Method for determining an energy management plan, computer program and / or computer-readable medium, control unit, electrically powered vehicle, data processing device
Patent Information
- Application Number
- DE102023109352
- Authority / Receiving Office
- DE · DE
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-13
- Publication Date
- 2024-10-17
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
The present disclosure relates to a method for determining an energy management plan for charging an energy storage device of a vehicle of a plurality of electrically powered vehicles at one of a plurality of charging points connected to a grid connection of a business premises. The disclosure also relates to a computer program and / or computer-readable medium, a control device for an electrically powered vehicle, an electrically powered vehicle, and a data processing device for a business premises having a plurality of charging points connected to a grid connection. In other words, the disclosure relates to optimized charging of battery electric vehicles (BEVs), including plug-in hybrid electric vehicles (PHEVs), at a group of charging stations while maintaining a charging target. One embodiment of the disclosure particularly relates to a system for optimizing charging and discharging processes, i.e., so-called bidirectional charging processes, of battery electric vehicles at a group of charging stations while maintaining a charging target. The vehicles are in particular electrically powered vehicles that are set up for intelligent charging, for example in accordance with DIN EN ISO 15118-2:2016-08 “Road vehicles - Vehicle-to-charging station communication interface - Part 2: Network and application protocol requirements” from August 2016 and / or for direct current fast charging, for example in accordance with DIN EN ISO 15118-1:2019-08 “Road vehicles - Vehicle-to-charging station communication interface - Part 1: General information and use case specifications” from August 2019. The use of stationary batteries at charging stations to avoid peak loads at a grid connection point or, in the case of low grid connection point power, to charge BEVs with much higher power is well known. Charging planning is known from the state of the art to manage the load of charging stations for charging multiple vehicles, so-called BEV fleets, e.g. in fleet applications. When planning charging, various conditions must be taken into account, including so-called primary charging targets. Such a primary charging target can, for example, relate to the storage level or the state of charge (SOC) of an energy storage device of one of the vehicles at the end of its downtime at one of the charging points, i.e., at the time of departure. DE 10 2021 112 418 A1 discloses a method for operating an energy market platform for energy trading for at least one aggregator by means of an electronic computing device. A time period specified for energy trading is divided into a plurality of specified time units, and a respective energy potential is determined for each time unit as a function of at least one energy installation. The respective energy potential is clearly displayed for the aggregator on the energy market platform. A time-unit-dependent trading energy request is compared with the respective energy potential by input from the aggregator. To determine the respective time-dependent energy potential of each vehicle, an energy flexibility determination is carried out based on a charging strategy for the respective vehicle.In particular, the flexibility of the individual vehicles and the aggregation of the flexibilities can be used to create an overall flexibility of the vehicle fleet. In the case of bidirectional charging for vehicles according to ISO 15118-20:2022-04 "Road vehicles - Vehicle-to-charging station communication interface - Part 20: 2nd generation network and application protocol requirements" from April 2022, the charging of the energy storage device and / or the feeding of energy from the vehicle's energy storage device into a power grid can also be taken into account, optionally taking energy costs into account. DE 10 2021 104 556 A1 discloses a method for distributing electrical power in a local power grid, wherein the local power grid has at least one electrical consumer, at least one electric vehicle capable of bidirectional charging and connected to a respective charging device, and a measuring device for measuring a power currently drawn by the local power grid from a higher-level power grid, and wherein in the method the electrical discharge power from the electric vehicle connected to the charging device is fed into the local power grid. In other words, a system is described that controls bidirectionally chargeable vehicles by charging / discharging in such a way that a threshold value below a maximum power reference value for the local power grid is maintained (so-called “peak shaving”). WO 2019 / 162264 A1 discloses a method for adapting an electrical power supply to an electrical power demand in an electrical network on which at least one electric charging station is operated, wherein in the method, a control device of the network creates a charging forecast for at least one vehicle, which indicates in which future charging period the vehicle is expected to exchange electrical energy with the network, a temporal profile of the power demand present in the network is estimated depending on the respective charging forecast, a temporal profile of the power supply in the network is determined, and at least one predetermined compensating measure is triggered for at least one charging period for which it is recognized that the power supply is less than the estimated power demand,whereby at least one compensatory measure aligns the service supply with the service demand. In other words, the amount of energy that a BEV will exchange upon its expected arrival at a charging station connected to the grid is predicted. However, the state of the art cannot guarantee that the primary charging target of each individual BEV in the group of charging stations will be met, taking into account additional boundary conditions, so-called secondary charging targets, such as a specified power at a grid connection point for the group of charging stations, energy procurement costs and / or revenues from feed-in, for example including taking into account CO2 pricing, the state of health (SOH) of the energy storage devices of the vehicles and optionally a stationary storage device. Against the background of this prior art, one object of the present disclosure is to enable charging planning that is suitable for enriching the prior art. In particular, the object of the disclosure is to enable charging planning or energy management to enable more comprehensive compliance with primary and secondary charging targets. The problem is solved by the features of the independent claims. The subclaims contain further developments of the disclosure. According to this, the object is achieved by a method for determining an energy management plan for charging an energy storage device of a vehicle of a plurality of electrically driven vehicles at one of a plurality of charging points connected to a network connection of a business premises.The operating site has an energy converter, different from the charging points and connected to the grid connection, for consuming and / or generating electrical energy at the operating site and / or an energy storage device for storing electrical energy at the operating site, wherein the method comprises: detecting idle time information relating to the vehicle, charging information relating to an energy transfer between the vehicle and the charging point, and energy information relating to the energy converter and / or energy storage device; determining flexibility information depending on the idle time information, the charging information, and the energy information; and outputting the energy management plan with a charging plan for charging the energy storage device, taking the flexibility information into account. The energy management plan includes the charging plan. The charging plan can include information on a planned energy transfer between one or more vehicles and one or more charging points, with each of the vehicles connected and / or connectable to one of the charging points for energy transfer. The energy management plan can thus influence the facility's energy requirements and ensure compliance with definable charging targets. For this purpose, the energy management plan and in particular the charging plan are based on the flexibility information. The basic principle of the disclosure is the creation or determination of the flexibility information, for example as one or more flexibility diagrams, based on the downtime information, for example the arrival time and departure time, and the charging information, for example comprising a requested and / or released amount of energy for energy transfer, for each of the vehicles. Further flexibilities, such as the generation and / or consumption of electrical power by the energy converters and / or charging and / or discharging of the energy storage device, are additionally determined or are incorporated via the energy information when determining the flexibility information. The flexibility information can then be calculated as the total flexibility, the sum of the individual contributions from the vehicles and other on-site systems, such as the energy converter and / or the energy storage system. The flexibility information thus determined can then be used to determine the energy management plan, taking the charging targets into account. This makes it possible to consider various charging targets. For example, a primary charging target, i.e., a state of charge at the end of the standstill period, can be considered for each vehicle. Secondary charging targets include a maximum specified power at the grid connection point, energy procurement costs or revenues from feed-in and grid stabilization, and a state of health (SOH) of the energy storage device and / or energy storage system, including operating times. Optionally, the energy management plan can be issued taking into account a peak load affecting the grid connection. The peak load can be defined as a premise when issuing the energy management plan. This ensures that the peak load at the grid connection remains below the peak, thus avoiding destabilization of the power grid and simultaneously ensuring effective and cost-efficient operation of the facility, including the charging points. Optionally, the operating site has a controllable energy converter, and the flexibility information is determined depending on control information relating to the controllable energy converter. The controllable energy converter can in particular be a so-called controllable load, for example a heating and / or air conditioning unit and / or a system on the operating site that does not have to be operated with a specific load at a specific time. Therefore, with a controllable energy converter, it is possible to flexibly coordinate the operation of the controllable energy converter in terms of time and / or power. The control information can, for example, relate to a minimum load, a maximum load and / or temporal information relating to a target control of the controllable energy converter. The temporal information relating to a target control includes, for example, a time interval in which the controllable energy converter is to be operated.By taking the controllable energy converter into account, the flexibility information can be provided taking into account the control information, which can positively influence the flexibility of the facility and thus the energy management plan. Optionally, the energy management plan includes a control plan for controlling the controllable energy converter. This makes it possible to further increase the flexibility of the facility's energy management by controlling the controllable energy converter according to the control plan. The control plan can be created taking the control information into account. Optionally, the facility includes the energy storage system, and the energy management plan includes an operating plan for controlling the energy storage system's state of charge. This makes it possible to further increase the flexibility of energy management by charging and / or discharging the energy storage system according to the operating plan. The control plan can be created taking energy information into account. The energy information can, for example, include a state of charge and / or capacity of the energy storage system. Optionally, the charging information relates to the feeding of electrical energy by the vehicle into an external power grid and the charging of the vehicle's energy storage device. In other words, the charging information can relate to bidirectional charging. For this purpose, one or more of the vehicles can be configured for bidirectional charging. Flexibility can be further increased by the possibility of feeding electrical energy from the energy storage device of one of the vehicles into the power grid via one of the charging points. The energy management plan, and in particular the charging plan, can also include information on feeding electrical energy from the energy storage device into the power grid via the charging point. In other words, the above description can be summarized as follows, based on a specific embodiment that is described as non-limiting to the present disclosure: The starting point is maintaining a specified power at a grid connection point for a group of charging stations, optionally by charging and / or feeding back energy, taking into account energy costs, self-generation with storage, and compliance with the charging target (storage level, departure time) of the electrified vehicles (BEVs) capable of optional bidirectional charging. The basic principle is the creation of flexibility diagrams based on arrival time, departure time, and the amount of energy to be charged for each individual vehicle, and the consideration of the flexibility in charging / discharging a stationary battery storage system and / or a controllable load to determine overall flexibility.Total flexibility is the sum of the flexibilities across all vehicles and systems. This way, with a given level of flexibility, exceeding a predefined maximum peak load at the grid connection can be avoided, thus avoiding high power provision costs. Total flexibility can be used to optimize energy procurement costs and revenues from feed-in and grid stabilization, taking into account the health status of the vehicle storage systems and the stationary storage systems, including their respective operating times. The energy can then be disaggregated to the individual vehicles or systems through the energy management plan for the vehicles and through deployment planning for the stationary battery storage systems or controllable loads. The charging target of each individual BEV can be met, taking into account the total energy costs and revenues, self-generation, and energy storage. According to one aspect of the disclosure, a computer program and / or a computer-readable medium is provided. The computer program and / or the computer-readable medium comprise instructions which, when the program or instructions are executed by a computer, cause the computer to perform the method according to the disclosure and / or steps thereof. Optionally, the computer program and / or the computer-readable medium comprises instructions which, when the program or instructions are executed by a computer, cause the computer to perform the method steps described as advantageous or optional in order to achieve an associated technical effect. According to one aspect of the disclosure, a control unit for an electrically driven vehicle is provided. The control unit is configured to carry out the method described above. Optionally, the control unit is configured to carry out a method step described as advantageous or optional and / or to implement a method feature in order to achieve an associated technical effect. According to one aspect of the disclosure, an electrically driven vehicle comprising the control unit described above is provided. Optionally, the control unit of the vehicle and / or the vehicle is configured to perform a method step described as advantageous or optional and / or to implement a method feature in order to achieve an associated technical effect. This makes it possible for the charging plan to be calculated on a vehicle-by-vehicle basis. For this purpose, the vehicle can query the relevant information relating to the operating site and possibly other vehicles via the charging points in order to determine the charging plan and output it for charging the vehicle at the charging points. According to one aspect of the disclosure, a data processing device for a business premises is provided, comprising a plurality of charging points connected to a grid connection, an energy converter different from the charging points and connected to the grid connection for consuming and / or generating electrical energy at the business premises, and / or an energy storage device for storing electrical energy at the business premises. The data processing device is configured to carry out the method described above. Optionally, the data processing device is configured to carry out a method step described as advantageous or optional and / or to implement a method feature in order to achieve an associated technical effect. This makes it possible for the charging point to calculate the charging plan and to specify it to the vehicle for charging at the charging point.This allows information relating to the facility to remain with the charging point operator and does not need to be transmitted to the vehicle for processing. This allows the facility's energy management to be comprehensively reviewed without potentially sensitive data having to be transferred. In the following, one embodiment is described with reference to the figures. Fig. 1 schematically shows a business site, each with a plurality of charging points and business site-side energy converters and a business site-side energy storage device for carrying out a method according to one aspect of the disclosure; and Fig. 2 schematically shows a flexibility diagram as flexibility information for carrying out a method according to one aspect of the disclosure; Fig. 3 schematically shows a charging and discharging curve of a business site-side energy storage device as energy information for determining the flexibility information for carrying out a method according to one aspect of the disclosure; Fig. 4 shows features that can be taken into account in a method according to one aspect of the disclosure; Fig. 5 shows an exemplary scenario for carrying out a method according to one aspect of the disclosure; and Fig.6 schematically shows a flowchart of a method according to one aspect of the disclosure. Fig. 1 schematically shows a business site 60 with a plurality of charging points 65a, 65b, 65c and business site-side energy converters 62a, 63b, 63 and a business site-side energy storage device 64 for carrying out a method 100 according to one aspect of the disclosure. The operating facility 60 comprises a number of so-called systems. The systems of the operating facility 60 are an energy converter 62a designed as an uncontrolled consumer, an energy converter 62b designed as a generator, an energy storage device 64, and a controllable energy converter 63 designed as a controllable consumer. The operating site 60 comprises a plurality of charging points 65a, 65b, 65c. In the example shown in Fig. 1, three charging points 65a, 65b, 65c are illustrated, whereby the operating site 60 may have any plurality of charging points 65a, 65b, 65c, as schematically illustrated by the horizontally arranged points between the charging points 65a, 65b, 65c. The systems of the operating site 60, i.e., the energy converters 62a, 62b, 63, the energy storage unit 64, and the charging points 65a, 65b, 65c, are connected to a grid connection 61 via a power grid 66 on the operating site. The operating site 60 can obtain electrical energy from an external power grid 80 via the grid connection 61 in order to supply the systems and the charging points 65a, 65b, 65c with electrical energy. Furthermore, the operating site 60 can feed electrical energy into the external power grid 80 via the grid connection 61. Each of the charging points 65a, 65b, 65c is configured to allow an electrically powered vehicle 50a, 50b, 50c to be connected to the respective charging points 65a, 65b, 65c for the transfer of electrical energy. Each of the vehicles 50a, 50b, 50c has an energy storage device 51 that can be charged at one of the charging points 65a, 65b, 65c during a standstill. One or more of the vehicles 50a, 50b, 50c can be configured for bidirectional charging. Electrical energy can be fed from the energy storage device 51 of one of the vehicles 50a, 50b, 50c into the power grid 66 via one of the charging points 65a, 65b, 65c, wherein the energy storage device 51 can be discharged during the standstill. Each of the vehicles 50a, 50b, 50c has a control unit 52. The control unit 52 of each of the vehicles 50a, 50b, 50c is configured to control the charging of the energy storage device 51 of the respective vehicle 50a, 50b, 50c. For this purpose, the control unit 52 can be configured to perform the method 100 described with reference to Fig. 6. The business premises 60 has a data processing device 67 and / or is communicatively connected to the data processing device 67. The data processing device 67 can thus be, for example, a server located on the business premises or external to the business premises. The data processing device 67 is configured for energy management of the business premises 60. For this purpose, the data processing device 67 can, for example, retrieve an electricity tariff, a grid utilization, and / or an energy requirement from the business premises 60. For energy management, the data processing device 67 can be configured to perform the method 100 described with reference to Fig. 6. Fig. 2 schematically shows a flexibility diagram as flexibility information 220 for performing a method 100 according to one aspect of the disclosure. In Fig. 2, a flexibility F and a state of charge SOC of an energy storage device 51 of one of the vehicles 50a, 50b, 50c are plotted against time t. Regarding the state of charge (SOC), three pairs of curves are shown, each of which illustrates the state of charge (SOC) as a function of time t in a specific scenario. The three pairs of SOC state of charge curves begin at an initial state of charge SOC_0 at an initial time t0. The initial time t0 describes, for example, the time at which the vehicle 50a, 50b, 50c is connected to the energy storage device 51 for transferring electrical energy to one of the charging points 65a, 65b, 65c. For example, the initial time t0 describes the arrival time of the vehicle 50a, 50b, 50c at the charging point 65a, 65b, 65c. The three pairs of SOC state of charge curves end at a final state of charge at an end time t1, wherein the final state of charge is a target state of charge SOC_1 or a maximum state of charge SOC_M, depending on the scenario. The maximum state of charge SOC_M is, for example, the maximum state of charge SOC typically provided for the energy storage device 51. The target state of charge SOC_1 is less than the maximum state of charge SOC_M and can result, for example, from a requirement and / or planning related to the energy storage device 51 of the corresponding vehicle 50a, 50b, 50c. The end time t1 describes, for example, a time after the initial time t0, wherein the transfer of electrical energy between the energy storage device 51 and the charging point 65a, 65b, 65c is terminated at the end time t1. For example, the end time t1 describes the departure time of the vehicle 50a, 50b, 50c. A pair of curves of the state of charge SOC describes the charging of the energy storage device 51 according to a latest possible charging S such that the respective final state of charge is reached at the end time t1 and not earlier than the end time t1. A pair of curves of the state of charge SOC describes the charging of the energy storage device 51 according to an earliest possible charging E such that the respective final state of charge is almost or completely reached before the end time t1 and optionally as early as possible. A pair of curves describes the flexibility F. The flexibility F results for each of the final states of charge from the difference between the curve of the state of charge SOC according to the latest possible charging S and the curve of the state of charge SOC according to the earliest possible charging E, wherein between the latest possible charging S and the earliest possible charging E, a discharging of the energy storage device 51 or a reduction of the state of charge S can occur by bidirectional charging. Thus, the flexibility F is maximum at the initial time t0 for simple charging (without the possibility of bidirectional charging) and decreases monotonically until the end time t1 is reached. The flexibility F can be non-monotonic for bidirectional charging (see bold-lined flexibility F in Fig. 2 ), i.e. the flexibility F can decrease when the energy storage device 51 is charged and increase when the energy storage device 51 is discharged.The increased flexibility F in bidirectional charging compared to simple charging results from the possibility of charging and / or discharging the energy storage device 51. For a charging point 65a, 65b, 65c, the flexibility F reflects the possibility of having an energy storage device 51 connected to the charging point 65a, 65b, 65c charged and / or, in the case of bidirectional charging, discharged at a given time. A pair of SOC state of charge curves describes the charging of the energy storage device 51 as charging curves according to two examples R. The two dotted lines show the SOC state of charge using the flexibility F. The SOC state of charge according to the examples R is always between the SOC state of charge according to the earliest possible charging E and the SOC state of charge according to the latest possible charging S. The SOC state of charge according to the examples R also shows bidirectional charging through a SOC state of charge that decreases in stages over time, with energy being fed from the energy storage device 51 into the power grid 66 via the charging point 65a, 65b, 65c. The SOC state of charge can temporarily exceed the target SOC_1 in order to subsequently discharge the energy storage device 51 to the target SOC_1 and thus feed in electrical energy. The start time t0 and the end time t1 are, for example, included in the service life information 201 and / or define the service life information 201. The initial state of charge SOC_0 and the final state of charge, i.e. the target state of charge SOC_1 and / or the maximum state of charge SOC_M, are included, for example, in the charging information 202 and / or define the charging information 202. For each of the vehicles 50a, 50b, 50c, such a flexibility diagram can be determined based on the idle time information 201 and the loading information 202 as a contribution to the flexibility information 220. Fig. 3 schematically shows a charging and discharging curve of an on-site energy storage device 64 as energy information 203 for determining the flexibility information 220 for carrying out a method 100 according to one aspect of the disclosure. Fig. 3 (A) shows the charging curve, i.e., the state of charge SOC as a function of time t during charging, of the energy storage device 64; Fig. 3 (B) shows the charging curve, i.e., the state of charge SOC as a function of time t during discharging, of the energy storage device 64. The box with a dashed line indicates a flexible range with a high degree of flexibility F. Within the flexible range, the energy storage device 64 can be charged and discharged without either a low or high state of charge (SOC) occurring. Therefore, charging and discharging within the flexible range is possible without significant degradation of the health of the energy storage device 64. The charging and discharging curve of the facility-side energy storage device 64 as energy information 203 can thus be a contribution to the flexibility information 220 in addition to the flexibility F described with reference to Fig. 2. Fig. 4 shows features that can be considered in a method 100 according to one aspect of the disclosure. Such a method 100 is described with reference to Fig. 6. Fig. 4 is described with reference to Figs. 1 to 3. In order to be able to output an energy management plan 250 as shown in Fig. 4, an optimization 280 of a plurality of variables that have an influence on the energy management of the facility 60 takes place. A peak load 260 relating to grid connection 61 and an energy market condition 261 are incorporated into the optimization 280 as premises (secondary charging targets). The peak load 260 refers to the maximum amount of electrical energy to be supplied from the external power grid 80 via the grid connection 61. The energy market condition 261 can describe the energy tariffs. The energy market condition 261 includes, for example, a night tariff and a day tariff and / or an energy tariff broken down per unit of time, for example, every quarter of an hour. Furthermore, site-side conditions 262 and vehicle-side conditions 263 are incorporated into the optimization as premises. The site-side conditions 262 relate, for example, to the energy storage device 64 and indicate that downtimes of the energy storage device 64 with a high storage fill level, cycles, and / or long operating times should be avoided in order to prevent the energy storage device 64 from aging unnecessarily. The vehicle-side conditions 263 relate to the energy storage device 51 of the vehicle(s) 50a, 50b, 50c and indicate, for example, that cycles, long operating times, and / or downtimes of the vehicle 50a, 50b, 50c with a high storage fill level of the energy storage device 51 should be avoided. The optimization 280 also incorporates the idle time information 201 and the charging information 202, as described with reference to Fig. 2, respectively. In other words, the flexibility F for each of the vehicles 50a, 50b, 50c is incorporated based on the arrival time, departure time, and amount of energy to be charged. In this case, the amount of energy that each of the vehicles 50a, 50b, 50c will exchange upon expected arrival at the charging point 65a, 65b, 65c can be predicted when connecting the respective vehicle 50a, 50b, 50c to the respective charging point 65a, 65b, 65c. The energy information 203 and the control information 204 also flow into the optimization 280. The energy information 203 relates to the energy consumption and / or energy generation of the energy converters 62a, 62b, 63 and / or the charging and / or discharging of the energy storage device 64. With regard to the energy converters 62a, 62b, 63, the energy information 203 includes a load profile, i.e., a time-dependent load and / or a generation of electrical energy, for example, by photovoltaic systems. The energy information 203 can be measured and / or predicted in each case. With regard to the energy storage device 64, the energy information 203 includes the flexibility F during charging and / or discharging of the energy storage device 64, as described with reference to Fig. 3. The control information 204 relates to the controllable energy converter 63. The control information 204 includes information for determining the flexibility F of the controllable energy converter 63, for example, regarding operating times and / or an energy requirement of the controllable energy converter 63. The optimization 280 may have a warning 270 as output, for example, where the premises are to be adjusted. The output of optimization 280 is an energy management plan 250. The energy management plan 250 includes a control plan 251 for controlling or operating the controllable energy converter 63, an operating plan 252 for charging and / or discharging the energy storage device 64, and a charging plan 253 for charging the vehicles 50a, 50b, 50c at the charging points 65a, 65b, 65c. Each of the plans includes information regarding the conversion and / or transfer of electrical energy over time. Fig. 5 shows an exemplary scenario of implementing a method 100 according to one aspect of the disclosure. Fig. 5 is divided into four sections. Fig. 5 (A) shows the purchase price for electrical energy as an energy market condition 261 as a function of time. The purchase price for electrical energy is schematically plotted in an arbitrary unit. Time-of-day-dependent fluctuations in the purchase price for electrical energy are evident from the energy market condition 261. The purchase price for electrical energy is lowest at midday and at night and highest in the morning and evening hours. Fig. 5 (B) shows an exemplary scenario for electrical power 300 as a function of time according to the prior art. The time scale is the time scale shown with reference to Fig. 5 (A). A solid horizontal line marks a zero line. Above the zero line, the power 300 is plotted as generation by an energy converter 62b designed as a generator. Below the zero line, the power 300 is plotted as consumption by an energy converter 62a designed as a consumer (dashed line). The fine solid line shows a load profile for charging according to the prior art, for example, the earliest possible charging E. The strong (bold) solid line shows a load profile as the sum of the generation and consumption of energy within the operating facility 60. The sum is always negative, which means that electrical energy must always be drawn via the grid connection 61.The sum of the power 300 can exceed the peak load 260. Fig. 5 (C) shows an exemplary scenario for electrical power 300 as a function of time, the scenario being controlled according to an energy management plan 250 determined by a method 100 according to one aspect of the disclosure. Fig. 5 (C) is described with reference to Fig. 5 (B), and the differences between Fig. 5 (C) and Fig. 5 (B) are described. The dotted line shows the power 300 of a bidirectional charging of vehicles 50a, 50b, 50c. The energy storage device 51 of vehicles 50a, 50b, 50c is charged in such a way that as little energy as possible needs to be drawn via the grid connection 61. Furthermore, energy from the energy storage device 51 of vehicles 50a, 50b, 50c is fed in via the charging points 65a, 65b, 65c to avoid a comparatively high supply price. The strong (bold) solid line shows a load profile as the sum of energy generation and consumption within facility 60. The sum is partly negative and partly positive, meaning that, depending on the time, electrical energy is drawn in or fed into the grid via grid connection 61. The total power 300 is always less than the peak load 260. Fig. 5 (D) shows the flexibility F of various installations of the operating site and vehicles 50a, 50b, 50c as part of the flexibility information 220 for the scenario according to Fig. 5 (C). Fig. 5 (D) is described with reference to Fig. 5 (C). The strong (bold) line shows the total flexibility, i.e. the sum of all flexibilities F as flexibility information 220. The total flexibility results from the flexibilities F of the vehicle 50a, 50b, 50c, the energy storage device 64 and the controllable energy converter 63. Fig. 6 schematically shows a flowchart of a method 100 according to one aspect of the disclosure. The method 100 is a method 100 for determining an energy management plan 250 for charging an energy storage device 51 of a vehicle 50a, 50b, 50c of a plurality of electrically driven vehicles 50a, 50b, 50c at one of a plurality of charging points 65a, 65b, 65c connected to a grid connection 61 of a business location 60. The business location 60 has an energy converter 62a, 62b, 63, which is different from the charging points 65a, 65b, 65c and is connected to the grid connection 61, for consuming and / or generating electrical energy at the business location, and an energy storage device 64 for storing electrical energy at the business location. Such a facility 60 with its features and electrically driven vehicles 50a, 50b, 50c are described with reference to Fig. 1. Fig. 6 is described with reference to Figs. 1 to 5. The method 100 comprises: detecting 110 a piece of idle time information 201 relating to the vehicle 50, a piece of charging information 202 relating to an energy transfer between the vehicle 50a, 50b, 50c and the charging point 65a, 65b, 65c, and an piece of energy information 203 relating to the energy converter 62a, 62b, 63 and / or energy storage device 64. The charging information 202 relates to a feed-in of electrical energy by the vehicle 50a, 50b, 50c into a vehicle-external power grid 66 and a charging of the energy storage device 51 of the vehicle 50a, 50b, 50c. A determination 120 of flexibility information 220 takes place as a function of the downtime information 201, the charging information 202 and the energy information 203. The operating site 60 has a controllable energy converter 63, and the determination 120 of the flexibility information 220 takes place as a function of control information 204 relating to the controllable energy converter 63. The energy management plan 250 is output 130 with a charging plan 253 for charging the energy storage device 51, taking into account the flexibility information 220. The energy management plan 250 is output taking into account a peak load 260 relating to the grid connection 61. The energy management plan 250 includes a control plan 251 for controlling the controllable energy converter 63. The energy management plan 250 includes an operating plan 252 for controlling a state of charge SOC of the energy storage device 64. Reference symbol (part of the description) 50a, 50b, 50c Vehicle 51 Energy storage device 52 Control unit 60 Operating site 61 Grid connection 62a, 62b Energy converter 63 Energy converter, controllable energy converter 64 Energy storage 65a, 65b, 65c Charging point 66 Power grid 67 Data processing device 80 External power grid 100 Procedure 110 Acquire 120 Determine 130 Output 201 Standby time information 202 Charging information 203 Energy information 204 Control information 220 Flexibility information 250 Energy management plan 251 Control plan 252 Operating plan 253 Charging plan 260 Peak load 261 Energy market condition 262 Operating site conditions 263 Vehicle conditions 270 Warning 280 Optimization 300 Power t Time t0 Start time t1 End time S Charging curve for latest possible charging SOC State of charge E Charging curve for earliest possible charging F Flexibility R Charging curves according to example QUOTES CONTAINED IN THE DESCRIPTION This list of documents submitted by the applicant was generated automatically and is included solely for the convenience of the reader. This list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions. Cited patent literature DE 102021112418 A1
[0007] DE 102021104556 A1
[0009] WO 2019162264 A1
[0011] Cited non-patent literature DIN EN ISO 15118-2:2016-08
[0003] DIN EN ISO 15118-1:2019-08
[0003]
Claims
Method (100) for determining an energy management plan (250) for charging an energy storage device (51) of a vehicle (50a, 50b, 50c) of a plurality of electrically driven vehicles (50a, 50b, 50c) at one of a plurality of charging points (65a, 65b, 65c) connected to a grid connection (61) of a business location (60), wherein the business location (60) has an energy converter (62a, 62b, 63) different from the charging points (65a, 65b, 65c) and connected to the grid connection (61) for consuming and / or generating electrical energy at the business location and / or an energy storage device (64) for storing electrical energy at the business location, wherein the method (100) comprises: - detecting (110) downtime information relating to the vehicle (50) (201), charging information (202) relating to an energy transfer between the vehicle (50a, 50b, 50c) and the charging point (65a, 65b, 65c) and an energy converter (62a, 62b,63) and / or energy storage device (64);- determining (120) flexibility information (220) as a function of the downtime information (201), the charging information (202), and the energy information (203); and- outputting (130) the energy management plan (250) with a charging plan (253) for charging the energy storage device (51) taking into account the flexibility information (220). Method (100) according to claim 1, wherein the energy management plan (250) is output taking into account a load peak (260) relating to the grid connection (61). Method (100) according to claim 1 or 2, wherein the operating site (60) has a controllable energy converter (63), and the determination (120) of the flexibility information (220) takes place as a function of control information (204) relating to the controllable energy converter (63). Method (100) according to claim 3, wherein the energy management plan (250) comprises a control plan (251) for controlling the controllable energy converter (63). Method (100) according to one of the preceding claims, wherein the operating site (60) comprises the energy storage device (64), and the energy management plan (250) comprises an operating plan (252) for controlling a state of charge (SOC) of the energy storage device (64). Method (100) according to one of the preceding claims, wherein the charging information (202) relates to a feed-in of electrical energy by the vehicle (50a, 50b, 50c) into a vehicle-external power grid (66) and a charging of the energy storage device (51) of the vehicle (50a, 50b, 50c). Computer program and / or computer-readable medium comprising instructions which, when the program or instructions are executed by a data processing device, cause the device to carry out the method (100) and / or the steps of the method (100) according to one of claims 1 to 6 Control unit (52) for an electrically driven vehicle (50a, 50b, 50c), wherein the control unit (52) is configured to carry out the method (100) according to one of claims 1 to 6. Electrically driven vehicle (50a, 50b, 50c) comprising the control device (52) according to claim 8. Data processing device (67) for a business location (60) with a plurality of charging points (65a, 65b, 65c) connected to a network connection (61), an energy converter (62a, 62b, 63) different from the charging points (65a, 65b, 65c) and connected to the network connection (61) for consuming and / or generating electrical energy at the business location and / or an energy store (64) for storing electrical energy at the business location, wherein the data processing device (67) is configured to carry out the method (100) according to one of claims 1 to 6.
Citation Information
Patent Citations
Distributing electrical power in a local power grid
DE102021104556A1
Method for operating an energy market platform for energy trading for at least one aggregator by means of an electronic computing device, computer program product and energy market platform
DE102021112418A1
Method and control device for adjusting electrical power available to an electrical power requirement in an electrical network
WO2019162264A1
Method for operating a network management system for a local energy network, computer program product and network management system
DE102021121127A1
Control unit for controlling a flow of electrical energy between one or more electrical energy repositories and a power grid
WO2022220720A1
Cited By
Method, system, computer program and computer-readable storage medium for charging and discharging an energy storage device of a vehicle
DE102024102763A1
Method and system for integrating an electric vehicle into an electrical grid as a bidirectional distributed energy source
DE102024126513A1
