Heat exchanger with defrosting device and temperature control device
Patent Information
- Application Number
- DE102023202884
- Authority / Receiving Office
- DE · DE
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-29
- Publication Date
- 2024-10-02
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
The present invention relates to the temperature control of a room to be temperature controlled and in particular to cold generation or heat generation and distribution in mobile or stationary refrigeration applications. In particular, the present invention relates to methods and devices for the generation and distribution of cold or heat in mobile cold applications or heat applications and can be used in road-bound motor vehicles or trailers or semi-trailers with a refrigerated body or a heated body, a rail- or sea-bound refrigerated or heated body or a container, or generally in rooms to be tempered in air conditioning or air conditioning applications, which are cooled or heated, for example, by means of a compression refrigeration machine. Furthermore, this invention can also be used in the field of comfort air conditioning in mobile applications such as buses or rail-bound passenger cars. However, from a purely technical perspective, a restriction to these areas is not necessary, as the solutions described here can also be used advantageously in stationary applications. The compression refrigeration machine is the most common type of refrigeration machine. This design utilizes the physical effect of the latent heat of vaporization during the change of state from liquid to gaseous, or from gaseous to liquid. In a compression refrigeration machine, a refrigerant with suitable thermodynamic properties is moved in a closed circuit. In the process, it undergoes various changes of state sequentially and repeatedly. The gaseous refrigerant is first compressed by a compressor. In the subsequent heat exchanger (condenser or heat sink of the process), it is condensed (liquefied) while releasing heat. The liquefied refrigerant is then expanded to the evaporation pressure via an expansion device, e.g., an expansion valve or, in the simplest case, an orifice plate or a capillary tube, to reduce the pressure. It cools down in the process.In the downstream second heat exchanger (evaporator, or heat source of the process), the refrigerant evaporates at a low temperature while absorbing heat (evaporative cooling). The heat absorbed in this process represents the utilized cooling power of the refrigeration system. The absorbed heat flow is referred to as the cooling capacity. The evaporator is therefore advantageously located directly in the refrigerated body, in the refrigerated container, or generally in the enclosed space to be cooled in order to keep heat transfer losses to a minimum by bringing the goods to be refrigerated into direct contact with the heat source as much as possible. The cycle can now begin again. The process must be kept going from the outside by supplying mechanical work (drive power) via the compressor. The refrigerant absorbs heat at a low temperature level and releases it, usually to the environment, at a higher temperature level by supplying technical work.The identical process described is referred to as a heat pump process if, instead of the cooling capacity or energy supplied to the evaporator, the condenser heat released by the system's condenser is to be used. In the present application, this results in the possibility of supplying energy in the form of heat to the described structure or the closed interior of the application for heating purposes, with suitable process control and arrangement of the system components. One way to achieve this is to connect the pressure-side outlet of the compressor to the heat exchanger, which is located in the closed structure, in such a way that the heat exchanger heats up during system operation. The other components then fulfill their function according to the described application process for generating cold.The heat supply also allows for efficient defrosting or defrosting of the heat exchanger in a closed room, which can be either time-controlled or demand-controlled. The refrigerant circuit essentially consists of four components: compressor, condenser, expansion device, and evaporator. In a single-stage or multi-stage refrigeration system, a distinction is generally made between high-pressure and low-pressure sides. The high-pressure side extends from the pressure side of the compressor to the refrigerant inlet into the expansion device. The low-pressure side comprises the part of the refrigerant circuit from the refrigerant outlet from the expansion device to the compressor inlet. This also applies if the refrigerant circuit is operated as a heat pump, i.e., the heating output provided by the condenser is used rather than the cooling output of the evaporator. This heating output can be used, as described, to heat the application or to defrost the evaporator. Regardless of the application, the refrigerant used in the cycle should have as little impact on the environment as possible, be cost-effective, and particularly energy-efficient. A key measure of a refrigerant's environmentally damaging effect is its global warming potential (GWP). This value is given for refrigerants in relation to the GWP of CO2 (carbon dioxide). CO2 has a GWP of 1 by definition. For the F-gases frequently used as refrigerants, the global warming potential can reach values of several thousand. This in turn means that one kilogram of F-gas released into the atmosphere during its production, use, or disposal can correspond to the greenhouse effect of several tons of CO2. The main components of F-gases are carbon, hydrogen, and fluorine. F-gases often decompose very slowly and, once released, can remain in our atmosphere for hundreds or even thousands of years. Regardless of their residence time and their global warming potential, decomposition products are produced as F-gases decompose. These substances, such as trifluoroacetic acid or hydrogen fluoride, often have long-term negative impacts on humans and the environment. For these reasons, the use of F-gases as refrigerants is increasingly being restricted or even prohibited by international legislation through regulations and ordinances.The acceptance of F-gases as refrigerants by consumers, users of refrigeration technology, and also by society as a whole is decreasing, and as a result, the manufacturing industry of refrigeration systems and heat pumps is increasingly demanding alternatives to the current refrigeration technology based on the use of F-gases. Particularly when considering a room that is actually to be cooled and operates at temperatures below 0°C, ice will form on a heat exchanger in this room. The water contained in the air within the room first condenses on the cold surface of the heat exchanger and then freezes. To prevent the evaporators from freezing completely, they are regularly heated, which melts the ice and causes it to run off the surface of the evaporators as water. The water that then drips off the surface of the evaporators usually collects in a drip tray that is connected to a drain pipe system. In the area where the drain pipe for the thawed condensate runs through the cold room, there is a risk of freezing and subsequent blockage due to the low ambient temperature.To ensure the drainage of condensate, an electric resistance heater can be used to heat the defrost pipe. This could be installed inside the pipe and activated during the defrosting process. The disadvantage of this procedure is that a separate resistance heater must typically be provided in a harsh environment, such as within the loading space of a truck or container. However, when handling this resistance heater or the entire cooling device, it cannot be assumed that this is always carried out by people who are specialists in refrigeration technology. Therefore, resistance heaters often exhibit signs of failure, either due to incorrect operation or due to a lack of robustness in adverse environments. This leads to the defrosting process not being able to be carried out completely or to the situation in the cold room where defrosted condensate cannot drain away and collects in certain areas of the cold room, where it turns into ice during the next cooling cycle. This can lead to reduced cooling efficiency, damage to the load, and other problems.In addition, such defrost heating requires electrical energy, which is not always available in sufficient quantities or should be used for other purposes. The object of the present invention is to create an improved heat exchanger concept. This object is achieved by a heat exchanger device according to patent claim 1, a cooling chamber according to patent claim 13, or a device for tempering according to patent claim 15. A heat exchanger according to the invention comprises, as a measure to ensure that defrosted condensate can flow away, a drain for the liquid which extends away from a collecting tray of the heat exchanger, wherein a defrost line is also provided which extends between a first connection and a second connection of a line arrangement which forms the primary side of the heat exchanger and which is arranged at least partially in the drain for the defrost water. This means that resistance heating can be completely dispensed with. Instead, when the heat exchanger is put into the defrost cycle, warm refrigerant is automatically transported through the defrost line connected in parallel due to the normal operation of the heat exchanger with the coupled heat movement device. This not only heats the heat exchanger orNot only is the primary side of the heat exchanger and thus also the secondary side of the heat exchanger, which is implemented, for example, by an air register, defrosted, but the drain for the liquid collected in the drip tray, which is typically drained to the outside, is also defrosted or kept clear. This means that the drain to the outside is always defrosted and protected from permanent freezing, safely and without any further action—i.e., automatically, without the need for special activation of a resistance heater—simply due to the normal process of defrosting the heat exchanger, even if it extends over a long distance through the cold cold storage room, the temperature of which, of course, must not be affected, or only minimally affected, by defrosting the heat exchanger. Preferably, the defrost line, which is fluidically parallel to the line arrangement that represents the actual primary side of the heat exchanger, is designed as a "capillary line" that has a smaller diameter and higher fluid resistance than the main line arrangement of the heat exchanger. This ensures that, while the refrigerant also flows through the defrost line during normal cooling operation of the heat exchanger and cools its surroundings, this does not lead to, or only to, a minimal loss of efficiency. This is because the defrost line is located in an area, namely within the drain line for the defrosted liquid, where cooling may not be desired, or at least not as much cooling, because, for example, there is an opening to the outside that is closed or always open depending on the implementation. On the other hand, it has been found that for efficient defrosting and keeping the drain from the drip tray to the outside of the cold room clear, only a defrost pipe with a small diameter is sufficient. This is because when defrosting is required, the defrosted water in the drip tray has a tendency to freeze very quickly in the drain for the liquid, because this is located in the cold room, which is kept at a temperature of, for example, 0°C or -30°C. However, even the small diameter is sufficient for a small channel to form in the drain, even if it is completely frozen for some reason. This channel, in a sense, "self-reinforces" itself. This is because melted condensate runs along the heated defrost pipe and, in a sense, makes its own way along the defrost pipe and then to the outside of the cold room, because heated defrost water continues to "flow in". According to the invention, no resistance heating is used, which requires electrical power for operation and is prone to failure. Instead, the defrost line is connected to the evaporator in such a way that it is arranged parallel to the evaporator coil through which the flow is directed. As a result of this installation, in the case of the heated evaporator coil with warm refrigerant, the refrigerant also flows through it as a parallel flow passage. Depending on the implementation, this parallel passage extends over the entire discharge pipe, which serves as the drain pipe for the condensate, or only through part of it. The heat introduced into the pipe ensures that the defrost water or the thawed ice can be drained unhindered from the heat exchanger and out of the evaporator's drip tray. A further advantage is that no electrical installation of the resistance heater is required, and no energy other than the normal energy required to defrost the primary side of the heat exchanger to ensure condensate drainage is required. Instead, the defrosting process of the drain line or drain pipe occurs in the same way as the entire heat exchanger in the cold room is defrosted, namely by flowing warm refrigerant through both components, thus supplying them with the necessary heat. Preferred embodiments of the present invention are explained below with reference to the accompanying drawings. They show: Fig. 1 a schematic representation of the heat exchanger with defrosting device; Fig. 2a a first embodiment of the heat exchanger with connected heat movement device, which consists of two heat exchangers and a heat transport device; Fig. 2b a further embodiment of the heat exchanger with connected heat movement device in the form of two pumps and a heat exchanger; Fig. 3 a schematic embodiment of the heat exchanger with heat movement device using a pump and a heat exchanger; Fig. 4 a schematic representation of the secondary side and the primary side of the heat exchanger with associated collecting tray and still wound defrost line; Fig. 5 a schematic representation of the heat exchanger with tubular discharge line and defrost line arranged in the discharge line; Fig.Fig. 6 shows a truck in which the cooling space can be arranged; and Fig. 7a shows a schematic view of the bulkhead evaporator in the loading space of a truck in an isometric representation; Fig. 7b shows a section through the bulkhead evaporator; Fig. 7c shows a detailed view of the fins on the conduit tubes; Fig. 8 shows a front view of the bulkhead evaporator and a side sectional view; and Fig. 9 shows various detailed views and overall views of the bulkhead evaporator. Fig. 1 shows a heat exchanger with a secondary side 220 and a conduit arrangement that is thermally coupled to the secondary side 220 and constitutes a primary side 210 of the heat exchanger. Furthermore, the conduit arrangement comprises a first connection 211, which is connected to a first point of this conduit arrangement, and a second connection 212, which is connected to a second point of the conduit arrangement, such that a fluid can be transported from the first connection via the conduit arrangement to the second connection. The heat exchanger according to the invention further comprises a collecting tray 400, which is arranged to collect liquid originating from the secondary side 220 due to a thawing mode. Furthermore, a drain line 500 is provided for the liquid, wherein the drain line 500 extends away from the collecting tray 400. In addition, the heat exchanger with defrosting device according to the invention comprises a defrost line 300 which extends between the first connection 211 and the second connection 212 in fluidic parallel connection to the line arrangement. At least a part of the defrost line, namely, for example, the part 310 in Fig. 1, is arranged in the drain line 500. The line arrangement can, for example, in the specially designed end-wall evaporator 200 shown in Fig. 2a, consist of an upper header pipe 31, a lower header pipe 32 and cooling pipes arranged in parallel therebetween. Other line arrangements, such as a single line arrangement extending through an air register as the secondary side 220, as shown, for example, in Fig. 4 or Fig. 5, can also be used.Any heat exchanger having a primary side, which is a liquid side of the heat exchanger, will have some type of piping arrangement to which the defrost line 300 is connected in parallel. Preferably, a diameter of the defrost line 300 is smaller than the diameter of the line arrangement. If the line arrangement comprises different diameters, the diameter of the defrost line 300 is preferably smaller than the smallest diameter of the line arrangement. In particular, the line can even be designed as a capillary tube with a thin diameter that is less than 0.1 times a minimum diameter of the line arrangement. This ensures that in normal cooling operation, the parallel-connected defrost line has little influence, but that in heating operation, sufficient heating power is brought into the line, which typically extends along a significant length within the cold room and will therefore be at the temperature of the cold room in normal cooling operation, which can be in the range of, for example, -20°C. Even if warm defrost water is used during, for example,If the defrost water drips into the drip tray during a periodic defrosting process and from there enters the drain, this defrost water would freeze very quickly without the defrost line, and the ice would clog the drain. However, even a relatively small heating output in the drain is sufficient to keep the drain clear according to the invention, so that the defrost water can flow unhindered, typically to the outside of the truck or container, or into a designated collecting container if no opening to the outside is desired. The drain line is preferably made of a metal so that the drain line itself achieves good heat transport when supplied with heat during the defrosting process. In preferred embodiments of the present invention, as shown, for example, in Fig. 4 and Fig. 5, the heat exchanger is a typical heat exchanger with a piping arrangement shown at 216 in Fig. 4. Furthermore, the secondary side comprises a typical air register 222, which can be supplemented by a fan, for example, to blow air through the air register so that the heat transfer from the piping arrangement 216 of the primary side into the air is accelerated. Furthermore, Fig. 4 also shows the drain tray 400 as being arranged below the primary side and the secondary side. Fig. 5 shows the drain line 500 designed as a hose having a hose interior, wherein the defrost line 300 extends at least partially, namely with the part 310, within the hose interior. In particular, the defrost line also extends through the opening in the drip tray, shown at 410, and through the drip tray, so that the opening from the drip tray into the hose-shaped drain line is also kept reliably ice-free and thus permeable to condensate. The drain line 500 extends to a drain opening 520, wherein the drain opening 520 can lead to the exterior of the cooling chamber or into a special condensate collection container located outside the cooling chamber. The defrost line 300 does not necessarily have to extend from the drip tray 400 to the opening 520, but can also end before the opening 520. The last stretch is then thawed and kept clear by the warm condensate water due to contact with the defrost line 300. In particular, the defrost line 300, as also schematically shown in Fig. 1, is arranged in a forward and return path in the drain line 500, so that no separate opening is necessary, apart from the opening 520 to the outside and the opening 410 in the drip tray 400. Preferably, however, the defrost line 300 extends at least half the length of the drain line from the drip tray opening 410 to the drain opening 520 to the outside or to a collecting container. In the following, reference is made to Fig. 2a and Fig. 2b to various temperature control devices which can be combined with the heat exchanger according to the present invention to form a temperature control device according to the invention. Fig. 2a shows a temperature control device with a gas-liquid heat exchanger 2, which has a liquid side 2a. The air side, or the so-called "air register," is formed by the arrangement and internal construction of the gas-liquid heat exchanger. The gas-liquid heat exchanger 4 is coupled via a pipeline to a first heat exchanger 8, which is arranged at least partially below the gas-liquid heat exchanger and has a primary side 8b and a secondary side 8a. Furthermore, a second heat exchanger 6 is provided, which is arranged at least partially higher than the gas-liquid heat exchanger, wherein the second heat exchanger has a second secondary side 6a and a second primary side 6b. Furthermore, a heat transport device 20 is provided. The heat transport device 20 serves to supply heat to the primary side 8b of the first heat exchanger or to remove heat from the primary side 6b of the second heat exchanger. In particular, the first secondary side 6a of the first heat exchanger 8 and the second secondary side 6a of the second heat exchanger 6 can be coupled to the liquid side 2a of the gas-liquid heat exchanger 2. In the embodiment shown in Fig. 2a, this coupling is fixed, i.e., without a controllable variant. Depending on requirements, this coupling can also be implemented selectively, i.e., controllably. Furthermore, in Fig. 2a, the coupling of the secondary sides 8a, 6a of the heat exchangers is also fixed. This coupling can also be designed to be controllable or can even be implemented such that the two heat exchangers are not connected in series, but are arranged in different circuits for heating one room with a first gas-liquid heat exchanger and for cooling another room with a second gas-liquid heat exchanger. In such an implementation, the two secondary sides of the heat exchangers 6 and 8 are not connected to each other, but in different circuits, so that both heat exchangers are in operation, while alternatively, one heat exchanger is always only flowed through, and the other heat exchanger is active, either for supplying heat or for dissipating heat from the respective primary side. The heat transport device 20 can be configured as desired to fulfill the corresponding function, i.e., to supply heat to the primary side of the first heat exchanger or to remove heat from the primary side of the second heat exchanger. However, the heat transport device preferably comprises a refrigeration circuit, as shown, for example, in Fig. 2b. In Fig. 2b, the refrigeration circuit consists of an evaporator 11, a compressor 7a, a condenser 12, and an expansion element 7b. Preferably, the gas-liquid heat exchanger 2 is arranged in a space 1, which is to be tempered by the device. To cool this space, the primary side 6b of the second heat exchanger 6 is addressed by the heat transport device. If, however, the room is to be heated or the gas-liquid heat exchanger is to be supplied with heat from the heat transfer device, no steam will enter the second heat exchanger 6 via the primary side 6b. Instead, the first heat exchanger is activated in such a way that it receives compressed hot steam on its primary side 8b. Fig. 2b shows a temperature control device, which in particular has a gas-liquid heat exchanger 2 with a liquid side having two connections 2a. Furthermore, a heat exchanger 4 is provided, which has a primary side 4a and a secondary side 4b, wherein the secondary side 4b has two secondary connections, namely a secondary connection directed towards the gas-liquid heat exchanger 2a, and another secondary connection at the bottom of the heat exchanger 4 in Fig. 2b, which is directed towards a second pump 8. Furthermore, a heat transport device 10 is provided, which is designed to supply thermal energy to the primary side 4a of the heat exchanger 4 for heating the gas-liquid heat exchanger 2, or which is designed to remove heat from the primary side 4a of the heat exchanger 4 for cooling the gas-liquid heat exchanger. In addition, a first pump 6 is provided, which has a first suction side and is connected on its suction side to a connection 2a of the gas-liquid heat exchanger. Furthermore, a second pump 8 is provided, which has a second suction side and is connected on the second suction side to a secondary connection of the heat exchanger 4. In addition, a controller 15 is provided to activate the first pump 6 and to control the heat transport device 10 in order to supply heat to the primary side 4a of the heat exchanger 4 for heating the gas-liquid heat exchanger 2, or to activate the second pump 8 and to control the heat transport device 10 such that heat is removed from the primary side 4a of the heat exchanger 4 for cooling the gas-liquid heat exchanger. For this purpose, the control comprises control lines 15a for the heat transport device 10 and control lines 15b and 15c for the two pumps 6, 8. Preferably, as shown in Fig.2b, the first suction side of the first pump 6 is connected to the connection 2a of the gas-liquid heat exchanger, which, in the operating direction of the device, is the lower connection of the two connections 2a of the liquid side of the gas-liquid heat exchanger 2. Additionally or alternatively, the second suction side of the second pump is connected to the connection of the heat exchanger 4, which, in the operating direction of the device, is the lower connection of the two connections of the heat exchanger 4. This ensures that, due to gravity, the suction sides of the two pumps are always supplied with liquid, so that a pump cannot run dry. Preferably, the first pump 6 and the second pump 8 are arranged as close as possible to the gas-liquid heat exchanger 2 and the heat exchanger 4, respectively, with respect to their suction side. This connection, as close as possible, can be a direct connection of the suction side of the pump to the corresponding connection of the gas-liquid heat exchanger. However, if such direct connections are not possible, e.g., for structural reasons, a line is provided between the corresponding suction side and the corresponding connection of the element 2 or 4, which line is preferably less than 1 m long, particularly preferably less than 50 cm long, and most preferably less than 30 cm long. The gas-liquid heat exchanger 2 is preferably arranged in a room so that the temperature control device is designed to temperature-control this room. In this case, the gas-liquid heat exchanger 2 and the first pump 6 are arranged in this room. Furthermore, the heat exchanger 4 and the second pump 8 are arranged outside the room. If the room is, for example, a loading area of a truck, as shown from the outside in Fig. 6, for example, the gas-liquid heat exchanger 2 and the first pump 6 are arranged inside the room, while the second pump 8, the heat exchanger 4, and the heat transport device 10 are arranged in a housing 41 outside the room.Preferably, the housing 41 is arranged as a cooling unit in a niche 40 in a body at the front end of the body, more typically in line with the other dimensions of the body, so that the housing 41 fits well, both aerodynamically and aesthetically, into the overall appearance of the truck, which is shown schematically in Fig. 6. Both the gas-liquid heat exchanger 2 and the first pump 6 can therefore be arranged on a ceiling of a loading space of the truck, while the heat exchanger 4 and the second pump are arranged externally on the body of the truck, preferably in the immediate vicinity of the “internal unit”, i.e., when referring to Fig. 6, directly below the housing 41, but in the loading space. This strict separation into elements inside and outside the cargo space ensures that both circuits, i.e., the circuit of the heat transfer device 41 and the circuit of the gas-liquid heat exchanger, can use refrigerants optimally adapted to the respective specifications. In particular, the refrigerant that enters the interior of the truck body must ideally be non-toxic and non-flammable, while the refrigerant that is located outside the truck and essentially circulates in the housing 41 can be optimally adapted to the efficiency of the refrigeration circuit, and specific requirements for non-toxicity or flammability, which are essential inside the body, are not required. By way of example, the gas-liquid heat exchanger 2 comprises a cuboid-shaped heat exchanger with an air register, as shown in Fig. 2, through which one or more liquid-conducting lines are routed, wherein a first connection of the two connections is connected to a connection of the heat exchanger and a second connection is connected to the pump side of the first pump 6. Such an arrangement is shown schematically in Fig. 5, wherein a fan 23 is also shown, which typically draws air from below and blows it upwards through the front of the air register from the front wall of the truck body towards the rear into the loading space. Fig. 2c shows a further embodiment in which two changeover switches 35a, 35b are provided for reconfiguring the heat transport device 10. In a first state, these changeover switches switch the heat exchanger 4 as a condenser of the refrigeration circuit of the heat transport device 10, i.e., to heat the heat exchanger 2. In the alternative configuration, the changeover switches 35a, 35b are switched such that the heat exchanger is switched as an evaporator, i.e., is located on the low-pressure side of the refrigeration circuit, as indicated by Fig. 2c. In the first configuration, the connections between the two ports in the control elements 35a, 35b are simply continuous, whereas in the second configuration they switch the corresponding detours. Accordingly, the control line 15a is divided into two individual lines for the two control devices 35a, 35b.Furthermore, the controller 15 will control the two pumps 6 and 8 accordingly via lines 15b, 15c. An alternative implementation can be designed such that the controller 15 only controls the compressor 7 so that it reverses its direction of rotation and, in a sense, conveys from bottom to top. In this case, the two changeover switches 35a, 35b would not be present, the connections of the (then non-existent) changeover switches would be directly connected, and the controller would simply reverse the direction of rotation of the compressor 7a to switch from heating mode to cooling mode and vice versa. However, for implementation reasons, it is preferred to always run the compressor 7a in the same conveying direction and to perform the switching via fluid switches, such as the fluid switches 35a, 35b. Depending on the implementation, the heat exchanger 4 can be integrated with the evaporator or condenser of the refrigeration circuit of the heat transport device. Alternatively, however, the heat exchanger 4 can also be connected into the process, although the refrigeration circuit itself has its own evaporator and condenser. In such a case, for example, to heat the heat exchanger 4, the liquefied warm liquid from its own condenser would be fed into the heat exchanger. Alternatively, the liquid cooled in the evaporator due to evaporation could be fed into the heat exchanger 4 for cooling purposes, or the primary side 4a of the heat exchanger 4 could also be connected to a condenser or evaporator of the refrigeration circuit of the heat transport device via another heat exchanger. The heat exchanger 4 is preferably designed as a plate heat exchanger. The gas-liquid heat exchanger, as shown for example in Fig. 2b and other figures, and preferably but not exclusively used for tempering, comprises a first manifold 31, a second manifold 32 and a plurality of conduit tubes arranged between the first manifold 31 and the second manifold 32 in a fluidic parallel circuit, as shown in Fig. 2a at 33. In particular, the first manifold 31 is provided with a first outlet 31a. Furthermore, the second manifold 32 is connected to a second outlet 32a. The individual conduit tubes are preferably welded or soldered to the first and second manifolds 31, 32, so that a liquid- and vapor-tight connection is achieved. The openings 31a, 32a of the manifolds represent the upper connection 31a and the lower connection 32a of the gas-liquid heat exchanger, which is preferably used as a front wall evaporator in a space to be cooled, which is, for example, the loading space of a truck. Fig. 8 shows, on the far left, a plan view of the front wall evaporator without a front wall. In contrast, in Fig. 8, on the left side in the middle image, a front wall 33 is shown which has air intake openings 34. In the right-hand part of the image on the left side of Fig.Fig. 8 is a view of the area in which only the lower supports 35 are shown as impact protection for the load. Fig. 8 shows in the right-hand image a section along the line CC of Fig. 8 , left side. Here, an air blower 36 is shown as well as a cold air blower device 37, which is also shown on the left side in Fig. 8. The blower 36 is designed to draw air from bottom to top. As a result, the air is drawn through the air intake openings 34 from the lower area, i.e. where the air intake openings 34 are arranged, behind the front wall 33, in order to then flow from bottom to top, typically on both sides of the plurality of conduit tubes 33, in order to then be cooled in this way.The cold air is then blown out at an angle of substantially 90° from the cold air blower 37, which typically has a flat shape to blow out substantially evenly across the width of the truck. Fig. 7a shows an isometric view of the top view of Fig. 8 with the front wall evaporator, which includes the front wall 33, the intake openings 34, and the blow-out device 37. Furthermore, Fig. 7a shows a niche 40 at the top, which is located in the upper area of the semitrailer of a truck, specifically behind the driver's cab, in which the external device, i.e. the external refrigeration circuit, is housed. Fig. 7a shows a detailed view of the front wall evaporator, specifically of the first manifold 31, to which the individual conduit tubes 33 are attached. Furthermore, heat sinks 35 are always attached to two adjacent conduit tubes 33, which are intended to increase the surface area of the conduit tubes. This increases the heat transfer efficiency from gas to liquid, or vice versa from liquid to gas, since the thermally effective surface is significantly increased. Preferably, the heat sinks 35 have fins 35a, with gas channels being present between the fins 35a, which extend in the direction of the conducting tubes 33 between the first header tube 31 and the second header tube 32. It should be noted that the heat sinks 35 in Fig. 7c can be designed as shown in Fig. 9 merely by way of example. In particular, Fig. 9 again shows a plan view on the left and an isometric view on the right of the gas-liquid heat exchanger with the two header tubes 31, 32 and the conducting tubes arranged therebetween, which, however, are concealed by the heat sinks 35 in both views. An exemplary heat sink is shown in the middle of Fig. 9 at 35. Fig. 9 also shows a fastening rail 36a approximately in the middle of the heat sink, and an upper fastening rail 36b and a lower fastening rail 36c. Furthermore, this fastening rail 36a is also shown in the section in the upper middle of Fig.9, wherein, in particular, a heat sink is screwed to the rail 36a by a screw 30a or 37b, respectively. The heat pipes 33 are also shown in Fig. 9. Fig. 6 shows a schematic view of a truck with a cooling unit 41, which is housed in the niche 40 described in Fig. 7a. In particular, the housing 41, i.e. the upper heating unit, comprises all elements with transport device and additionally preferably the second heat exchanger 6 from Fig. 2a . The first heat exchanger 8 of Fig. 2a, on the other hand, is mounted in an area that is outside the loading space, but below the bulkhead evaporator, i.e. at the bottom of the truck body. Since the first heat exchanger 8 does not require a connection to the outside world, but only needs to be housed below the bulkhead evaporator 2 in the direction of operation in order to keep the thermosiphon circuit running as described, and therefore does not require any connections to the outside, the accommodation of this heat exchanger involves little effort.However, it is preferred that the heat exchanger is located in a space that is isolated from the cargo space so that the refrigerant from the external circuit cannot enter the cargo space. In the embodiment shown in Fig. 9, a heat sink 35 comprises a total of ten fins. In contrast, in the embodiment of Fig. 7c, a heat sink comprises eleven fins. Preferably, the number of fins per heat sink is between five and twenty, which also depends on the number of connected tubes. Furthermore, it is possible to arrange the heat sinks on both sides of the tubes in order to further increase the air-side area. In addition, the diameter of the upper manifold is set similarly to the diameter of the lower manifold, with the lower, liquid-carrying tube having a smaller diameter than the upper, vapor-carrying tube in order to keep the total fill volume of the system as low as possible.However, the diameter of the individual conduit tubes is set correspondingly smaller, so that in the embodiment, the combined area of the diameters of the individual conduit tubes is equal to the opening area of the upper manifold 31 or the lower manifold 33. However, the cross-sectional area of the upper and lower manifold can also be set somewhat smaller than the combined cross-sectional areas of the individual conduit tubes, whereby the minimum cross-sectional area of the upper and lower manifold 31, 32 should preferably be at least half the combined cross-sectional area of the individual conduit tubes. Furthermore, the two manifolds 31, 32 and the conducting tubes 33 are made of copper for good heat conduction. Furthermore, the individual heat sinks with the fins 35a are made of aluminum. The diameter of a conducting tube should be between 1 mm and 10 mm, and preferably between 4 mm and 6 mm, and for example, 5 mm. With reference to Fig. 3, a further embodiment of the present invention is explained below using an exemplary heat exchanger as a front wall evaporator, in which the collecting tray 400 is mounted in the front wall evaporator 200, which is designed as a liquid-gas heat exchanger. The collecting tray 400 merges, so to speak, into the discharge line 500 for the liquid and extends through the opening 520 out of the cooling chamber 1. In the embodiment shown in Fig. 3, it is further shown that the defrost line even extends through the discharge opening 520, i.e. all the way to the outside, although this is merely a preferred embodiment. Furthermore, the defrost line 300 extends from the upper connection 211 to the lower connection 212 of the heat exchanger or the primary-side line arrangement of the heat exchanger. Fig. 3 further shows the configuration of the heat movement device, which represents the pump 90 and the heat exchanger 6. In defrosting or heating mode, "cold" liquid is pumped from the heat exchanger 200 to the heat exchanger 6. At the same time, "hot" vapor flows from the heat exchanger 600 to the heat exchanger 200. Due to the heat supply QH, the heat exchanger 6 is heated by a heat transport device, which has been described with reference to Fig. 2a, Fig. 2b or Fig. 2c, so that the liquid in the heat exchanger 6 and in particular in the secondary side of the heat exchanger 6 evaporates. Within the pipe arrangement of the heat exchanger in the cold storage room, the "hot" vapor from the heat exchanger 6 is liquefied, specifically on the tubes "cooled" by the cold storage room itself. The steam liquefies in the pipe arrangement of the primary side 210, collects at the bottom of the heat exchanger and is transported back by the pump 90.Parallel to this process, "hot" steam is also introduced from top to bottom through the defrost line 300. This steam, in contact with the potentially present ice on the outside of the defrost line 300, condenses into working fluid within the discharge line 500. The working fluid then flows back into the lower connection 212 of the heat exchanger and from there is returned by the pump 90. During the normal cooling process, i.e., when the heat exchanger is not currently being defrosted, "warm" steam flows from the heat exchanger 200 to the heat exchanger 6, while cold fluid flows from the heat exchanger 6 to the heat exchanger 200 in the opposite direction without being driven by the pump 90. In this mode, the heat exchanger 6 is cooled by the heat transport device, while the secondary side 210 of the heat exchanger is "heated" by the air in the cold room. This causes the fluid in the secondary side 210 to evaporate.This steam in turn rises upwards and returns via the pipe to the heat exchanger 6, where this steam condenses again due to heat removal from the heat exchanger 6. The same process takes place in the defrost line 300. Cold liquid is pumped from bottom to top into the capillary tube 300, opposite the direction of the arrow in Fig. 3. This cold liquid evaporates when it comes into contact with warmer air (to be cooled) in the cold storage compartment and flows through the defrost line to the upper connection 211, where this vapor then enters the heat exchanger 6 during normal cooling operation. The defrost line thus contributes to the cooling effect of the heat exchanger in the same way as the piping arrangement of the primary side 210 of the heat exchanger. However, due to the smaller diameter of the defrost line, this does not lead to a significant reduction in the efficiency of the heat exchanger itself. Although some aspects have been described in the context of a device, it should be understood that these aspects also represent a description of the corresponding method, so that a block or component of a device can also be understood as a corresponding method step or as a feature of a method step. Analogously, aspects described in the context of or as a method step also represent a description of a corresponding block, detail, or feature of a corresponding device. Some or all of the method steps may be performed by (or using) a hardware apparatus, such as a microprocessor, a programmable computer, or an electronic circuit. In some embodiments, some or more of the key method steps may be performed by such an apparatus.
Claims
Heat exchanger device with the following features: a secondary side (220); a line arrangement that is thermally coupled to the secondary side (220) and represents a primary side (210) of the heat exchanger; a first connection (211) that is connected to a first point of the line arrangement and a second connection (212) that is connected to a second point of the line arrangement, such that a fluid can be transported from the first connection (211) to the second connection (212) via the line arrangement; a collecting tray (400) that is arranged to collect liquid originating from the primary side (210) or the secondary side (220) due to a thawing mode; a discharge line (500) for the liquid, the discharge line extending away from the collecting tray (400);anda defrost line (300) extending between the first connection (211) and the second connection (212) in fluidic parallel connection to the line arrangement, wherein at least a part (310) of the defrost line (300) is arranged in the discharge line (500); Heat exchanger device according to claim 1, wherein the defrost line (300) has a diameter which is smaller than a diameter of the line arrangement. Heat exchanger device according to claim 1 or 2, wherein the defrost line (300) is designed as a capillary tube, or wherein the defrost line has a diameter which is smaller than 0.1 times a smallest diameter of the line arrangement. Heat exchanger device according to one of the preceding claims, wherein the defrost line (300) is formed from a metal. Heat exchanger device according to one of the preceding claims, which is designed as a gas-liquid heat exchanger, wherein the secondary side (220) has an air register (222) through which air can flow, wherein the air register (222) is in thermal interaction with the line arrangement (216). Heat exchanger device according to claim 5, wherein the defrost line (300) is arranged outside the air register (222). Heat exchanger device according to one of the preceding claims, wherein the discharge line (500) comprises a hose which comprises a hose interior, wherein the defrost line (300) is arranged in the hose interior. Heat exchanger device according to claim 7, wherein the defrost line has a first section in the hose, a second section connected to the first section, and a connection point between the first section and the second section, the connection point being located at a location on the hose that is closer to an end of the hose that is remote from the drip tray (400) or to the end of the hose that is remote from the drip tray (400). Heat exchanger device according to one of the preceding claims (2), wherein the conduit arrangement comprises the following features: a first manifold (31) having a first connection (31a); a second manifold (32) having a second connection (32); and a plurality of conduit tubes (33) arranged between the first manifold (31) and the second manifold (32) in a fluidic parallel circuit to connect the first manifold and the second manifold so that liquid or vapor of the liquid can flow from the first connection (31a) to the second connection (32a) or vice versa, wherein the defrost line (300) is arranged between the first connection (31a) and the second connection (32), and the collecting tray (400) is arranged below the second manifold (32). Heat exchanger device according to claim 9, wherein heat sinks (35) with fins (35a) are thermally conductively attached to the conducting tubes (33) to form gas channels between the fins (35a) extending in the direction of the conducting tubes (33) between the first header pipe (31) and the second header pipe (32). Heat exchanger device according to claim 9 or 10, further comprising a front wall (33) which is arranged in alignment with the conduit tubes (33) so that a gas flow can be formed between the conduit tubes (33) and the front wall (33a), wherein the front wall (33a) has gas inlet openings (34) at a region of the front wall (33a) arranged downwards in the operating direction, or is open at a lower end so that gas can enter behind the front wall and flow from bottom to top. Heat exchanger device according to one of claims 9 to 11, further comprising the following feature: a fan (36) arranged at an upper end of the gas-liquid heat exchanger (2) in the operating direction, for sucking gas upwards from a rear region of the gas-liquid heat exchanger in the operating direction and expelling it above the gas-liquid heat exchanger via an expulsion device (37) into an upper region in front of the gas-liquid heat exchanger, or wherein the plurality of conduit tubes (33) are arranged in a straight form, the conduit tubes connecting the first manifold (31) and the second manifold (32) directly, without bends, or wherein the lower manifold (33) has a smaller diameter than the upper manifold (31). A cooling chamber having the following features:a heat exchanger device according to one of claims 1-12, wherein the heat exchanger device is arranged in the cooling chamber; anda drain opening (520) for the liquid in a cooling chamber boundary, wherein the drain line (500) extends between the drain opening (520) and the collecting tray (400) and is arranged in the cooling chamber, and wherein the defrost line (300) extends through at least half of a length of the drain line (500) between the drain opening (520) and the collecting tray (400). Refrigeration chamber according to claim 13, which is arranged in a body of a truck or in a container. A temperature control device, comprising: a heat exchanger device according to one of claims 1-12; and a heat movement device for supplying heat to the heat exchanger in the heating mode or for removing heat from the heat exchanger in a cooling mode. Device according to claim 15, wherein the heat movement device has the following features: a heat exchanger (6, 8) with a primary side and a secondary side, wherein the secondary side is coupled to the primary side of the heat exchanger; and a heat transport device (20) for supplying heat to the primary side of the heat exchanger or for removing heat from the primary side of the heat exchanger. Device according to claim 15, wherein the heat movement device has the following features: a first heat exchanger (8) which is arranged at least partially below the gas-liquid heat exchanger (2) and has a first primary side (8b) and a first secondary side (8a); a second heat exchanger (6) which is arranged at least partially higher than the gas-liquid heat exchanger (2) and has a second primary side (6b) and a second secondary side (6a); and a heat transport device (20) for supplying heat to the primary side (8b) of the first heat exchanger (8) or for removing heat from the primary side (6b) of the second heat exchanger (6), wherein the first secondary side (8a) of the first heat exchanger (8) and the second secondary side (6a) of the second heat exchanger (6) can be coupled to the line arrangement.
Citation Information
Patent Citations
DEICE DEVICE FOR AN AIR CONDITIONING SYSTEM
DE2919892A1
Condensate trap for heat pump evaporator - uses loop in line from condenser, preceding expansion valve, to prevent ice formation
DE3023680A1
