Handling station for liquid medical samples
An articulated connection between the gripper and gantry in medical sample handling stations addresses throughput limitations by enabling faster movements without sample loss, improving efficiency and reducing contamination risks.
Patent Information
- Application Number
- DE102023212595
- Authority / Receiving Office
- DE · DE
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2023-12-13
- Publication Date
- 2024-11-07
- Estimated Expiration
- 2043-12-13
AI Technical Summary
Existing handling stations for medical sample containers face limitations in throughput due to rigid gripper connections, leading to restricted speed, acceleration, and jerk, which result in low throughput and potential sample loss during handling.
Implementing an articulated connection between the gripper and the gantry via a joint structure, allowing the gripper to deflect relative to the vertical, enabling higher travel speeds and minimizing sample displacement during movement by coordinating the travel movement to ensure the gripper is horizontal at the target location.
This approach allows for significantly higher travel speeds without sample loss, reducing the cycle time and enhancing throughput while maintaining hygiene standards.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
[0001] The present invention is based on an operating method for a handling station for a sample container containing a liquid medical sample, comprising the following sequential steps: - a control device moves a gantry arranged on a guide structure horizontally along the guide structure to a starting location, so that an upper load suspension point arranged on the gantry is located vertically above a receiving point for the sample container and a lower load suspension point connected to the upper load suspension point via a connecting element is located vertically below the upper load suspension point, - the control device controls a gripper arranged at the lower load suspension point so that the gripper grips the sample container, - the control device lifts the gripper including the gripped sample container by moving the upper load suspension point upwards relative to the gantry and / or shortening the connecting element, moves the gantry horizontally along the guide structure to a target location so that the upper load suspension point is located vertically above a set-down point for the sample container and the lower load suspension point is located vertically below the upper load suspension point, and lowers the gripper including the gripped sample container by moving the upper load suspension point downwards relative to the gantry and / or lengthening the connecting element, - the control device controls the gripper in such a way that the gripper releases the sample container.
[0002] The present invention further relates to a control program for a control device, wherein the control program comprises machine code that can be processed by the control device, wherein the processing of the machine code by the control device causes the control device to operate a handling station for a sample container in which a liquid medical sample is located, according to such an operating method.
[0003] The present invention further relates to a control device for a handling station for a sample container in which a liquid medical sample is located, wherein the control device is programmed with such a control program, so that the control device operates the handling station according to such an operating method.
[0004] The present invention further relates to a handling station for a sample container containing a liquid medical sample, - wherein the handling station has a guide structure and a gantry arranged on the guide structure and movable horizontally along the guide structure, - an upper load suspension point is arranged on the gantry, which is connected to a lower load suspension point via a connecting element, - wherein a gripper for gripping and releasing the sample container is arranged at the lower load suspension point, - wherein the upper load suspension point is vertically movable relative to the gantry and / or the length of the connecting element is variable, - wherein the handling station has such a control device which operates the handling station according to such an operating method.
[0005] The items mentioned are generally known.
[0006] In medical laboratories, chemical, biological, or physical analyses of medical samples (e.g., blood or urine samples) are often performed. The medical samples are contained in small, open-topped sample containers. Such sample containers are often designed as tubes with a diameter of approximately 1 cm to 2 cm and a length of between 7 cm and 15 cm. The associated analytical devices often operate fully automatically. This also applies to the feeding and removal of the sample tubes. The feeding and removal of the sample tubes takes place via a conveyor structure. The conveyor structure can, for example, comprise conveyor belts or rail-bound systems or rail-like magnetic systems on which corresponding transport carts are conveyed.
[0007] The loading and unloading of the conveyor structures takes place using a handling station of the type mentioned above. For this purpose, a transfer area of the handling station is loaded – often manually. In particular, so-called racks are placed in the transfer area by an operator. The racks are then manually removed from the transfer area again. The racks usually each have a large number of receptacles for sample tubes, for example 5 x 10 = 50 or 10 x 10 = 100 or 5 x 20 = 100 receptacles. The sample containers are removed individually from the respective rack by the handling station and transferred to the conveyor structure. The sample tubes are later picked up individually by the conveyor structure and deposited in the respective rack (more precisely: in the corresponding receptacle of the rack).
[0008] In the prior art transfer station, the handling system is designed as an xyz manipulator. A crossbeam moves along two rails in a first horizontal direction (e.g., the y-direction). A travel element is arranged on the crossbeam, which can be moved along the crossbeam in a second horizontal direction (e.g., the x-direction). The two horizontal directions are usually orthogonal to each other. A gripper is arranged on the travel element, which can be moved in a vertical direction (usually the z-direction). The gripper grips the sample containers, lifts them, moves them horizontally, and then releases them again, thereby setting them down.
[0009] When handling open-top sample containers, it is crucial that no sample loss occurs during handling. While such loss is not critical as far as the sample itself is concerned, it does cause hygiene problems. Furthermore, the loss can contaminate other samples, potentially leading to misdiagnosis of other samples and, as a result, incorrect treatment of individuals.
[0010] In the prior art, the gripper is rigidly connected to the gantry in the horizontal direction. The gripper follows every movement of the gantry directly and immediately in the horizontal direction. For such configurations, it is known to transport the gantry, and thus the sample containers, with a suitable motion profile. Such motion profiles are limited accordingly in speed, acceleration, and jerk, so that no losses occur. However, due to the limitations in speed, acceleration, and jerk, a relatively low throughput results.
[0011] From the document WO2008055956A1 a method for moving a freely swinging load is known, comprising the following method steps: defining a first trajectory along which a load is to be moved from a starting point to a target point at a first location-dependent speed, wherein the load is suspended freely swinging at a predetermined distance from a movable suspension point; determining a second trajectory along which the suspension point is to move at a second location-dependent speed such that the load moves along the first trajectory at the first location-dependent speed from the starting point to the target point, and moving the suspension point at which the load is suspended freely swinging along the determined second trajectory at the second location-dependent speed.
[0012] The document US 2019 / 0 250 180 A1 describes a method comprising providing a robot with a gripper, wherein the gripper is movable by the robot and comprises gripper fingers, providing a sample rack with receiving devices accessible by the gripper, wherein at least some of the receiving devices are suitable for receiving sample containers, providing data obtained by imaging regarding the sample rack and the sample containers located therein, and determining an accessible target receiving device for a picking or placing operation based on the data.
[0013] The objective of the present invention is to provide options for maximizing the throughput of such a handling station. To achieve this, the time required to transport a single sample container from its pick-up point to its drop-off point must be minimized.
[0014] The object is achieved by an operating method having the features of claim 1. Advantageous embodiments of the operating method are the subject of dependent claims 2 to 4.
[0015] According to the invention, an operating method of the type mentioned at the outset is designed in that the control device determines the travel movement of the gantry from the starting location to the destination location in such a way that a deviation of the deflection of the connecting element from the vertical on a joint structure, via which the connecting element is articulated to the upper load suspension point, from a direction resulting from vectorial subtraction of the movement acceleration of the lower load suspension point from the acceleration due to gravity remains below a predetermined limit and the gripper is located below the upper load suspension point at a horizontal speed of 0 at the time the gantry reaches the destination location.
[0016] In contrast to the prior art, in which the gripper is rigidly connected to the gantry in the horizontal direction, an articulated connection is created via the joint structure. The lower load suspension point, and with it the gripper, can thus be deflected relative to the upper load suspension point. The ability to deflect the connecting element from the vertical position prevents significant displacement of the liquid sample in the sample container during the movement itself and when approaching the target location. The movement of the gantry, and thus also of the gripper and sample container, can thus take place at a significantly higher travel speed than with prior art procedures.By coordinating the travel movement in such a way that the gripper is below the upper load suspension point with a horizontal speed of 0 at the time the gantry reaches the target location, a pendulum movement is avoided, which would otherwise have to subside before the sample container is set down or could cause a displacement of the liquid medical sample in the sample container.
[0017] Provided the joint structure is appropriately designed, it is possible for the control device to adjust the deflection of the connecting element from the vertical by appropriately controlling the joint structure. This approach is particularly flexible. Alternatively, it is possible for the control device to determine the deflection of the connecting element from the vertical using a model or to accept a measured deflection of the connecting element from the vertical. In all three cases, however, the control device knows the current deflection of the connecting element from the vertical.
[0018] Preferably, the control device determines the movement of the gantry from the starting location to the destination location in such a way that - the lower load suspension point lags behind the upper load suspension point only at the beginning of the gantry's travel movement, - the lower load suspension point leads the upper load suspension point only at the end of the travel movement and - the end of the travel movement follows immediately after the start of the travel movement or the lower load suspension point follows the travel movement of the upper load suspension point without swinging between the start and the end of the travel movement.
[0019] This procedure is easy to implement and also particularly reliable in preventing sample losses.
[0020] Preferably, the control device moves the gantry within a vertical plane, in particular along a horizontal straight line, from the starting location to the destination location. This approach can be implemented with relatively low computational effort, since only the two-dimensional vertical plane, not the three-dimensional space, needs to be considered.
[0021] The object is further achieved by a control program having the features of claim 5. According to the invention, the processing of the control program by the control device causes the control device to operate the handling station according to an operating method according to the invention.
[0022] The object is further achieved by a control device having the features of claim 6. According to the invention, the control device is programmed with a control program according to the invention, so that the control device operates the handling station according to an operating method according to the invention.
[0023] The object is further achieved by a handling station having the features of claim 7. According to the invention, a handling station of the type mentioned at the outset is further configured in that the connecting element is articulated to the upper load suspension point via a joint structure and the control device is designed as a control device according to the invention.
[0024] According to the invention, the joint structure is designed as a driven joint structure, so that the deflection of the connecting element from the vertical can be adjusted by the control device by appropriately controlling the joint structure. This design enables active adjustment of the deflection and thus more flexible operation of the handling station.
[0025] In the simplest case, the joint structure is designed as a single-axis joint, so that one axis of rotation of the single-axis joint is oriented horizontally and always runs in the same direction. This design is particularly simple in terms of construction. However, it requires that the direction of travel of the gantry remains the same across multiple handling operations. The gantry is therefore not moved within a horizontal plane, but only along a horizontal straight line.
[0026] Alternatively, the joint structure can be designed as a ball joint or a universal joint. In this case, a relatively simple design is achieved, combined with free movement of the lower load suspension point relative to the upper load suspension point.
[0027] The same advantages of free movement of the lower load suspension point relative to the upper load suspension point while avoiding the complexity of a ball joint or a universal joint are achieved by - that the joint structure is designed as a sequential sequence of a first and a second uniaxial joint, - that an axis of rotation of the first single-axis joint is oriented horizontally and always runs in the same direction, - that an axis of rotation of the second single-axis joint is oriented horizontally and always runs in the same direction and - that the axis of rotation of the first uniaxial joint and the axis of rotation of the second uniaxial joint are oriented orthogonally to each other.
[0028] However, this approach is only practical if the distance between the two single-axis joints, viewed in the direction from the upper to the lower load suspension point, is significantly smaller (maximum 20%, better maximum 10%) than the length of the connecting element, or in the case of length-adjustable connecting element, the minimum length of the connecting element.
[0029] In a particularly advantageous embodiment, the joint structure is designed as a sequence of a vertically oriented rotary axis controlled by the control device and a single-axis joint, so that the control device can adjust the orientation of a horizontal axis of rotation of the single-axis joint within a horizontal plane.
[0030] In this case, with a specific setting of the vertically oriented rotary axis, only the lower load suspension point moves relative to the upper load suspension point in a single vertical plane. However, by controlling the vertically oriented rotary axis accordingly, this plane can be rotated around a vertical axis, allowing the orientation of the respective vertical plane to be adjusted according to the respective travel movement. This vertical axis usually contains the upper load suspension point.
[0031] The above-described properties, features, and advantages of this invention, as well as the manner in which they are achieved, will become clearer and more readily understood in connection with the following description of the embodiments, which are explained in more detail in conjunction with the drawings. Herein, in schematic representation: Fig. 1 a handling station for a sample container, Fig. 2 a sample container, Fig. 3 and Fig. 4 each a gantry and elements arranged directly or indirectly on the gantry, Fig. 5 to 9 joint structures, Fig. 10 a flow chart, Fig. 11 and Fig. 12 each a gantry, elements arranged directly or indirectly on the gantry, a sample container and a pickup point, Fig. 13 a gantry, elements arranged directly or indirectly on the gantry, a sample container and a settling point, Fig. 14 accelerations and directions, Fig. 15 a gantry, elements arranged directly or indirectly on the gantry, a sample container and a settling point, Fig. 16 and Fig. 17 each shows a time diagram and Fig. 18 a horizontal plane.
[0032] Fig. 1 schematically shows a handling station for a sample container 1. In the sample container 1 is located according to Fig. 2 a liquid medical sample 2, for example, blood or urine. The sample container 1 is open at the top. Typically, the sample container 1 has relatively small dimensions, for example, a length L1 of approximately 7 cm to approximately 15 cm and a diameter D1 of approximately 1 cm to approximately 2 cm. The sample container 1 is to be transported by the handling station from a pick-up point 3 to a drop-off point 4.
[0033] For transporting the sample container 1, the handling station has a guide structure 5. The guide structure 5 can, for example, be designed as a so-called xy manipulator. A gantry 6 is arranged on the guide structure 5 and can be moved horizontally along the guide structure 5. In some cases, it may be sufficient if only the gantry 6 can perform a single movement (forward and backward) in a single direction, i.e., can be moved purely one-dimensionally in the horizontal plane. In many cases, however, the gantry 6 can be moved in both directions within the horizontal plane, i.e., two-dimensionally.
[0034] An upper load suspension point 7 is arranged on the gantry 6. The upper load suspension point 7 is moved 1:1 as far as the horizontal movement of the gantry 6 is concerned. However, it can be adjusted as shown in the Fig. 3 and Fig. 4 it should be possible to set a vertical position of the upper load suspension point 7 relative to the gantry 6 between a maximum raised position ( Fig. 3) and a maximum lowered position ( Fig. 4). The upper load suspension point 7 is connected to a lower load suspension point 10 via a joint structure 8 and a connecting element 9. The connecting element 9 is, as shown in Fig. 1 indicated by a curved arrow, is connected to the upper load suspension point 7 via the joint structure 8. The joint structure 8 is located in the immediate vicinity of the upper load suspension point 7. The connecting element 9 has a length L2 (see Fig. 1). The length L2 can be constant. Alternatively, the length L2 can vary between a minimum value ( Fig. 3) and a maximum value ( Fig. 4) can be set.
[0035] Within the scope of the present invention, it is important that the lower load suspension point 10 can be raised or lowered relative to the gantry 6. Such raising or lowering can be achieved as needed by adjusting the vertical position of the upper load suspension point 7 relative to the gantry 6 between the maximum raised position and the maximum lowered position, or by adjusting the length L2 of the connecting element 9 between the minimum and maximum values, or a combination of both measures.
[0036] A gripper 11 is also arranged at the lower load suspension point 10. Using the gripper 11, the sample container 1 can be gripped and released again.
[0037] In the simplest case, the joint structure 8 is according to Fig. 5 is designed as a single-axis joint 12. In this case, one rotation axis 13 of the single-axis joint 12 is always the same. This design is generally useful if the direction of travel of the gantry 6 is always the same. In this case, the orientation of the rotation axis 13 is orthogonal to the direction of travel of the gantry 6.
[0038] Alternatively, it is possible to do so as shown in the Fig. 6 and Fig. 7 possible that the joint structure 8 is designed as a ball joint 14 ( Fig. 6) or as a universal joint 15 ( Fig. 7). In these cases, the direction of travel of Gantry 6 in the horizontal plane can be adjusted as desired.
[0039] It is almost equivalent to a design as a ball joint 14 or as a cardan joint 15 according to the illustration in Fig. 8, if the joint structure 8 is designed as a sequential sequence of a first and a second single-axis joint 16, 17. In this case, the axes of rotation 18, 19 of the two joints 16, 17 can both be oriented horizontally and always run in the same direction. However, in this case, the two axes of rotation 18, 19 should be oriented orthogonally to each other. The distance between the two axes of rotation 18, 19 should also be small compared to the length L2 or the minimum value of the length L2, for example, at a maximum of 20% of the length L2 and preferably at smaller values such as a maximum of 10% of the length L2.
[0040] Currently, it is particularly preferred according to the presentation in Fig. 9, if the joint structure 8 is designed as a sequence of a vertically oriented rotary axis 20 and a single-axis joint 21. In this case, by rotating the rotary axis 20, the orientation of a horizontal axis of rotation 22 of the single-axis joint 21 can be adjusted within a horizontal plane. In this case, the orientation of the axis of rotation 22 is adjusted by a control device 23 of the handling station. As a rule, the orientation of the axis of rotation 22 is adjusted before the sample container 1 is moved from its pick-up point 3 to its drop-off point 4. In the case of more complex movements, in particular when the direction of the travel movement of the gantry 6 changes, the orientation of the axis of rotation 22 can also be changed during the movement of the sample container 1 from its pick-up point 3 to its drop-off point 4.
[0041] The upper load suspension point 7 can be used in cases of Fig. 5 to 7 coincide with the location of the rotation axis 13, the center of the ball joint 14 or the intersection point of the axes of the universal joint 15. In the case of Fig. 8, the upper load suspension point 7 is preferably located in the area between the two axes of rotation 18, 19, in particular approximately in the middle between the two axes of rotation 18, 19. In the case of Fig. 9, the upper load suspension point 7 can coincide with the location of the rotation axis 22.
[0042] The control device 23 is - see Fig. 1 - programmed with a control program 24. The control program 24 includes machine code 25 that can be executed by the control device 23. The execution of the machine code 25 by the control device 23 causes the control device 23 to operate the handling station according to an operating method that is explained in more detail below.
[0043] According to Fig. 10, the control device 23 moves the gantry 6 horizontally along the guide structure 5 to a starting location p1 in a step S1. The starting location p1 is determined by the fact that the upper load suspension point 7 is located (exactly) vertically above the pick-up point 3. Without loss of generality, it can be assumed that, in the horizontal plane, the starting location p1 corresponds to the coordinates of the pick-up point 3. The process of step S1 is further carried out such that the lower load suspension point 10 is located (exactly) vertically below the upper load suspension point 7. In particular, the lower load suspension point 10 does not oscillate around the articulated structure 8. Fig. 11 shows schematically the corresponding state.
[0044] In a step S2, the control device 23 controls the gripper 11 so that the gripper 11 grips the sample container 1. Implementing step S2 may include, in addition to gripping the sample container 1 as such, lowering the lower load suspension point 10 relative to the gantry 6. Then, in a step S3, the control device 23 raises the gripper 11. As a result, the sample container 1 gripped by the gripper 11 is also raised. The lifting can be accomplished as needed by moving the upper load suspension point 7 upward relative to the gantry 6 and / or by shortening the connecting element 9. Fig. 12 shows schematically the corresponding state.
[0045] In a step S4, the control device 23 determines a travel movement VB of the gantry 6 from the starting location p1 along the guide structure 5 horizontally to a target location p2. The target location p2 is determined by the fact that the upper load suspension point 7 is located (exactly) vertically above the set-down point 4. As previously for the starting location p1, it can be assumed without loss of generality that in the horizontal plane, the target location p2 coincides with the coordinates of the set-down point 4. Fig. 13 shows schematically the corresponding state.
[0046] The control device 23 determines the travel movement VB in step S4 such that two conditions are met. One condition is that a deviation of the deflection α of the connecting element 9 from the vertical on the joint structure 8 from a direction resulting from vectorial subtraction of the acceleration of motion of the lower load suspension point 10 from the acceleration due to gravity g remains below a predetermined limit δ. Thus, if the lower load suspension point 10 is accelerated at a certain point in time with an acceleration a in the horizontal direction, the direction resulting from vectorial subtraction of the acceleration of motion a of the lower load suspension point 10 from the acceleration due to gravity g is as shown in Fig. 14. This direction forms an angle β with the vertical. The absolute value of the difference between the deflection α and the angle β may now be no greater than the predetermined limit δ. The predetermined limit δ is generally in the single-digit degree range, i.e., a maximum of 10°. Preferably, it is 5° or less. The other condition is that, at the time the gantry 6 reaches the target location p2, the gripper 11 is located (exactly) vertically below the upper load suspension point 7 at a horizontal speed of 0. In particular, the lower load suspension point 10 does not oscillate around the articulated structure 8.
[0047] In a step S5, the control device 23 moves the gantry 6 according to the movement VB determined in step S4. In a step S6, the control device 23 lowers the gripper 11. As a result, the sample container 1 gripped by the gripper 11 is also lowered. The lowering can be achieved as needed by moving the upper load suspension point 7 downward relative to the gantry 6 and / or by extending the connecting element 9. Fig. 15 schematically shows the corresponding state. Finally, in a step S7, the control device 23 opens the gripper 11 by appropriately controlling the gripper 11, so that the gripper 11 releases the sample container 1. This is not shown separately.
[0048] Optionally, a step S8 may also be present. Because step S8 is only optional, it is Fig. 10 is shown only in dashed lines. Step S8 is present when the joint structure 8 is connected to Fig. 9. In this case, the control device 23 controls the rotary axis 20 in step S8, so that the rotational axis 22 of the single-axis joint 21 runs orthogonally to the direction of travel of the gantry 6. The direction of travel of the gantry 6 is defined by the connecting line of the starting location p1 and the destination location p2. Step S8, if present, is executed before step S5. It can, as in Fig. 10, immediately before step S5, but it can also be executed before one of the steps S1 to S4.
[0049] For the subsequent positioning of the gripper 11 at a (new) starting location p1, the sequence of steps S1 to S7 or S1 to S8 can be carried out analogously. The only difference is that, if necessary, the gripper 11 must be raised before executing step S1 and the gripper 11 is positioned without the sample container 1.
[0050] The core of the present invention is the travel movement VB determined in step S4. A possible embodiment of the travel movement VB is described below in connection with Fig. 16 is explained in more detail.
[0051] According to Fig. 16, in phase I, starting from the starting location p1, the gantry 6 is accelerated toward the target location p2 at a speed v1. Then, in phase II, the acceleration of the gantry 6 is stopped. In phase II, however, the gantry 6 continues to move toward the target location p2 at speed v1. During phase I, a lag of the lower load suspension point 10 builds up relative to the upper load suspension point 7. Figuratively speaking, the pendulum consisting of the connecting element 9, the lower load suspension point 10, the gripper 11, and the sample container 1 swings backward.
[0052] During phase II, the lag of the lower load suspension point 10 relative to the upper load suspension point 7 decreases. Figuratively speaking, the pendulum swings forward again.
[0053] In phase II, the system waits until the lower load suspension point 10 is (exactly or at least almost exactly) below the upper load suspension point 7. Then, in phase III, the gantry 6 is accelerated from speed v1 to speed v2, so that the gantry 6 moves at the same speed as the lower load suspension point 10. Figuratively speaking, the pendulum's pendulum motion is stopped. As a result, in phase IV following phase III, the lower load suspension point 10 follows the travel movement VB of the upper load suspension point 7 without pendulum movement. Both the upper load suspension point 7 and the lower load suspension point 10 move at speed v2 in phase IV.
[0054] To determine the correct time to accelerate the gantry 6 again, i.e., the transition from phase II to phase III, the control device 23 must know the deflection α of the connecting element 9. This is, however, readily possible. For example, it is possible for the control device 23 to adjust the deflection α by appropriately controlling the joint structure 8. The possible control of the joint structure 8 is shown in Fig. 1 is indicated by dashed lines. In this case, the joint structure 8 must be designed as a driven joint structure. Alternatively, the deflection α can be measured and transmitted to the control device 23. In this case, the control device 23 receives the deflection α. This possibility is also provided in Fig. 1 is indicated by dashed lines. Steps S4 and S5 are inextricably linked in this case. Alternatively, the control device 23 can internally implement a model 26 of the gantry 6, the upper load suspension point 7, the articulated structure 8, the connecting element 9, the lower load suspension point 10, the gripper 11, and the sample container 1 based on the programming with the control program 24. In this case, the control device 23 can determine the deflection α using a model. Corresponding models 26 are generally known to those skilled in the art. They are used, for example, in the automated control of container cranes or other rope-guided loads.
[0055] Phase IV is maintained until gantry 6 is still in front of the target location p2. From this point on, gantry 6 is decelerated in phase V, starting from speed v2, to speed 0, i.e., to a standstill. During phase V, the lower load suspension point 10 builds up a lead over the upper load suspension point 7. Figuratively speaking, the pendulum swings forward.
[0056] Then, in phase VI (i.e., with gantry 6 stationary), the system waits until the deflection α reaches its maximum value, i.e., the lower load suspension point 10 has come to a standstill relative to the upper load suspension point 7 or is close to coming to a standstill. Then, in phase VII, the gantry 6 is briefly accelerated again to a speed v3 and decelerated to a standstill, so that the upper load suspension point 7 is directly above the lower load suspension point 10. As a result, from this point on, the lower load suspension point 10 is again located (exactly) vertically below the upper load suspension point 7, free from pendulum motion.
[0057] Acceleration in phases I, III, V and VII is preferably limited by jerk, but otherwise with constant acceleration.
[0058] The point in time at which deceleration of gantry 6 begins, i.e., the start of phase V, must be selected such that the lower load suspension point 10 is located as precisely as possible above the settling point 4 at the point in time at which deflection α reaches its maximum value. The time required to decelerate gantry 6 and the associated braking distance can be readily determined by control device 23 based on the dynamics of the drive of gantry 6 and the moving masses. The extent of the maximum deflection α can also be readily determined by control device 23. In particular, the dynamics of the drive of gantry 6, the moving masses, and the structural design of the handling station can be readily known to control device 23.
[0059] Phases I to III correspond to the start of the travel movement VB of gantry 6. Only during phases I to III does the lower load suspension point 10 lag behind the upper load suspension point 7. Phases V to VII correspond to the end of the travel movement VB of gantry 6. Only during phases V to VII does the lower load suspension point 10 lead the upper load suspension point 7. During phase IV, however, i.e. between the start and end of the travel movement VB of gantry 6, the lower load suspension point 10 follows the travel movement VB of the upper load suspension point 7 without any pendulum movement.
[0060] The approach of Fig. 16 can be modified by appropriately adjusting the (positive and negative) acceleration of the gantry 6 so that, as shown in Fig. 17 Phase IV is omitted (or has a duration of 0). In this case, too, the lower load suspension point 10 lags behind the upper load suspension point 7 only at the beginning of the travel movement VB of the gantry 6 and only at the end of the travel movement VB. In this case, however, the end of the travel movement VB immediately follows the beginning of the travel movement VB. Furthermore, with a suitable design of the travel movement VB, phase VI can also have a duration of 0.
[0061] As already explained and again in Fig. As shown in Figure 18, the control device 23 generally moves the gantry 6 within a vertical plane, in particular along a horizontal straight line 27, from the starting location p1 to the destination p2. Although this is not absolutely necessary, it considerably facilitates the swing-free movement of the lower load suspension point 10 from the starting location p1 to the destination p2.
[0062] The present invention was further explained above in its simplest embodiment, in which the raising of the gripper 11, the movement of the gantry 6 from the starting location p1 to the target location p2, and the lowering of the gripper 11 take place one after the other. However, it is also easily possible to begin moving the gantry 6 from the starting location p1 to the target location p2 while the gripper 11 is still being raised. Likewise, it is also easily possible to lower the gripper 11 while the movement of the gantry 6 from the starting location p1 to the target location p2 has not yet been completed. In this case, step S4 must be executed before step S3. When executing step S4, the influence of the raising and lowering of the gripper 11 on the pendulum movement must also be taken into account. Corresponding procedures are known to those skilled in the art.
[0063] In summary, the present invention relates to the following:A gantry 6 is moved horizontally along a guide structure 5 to a starting location p1, such that an upper load suspension point 7 arranged on the gantry 6 is located vertically above a pick-up point 3 for a sample container 1 and a lower load suspension point 10 connected to the upper load suspension point 7 via a connecting element 9 is located vertically below the upper load suspension point 7. A liquid medical sample 2 is located in the sample container 1. The sample container 1 is gripped by means of a gripper 11 arranged at the lower load suspension point. The gripper 11 is lifted and the gantry 6 is moved horizontally along the guide structure 5 to a target location p2, such that the upper load suspension point 7 is located vertically above a set-down point 4 for the sample container 1 and the lower load suspension point 10 is located vertically below the upper load suspension point 7.The gripper 11 is lowered again and the sample container 1 is released again. The travel movement VB of the gantry 6 from the starting location p1 to the target location p2 is determined such that a deviation of the deflection α of the connecting element 9 from the vertical at a joint structure 8, via which the connecting element 9 is articulated to the upper load suspension point 7, from a direction resulting from vectorial subtraction of the movement acceleration a of the lower load suspension point 10 from the acceleration due to gravity g, remains below a predetermined limit δ and the gripper 11, when the gantry 6 reaches the target location p2, is located below the upper load suspension point 7 with a horizontal speed of 0.
[0064] The present invention has many advantages. In particular, the sample container 1 containing the sample 2 can be subjected to considerably greater accelerations a than in the prior art. Nevertheless, there is no risk of completely or partially spilling the sample 2. As a result, the cycle time—i.e., the time between picking up the sample container 1 and setting it down—can be significantly reduced compared to prior art procedures. The same also applies to the positioning of the empty gripper 11, i.e., when the gripper 11 is positioned without the sample container 1.
[0065] Although the invention has been illustrated and described in detail by the preferred embodiment, the invention is not limited to the disclosed examples and other variations may be derived therefrom by those skilled in the art without departing from the scope of the invention.
[0066] Regardless of the grammatical gender of a particular term, persons with male, female or other gender identities are included.
Claims
[1] Operating method for a handling station for a sample container (1) containing a liquid medical sample (2), comprising the following sequential steps: - a control device (23) moves a gantry (6) arranged on a guide structure (5) horizontally along the guide structure (5) to a starting location (p1), so that an upper load suspension point (7) arranged on the gantry (6) is located vertically above a receiving point (3) for the sample container (1) and a lower load suspension point (10) connected to the upper load suspension point (7) via a connecting element (9) is located vertically below the upper load suspension point (7), - the control device (23) controls a gripper (11) arranged at the lower load suspension point, so that the gripper (11) grips the sample container (1), - the control device (23) lifts the gripper (11) including the gripped sample container (1) by moving the upper load suspension point (7) upwards relative to the gantry (6) and / or shortening the connecting element (9), moves the gantry (6) horizontally along the guide structure (5) to a target location (p2) such that the upper load suspension point (7) is located vertically above a set-down point (4) for the sample container (1) and the lower load suspension point (10) is located vertically below the upper load suspension point (7), and lowers the gripper (11) including the gripped sample container (1) by moving the upper load suspension point (7) downwards relative to the gantry (6) and / or lengthening the connecting element (9), - the control device (23) controls the gripper (11) in such a way that the gripper (11) releases the sample container (1), characterized bythat the control device (23) determines the travel movement (VB) of the gantry (6) from the starting location (p1) to the destination (p2) in such a way that a deviation of the deflection (α) of the connecting element (9) from the vertical at a joint structure (8), via which the connecting element (9) is jointly connected to the upper load suspension point (7), from a direction resulting from vectorial subtraction of the movement acceleration (a) of the lower load suspension point (10) from the acceleration due to gravity (g), remains below a predetermined limit (δ) and the gripper (11) is located at a horizontal speed of 0 below the upper load suspension point (7) at the time at which the gantry (6) reaches the destination (p2), wherein the joint structure (8) is designed as a driven joint structure (8),so that the deflection (α) of the connecting element (9) from the vertical can be adjusted by the control device (23) by a corresponding control of the joint structure (8). [2] Operating method according to claim 1, characterized by that the control device (23) sets the deflection (α) of the connecting element (9) from the vertical by a corresponding control of the joint structure (8) or determines the deflection (α) of the connecting element (9) from the vertical using a model or receives a deflection (α) of the connecting element (9) from the vertical detected by measurement. [3] Operating method according to claim 1 or 2, characterized by that the control device (23) determines the movement (VB) of the gantry (6) from the starting location (p1) to the destination location (p2) in such a way that - the lower load suspension point (10) lags behind the upper load suspension point (7) only at the beginning of the travel movement (VB) of the gantry (6), - the lower load suspension point (10) leads the upper load suspension point (7) only at the end of the travel movement (VB) and - the end of the travel movement (VB) immediately follows the start of the travel movement (VB) or the lower load suspension point (10) follows the travel movement (VB) of the upper load suspension point (7) without swinging between the start and the end of the travel movement (VB). [4] Operating method according to claim 1, 2 or 3, characterized by that the control device (23) moves the gantry (6) within a vertical plane, in particular along a horizontal straight line (27), from the starting location (p1) to the destination location (p2). [5] Control program for a control device (23), wherein the control program comprises machine code (25) which can be processed by the control device (23), wherein the processing of the machine code (25) by the control device (23) causes the control device (23) to operate a handling station for a sample container (1) in which a liquid medical sample (2) is located, according to an operating method according to one of the above claims. [6] Control device for a handling station for a sample container (1) in which a liquid medical sample (2) is located, wherein the control device is programmed with a control program (24) according to claim 5, so that the control device operates the handling station according to an operating method according to one of claims 1 to 4. [7] Handling station for a sample container (1) containing a liquid medical sample (2), - wherein the handling station comprises a guide structure (5) and a gantry (6) arranged on the guide structure (5) and horizontally movable along the guide structure (5), - wherein an upper load suspension point (7) is arranged on the gantry (6), which is connected to a lower load suspension point (10) via a connecting element (9), - wherein a gripper (11) for gripping and releasing the sample container (1) is arranged at the lower load suspension point (7), - wherein the upper load suspension point (7) is vertically movable relative to the gantry (6) and / or the length (L2) of the connecting element (9) is variable, - wherein the connecting element (9) is articulated to the upper load suspension point (7) via a joint structure (8), - wherein the handling station has a control device (23) which operates the handling station according to an operating method according to one of claims 1 to 4, - the joint structure (8) is designed as a driven joint structure (8), so that the deflection (α) of the connecting element (9) from the vertical can be adjusted by the control device (23) by appropriately controlling the joint structure (8). [8] Handling station according to claim 7, characterized by that the joint structure (8) is designed as a uniaxial joint (12), so that an axis of rotation (13) of the uniaxial joint (12) is oriented horizontally and always runs in the same direction. [9] Handling station according to claim 7 characterized by that the joint structure (8) is designed as a ball joint (14) or as a cardan joint (15). [10] Handling station according to claim 7, characterized by , - that the joint structure (8) is designed as a sequential sequence of a first and a second uniaxial joint (16, 17), - that an axis of rotation (18) of the first single-axis joint (16) is oriented horizontally and always runs in the same direction, - that a rotation axis (19) of the second single-axis joint (17) is oriented horizontally and always runs in the same direction and - that the rotation axis (18) of the first uniaxial joint (16) and the rotation axis (19) of the second uniaxial joint (17) are oriented orthogonally to one another. [11] Handling station according to claim 7, characterized by that the joint structure (8) is designed as a sequence of a vertically oriented rotary axis (20) controlled by the control device (23) and a uniaxial joint (21), so that the control device (23) can adjust the orientation of a horizontal axis of rotation (22) of the uniaxial joint (21) in a horizontal plane.
Citation Information
Patent Citations
Crane with active damping of pendular movements of loads
EP2902356A1
Crane with active damping of pendular movements of loads
EP2977343B1
Operating method for a crane
EP3326957A1
Methods, systems, and apparatus for dynamic pick and place selection sequence based on sample rack imaging data
US20190250180A1
Methods of and system for swing damping movement of suspended objects
US4997095A
