A training device for plumbing and electrical installation
The integrated design and square profile structure of the water and electricity installation training device solve the problem that existing devices cannot be used for comprehensive training, realize integrated water and electricity teaching and flexible practical operation, and improve the students' operating skills and safety.
Patent Information
- Application Number
- CN202522313211.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-31
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-10-31
AI Technical Summary
Existing plumbing and electrical installation training equipment cannot provide comprehensive training for hot and cold water systems, drainage systems, and power distribution systems. Fixed pipe connections make disassembly and assembly difficult, preventing repeated operations and material changes, and lacking practical flexibility.
An integrated water and electricity installation training device was designed, which includes a training frame assembly, a water inlet assembly, a drainage assembly, and a power distribution assembly. It is constructed with square profiles and incorporates a clamp design to enable repeated installation and disassembly of pipes. It supports the replacement of pipes of different materials and diameters and integrates the water inlet, drainage, and power distribution systems on a unified platform for teaching.
This integrated teaching approach for hydropower has improved students' operational skills and systematic understanding of hydropower systems, enhanced the flexibility and safety of practical training, and facilitated actual installation and disassembly operations.
Smart Images

Figure CN224985887U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of teaching equipment technology, specifically to a water and electricity installation training device. Background Technology
[0002] Plumbing and electrical installation is a crucial and fundamental aspect of modern construction engineering, directly impacting the building's functionality and occupant safety. Its construction quality affects not only daily convenience but also electrical safety and waterproofing performance. However, in actual plumbing and electrical installation, due to varying skill levels among operators, complex construction environments, and stringent installation requirements, problems such as pipe leaks, drainage blockages, short circuits, and electrical leakage frequently occur, sometimes even leading to equipment damage or safety accidents.
[0003] To improve the practical skills of practitioners, plumbing and electrical worker training typically requires the use of installation training devices. Existing plumbing and electrical installation training devices still have the following shortcomings: traditional devices usually separate water and electrical circuits, making it impossible to conduct comprehensive drills of hot and cold water systems, drainage systems, and power distribution systems, lacking a holistic understanding of building plumbing and electrical systems and ensuring continuity of training; existing devices often have fixed pipe connections, making disassembly and assembly difficult and preventing repeated operations, which is not conducive to trainees' training in replacing and comparing pipes of different diameters and materials, resulting in insufficient practical flexibility. Therefore, improvements and optimizations are needed to address these issues. Utility Model Content
[0004] To address the above problems, the technical problem to be solved by this utility model is to provide a training device for plumbing and electrical installation.
[0005] The technical solution adopted by this utility model of a water and electricity installation training device includes: a training frame assembly, a water inlet assembly, a drainage assembly, and a power distribution assembly fixed on the training frame assembly. The training frame assembly is characterized by comprising a training frame base frame assembled from square profiles and arranged horizontally, a training frame rear frame vertically arranged at the upper rear of the training frame base frame, a base plate installed on the training frame base frame, a front mesh plate and a concrete wall template located at the front of the training frame rear frame, a rear mesh plate located at the rear of the training frame rear frame, and a washbasin support frame mounted on the base plate and the front mesh plate. The water inlet assembly includes a cold water pipe and a hot water pipe horizontally fixed within the training frame base frame, and a connection between the cold water pipe and the... The shower assembly connected to the hot water pipe includes a drainage assembly comprising a drainage connecting pipe horizontally fixed to the bottom frame of the training rack by clamps, a main drain pipe vertically passing through the bottom frame of the training rack and connected to the end of the drainage connecting pipe, a washbasin assembly, a smart toilet, and a floor drain respectively connected to branches of the drainage connecting pipe. The washbasin assembly is fixed to the washbasin support frame, and the smart toilet and the floor drain are both fixed to the base plate. The power distribution assembly includes a power distribution box assembly fixed to the rear mesh plate, a socket, a switch, and a light. The socket, the switch, and the light are respectively electrically connected to the power distribution box assembly through conduits.
[0006] The cold water pipeline includes a horizontally arranged main cold water pipe body, a cold water pipe valve connected to the end of the main cold water pipe body, and a cold water pipe external connection end that is vertically installed on the bottom frame of the training rack and connected to a branch of the main cold water pipe body; the hot water pipeline includes a horizontally arranged main hot water pipe body, a hot water pipe valve connected to the end of the main hot water pipe body, and a hot water pipe external connection end that is vertically installed on the bottom frame of the training rack and connected to a branch of the main hot water pipe body.
[0007] The clamp includes an upper clamp and a lower clamp. The upper clamp includes an upper clamp arc portion and an upper clamp screw portion located at the upper end of the upper clamp arc portion and threadedly connected to the base plate and the front mesh plate, respectively. A clamp through hole for pipeline passage is formed between the upper clamp arc portion and the lower clamp. The two ends of the upper clamp arc portion and the two ends of the lower clamp are connected by bolts.
[0008] The training rack assembly also includes training rack support legs fixed below the bottom frame of the training rack.
[0009] The advantages of this utility model of water and electricity installation training device are as follows: This structure can be used for training in electrical wiring connection, lighting control and circuit testing. The device integrates the water inlet system, drainage system and power distribution system on a unified training platform, which can realize integrated water and electricity teaching. Students can complete the entire process of hot and cold water installation, drainage layout and electrical wiring on the same platform, which helps to systematically understand water and electricity installation technology and safety regulations. The whole is constructed of square profiles, which have high strength and good stability, making it convenient for students to perform actual installation and disassembly operations. Attached Figure Description
[0010] The present invention will now be described in further detail with reference to the accompanying drawings and specific embodiments.
[0011] Figure 1 This is a structural schematic diagram of the electrician installation training device of this utility model; Figure 2 This is a structural schematic diagram of the training rack assembly of this utility model; Figure 3 This is a schematic diagram of the water inlet assembly of this utility model; Figure 4 This is a schematic diagram of the drainage assembly of this utility model; Figure 5 This is a schematic diagram of the power distribution assembly of this utility model; Figure 6 This is a schematic diagram of the structure of the clamp of this utility model. Detailed Implementation
[0012] like Figure 1-6As shown, the water and electricity installation training device of this utility model includes a training frame assembly 1, a water inlet assembly 2, a drainage assembly 3, and a power distribution assembly 4 fixed on the training frame assembly 1. The training frame assembly 1 includes a training frame bottom frame 6 assembled from square profiles and arranged horizontally, a training frame rear frame 7 vertically arranged at the upper rear of the training frame bottom frame 6, a base plate 8 installed on the training frame bottom frame 6, a front mesh plate 9 and a concrete wall template 12 arranged at the front of the training frame rear frame 7, a rear mesh plate 10 arranged at the rear of the training frame rear frame 7, and a base plate 8 mounted on the bottom frame bottom frame 6. The washbasin support bracket 11 on plate 8 and the front mesh plate 9; the water inlet assembly 2 includes a cold water pipe and a hot water pipe horizontally fixed in the bottom frame 6 of the training rack, and a shower assembly 16 connected to the cold water pipe and the hot water pipe; the drainage assembly 3 includes a drainage connecting pipe 25 horizontally fixed in the bottom frame 6 of the training rack by clamps 15, a main drain pipe 26 vertically passing through the bottom frame 6 of the training rack and connected to the end of the drainage connecting pipe 25, a washbasin assembly 27 connected to branches of the drainage connecting pipe 25, a smart toilet 28, and a floor drain. 29. Through branch connection, the layout and construction process of domestic water supply and drainage can be realistically simulated, allowing trainees to perform practical training operations such as drain pipe connection, sealing test and fault diagnosis, improving their hands-on skills. The washbasin assembly 27 is fixed on the washbasin support frame 11, and the smart toilet 28 and the floor drain 29 are both fixed on the base plate 8. The power distribution assembly 4 includes a power distribution box assembly 31, a socket 34, a switch 33 and a light 35 fixed on the rear mesh plate 10. The socket 34, switch 33 and light 35 are respectively connected via... The conduit 32 is electrically connected to the distribution box assembly 31 to form a complete circuit system. This structure can be used for training in electrical wiring, lighting control, and circuit testing. The device integrates the water inlet system, drainage system, and power distribution system on a unified training platform, enabling integrated water and electricity teaching. Students can complete the entire process of hot and cold water installation, drainage layout, and electrical wiring on the same platform, which helps to systematically understand water and electricity installation technology and safety regulations. The whole structure is made of square profiles, which have high strength and good stability, making it convenient for students to perform actual installation and disassembly operations.
[0013] The cold water pipeline includes a horizontally arranged main cold water pipe body 17, a cold water pipe valve 18 connected to the end of the main cold water pipe body 17, and a cold water pipe external connection end 19 that is vertically inserted through the bottom frame 6 of the training frame and connected to a branch of the main cold water pipe body 17; the hot water pipeline includes a horizontally arranged main hot water pipe body 20, a hot water pipe valve 21 connected to the end of the main hot water pipe body 20, and a hot water pipe external connection end 22 that is vertically inserted through the bottom frame 6 of the training frame and connected to a branch of the main hot water pipe body 20. This facilitates connection to an external water supply system, makes it convenient for teachers to demonstrate and for students to operate, and significantly improves the visualization and safety of practical training.
[0014] The clamp 15 includes an upper clamp 40 and a lower clamp 41. The upper clamp 40 includes an upper clamp arc portion 43 and an upper clamp screw portion 44 located on the upper end of the upper clamp arc portion 43 and threadedly connected to the base plate 8 and the front mesh plate 9, respectively. A clamp through hole 45 for pipe passage is formed between the upper clamp arc portion 43 and the lower clamp 41. The two ends of the upper clamp arc portion 43 and the two ends of the lower clamp 41 are connected by bolts, realizing the repeated installation and disassembly of the pipe, which is convenient for replacing pipes of different diameters or materials during teaching, and at the same time can stably support the pipe and prevent loosening and displacement.
[0015] The training rack assembly 1 also includes a training rack support leg 13 fixed below the training rack base frame 6, which enhances the support stability of the device and is suitable for different ground environments.
[0016] The drainage assembly 3 also includes a water tank 30 placed in the rear frame 7 of the training frame, which can realistically simulate the layout and construction operation process of domestic water supply and drainage, enabling trainees to perform practical training operations such as drainage pipe connection, sealing test and fault diagnosis, and improve their hands-on skills.
[0017] The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present utility model are included within the protection scope of the present utility model.
Claims
1. A water electrician installation training device, comprising a training frame assembly (1), a water inlet assembly (2), a drainage assembly (3) and a power distribution assembly (4) fixed on the training frame assembly (1), characterized in that: The training rack assembly (1) includes a training rack bottom frame (6) assembled from square profiles and arranged horizontally, a training rack rear frame (7) vertically arranged at the upper rear of the training rack bottom frame (6), a base plate (8) installed on the training rack bottom frame (6), a front mesh plate (9) and a concrete wall template (12) arranged at the front of the training rack rear frame (7), a rear mesh plate (10) arranged at the rear of the training rack rear frame (7), and a washbasin support frame (11) mounted on the base plate (8) and the front mesh plate (9). The water inlet assembly (2) includes a cold water pipe and a hot water pipe horizontally fixed in the training rack bottom frame (6), and a shower head assembly (16) connected to the cold water pipe and the hot water pipe. The drainage assembly (3) includes a training rack bottom frame horizontally fixed by a clamp (15). (6) The drainage connecting pipe (25) is vertically installed on the bottom frame (6) of the training rack and connected to the end of the drainage connecting pipe (25). The washbasin assembly (27), smart toilet (28) and floor drain (29) are respectively connected to the branch of the drainage connecting pipe (25). The washbasin assembly (27) is fixed on the washbasin support frame (11). The smart toilet (28) and the floor drain (29) are both fixed on the base plate (8). The power distribution assembly (4) includes a power distribution box assembly (31), a socket (34), a switch (33) and a light (35) fixed on the rear mesh plate (10). The socket (34), the switch (33) and the light (35) are respectively electrically connected to the power distribution box assembly (31) through the conduit (32).
2. The water electrician installation training device according to claim 1, characterized in that: The cold water pipeline includes a horizontally arranged main cold water pipe body (17), a cold water pipe valve (18) connected to the end of the main cold water pipe body (17), and a cold water pipe external connection end (19) that is vertically installed on the bottom frame (6) of the training rack and connected to a branch of the main cold water pipe body (17); the hot water pipeline includes a horizontally arranged main hot water pipe body (20), a hot water pipe valve (21) connected to the end of the main hot water pipe body (20), and a hot water pipe external connection end (22) that is vertically installed on the bottom frame (6) of the training rack and connected to a branch of the main hot water pipe body (20).
3. The water electrician installation training device according to claim 1, characterized in that: The clamp (15) includes an upper clamp (40) and a lower clamp (41). The upper clamp (40) includes an upper clamp arc portion (43) and an upper clamp screw portion (44) located at the upper end of the upper clamp arc portion (43) and threadedly connected to the base plate (8) and the front mesh plate (9) respectively. A clamp through hole (45) for pipeline passage is formed between the upper clamp arc portion (43) and the lower clamp (41). The two ends of the upper clamp arc portion (43) and the two ends of the lower clamp (41) are connected by bolts.
4. The water electrician installation training device according to claim 1, characterized in that: The training rack assembly (1) also includes a training rack support leg (13) fixed below the training rack bottom frame (6).
