter) and a current transformer (model LZZBJ9-10, ratio 50A / 5A, accuracy class 0.5, used to collect the output current of the frequency converter) via signal lines. The output terminals of the voltage transformer and the current transformer are connected to the input terminal of the power analyzer via shielded wires (the power analyzer analyzes and processes the collected voltage and current data and feeds it back to the PLC to monitor the power status).
[0028] The output terminal of the frequency converter is connected to the input terminal of the insulation resistance test module via a multi-core control line (providing the insulation resistance test module with an adjustable voltage that meets the test requirements, satisfying the test needs of transformers with different insulation levels).
[0029] The output of the communication module is connected to the input of the support chassis. The PLC can send commands to the support chassis through the communication module, such as adjusting the height of the chassis support feet to enhance the stability of the device during testing.
[0030] The input terminals of the PLC are connected via signal lines to an electronic fence (an infrared beam fence that can detect personnel entering the dangerous test area and trigger an emergency stop of the PLC) and an experimental report (the PLC calls a preset template, automatically integrates test data to generate a standardized report, supports PDF export and printing, and the report includes information such as test time, equipment number, test data, and pass / fail determination).
[0031] The surfaces of the wheel hub tooth ring 13 mesh with the flexible chain link 14 (made of polyurethane material with an internal steel wire skeleton, which has wear-resistant and anti-aging properties) (through the meshing transmission between the tooth ring and the chain link, the rotation of the rotating shaft 101 is converted into the linear movement of the track). The surface of the flexible chain link 14 is connected to the track 12 (a rubber track with anti-slip patterns on the surface, a ground pressure of 0.05MPa, suitable for driving on complex terrain) by M8×20 bolts.
[0032] The protective frame 11 has a towing shaft 16 bolted to its side at equal intervals. One end of the towing shaft 16 is connected to a towing wheel 15 through a bearing (model 6004). The towing wheel 15 is in close contact with the surface of the track 12 (the towing wheel 15 can support the track 12, prevent the track from sagging and deforming, and reduce the friction between the track and the protective frame 11, ensuring smooth track operation and preventing derailment).
[0033] A locking component 17 is connected between the rotating shaft 101 and the hub gear ring 13. The locking component 17 is a double nut locking structure, which, together with a spring washer, can prevent relative slippage between the rotating shaft 101 and the hub gear ring 13 during transmission, thus ensuring the stability and reliability of power transmission.
[0034] The handheld remote control integrated device consists of two main parts: one is the main body of the device, which integrates multiple testing functions. This part is carefully designed to minimize the size and maximize the functional integration; the other is the remote control vehicle, which serves as a mobile platform. The vehicle carries the main body of the device and is wirelessly connected to the handheld remote control to achieve remote control. The specific operating procedures are as follows: Preparation stage Equipment inspection: Confirm that the integrated testing equipment has been correctly installed on the remote control vehicle, and that all interfaces are securely connected without any looseness or damage.
[0035] Battery charging: Check and ensure that the batteries of the remote control car and handheld remote control are fully charged to avoid affecting operation due to insufficient power.
[0036] Environmental preparation: Place the remote control car in an open and safe test area, avoiding obstacles that may interfere with the wireless signal or cause safety hazards.
[0037] Startup and Connection To start the remote control car: Press the power button on the remote control car to start the vehicle and put it into standby mode.
[0038] Pairing the remote control: Use the handheld remote control and follow the instructions to pair it with the remote control car to ensure a stable wireless signal connection.
[0039] Equipment self-test: Send commands via remote control to enable the integrated testing equipment to perform a self-test and confirm that each functional module is operating normally.
[0040] Remote control Driving control: Use the directional keys or joystick on the remote control to control the forward, backward, and turning movements of the remote-controlled car to transport the equipment to the designated test location.
[0041] Functional Operation: Different test modes or parameter settings on the testing equipment can be selected and activated via the function buttons on the remote control or the touchscreen (if equipped). For example, adjusting the test voltage and frequency, and selecting test items.
[0042] Data monitoring: Equipped with data transmission function, allowing users to view test data or graphs in real time via the display screen on the remote control or by connecting to external devices (such as computers or tablets).
[0043] This allows the tracked vehicle 1 and the integrated test unit 2 to operate.
[0044] Stop and close Stop Test: When the test is completed or needs to be interrupted, send a stop command via remote control to stop the test equipment from working.
[0045] Safe parking: Drive the remote-controlled car to a safe location and turn off its power.
[0046] Equipment organization: Check the equipment for any damage or leftovers, and organize all accessories and connecting cables for future use.
[0047] Specifically, during use, when the device needs to move, the control terminal sends a movement command to the PLC through the communication module. After receiving the command, the PLC sends a start signal to the motor 19 inside the protective frame 11. After the motor 19 is powered on, it starts to run and outputs initial power. The output end of the motor 19 is directly connected to the reducer 100. Since the output speed of the motor 19 is high but the torque is low, it cannot directly drive the track. The reducer 100 will reduce the power output by the motor and convert the high speed into high torque through the meshing transmission of the internal gear set to ensure that the power can meet the needs of the track to move in complex terrain (such as potholes and sloping roads in the power distribution site). The output end of the reducer 100 is connected to the rotating shaft 101. The power after reduction and torque amplification is transmitted to the hub gear ring 13 on the outside of the protective frame 11 through the rotating shaft 101. In order to prevent the rotating shaft 101 and the hub gear ring 13 from sliding relative to each other during the transmission process, the two are locked together by the locking member 17 to ensure the stability of power transmission. The hub gear ring 13 and the flexible chain ring 14 mesh with each other. When the hub gear ring 13 rotates under the drive of the rotating shaft 101, it will drive the flexible chain ring 14 to move synchronously. The flexible chain ring 14 is fixedly connected to the track 12 by bolts, and finally drives the track 12 to roll along the ground to realize the movement of the entire device. The towing shafts 16, which are installed at equal intervals on the side of the protective frame 11, have towing wheels 15 connected to their ends that are in close contact with the surface of the track 12. The towing wheels 15 have two main functions: first, to support the track 12 and prevent it from sagging or deforming due to the weight of the device itself (including the integrated test unit); second, to reduce the friction between the track and the protective frame during track rolling by the rolling of the towing wheels 15, while ensuring the stability of the track's running trajectory, preventing track deviation or derailment, and ensuring the stability of the device during movement. The integrated testing unit, as the core functional module, is responsible for completing four key tests of the high-voltage transformer: power frequency withstand voltage, insulation resistance, turns ratio, and DC resistance. Its operation relies on centralized control by PLC, coordination among various functional modules, and data acquisition and feedback mechanisms. The specific process can be divided into four stages: "test preparation - test execution - data processing - safety protection". Test preparation stage: Module selection and wiring. Based on the test requirements of the high-voltage transformer to be tested, the staff selects the corresponding test modules (power frequency withstand voltage test module, insulation resistance test module, turns ratio test module, and DC resistance test module) through the control terminal. After receiving the module selection command, the PLC automatically confirms the power-on status and interface connection of each module. In the wiring process, the output terminal of the power frequency withstand voltage test module is directly connected to the transformer to be tested, while the output terminals of the insulation resistance measurement module, turns ratio test module, and DC resistance test module are uniformly connected to the test junction box. The test junction box is then connected to the transformer. This "multi-module-single junction box-transformer" wiring method realizes "completing all tests with one wiring" without the need for repeated disassembly and reassembly. The battery serves as the power source for the entire test unit. On one hand, it provides input power to the frequency converter. On the other hand, it transmits its own voltage and current signals to the power analyzer through voltage and current transformers to achieve real-time monitoring of the power supply status. The PLC obtains real-time temperature data of the power analyzer, frequency converter, and chassis through a temperature monitoring device. If the temperature is within the normal range (not exceeding the equipment tolerance threshold), the PLC sends a start command to the frequency converter. The frequency converter adjusts its output parameters according to the test requirements (e.g., insulation resistance tests require different voltage levels such as 500V / 1000V) and delivers the adjusted power to the insulation resistance test module (while also providing basic power to other modules), completing the parameter initialization before the test. Test Execution Phase: Taking four typical tests as examples, the execution flow of each module under PLC control is as follows: Power frequency withstand voltage test: The PLC sends a start command to the power frequency withstand voltage test module. After receiving the command, the module converts the basic power provided by the frequency converter into a high voltage output of AC50KV (compliant with the 10kV transformer withstand voltage test standard) and applies the high voltage to the transformer winding. During the test, the voltage transformer collects the output voltage data in real time, and the current transformer collects the loop current data. Both transmit the data to the power analyzer. The power analyzer performs preliminary processing on the data and feeds it back to the PLC. The PLC monitors in real time whether the voltage and current are stable within the test requirements (e.g., the output current does not exceed 100mA). The PLC switches the test mode and sends a command to the insulation resistance test module. The module generates the corresponding test voltage using the power provided by the frequency converter according to the preset parameters (such as selecting 2500V measurement voltage). The voltage is applied between the transformer winding and the casing. The measurement circuit inside the module collects the insulation resistance value in real time (measurement range 0.0-1000GΩ) and transmits the data to the PLC through the communication module. The PLC then feeds the data back to the control terminal for display. The execution logic for the turns ratio test and the DC resistance test is similar to that described above. The PLC sends instructions to the turns ratio test module and the DC resistance test module, respectively: The turns ratio test module inputs a test signal to the transformer through the test junction box, collects the voltage ratio between the high and low voltage windings of the transformer, calculates the turns ratio (range 0.9-6000, accuracy up to ±0.1%), and transmits the result to the PLC; The DC resistance test module selects the output current (maximum 5A for high voltage CH1, maximum 20A for low voltage CH2) according to the transformer winding type (high voltage / low voltage), measures the DC resistance of the winding (range 0-2000Ω / 0-0.1Ω, accuracy ±0.2%), and the data is also fed back to the PLC; During the data processing and report generation phase, data storage and analysis are performed. After receiving the raw data from each test module, the PLC stores the data in real time to the local database (or remote server) of the control terminal via the communication module. Simultaneously, it performs compliance analysis on the data, such as comparing the voltage stability and insulation resistance values of the power frequency withstand voltage test with national standard thresholds to determine whether the test results are qualified. After all tests are completed, the PLC calls the preset report generation program to integrate information such as test time, environmental parameters (e.g., temperature and humidity, which can be expanded through external sensors), test data from each module, and qualification judgment results to generate standardized test reports (e.g., "Voltage Ratio Measurement and Connection Group Label Verification Report" and "External Withstand Voltage Test Report"). The reports can be printed directly from the control terminal or exported as electronic documents for archiving. Safety Protection and Anomaly Handling Principle: The electronic fence connects to the PLC input terminal, forming a virtual protective boundary within the test area. When personnel accidentally enter the test area, the electronic fence's sensors (such as infrared and microwave sensors) detect the abnormal signal and immediately transmit it to the PLC. Upon receiving the signal, the PLC triggers a triple safety mechanism: first, it sends an audible and visual alarm to the control terminal via the communication module to alert the operator; second, it automatically sends a "stop test" command to each test module, cutting off the high-voltage output; and third, it controls modules such as the power frequency withstand voltage module to perform a discharge operation, preventing residual charge on the transformer from causing electric shock. The temperature monitoring instrument collects real-time temperature data from the power analyzer, frequency converter, and chassis. If the temperature of any device exceeds a preset threshold (e.g., the frequency converter is too hot), the temperature monitoring instrument will send an abnormal signal to the PLC. The PLC will immediately stop the operation of the corresponding module and display the fault location and cause on the control terminal (e.g., "Frequency converter overheating, please stop and cool down"). This facilitates quick troubleshooting by staff. In case of an emergency (e.g., equipment malfunction or personnel misoperation), staff can send an "emergency stop" command directly to the PLC via a handheld remote control terminal (a mobile form of the control terminal). The PLC will execute the stop command first, cutting off power to all modules and high-voltage output to ensure test safety.
[0048] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A self-propelled crawler-type high-voltage transformer comprehensive test device, characterized in that, include: Tracked vehicle (1), tracked vehicle (1) includes a protective frame (11), a motor (19) is provided on the inner side of the protective frame (11), a reducer (100) is connected to the output end of the motor (19), a rotating shaft (101) is connected to one end of the reducer (100), a wheel hub gear ring (13) is connected to one end of the rotating shaft (101) after passing through the protective frame (11), and a top plate (18) is connected to the top of the protective frame (11). The integrated test unit (2) is set on the top of the top plate (18). The integrated test unit (2) integrates the power frequency withstand voltage test module, insulation resistance test module, turns ratio test module and DC resistance test module through the coordinated use of the integrated test unit (2) to integrate the integrated test of the high voltage transformer.
2. The self-propelled track vehicle type high voltage transformer comprehensive test device according to claim 1, characterized in that, The comprehensive test unit (2) also includes a PLC. The output terminal of the PLC is connected to a communication module, and the output terminal of the communication module is connected to a control terminal. The power frequency withstand voltage test module, insulation resistance test module, turns ratio test module and DC resistance test module are respectively connected to the output terminal of the PLC. The output terminal of the power frequency withstand voltage test module is connected to a transformer. The output terminals of the insulation resistance test module, turns ratio test module and DC resistance test module are respectively connected to a test junction box. The test junction box is connected to the transformer.
3. The self-propelled track vehicle type high voltage transformer comprehensive test device according to claim 2, characterized in that, The input terminal of the PLC is connected to a temperature monitoring instrument, and the output terminal of the temperature monitoring instrument is connected to a power analyzer, a frequency converter, and a support chassis.
4. The self-propelled track vehicle type high voltage transformer comprehensive test device according to claim 3, characterized in that, The input terminal of the frequency converter is connected to a battery, and the output terminals of the battery are respectively connected to a voltage transformer and a current transformer. The output terminals of the voltage transformer and the current transformer are connected to the input terminal of the power analyzer.
5. The self-propelled track vehicle type high voltage transformer comprehensive test device according to claim 3, characterized in that, The output terminal of the frequency converter is connected to the input terminal of the insulation resistance test module.
6. The self-propelled track vehicle type high voltage transformer comprehensive test device according to claim 2, characterized in that, The output of the communication module is connected to the input of the supporting chassis.
7. The self-propelled track vehicle type high voltage transformer comprehensive test device according to claim 2, characterized in that, The input terminals of the PLC are connected to an electronic fence and an experimental report, respectively.
8. The self-propelled crawler-type high voltage transformer comprehensive test device according to claim 1, characterized in that, The surfaces of the wheel hub gear ring (13) are respectively engaged with flexible chain links (14), and the surfaces of the flexible chain links (14) are connected to tracks (12) by bolts.
9. The self-propelled track vehicle type high voltage transformer comprehensive test device according to claim 8, characterized in that, The protective frame (11) is connected to a towing shaft (16) at equal intervals on its side. One end of the towing shaft (16) is connected to a towing wheel (15), and the towing wheel (15) is in contact with the surface of the track (12).
10. A comprehensive testing device for a self-propelled tracked high-voltage transformer according to claim 1, characterized in that, A locking element (17) is connected between the rotating shaft (101) and the hub gear ring (13).