METHOD FOR CONTROLLING NETWORK RECONSTRUCTION
Patent Information
- Application Number
- DE502017016895
- Authority / Receiving Office
- DE · DE
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2016-12-19
- Filing Date
- 2017-12-05
- Publication Date
- 2025-07-03
- Estimated Expiration
- 2037-12-05
AI Technical Summary
The increasing share of decentralized generation units, such as wind farms, complicates grid restoration processes due to reduced control options for grid operators and the dependency of wind farm feed-in capacities on weather conditions.
A method and communication device for controlling grid restoration, which includes a wind farm control center that communicates with a grid control center via fail-safe connections, allowing for direct control of wind farms during grid restoration, including activation of reserve power, frequency-dependent active power control, and voltage-dependent reactive power control.
Enhances the ability of grid operators to manage grid restoration by providing real-time data and control over wind farms, improving the reliability and efficiency of grid restoration processes despite weather-dependent feed-in capacities.
Description
[0001] The present invention relates to a method for controlling grid restoration of an electrical supply network. Furthermore, the present invention relates to a communication device for controlling grid restoration. The invention also relates to a wind farm with multiple wind turbines that is used in such a method for controlling grid restoration.
[0002] An electrical supply network can be made up of several network sections. If a fault occurs in a network section that endangers the stability of this network section or has already led to instability in this network section, it is advisable and usually also required to isolate this network section from the rest of the electrical supply network. This ensures that the fault does not endanger other parts of the electrical supply network or even the electrical supply network as a whole. In principle, however, other reasons for such a separation of a network section from the rest of the electrical supply network can also be considered, such as maintenance or repair work. This separated network section is also usually not operated or at least not in a normal operating mode.
[0003] As soon as the fault or other reason for the disconnection of this network section has been resolved, this network section should be restored to normal operating status as soon as possible and reconnected to the rest of the electrical supply network. This process is referred to as network restoration. Network restoration refers to the restart of a network section and its reconnection to the rest of the electrical supply network, particularly to at least one other neighboring network section.
[0004] Such a grid restoration process is generally known and is usually coordinated by the grid operator, who, in particular, controls large power plants feeding into the affected grid section and also controls any switching devices for disconnecting or reconnecting the affected grid section to the rest of the electrical supply network. If necessary, the grid operator can also control large consumers or at least connection interfaces to such consumers.
[0005] However, with an increasing share of decentralized generation units, especially photovoltaic systems and wind turbines, especially wind farms, the number and / or dominance of large power plants in the electrical supply grid is now decreasing.
[0006] Accordingly, such wind farms must at least be included in the grid reconstruction considerations in the event of a grid reconstruction. However, such a task is sometimes not easy for the grid operator to solve because, on the one hand, the dwindling proportion of large power plants also reduces the control options to which they have direct access. On the other hand, such decentralized generation units, especially wind turbines, react differently in many respects than the grid operator is used to from large power plants, or at least large power plants. One particular problem here is that the current feed-in capacities of a wind farm depend significantly on the weather, over which the grid operator has no influence.
[0007] The German Patent and Trademark Office has searched the following prior art in the priority application for the present application: DE 10 2007 035 391 A1, DE 10 2007 049 251 A1, US 2008 / 0118354 A1, US 2014 / 0297206 A1, EP 1 993 184 A1 and CN 105 846 462 A.
[0008] The present invention is therefore based on the object of addressing at least one of the aforementioned problems. In particular, a solution is to be proposed for improving the grid restoration of an electrical supply network with the aid of at least one wind farm connected to this electrical supply network. At the very least, a solution is to be proposed for helping to take into account the special features of a wind farm during grid restoration. At the very least, an alternative solution to previously known solutions is to be proposed.
[0009] According to the invention, a method according to claim 1 is proposed. This method relates to controlling the restoration of an electrical supply network. The electrical supply network to be controlled has at least a first and at least one further network section. At least one wind farm is connected to the first network section, and the wind farm can be controlled via a wind farm control center.
[0010] In principle, however, additional wind farms can also be connected to at least one additional grid section and also to the remaining electrical supply grid. Several wind farms can also be connected to the first grid section. The wind farm control center is not, or at least not necessarily, part of the wind farm in the first grid section, but can control it. The wind farm control center can also control other wind farms, at least if they are located nearby. The wind farm control center is therefore a central control unit that oversees several wind farms. In principle, however, it can also control just one wind farm.
[0011] The first grid section, to which the wind farm is connected, is coupled to the at least one further grid section via at least one switching device. Electrical energy can be transmitted between these grid sections via this switching device. Furthermore, the at least one switching device is configured to disconnect the first grid section from the at least one further grid section in the event of a fault. Such a fault can generally be referred to as an event. In other words, the switching device then disconnects the first grid section from the remaining electrical supply grid.
[0012] A network control center is provided to control this at least one switching device. Such a network control center is typically controlled by the network operator and can control additional switching devices. Here, too, it is generally possible for it to control only one switching device, for example, if another switching device is located far away in the network topology, and especially if this first network section is only connected to the rest of the electrical supply network via a single switching device.
[0013] The method now concerns a fault scenario in which a network fault occurs affecting the first network section. In particular, the network fault can also occur in the first network section. For example, an electrical short circuit can occur in the network section, which can lead to a voltage drop, to name just one example. However, an overvoltage can also occur, to name another example.
[0014] If this fault is serious enough, and this is the only definition of a fault here, the first network section is separated from the at least one further network section by the at least one switching device. It is also particularly important here that the first network section is not only connected to the rest of the electrical supply network by a single connection; rather, such a connection can usually be present via multiple connection points. In this case, multiple switching devices are also present. The first network section can also be connected to several further network sections, and in this case, correspondingly, multiple switching devices are also present.
[0015] If this fault occurs, the wind farm control center exchanges data with the grid control center via a control center connection. Communication is therefore proposed here between the wind farm control center, which controls at least one wind farm, and the grid control center, which controls at least one switching device. This communication is referred to here as a control center connection because it is used by the grid control center to communicate with the control center, namely the wind farm control center. This control center connection is a fail-safe communication link between the wind farm control center and the grid control center. This control center connection can be operated independently of the electrical supply grid. In particular, this control center connection can also be operated if the fault occurs in the first grid section. This control center connection can, for example, be implemented via a direct line between the wind farm control center and the grid control center.An uninterruptible power supply can be provided for operation. This control center connection would then not be dependent on power from the first network section and would therefore be operable even in the event of a fault in the first network section.
[0016] The wind farm also receives data from the grid control center via a wind farm connection. This communication facility is therefore called a wind farm connection because the grid control center can use it to transmit data to the wind farm. This wind farm connection is also intended as a fail-safe communication link between the wind farm and the grid control center and can be operated independently of the electrical supply grid. In particular, it can also be operated if the fault occurs in the first grid section. Data can therefore be transmitted directly from the grid control center to the wind farm, even if the first grid section to which this or that wind farm is connected is experiencing a fault.
[0017] Furthermore, at least one further data connection, in particular a conventional data connection, is provided, via which further data is transmitted, namely data that is not transmitted via the control room connection or the wind farm connection. Such a conventional data connection can, for example, be a radio connection and / or a satellite connection. It is also possible to use generally existing communication networks. This at least one further data connection does not need to be fail-safe. This at least one further data connection or one of these at least one further data connections exists in particular between the wind farm and the wind farm control room and can be referred to as a park connection because it transmits data relating to the wind farm between the wind farm and the wind farm control room. The wind farm control room can use this to control the wind farm and receive data from the wind farm, such as, for example,current power outputs or information on disruptions in the wind farm, such as a failed wind turbine, to name just a few examples.
[0018] The method therefore proposes a special type of communication in the event of a fault, which is provided on the one hand as direct communication between the wind farm control center and the grid control center, and on the other hand as direct communication between the wind farm and the grid control center. It is therefore specifically proposed that two special communication connections be provided, each adapted to the data transmitted between the wind farm control center and the grid control center on the one hand, and between the grid control center and the wind farm on the other. The respective communication connection, i.e. the control center connection on the one hand and the wind farm connection on the other, can be adapted to the specific requirements of the respective data. In particular, it is conceivable that the wind farm control center transmits information about the status of the wind farm before the fault occurred to the grid control center.The data was collected in the wind farm control center prior to the fault and can be transmitted to the grid control center in the event of a fault. Accordingly, the control center connection is configured to transmit data on the status of the wind farm or the wind turbines. The wind farm control center can also receive data from the grid control center, and the control center connection can be configured for such bidirectional communication.
[0019] For example, a simple setpoint or command can be transmitted from the grid control center to the wind farm via the wind farm connection. Accordingly, very few requirements are placed on such a wind farm connection.
[0020] According to one embodiment, it is proposed that in the event of a fault, the wind farm is placed into grid restoration mode by the grid control center via the wind farm connection once the grid fault has been rectified or will be rectified. If the first grid section is disconnected from the rest of the supply grid and a voltage dip or other problem regularly occurs in the process, at least one wind farm will also disconnect automatically from the grid, namely from the first grid section. At least it will initially stop feeding in, or at least not in the normal way. Once the fault has been rectified, i.e. the original reason for disconnecting the first grid section from the rest of the supply section has been rectified, grid restoration can begin. The wind farm preferably supports such grid restoration. For this purpose, it can be placed into grid restoration mode.Such a grid restoration mode may in particular provide for first restoring the wind turbines to an operating state and may provide for offering voltage levels, reactive power levels and / or active power levels and, if necessary, feeding them into the electrical supply grid, particularly at the request of the grid operator.
[0021] In other words, a grid restoration mode for the wind farm is a mode in which the wind farm is prepared to feed in, and possibly also feeds in, namely into the first grid section, but does so under special conditions and / or in a special way.
[0022] For this purpose, the grid control center puts the wind farm into this grid restoration mode. The grid control center uses the wind farm connection to do this and transmits a corresponding signal from the grid control center to the wind farm. This can mean in particular that the wind farm has a central wind farm control device that receives this signal and can therefore be controlled via this signal. In the simplest case, this is a digital signal that only knows two values: to switch the grid restoration mode on or not. This grid restoration mode can be achieved in a simple way and in particular by means of a technically simple wind farm connection. Because the grid control center uses the wind farm connection to transmit the corresponding signal directly to the wind farm, no functioning communication connection is required between the wind farm and the central control center.the central wind farm control system on the one hand, and the wind farm control center on the other. This also makes it possible to achieve a simple connection between the grid control center and the wind farm that is sufficient to put the wind farm into grid restoration mode. For such a simple wind farm connection, only the prerequisite of grid resilience needs to be implemented. This can be significantly more cost-effective than making a complex, high-data-rate connection between the central wind farm control system and the wind farm control center fail-safe.
[0023] According to one embodiment, it is proposed that the grid control center controls active power generation and, additionally or alternatively, active power output from the wind farm to the first grid section. This is done in particular by transmitting active power setpoints to the wind farm via the wind farm connection. Preferably, the values for the active power output to be fed into the first grid section are specified. However, it is also possible to control active power generation in this way, namely by means of a corresponding additional setpoint. In the most common and idealized case, active power generation and active power output are the same. However, it can be useful to provide active power generation, at least for a short time, without feeding in this generated active power, or at least without feeding it in completely. At least for a short moment, the surplus active power generated in this way can, for example, be thermally consumed in the wind farm orThis increases the controllability of the wind farm, and the grid operator, who operates the grid control center, has greater certainty about the available active power output.
[0024] For this purpose, it is also proposed to use the wind farm connection, and in particular, it is proposed that the grid control center directly control or activate the wind farm. Here, too, a central wind farm control device within the wind farm can be used, to which the grid control center directly transmits these active power setpoints.
[0025] To implement this transmission using the simplest possible transmission connection, the active power setpoint can be specified in rough increments, such as 0%, 30%, 60%, and 90%. A technically undemanding transmission connection can thus be used for these few values. This can be used to connect the grid control center directly to the wind farm, particularly to the central wind farm control system, at a reasonable cost.
[0026] According to one embodiment, it is proposed that the wind farm control center transmits at least one piece of information from the following information list to the grid control center. This information list contains, as one item, a value indicating the level of active power generated by the wind farm and / or fed into the first grid section immediately before the fault occurred. Such information can be important for the grid operator and thus for control via the grid control center, as it should also provide a fairly precise idea of how much active power the wind farm can currently generate and feed into the grid. The key consideration here is that such a fault occurs only very briefly, for example, only a few seconds or a few minutes, for example, a maximum of five minutes or a maximum of 10 minutes. Within this short time, the power available from the wind farm due to the prevailing wind conditions will change only insignificantly at most.This last value before the fault occurs is therefore a fairly accurate value of the currently available active power of the wind farm.
[0027] At the same time, the underlying idea is that the wind farm normally always transmits such current values via the active power fed in to the wind farm control center, for example every second, 10 seconds, or at least every minute. This can be done via a conventional, broadband communication connection, such as the conventional data connection mentioned above. If a fault occurs and this conventional data connection is disrupted or interrupted, the most recently sent data is still available in the wind farm control center and can therefore be transmitted to the grid control center via the control center connection. All that is required for this is that the control center connection is still functioning during this fault situation. Ideally, this data is also constantly updated in the grid control center before a fault occurs.In this case, even a connection via the control room connection from the wind farm control room to the grid control center would be unnecessary in the event of a fault.
[0028] In any case, it can be achieved that at least the level of the last values of active power fed in is known in the grid control center.
[0029] Additionally or alternatively, it is proposed that the wind farm control center transmit an active power forecast to the grid control center, which indicates a value or temporal progression of the power that can be generated for a predetermined forecast period. The predetermined forecast period is, in particular, a period from the current time to a point in time approximately two to eight hours, in particular approximately four to six hours, in the future. This is also transmitted via the control center connection.
[0030] This also ensures that the grid control center has information about the expected active power to be fed in. This allows it to plan and, in particular, to utilize the wind farm for the upcoming grid restoration. Here, too, the communication method is cleverly chosen so that the grid control center has this forecast information available for the predetermined forecast period, even if the conventional data connection between the wind farm and the wind farm control center is disrupted or collapses when a fault occurs.
[0031] The active power forecast can be composed of knowledge about the properties of the wind farm, namely the static properties of the wind turbines as a whole, as well as knowledge about, for example, failed wind turbines, on the one hand, and a weather forecast, particularly the wind forecast, on the other. In other words, this active power forecast can be calculated from the forecast wind intensity and knowledge of the wind farm. For this purpose, information about such a weather forecast, particularly the wind forecast, can be received from an external entity such as a meteorological service, and information about the wind farm can be obtained from the wind farm itself. The calculation can be performed, for example, at the wind farm control center.
[0032] According to one embodiment, it is proposed that the grid control center transmits at least one of the following information to the wind farm: a signal for starting a grid reconstruction mode, an active power setpoint for specifying an active power to be fed into the first grid section by the wind farm, a reactive power setpoint for specifying a reactive power to be fed into the first grid section by the wind farm, and a voltage setpoint for specifying a grid voltage to be regulated by the wind farm (304) at the first grid section (302).
[0033] Specifically, it is proposed here that this transmission from the grid control center to the wind farm be carried out via the wind farm connection. The wind farm connection can be designed to be unidirectional for this purpose. It can therefore be provided that this wind farm connection only transmits this limited information from the grid control center to the wind farm. With the signal to start grid restoration mode, which can also be referred to as the grid restoration signal, the grid control center can easily put the wind farm into grid restoration mode, as already explained above. A single data bit may be sufficient for this.
[0034] The active power setpoint also only needs to be transmitted in one direction and can also be limited to a few rough values, especially for grid restoration. As an example, 0%, 30%, 60%, and 90% can be specified as the active power setpoint. This can, for example, be based on the nominal power of the wind farm or the last active power fed into the grid by the wind farm before the fault occurred.
[0035] If only four values (0%, 30%, 60%, and 90%) are transmitted or available for selection, two data bits are sufficient to transmit this information. With an additional data bit, i.e., a total of three data bits, eight values can be selected, e.g., 0%, 15%, 30%, 45%, 60%, 75%, 90%, and 100%.
[0036] Alternatively or additionally, it may also be provided to transmit a reactive power setpoint to specify the reactive power to be fed into the first grid section by the wind farm. Here, too, it may be provided to transmit such a reactive power setpoint in rough steps or stages. The example given for active power also applies here, namely, transmitting only one of the values 0%, 30%, 60%, and 90% as the reactive power setpoint. This value can refer to the maximum reactive power that can be transmitted by the wind farm.
[0037] This allows the grid operator to easily activate and control grid support for the wind farm by feeding in reactive power via the grid control center. Two data bits are sufficient for these four reactive power values mentioned as examples. Preferably, the grid control center transmits only these three values: a signal to start grid restoration mode, an active power setpoint, and a reactive power setpoint. If the rough setpoint levels described above are selected for transmission, five bits may be sufficient to transmit all three signals. The entire information could therefore easily be transmitted using a single byte, leaving three bits available for other purposes, such as a control bit. It is also possible to use an additional bit to slightly refine the active power setpoint and / or the reactive power setpoint.By using an additional bit, twice as many values can be transmitted.
[0038] This allows the wind farm to be easily controlled from the control center, especially for grid restoration. The necessary communication connection essentially needs to meet minimal requirements. A unidirectional connection from the grid control center to the wind farm, especially to the central wind farm control unit, is ideal. A data byte must be transmitted occasionally, for example, at intervals of 1 second, 10 seconds, or 1 minute.
[0039] Furthermore, this also ensures data security via this wind farm connection, because such a very simple communication connection also makes extensive access by unauthorized persons difficult, if not impossible. If the wind farm connection only allows the transmission of the three values or signals mentioned above, even an unauthorized person who gains access can only transmit and influence these three values.
[0040] Because the grid control center transmits a voltage setpoint over the wind farm connection to specify the grid voltage to be regulated by the wind farm at the first grid section, the grid control center, and thus the grid operator, can also use the wind farm to specify the voltage level, or at least to contribute to this. The grid control center can easily specify a corresponding voltage value, namely via a voltage setpoint. Because this is done by the control center, it can be well coordinated with other requirements that are also controlled by the grid control center.
[0041] According to a further embodiment, it is proposed that the wind farm control center be connected to a wind forecasting device, in particular via a forecast transmission connection, and receive and temporarily store wind forecast values, in particular a forecast average wind speed, from the wind forecasting device in order to calculate the active power forecast therefrom, if necessary. In this case, it is particularly proposed that the wind farm control center calculates the active power forecast. For this purpose, it has access to a wind forecast that it receives from the wind forecasting device. It also has access to knowledge about the wind farm for which the active power forecast is to be calculated. The result can then be easily transmitted to the grid control center, either generally or only in the event of a fault, when the grid control center requires this active power forecast to control the wind farm for grid restoration.Such a wind forecasting facility could be, for example, a weather service.
[0042] According to one embodiment, it is proposed that the wind farm connection be unidirectional and only transmit data in the direction from the grid control center to the wind farm. In particular, data is only transmitted from the grid control center to the central wind farm control device. Furthermore, this operating principle is preferably also applied to multiple wind farms on the same first grid section. By using a unidirectional wind farm connection, this can be implemented in a simple manner. Only a small amount of data needs to be transmitted, and there is no need for two-way communication between the grid operator and the wind farm. It may be sufficient for the wind farm to be able to receive and evaluate the small amount of data transmitted by the grid control center.If so little is transmitted that the transmission of one byte is sufficient for all information, as described above, it may be sufficient if the grid control center can generate and transmit this byte and the wind farm or the central wind farm control device can decode this one byte.
[0043] Additionally or alternatively, it is proposed that the wind farm connection have a low bandwidth or a low transmission rate. In particular, it may be sufficient if a maximum of one byte per second, preferably a maximum of one byte in 10 seconds, and especially preferably one byte per minute, can be transmitted. Accordingly, it is sufficient if the transmission connection, in particular a corresponding transmission line and / or a corresponding radio connection, can ensure such a transmission rate or bandwidth. It is also not necessarily detrimental if more can be transmitted, but it is not necessary that more can be transmitted.
[0044] Preferably, the control room connection is bidirectional, and data is transmitted in both directions between the grid control center and the wind farm control center. Thus, the control room connection, i.e., the connection between the farm control center and the grid control center, can be more complex than the wind farm connection. Accordingly, more and more complex data can be transmitted via the control room connection. Such a control room connection can also be significantly more complex and therefore more expensive than the wind farm connection.
[0045] The proposed structure, particularly the use of a simple, particularly unidirectional wind farm connection on the one hand and the use of a more complex control room connection on the other, makes it possible, on the one hand, to supply the grid control center with sufficient data and thereby achieve bidirectional communication between the grid control center and the wind farm control center, while, on the other hand, avoiding costly additional connections. Nevertheless, each wind farm can advantageously be controlled directly by a corresponding grid control center. It is also not necessary to maintain a communication connection between the wind farm control center and the wind farm in the event of a fault. In particular, a conventional data connection can be used there, which is correspondingly more cost-effective and does not need to be designed to be fail-safe.
[0046] According to one embodiment, it is proposed that data for controlling the wind farm be stored in the grid control center. Additionally or alternatively, it is possible for this data to be stored in the wind farm control center and, in the event of a fault, to be transmitted to the grid control center via the control center connection. This data is selected from the following list. The data thus relates to at least one element, some elements, or all elements of the following list with the following elements: an active power forecast, a wind speed forecast, characteristics of the wind farm, in particular nominal power, nominal reactive power and / or power gradients indicating a maximum active power change of the farm, and an available active power of the wind farm.
[0047] This means that an active power forecast can always be available in the grid control center, either because it is stored there or because it can be obtained from the wind farm control center via the fail-safe control center connection. If a fault occurs and some other data connections are disrupted or have failed, the grid control center still has access to this active power forecast, thus knowing what active power the wind farm can generate and feed into the grid in the near future, particularly in the next two to eight hours, and especially four to six hours, and can use this data to control grid restoration.
[0048] Likewise, a wind speed forecast can be available to the grid control center, and this can also be used to determine an active power forecast. This active power forecast can then be created either at the wind farm control center or directly at the grid control center. This also makes an active power forecast available to the grid control center even in the event of a fault.
[0049] Additionally, or alternatively, the grid control center has access to wind farm data. It can also use this data for grid restoration with the assistance of at least one wind farm. If necessary, it can determine an active power forecast from the wind farm data and a wind speed forecast, or this determination can be made at the wind farm control center, from which data can be transmitted to the grid control center via the control center connection, even in the event of a fault.
[0050] The key data of a wind farm includes, in particular, nominal power, nominal reactive power, or a power gradient. The nominal power, in particular, can be used to calculate an active power forecast based on knowledge of a wind forecast. Similarly, a potentially adjustable reactive power can be determined from the nominal reactive power and a weather forecast or an active power forecast. For example, the reactive power can depend on the active power that can be generated; more active power, i.e., when there is sufficient wind, also generates more reactive power. At the same time, however, the current that can be fed into the grid is limited and must be divided between the active power to be fed in and the reactive power. For example, if high levels of active power are already being fed into the grid, usually only less reactive power can be fed in, depending on the dimensioning of the supply line and, in particular, the grid connection point.
[0051] Knowing the power limit gradient allows the grid control center to better plan its grid restoration, as it can take into account how quickly the wind farm's active power can be increased, particularly during feed-in. This can be taken into account, and thus, for example, the grid control center and thus the grid operator can better estimate how long it will take until the necessary active power is available in the first grid section, so that the first grid section can be reconnected to the rest of the supply grid via at least one switching device.
[0052] Additionally, or alternatively, it is suggested that the available active power of the wind farm be stored. This information provides the grid control center, and thus the grid operator, with immediate information about the active power available at that moment. This could, for example, be the last active power fed into the grid by the wind farm before the fault occurred, if the fault only lasted for a very short time, such as a few seconds.
[0053] Preferably, some, several, or all of the stored data are updated frequently, particularly continuously or quasi-continuously. This ensures that in the event of a fault, when updating is no longer possible due to a malfunction or communication interruption, the most recent current values are still available and stored in the wind farm control center or the grid control center. In other words, this continuous, or at least frequent, updating can be used to prepare for a grid failure. Quasi-continuous updating means that continuous updating is carried out within the scope of technical possibilities.In particular, an update, like many other data transfers, is carried out digitally and a continuous update is one that can be carried out as a digital update as frequently as is technically possible with the device used.
[0054] According to one embodiment, it is proposed that in the event of a fault, the wind farm is put into a grid restoration mode and the wind farm performs one, several or all of the following steps in the grid restoration mode, namely: Activating a reserve power, where the reserve power is a power that the wind farm can feed into the first grid section in response to a request signal, feeding electrical active power into the first grid section as a function of a frequency of the electrical voltage, while the grid restoration mode prescribes frequency-dependent active power control, feeding electrical active power while maintaining a power gradient that is limited in amount and describes a change in the active power as a function of time, while the grid restoration mode prescribes gradient-fixed active power control, and feeding electrical reactive power as a function of a voltage into the first grid section, while the grid restoration mode prescribes voltage-dependent reactive power feed-in.
[0055] It is therefore proposed to first initiate such a grid restoration mode. This is preferably done by the grid control center via the wind farm connection. This grid restoration mode can then be implemented and coordinated in the wind farm by the central wind farm control unit.
[0056] The proposed activation of a reserve power means that the wind farm, and in particular its wind turbines or some of them, are started up and are already rotating so that this reserve power can be activated in a very short moment and fed into the grid, in this case the first grid section. In the simplest case, this means that the wind turbines are already generating this power and this power is simply being consumed, particularly thermally by the electrical resistors. However, it is also conceivable that the respective wind turbine is simply brought up to speed and producing power for its own supply. For demand, this operation can then be changed so that the rotor blades are turned into the wind so that they extract significantly more power from the wind than before.Here, the power cannot be accessed immediately, but very quickly, because rotor blades can be turned into the wind in just a few seconds.
[0057] It may then be provided to feed in active electrical power depending on the frequency of the electrical voltage in the first grid section, whereby this only occurs or especially occurs when frequency-dependent active power control is prescribed in the grid restoration mode. Thus, a special control mode is activated during grid restoration, in which a predetermined frequency-dependent active power feed-in occurs.
[0058] The feed-in of electrical active power can be carried out while maintaining a power gradient limited in magnitude. It can therefore be provided that the active power only changes within specified limits. This can achieve a certain stability of the active power change. In particular, this can counteract oscillations, which can pose a danger in a comparatively unstable grid restoration state. This feed-in and compliance with the power gradient only occurs when a corresponding mode is activated, namely gradient-fixed active power control. This is prescribed, and then the feed-in occurs accordingly with a limited power gradient. Such modes, namely frequency-dependent feed-in and gradient-fixed active power control, can also be combined.In particular, it is proposed that a combination be such that a frequency-dependent active power feed-in occurs as long as it lies within the limits specified by the gradients.
[0059] The feed-in of reactive power can also be provided depending on the voltage in the first grid section. This mode should also be selected if it is prescribed as voltage-dependent reactive power feed-in. Furthermore, these regulations can also be specified by the grid operator via its grid control center. Alternatively, there are grid conditions that the wind farm or the central wind farm control system detects, and these modes are selected based on them. Depending on these conditions, frequency-dependent active power control, gradient-dependent active power control, and / or voltage-dependent reactive power control are selected.
[0060] According to the invention, a communication device according to claim 12 is also proposed. This is intended for controlling a network reconstruction of an electrical supply network. The underlying electrical supply network has a first network section and at least one further network section. At least one wind farm is connected to the first network section, and the wind farm can be controlled via a wind farm control center. The first network section is coupled to the at least one further network section via at least one switching device in order to transmit electrical energy between the network sections, and the at least one switching device is configured to disconnect the first network section from the at least one further network section in the event of a fault.
[0061] A grid control center is provided to control the switching device. In the event of a fault affecting the first grid section, the first grid section is separated from at least one other grid section by the switching device. The communication device for this purpose comprises a control center connection configured to allow the wind farm control center to exchange data with the grid control center. The control center connection is a fail-safe communication link between the wind farm control center and the grid control center and is operable dependent on the electrical supply grid, in particular even in the event of a fault in the first grid section.
[0062] Furthermore, a wind farm connection is provided which is designed so that the wind farm receives data from the grid control center via it. The wind farm connection is a fail-safe communication connection between the wind farm and the grid control center and can be operated independently of the electrical supply grid, in particular even in the event of a fault in the first grid section. In addition, a further data connection is provided which is provided at least between the wind farm and the wind farm control center. Such a data connection provided between the wind farm and the wind farm control center can be referred to as a farm connection. This further data connection is used in particular to transmit further data which is not transmitted via the control center connection or the wind farm connection. The further data connection can in particular be provided as a conventional data connection.It may also be provided that additional data connections are available, for example between a wind farm control center and a forecasting device.
[0063] The communication device operates as described above with reference to embodiments of the method for controlling network re-establishment.
[0064] Preferably, the communication device comprises the wind farm control center and also or alternatively the grid control center and furthermore or alternatively a wind farm control device of the wind farm and furthermore or alternatively a wind forecast device for creating a wind forecast.
[0065] Preferably, the communication device is configured to carry out a method according to one of the embodiments described above. In particular, it is configured to carry out the communications described therein, in particular to transmit the aforementioned data from the grid control center to the wind farm via the wind farm connection and / or to exchange the aforementioned data between the wind farm control center and the grid control center via the control center connection.
[0066] Preferably, the wind farm connection is unidirectional and prepared to operate as described in one of the corresponding embodiments of the method for controlling grid restoration.
[0067] According to a further embodiment, the control center connection is bidirectional and configured to transmit data between the grid control center and the wind farm control center in both directions. In particular, it is configured to operate as described in corresponding embodiments of a method for controlling grid restoration.
[0068] According to the invention, a wind farm is also proposed. This wind farm has a central wind farm control device, via which the wind turbines of the wind farm can be controlled and which can communicate externally. This wind farm control device is configured to receive data from a grid control center via a unidirectional wind farm connection. In particular, it operates as described in connection with embodiments of the method for controlling grid restoration. In particular, it operates or is configured for communication or data exchange as described in connection with data transmission from the grid control center to the wind farm or to the central wind farm control device.
[0069] Preferably, the wind farm and thus the central farm control device are prepared to be integrated into a communication device according to at least one embodiment of a communication device. In particular, it is connected to the control center via a described wind farm connection and to the wind farm control room via a further data connection, in particular via a farm connection.
[0070] The invention will now be described in more detail below using embodiments with reference to the accompanying figures. Figure 1 shows a perspective view of a wind turbine. Figure 2 shows a schematic view of a wind farm. Figure 3 shows a communication device according to the invention.
[0071] Figure 1shows a wind turbine 100 with a tower 102 and a nacelle 104. A rotor 106 with three rotor blades 108 and a spinner 110 is arranged on the nacelle 104. During operation, the rotor 106 is set into rotation by the wind and thereby drives a generator in the nacelle 104.
[0072] Figure 2shows a wind farm 112 with, for example, three wind turbines 100, which may be identical or different. The three wind turbines 100 are thus representative of essentially any number of wind turbines in a wind farm 112. The wind turbines 100 provide their power, namely in particular the generated electricity, via an electrical farm grid 114. The currents or power generated by the individual wind turbines 100 are added together, and a transformer 116 is usually provided, which steps up the voltage in the farm and then feeds it into the supply grid 120 at the feed-in point 118, which is also generally referred to as a PCC. Fig. 2is only a simplified representation of a wind farm 112, which, for example, does not show a control system, although a control system is of course present. The farm network 114 can also be designed differently, for example, by also having a transformer at the output of each wind turbine 100, to name just one other embodiment.
[0073] Figure 3 shows a communication device 300 embedded in a first network section 302. A wind farm 304 is connected to this first network section 302 via a network connection point 306. The first network section 302 is part of an electrical supply network and is connected to at least one further network section (342) via a switching device 340. In this respect, the first network section 302 is symbolized by a high-voltage transformer 308 and a high-voltage line 310.
[0074] The wind farm 304 has a plurality of wind turbines 312 that can be controlled via a control computer 314. A central wind farm control device 316 is also provided, which can communicate with the control computer 314 via an exchange line 318. In another embodiment, the control computer 314 can also be part of the central wind farm control device 316.
[0075] In any case, the central wind farm control unit, which can also be referred to as FCU for simplicity, records a farm-side voltage UP and a farm-side feed-in current I p at the grid connection point 306 or on the wind farm side in the vicinity of the grid connection point 306. This allows the central farm control unit 316 to record and evaluate the current and voltage at the grid connection point, namely in particular on the farm side, i.e. towards the wind farm 304. Depending on this evaluation, the central wind farm control unit can control the wind farm, namely in particular the wind turbines 312. In this process, values from the wind turbines 312 can also be recorded and evaluated. Such values can be the active power or reactive power currently being delivered and / or deliverable by the respective wind turbine 312. Such values can also relate to status information of the wind turbine, in particular fault or error signals.
[0076] The central wind farm control unit 316 also supplies such or other data to a wind farm control center 320. In particular, a data connection 322 is used for this purpose, which is also referred to here as the farm connection 322. In particular, the current feed-in of the wind farm 304 and the availability of the wind farm 304 are transmitted via this connection. The availability of the wind farm is in particular information about the available active power of the wind farm. Preferably, characteristic data of the wind farm, in particular the nominal power of the wind farm and also or alternatively the nominal reactive power of the wind farm and also or alternatively power limit gradients, which indicate a maximum active power change of the farm, are also transmitted. This data is preferably temporarily stored in the wind farm control center 320 and can be retrieved if necessary.
[0077] The wind farm control center 320 also communicates with a grid control center 324, and this communication occurs via a control center connection 326. This control center connection 326 and the communication between the wind farm control center 320 and the grid control center 324 are specifically designed for a grid restoration situation, namely when the first grid section 302 has been disconnected from another grid section and thus completely disconnected from the rest of the electrical supply grid. This is usually coupled with a collapse of the first grid section 302 or at least with a voltage dip in this first grid section 302, to name a most frequently expected situation.
[0078] For this purpose in particular, it is proposed that the grid control center 324 receive values from the wind farm control center 320. This includes, in particular, values of the last feed-in before this event or the fault or the disconnection of the first grid section from at least one other grid section or a resulting voltage drop in this first grid section. It is therefore proposed to receive the last values of the feed-in of the wind farm 304 up to this event. This is, in particular, the last active power feed-in before the occurrence of the aforementioned event. These values can thus be provided by the wind farm control center 320, even if the data connection 322, which can also be referred to as the additional data connection 322, should collapse in the event of the event. For this purpose, this data has already been transmitted from the central wind farm control device 316 to the wind farm control center 320 as a precautionary measure.It should be noted here that other wind farms may also be connected to the wind farm control center 320, in particular other central wind farm control facilities of other wind farms.
[0079] It is further proposed that the grid control center 324 receive a forecast from the wind farm control center 320 via the control center connection 326, specifically an active power forecast indicating how much active power the wind farm 304 in question (this can also be done for multiple wind farms) can deliver in the future, i.e., generate, and feed into the grid, particularly in the coming hours, especially in the next six hours. For example, for this exemplary period of six hours, a forecast value for the deliverable active power for each wind farm can be provided every 15 minutes.
[0080] The control room connection 326 is provided as a fail-safe communication connection. For example, an uninterruptible power supply (UPS) can be provided for this purpose to ensure continued operation even in the event of a power failure. The control room connection 326 can also be dimensioned such that it can transmit, for example, one kilobyte per wind farm via which information is exchanged. Such a fail-safe control room connection 326 can be comparatively expensive, but is only provided between the grid control center 324 and the wind farm control center 320. Especially if multiple wind farms are provided, all of which are connected to the same wind farm control center 320, this means that only one such control room connection 326 needs to be provided between the wind farm control center 320 and the grid control center 324.
[0081] Furthermore, the grid control center 324 is connected to the wind farm 304 via a wind farm connection 328. The connection goes to the central wind farm control device 316. If multiple wind farms are present, several of these wind farm connections 328 are required, namely one wind farm connection 328 for each wind farm.
[0082] For this purpose, however, a very cost-effective wind farm connection 328 is proposed here. It is unidirectional and only transmits data from the grid control center 324 to the central wind farm control device 316. Here, it is particularly proposed that an activation signal be transmitted to activate grid restoration operation. A single bit is sufficient for such information transmission. Furthermore, it is proposed that active power setpoints for active power control be transmitted from the grid control center 324 via the wind farm connection 328 to the central wind farm control device 316. All of this data transmission is also intended for a grid restoration situation. For such a grid restoration situation, it was recognized that the wind farm power available from the wind farm can be taken into account in rough steps. It may therefore be sufficient if only a few possible values are selectable, such as:0%, 30%, 60%, and 90% of the wind farm's nominal power. Accordingly, only these four values need to be identified, and identifying four values is possible with two bits.
[0083] In any case, only a few bits are required for this task and thus this wind farm connection 328 can be established cost-effectively, at least significantly more cost-effectively than the control room connection 326. This also makes it possible, with reasonable effort, to provide a wind farm connection 328 from one grid control center 324 to several wind farms.
[0084] Additionally, a forecasting device 330 is provided, which creates weather forecasts and may, for example, be a weather service. A special forecasting service for expected wind is also contemplated, which may, for example, also use a forecast model. This wind forecasting device 330 is connected to the wind farm control center 320 via a connecting device 332, and the connecting device may also be one of the proposed additional data connections. In particular, the wind forecasting device 330 transmits corresponding wind data and, if applicable, further weather data via this connecting device 332 to the wind farm control center 320. Using this weather information and information about the characteristics of the wind farm 304, which the wind farm control center 320 has received from the central wind farm control device, the wind farm control center can calculate active power forecasts and, if applicable, provide them to the grid control center 324.For this purpose, it may be appropriate, for example, and is hereby proposed, that data be provided for a multi-hour forecast, particularly for a 6-hour forecast, so that the wind farm control center 320 can also calculate a corresponding multi-hour active power forecast and provide it to the grid control center 324.
[0085] The communication device 300 thus comprises at least the control room connection 326 and the wind farm connection 328. It may also comprise the additional data connection 322 between the central wind farm control device 316 and the wind farm control center 320. Furthermore, the connection device 332 may also be part of the communication device 300.
[0086] The many communication links, especially the exchange line 318, the further data connection 322, the control room connection 326, the wind farm connection 328 and the connection device 332 are in the Figure 3essentially illustrated as a line. In fact, it is also conceivable that the connections, in particular the further data connection 322 or the farm connection 322, and the connection device 332 transmit data via a radio link. Furthermore, such communication connections include not only the illustrated transmission paths, be they wired or wireless, but also the corresponding transmitting and / or receiving devices. The transmitting and / or receiving devices are provided accordingly in the devices connected there. In particular, these are provided in the control computer 314, the central wind farm control device 316, the wind farm control center 320, the grid control center 324, and the wind forecasting device 330.Optionally, the control computer 314 and / or the central wind farm control device 316 and / or the wind farm control center 320 and / or the grid control center 324 and / or the wind forecast device 330 are part of the communication device.
[0087] It was thus recognized that the grid management strategy and the associated communication infrastructure have so far been geared towards the physical characteristics of conventional feeders, especially large power plants. To improve this, a proposal is made for integrating wind turbines into the grid operators' control technology.
[0088] Until now, in a grid restoration situation, the grid operator establishing the grid needed a communications interface to control all power plants and secondary technology in its grid, as well as to query the status of the power plants. It has been recognized that in the future, grids will not only be built up with conventional power plants, but that it is advantageous for the wind farms to also be accessible to the grid operator via a communications interface protected against power failures in the event of a blackout. Furthermore, it is advantageous if the grid operator in a grid restoration situation knows the available power at the substation level, i.e. related to a specific substation, throughout the entire grid restoration process. As a solution, a communications interface between the grid operator and the wind farm is proposed, which remains functional during a grid restoration situation and transmits the necessary signals.
[0089] This allows for an increase in the converter-based generation share in interconnected grids. The proposed solution also supports a control concept for grids that are temporarily operated almost entirely by converter-coupled feed-in, while maintaining system reliability.
[0090] It was recognized that it would be advantageous if a wind farm could exchange the following information, or at least part of it, with the grid operator in a grid restoration situation in the future: 1. Last power fed into the grid and status of the wind farm 2. Forecasted power for the next 6 hours 3. Information that the grid operator must use to put the wind farm into grid restoration mode. 4. Information that the grid operator can use to control the active power to be delivered by the wind farm, for example, a selection can be made between the values 0%, 30%, 60%, 90%. 5. Information that the grid operator can use to adjust reactive power parameters, in particular the voltage setpoint, reactive power setpoint, and / or cos(Phi).
[0091] According to at least one embodiment of the invention, a division into two communication paths is proposed, namely in particular: 1. Fail-safe bidirectional communication between the wind farm control center and the grid control center. The grid control center can be operated in particular by a grid operator and / or a transmission system operator. This bidirectional communication can be referred to as a control room connection. It is preferably designed as a leased line for the transmission of data and voice and is fail-safe even in the event of a total grid failure. 2. Fail-safe unidirectional communication between the grid operator and the wind farm. This unidirectional communication can be referred to as a wind farm connection. It is preferably designed as low-speed communication and has a data rate of a few bits per second. The data rate here is considered to be a maximum of 8 bytes per second, preferably a maximum of one byte per second and in particular a maximum of one bit per second, in particular no more than 20 bits per second (bit / s).
[0092] Data transmission can be achieved, for example, via familiar ripple control signals or using a simple GSM or other radio connection. It is also possible to use a fail-safe interface from a well-known feed-in management system. Such an interface is also known as an EISMAN interface.
[0093] Furthermore, we propose maintaining a continuous data set for all wind farms, which the grid operator can access as needed via a fail-safe connection. Alternatively, we propose that such data or such a data set be continuously available at the grid operator, particularly in a grid control center.
[0094] Such a second, very simple unidirectional communication channel allows the wind farms to be controlled by the grid operator.
[0095] It was recognized that the following advantages could arise: A data connection with a larger data requirement only needs to be provided once. The interface to the wind farms can be designed very simply.
[0096] Such a proposed communication structure can be used advantageously. In the event of a grid restoration situation, the grid operator first retrieves the data from the wind farm control center via its grid control center.
[0097] After a fault has occurred and after the grid operator, particularly through the grid control center, has switched the grid voltage back on to the wind farm, conventional communication, particularly via DSL, may not be available to the wind farm in question.
[0098] The grid operator can then put the wind farm into grid restoration mode via a very simple interface. This allows for the activation of reserve power, frequency-dependent power control, gradient-dependent control, and voltage-dependent reactive power control. The grid operator can thus implement power control via this interface to restart the grid.
[0099] By knowing the available power in combination with power control, the grid operator then knows the behavior of the wind farms and can ramp up the grid very quickly with the support of the wind farm or several wind farms.
[0100] In addition, this interface can also be used for reactive power control by transmitting a voltage setpoint or a reactive power setpoint, namely via the wind farm connection.
[0101] The following communication methods are generally considered: PLC communication, which can also be referred to as point-to-point power line communication. The use of familiar ripple control signals that operate unidirectionally. Radio transmission and / or coupling into an existing line are also possible.
[0102] Other radio connections, especially the use of telephone network operators and / or GSM, can also be considered.
Claims
1. A method for controlling the rebuilding of an electrical supply network (120), wherein a network rebuilding denotes a restart of a network section of the electrical supply network and denotes a reconnection to the remaining electrical supply network, and the electrical supply network (120) - has a first network section (302) and at least one further network section (342), - at least one wind farm (304) is connected to the first network section (302), - the wind farm (304) can be controlled via a wind farm control room (320), - the first network section (302) is coupled to the at least one further network section (342) via at least one switching device (340) in order to transmit electrical energy between the network sections (302, 342), - the at least one switching device (340) is set up to disconnect the first network section (302) from the at least one further network section (342) in the event of a fault, - a network control station is provided for the purpose of controlling the at least one switching device (340), wherein, in the event of a fault during which a network fault acting on the first network section (302) occurs, - the first network section (302) is disconnected from the at least one further network section (342) by the at least one switching device (340), - the wind farm control room (320) interchanges data with the network control station (324) via a control room connection (326), wherein a direct communication between the wind farm control room and the network control station is provided, and the control room connection (326) is a failsafe communication connection between the wind farm control room (320) and the network control station (324) and can be operated independently of the electrical supply network (120), and an uninterruptible power supply is provided to operate the control room connection, and can be operated even in the case of the fault in the first network section (302), and - the wind farm (304) receives data from the network control station (324) via a wind farm connection (328), wherein a direct communication between the wind farm and the network control station is provided, and the wind farm connection (328) is a failsafe communication connection between the wind farm (304) and the network control station (324) and can be operated independently of the electrical supply network (120), and can be operated even in the case of the fault in the first network section (302), the network control station puts the wind farm into a network rebuilding mode by transmitting a corresponding signal from the network control station to the wind farm via the wind farm connection and - further data which are not transmitted via the control room connection (326) and are not transmitted via the wind farm connection (328) are transmitted via a further data connection (322, 332) provided that the latter has not failed.
2. The method as claimed in claim 1, characterized in that in the event of a fault, the wind farm (304) is changed to a network rebuilding mode by the network control station (324) via the wind farm connection (328) if the network fault has been eliminated or is being eliminated and / or that the network control station (324) controls active power production and / or output of the wind farm (304), in particular by transmitting desired active power values to the wind farm (304) via the wind farm connection (328).
3. The method as claimed in one of the preceding claims, characterized in that the wind farm control room (320) transmits, to the network control station (324), at least one item of information from the list containing - a value of a level of active power produced by the wind farm (304) and / or fed into the first network section (302) immediately before the fault event, and - an active power forecast which indicates a value or a temporal profile of a power which can be produced for a predetermined forecast period, wherein the predetermined forecast period describes, in particular, a period from the current time to a time which is approximately 2 to 8 hours, in particular approximately 4 to 6 hours, in the future, wherein the at least one item of information is transmitted, in particular, via the control room connection (326).
4. The method as claimed in one of the preceding claims, characterized in that the network control station (324) transmits, to the wind farm (304), via the wind farm connection (328), at least one item of information from the list containing - a signal for starting a network rebuilding mode, - a desired active power value for specifying an active power to be fed into the first network section (302) by the wind farm, - a desired reactive power value for specifying a reactive power to be fed into the first network section (302) by the wind farm (304), and - a desired voltage value for specifying a network voltage to be controlled in the first network section (302) by the wind farm (304).
5. The method as claimed in one of the preceding claims, characterized in that the wind farm control room (320) is connected to a wind forecast device (330), in particular via a forecast transmission connection (332), and receives wind forecast values, in particular a forecast average wind speed, from the wind forecast device (330) and buffers said values in order to possibly calculate a or the active power forecast therefrom.
6. The method as claimed in one of the preceding claims, characterized in that the wind farm connection (328) is unidirectional and data are only transmitted in the direction from the network control station (324) to the wind farm (304), and / or in that the wind farm connection (328) has a low bandwidth or transmission rate, in particular of at most 8 bytes per second, preferably of at most one byte per second and, in particular, of at most one bit per second, and / or that the control room connection (326) is bidirectional and data are transmitted in both directions between the network control station (324) and the wind farm control room (320).
7. The method as claimed in one of the preceding claims, characterized in that data for controlling the wind farm (304) are stored in the network control station (324) or in the wind farm control room (320) and, in the event of a fault, can be transmitted to the network control station (324) via the control room connection (326), wherein the data are selected from the list containing - an active power forecast, - a wind speed forecast, - characteristic data of the wind farm (304), in particular nominal power, nominal reactive power and / or power limiting gradients, which indicate a maximum active power change in the wind farm (304), and - an available active power of the wind farm (304).
8. The method as claimed in claim 7, characterized in that some, a plurality of or all of the stored data are updated continuously.
9. The method as claimed in one of the preceding claims, characterized in that in the event of a fault, the wind farm (304) is changed to a network rebuilding mode and the wind farm (304) carries out one, a plurality of or all of the following steps in the network rebuilding mode: - activating a reserve power, wherein the reserve power is a power which can be fed into the first network section (302) by the wind farm (304) in response to a request signal, - feeding in electrical active power on the basis of a frequency of the electrical voltage in the first network section (302) while the network rebuilding mode prescribes frequency-dependent active power control, - feeding in electrical active power while complying with a power gradient, which is limited in terms of the absolute value and describes a change in the active power on the basis of time, while the network rebuilding mode prescribes active power control with a fixed gradient, and - feeding in electrical reactive power on the basis of a voltage in the first network section while the network rebuilding mode prescribes voltage-dependent reactive power feeding.
10. A communication apparatus (300) for controlling the rebuilding of an electrical supply network (120), wherein a network rebuilding denotes a restart of a network section of the electrical supply network, and denotes a reconnection with the remaining electrical supply network, and the electrical supply network (120) - has a first network section (302) and at least one further network section (342), - at least one wind farm (304) is connected to the first network section (302), - the wind farm (304) can be controlled via a wind farm control room (320), - the first network section (302) is coupled to the at least one further network section (342) via at least one switching device (340) in order to transmit electrical energy between the network sections (302, 342), - the at least one switching device (340) is set up to disconnect the first network section (302) from the at least one further network section (342) in the event of a fault, - a network control station (324) is provided for the purpose of controlling the at least one switching device (340), wherein, for a fault event during which a network fault acting on the first network section (302) occurs, provision is made for the first network section (302) to be disconnected from the at least one further network section (342) by the switching device (340), and the communication device (300) comprises: - a control room connection (326) set up to be used by the wind farm control room (320) to interchange data with the network control station (324), wherein - a direct communication is provided between the wind farm control room and the network control station, and - the control room connection (326) is a failsafe communication connection between the wind farm control room (320) and the network control station (324) and - can be operated independently of the electrical supply network (120), and can be operated even in the case of the fault in the first network section (302), and - a wind farm connection (328) set up to be used by the wind farm (304) to receive data from the network control station (324), wherein - a direct communication between the wind farm and the network control station is provided, and - the wind farm connection (328) is a failsafe communication connection between the wind farm (304) and the network control station (324) and - can be operated independently of the electrical supply network (120), and can be operated even in the case of the fault in the first network section (302), - the network control station puts the wind farm into a network rebuilding mode by transmitting a corresponding signal from the network control station to the wind farm via the wind farm connection and - a further data connection (322), in particular a wind farm connection (322), is arranged between the wind farm (304) and the wind farm control room (320) and is set up to transmit further data which are not transmitted via the control room connection (326) and are not transmitted via the wind farm connection (328).
11. The communication apparatus (300) as claimed in claim 10, characterized in that said apparatus comprises one, a plurality of or all devices selected from the list containing - the wind farm control room (320), - the network control station (324), - a wind farm control device (316) of the wind farm (304), and - a wind forecast device (330) for creating a wind forecast.
12. The communication apparatus (300) as claimed in claim 10 or 11, characterized in that said apparatus is set up to carry out a method as claimed in one of claims 1 to 9, and / or that the wind farm connection (328) is unidirectional and is set up such that data are only transmitted in the direction from the network control station (324) to the wind farm (304), and / or in that the wind farm connection (328) has a low bandwidth or transmission rate, in particular of at most 8 bytes per second, preferably of at most one byte per second and, in particular, of at most one bit per second.
13. The communication apparatus (300) as claimed in one of claims 10 to 12, characterized in that the control room connection (326) is bidirectional and is set up such that data are transmitted in both directions between the network control station (324) and the wind farm control room (320).
14. A wind farm (304) having a central wind farm control device (316) which is configured to receive data from a network control station (324) via a unidirectional wind farm connection (328), according to a method as claimed in any of claims 1 to 9.
15. The wind farm (304) as claimed in claim 14, characterized in that the central wind farm control device (316) is set up to be incorporated in a communication apparatus (300) as claimed in one of claims 10 to 13.