METHOD FOR PREPARING HOT WATER IN A BUILDING, HOT WATER PREPARATION SYSTEM AND CONTROL DEVICE FOR A HOT WATER PREPARATION SYSTEM
Patent Information
- Application Number
- DE502021005165
- Authority / Receiving Office
- DE · DE
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2020-09-16
- Filing Date
- 2021-06-24
- Publication Date
- 2024-10-02
- Estimated Expiration
- 2041-06-24
AI Technical Summary
Existing hot water preparation systems inefficiently utilize heat, leading to excess energy input and unwanted overheating, as the duration of the run-on phase is not adapted to the heating system's conditions, resulting in incomplete heat transfer and increased energy losses.
Implementing a method where the heat transfer is terminated when the current heat output falls below a defined threshold, and the heat source is switched off before the target temperature is reached, allowing residual heat to warm the water storage, thus optimizing energy utilization and reducing supply losses.
This approach ensures the complete transfer of generated heat into the storage, minimizing energy input and preventing overheating, thereby enhancing energy efficiency and reducing losses in hot water preparation systems.
Description
[0001] The invention relates to a method for preparing hot water in a building according to the preamble of claim 1, a hot water preparation system used therefor, in particular a central one, comprising a heat source, a heat accumulator and a charging circuit for transferring heat from the heat source to the heat accumulator and a heating circuit connected to the heat source according to the preamble of claim 9, as well as a control device therefor according to the preamble of claim 15. In the method, the hot water is heated in a heating phase in which heat is transferred from the heat source to the heat accumulator and in which the heat source generates heat at least temporarily. The hot water is typically heated in the heat accumulator and kept ready there for consumers. For this purpose, the heated water can be kept ready directly in the heat accumulator, i.e. for withdrawal from the heat accumulator.The heat storage tank can also be a buffer tank used for hot water preparation, for example, the heat storage tank of a fresh water station or a hygiene storage tank that stores heated heating water and in which the hot water is heated using the instantaneous principle. The hot water preparation can be combined with space heating or standalone. The buildings can be residential or commercial, for example.
[0002] The term "heat" is understood in this text as thermal energy, particularly in the sense of a heated heat carrier through which the heat can be transferred from the heat source to the heat storage unit. The heat source of the (in relation to the building) particularly central hot water system can be a boiler whose burner generates thermal energy, a heat pump that increases ambient heat from a low level to a level required for hot water preparation, a district or local heating station that draws thermal energy from a heating network, or any other device suitable for heating a heat carrier, such as a solar collector. Providing heat through the heat source is also referred to in this text as generating heat and is intended to explicitly include cases in which the heat is not generated by an active process but is provided by the heat source, e.g.by the heat source obtaining heat from a district or local heating network or solar collectors. The invention is independent of the method of heat generation in the heat source. In principle, the heat in the heat source according to the invention can be generated by converting final energy (e.g., by burning oil, gas, or pellets in a boiler or combined heat and power plant, by electrical heating, by a heat pump that increases ambient heat from a low level to a level required for hot water production, or by similar processes converting an energy source into heat) or by obtaining it from a district or local heating network (via a district or local heating station).
[0003] The charging circuit is usually a charging circuit that connects the heat source with the heat storage unit and transfers the heat transfer medium (also referred to as the heating medium, usually water) heated in the heat source to the heat storage unit via a conveying device. Heat transfer therefore occurs through the charging circuit, in particular by circulating the heat transfer medium within the charging circuit. Circulation can occur due to thermal differences within the charging circuit. Preferably, however, active circulation of the heat transfer medium takes place, e.g., by means of a circulation pump. This active heat transfer can then be stopped by terminating active circulation, e.g., by switching off the circulation pump or closing a valve to prevent circulation of the heat transfer medium. The heat transfer medium can simply be a liquid, e.g., water.
[0004] For the actual transfer of heat, a heat exchanger can be provided in the charging circuit, for example, which has a first area through which the heated heat transfer medium flows (primary side) and a second area with the water to be heated (secondary side), wherein the second area surrounds the first area at least in sections or there is a contact surface between the second and first areas. Typically, the water to be heated also flows through the secondary side of the heat exchanger. The heat is therefore transferred from the heat transfer medium to the water to be heated through the heat exchanger. However, the invention is also independent of the type and mode of operation of the heat transfer, i.e. the transfer of heat or thermal energy from the heat source to the heat storage device.
[0005] The temperature of the hot water in a building is usually measured at a central point in the heat storage tank and regulated by a controller. The control for heating the storage tank contents, i.e. for hot water preparation, then works in such a way that there is a lower and an upper setpoint for the hot water target value. The water temperature measured in the storage tank should always lie between these two values: as soon as the lower setpoint is undershot, the heating process starts and ends as soon as the upper setpoint is reached. This applies in a similar way to a hot water storage tank in which the hot water is permanently stored for use, as well as to a buffer tank which stores the heat and, like an instantaneous water heater, heats cold fresh water flowing into the instantaneous water heater, which then forms the hot water according to the invention when it flows out of the instantaneous water heater.
[0006] The setting options for the two setpoints can vary depending on the controller used: Often, only the upper setpoint is set on the controller. The lower setpoint results from a fixed offset stored in the controller (e.g., -5 K). In some cases, this offset can also be configured on the controller. Another setting method involves selecting an average value on the controller. The upper setpoint is then determined from the set average value and a positive offset (e.g., +2.5 K), while the lower setpoint is determined from the set average value and a negative offset (e.g., -2.5 K).
[0007] The contents of the heat storage tank are heated in the charging circuit, as already described and fundamentally also used according to the invention, either via a heat exchanger arranged directly in the storage tank or via an external heat exchanger through which heating water flows on the primary side and storage water to be heated on the secondary side. The heating process therefore starts when the charging circuit is activated. For this purpose, either a storage tank charging pump (circulation pump) can be switched on or - particularly in combination with a heating system - a two-way valve can be operated. The two-way valve directs the heating water towards the heat storage tank instead of towards the space heating system. Intermediate positions of the two-way valve are also possible, allowing the available heat to be distributed between the heat storage tank and the space heating system.Another option is common in smaller heating systems and / or in combination with space heating, where a direct, unmixed heating circuit is operated. In this case, the setpoint for the flow temperature of the heat generator or district heating transfer station is raised to a value sufficient to heat the storage tank contents, while the heating circuit is switched off.
[0008] When the measured storage temperature reaches the (upper) setpoint, the heating process is terminated and the setpoint of the heat generator or the district heating transfer station (and thus the heat source) in a system combined with space heating is reduced back to the value required for space heating. In a system without space heating or when the existing space heating is not in operation (for example, in the summer months), the heat generator is switched off or - in the case of district heating - the district heating supply is stopped and a charging phase is ended. The circulation of the heated heat transfer medium in the charging circuit can be maintained for the duration of a follow-up phase in order to charge residual heat from the boiler and pipes into the heat storage tank and thus still use it.
[0009] In the current state of the art, the duration of such a run-on phase is either permanently stored in the controller or configurable and is, for example, 3 minutes. Even if this value is configurable, the run-on phase has a fixed value after the hot water system has been set up or commissioned, which remains the same for each heating process of the storage tank. A disadvantage of this conventional approach is that the run-on phase is not adapted to the conditions of the existing heating system. Depending on the heat capacity on the heating side, which is determined by the water volume in the boiler and pipes and the other heat-storing materials (pipes, heat exchanger in the boiler) as well as the temperature level reached, an excess amount of heat is still present in the heat storage tank when the setpoint is reached, which could be released into the heat storage tank contents during the run-on phase.If the run-on phase is too short, some of this heat remains unused. A run-on phase that is too long, for example, in conjunction with space heating and hot water priority, can result in the heating circuit not being supplied with heat for an unnecessarily long time. Furthermore, a run-on phase that is too long can cause the storage tank to be partially discharged again due to the now cooler heating water.
[0010] A further disadvantage is that the actual heating process stops when the target temperature is reached, and the heat storage contents continue to heat up during the run-on phase. This results in unwanted overheating of the storage contents, which in turn leads to increased supply losses.
[0011] In the known processes for generating hot water, as described at the beginning, the heat generated is not used optimally.
[0012] DE 44 44 987 C1 describes a method for controlling domestic water heating in a heating system according to the preamble of claim 1, wherein the burner is switched off at a switch-off temperature below the domestic water target temperature by a controller that automatically determines the difference to a switch-off temperature based on the set domestic water target temperature. Various options are proposed for this. According to one option, the temperature increase can be determined within a standard overrun time, and the switch-off time can be automatically set based on this value. Another option provides for determining the amount of heat still required by the domestic water and the amount of heat still to be provided by the boiler water, and calculating the switch-off temperature from this.Another possibility is to continuously determine during the recharging phase by how many Kelvin the domestic water temperature can still be raised in order to determine the limit temperature for switching off the burner.
[0013] The task is to make optimal use of the heat generated during hot water preparation or to achieve the desired heating of the water for hot water preparation with the lowest possible energy input and thus a high degree of utilization, whereby a particularly smooth transition from operation of the heat source for hot water preparation to operation of the heat source for building heating should be achieved.
[0014] This object is achieved by a method having the features of claim 1 and a hot water preparation system having the features of claim 9. According to the invention, the proposed methods are particularly provided for the heat transfer of heat present in the heat source in the heating phase to take place in a charging phase during heat generation by the heat source and / or in a follow-up phase after the heat generation of the heat source has been switched off until the heat generated in the heat source has been transferred as completely as possible into the heat storage device, and / or that the heat generation by the heat source is switched off in a charging phase before a preset hot water target temperature T WW , Should in the heat storage is reached.
[0015] The charging phase is the part of the heating phase (period) during which both heat transfer (e.g., through active circulation of the heat transfer medium in the charging circuit) and the heat source generate heat take place. The heat source can also generate heat intermittently, meaning that heat generation by the heat source is alternately switched on and off. In a boiler, this process is also called "cycling."
[0016] The run-on phase is understood to be a part of the heating phase in which heat transfer is still taking place (e.g. through active circulation of the heat transfer medium in the charging circuit), but the heat source is no longer generating heat (i.e. after the heat source has been switched off during a heating phase or after it has been switched off for the last time in pulsed operation). The run-on phase therefore follows the charging phase directly or indirectly, with heated heat transfer medium from the charging phase still being present in the charging circuit during the run-on phase. The run-on phase can follow the charging phase indirectly if, for example, a pause is inserted after the charging phase before the run-on phase begins. During the pause, both heat generation (e.g. by switching off the burner or an external heat supply) and heat transfer (e.g. by switching off a circulation pump or otherwise preventing the circulation of the heat transfer medium) are interrupted.During a short pause, heat remains stored in the heat transfer medium in the charging circuit and can be transferred later in the run-on phase.
[0017] In accordance with the invention, the most complete possible transfer of the generated heat to the heat storage device is achieved, in particular, when the temperature of the heat carrier heated in the heat source and the temperature in the heat storage device have equalized to such an extent that, due to a thermodynamic equilibrium that has been at least almost reached, no significant energy transfer occurs. According to the invention, "generated heat" refers only to the heat that can be transferred in the hot water heating system. Necessarily occurring or unavoidable heat losses (supply losses, e.g., due to radiation of generated heat in the hot water heating system during normal operation and / or due to the system design) are not considered generated heat in this sense, because the unavoidable heat losses are not available for heat transfer during normal operation.
[0018] For example, it is possible to measure the current heat output delivered by the charging circuit Q̇ current and to stop the heat transfer when the current heat output Q̇ current falls below a defined (i.e., configurable) threshold. The termination of heat transfer always also results in the termination of heat generation in the heat source. This ends the heating phase by deactivating the charging phase or the run-on phase, depending on which phase is currently active. This will usually be the run-on phase. If the temperature of the heat transfer medium heated in the heat source and the temperature in the water storage tank equalize sufficiently during the charging phase that heat transfer no longer occurs, the charging phase may also be active.
[0019] According to the invention, the energy input required for hot water preparation can also be reduced by switching off or turning off the heat generation by a heat source during the charging phase before the preset hot water target temperature T WW , Should in the heat storage tank is reached. This measure also uses the heat already generated by the heat source and stored in the heat source or the charging circuit to heat the water in the heat storage tank after the heat source has been switched off. In a simplest version, a switch-off temperature can be set, possibly system-specifically depending on the heat capacity of the heat source and / or charging tank as well as the amount (volume) of water to be heated. T WW , out of for the hot water temperature measured in the heat storage tank T WW which is lower than the hot water target temperature T WW , Should and upon reaching which, heat generation is stopped, i.e., the heat source is switched off. Mathematically, this criterion can be described as follows: T WW , aus ≤ T WW , Soll
[0020] The hot water target temperature T WW , Should is only achieved after the heat source is switched off, by using the heat already generated to further heat the water in the heat storage tank. A suitable switch-off temperature T WW , out of can in the simplest case be determined empirically.
[0021] The two measures described reduce the energy input during hot water preparation by better and more complete utilization of the heat generated by the heat source. By switching off the heat source or the heat source's heat generator early before the hot water target temperature (in the sense of the target temperature) is reached, the target temperature is only reached with the residual heat available in the system. This reduces preparation losses because radiation losses and distribution losses in the building increase at a higher storage tank temperature (than the target temperature). Sizing the run-on phase so that the heat energy remaining in the heat generator and piping system is released as completely as possible into the heat storage tank prevents heat energy loss to the environment during the standstill phase.Both measures, which can be combined according to the invention or applied individually, ensure optimal utilization of the energy input.
[0022] For the described termination of the heat transfer, it is particularly advantageous that the charging phase or run-on phase is terminated when a current heat output delivered in the charging circuit Q̇ current less than (or less than or equal to, which is intended to be covered by the wording "less than") a weighted average heat output during previous charging phases or post-run phases.
[0023] Heat sources with a charging circuit often have a heat meter that measures, for example, the flow temperature T VL and the return temperature T RL in the charging circuit and the mass flow in the charging circuit and from this the current heat output Q̇ currentin the charging circuit, which is released in the heating circuit. This can be requested frequently. In a computing unit of a hot water system according to the invention, the values of the current heat output Q̇ current recorded and averages Q̇ MW the heat output delivered during previous charging phases and / or run-on phases Q These averages can be determined in each charging phase and / or run-on phase, for example, as moving averages over a specific period of time or a specific number of hot water preparations, and are thus continuously updated.
[0024] The weighting can be determined by a factor a be formed with which the mean Q̇ MW multiplied, where the factor a preferably in the range 0 < a< 1 can be configured and varied. The factor a gives (as a weighting) a ratio of the current heat output to the average value Q̇ MW before.
[0025] According to a particularly preferred embodiment, the following condition can be applied or queried as a condition for terminating the heat transfer: Q ˙ aktuell ≤ a × Q ˙ MW
[0026] Here are Q̇ current the currently registered (ie recorded) heat output delivered in the charging circuit, Q̇ MW the average heat output delivered in previous heating phases, charging phases or run-on phases and the factor a a defined value for the quotient of current heat output Q̇ current and medium heat output Q̇ MW , which triggers or causes the heat transfer to be switched off depending on the mean value. A possible value for the factor acan be 0.1, ie 10% of the average heat output Q̇ MW .
[0027] By determining the criterion for terminating heat transfer in the run-on phase in this way, it is ensured that—relative to the total heat transfer—the significant transfer has actually been achieved, and that the heat still present in the charging circuit would only make a negligible contribution. Accordingly, the heat loss upon terminating heat transfer is negligible.
[0028] The same applies to a variant of the preferred embodiment, in which the switching off of the transmission takes place in the charging phase and accordingly the current heat output Q̇ current is determined during the charging phase.
[0029] As an alternative or additionally applied criterion for switching off the heat transfer, it can be proposed according to an embodiment of the invention that at least during the charging phase and / or the run-on phase, the temperature profile of the flow temperature T VL in the charging circuit and the temperature curve of the return temperature T RL in the charging circuit and / or the hot water temperature T WW in the heat storage and the heat transfer is switched off when the difference between the flow temperature T VL and return temperature T RL and / or flow temperature T VL and hot water temperature T WW less than one or none are equal to a given threshold. Mathematically expressed, this condition can be formulated as follows: T VL − T RL ≤ Δ T Lad , min or T VL − T WW ≤ Δ T VL , min , where T VL the flow temperature in the charging circuit, T RLthe return temperature in the charging circuit. The threshold value for the difference between the flow temperature and the return temperature in the charging circuit is ΔT Load , min , which specifies a minimum spread in the charging circuit for the shutdown of heat transfer (e.g. 1K). The threshold value for the difference between the flow temperature in the charging circuit and the hot water temperature in the charging tank is ΔT VL , min , which specifies a minimum excess temperature of the charging circuit compared to the storage temperature for deactivating heat transfer (e.g., 3K). Each of the threshold values can be configured and varied according to the invention.
[0030] The hot water temperature T WWin the heat storage tank is only identical to the hot water temperature of the withdrawn water if the heat storage tank is designed as a hot water storage tank, in which the hot water is stored after heating until it is used. In the case of a heat storage tank designed as a buffer tank, in which the hot water is heated, for example, according to a continuous flow heater principle, the hot water temperature T WW In the heat storage tank, strictly speaking, the temperature of the heat medium in the heat storage tank, which defines the temperature of the hot water when it has flowed through the instantaneous water heater. Thus, this temperature of the heat storage tank determines the hot water temperature, so that in this text it is also referred to as the hot water temperature. T WW be referred to.
[0031] Observing temperature profiles also makes it possible to determine, with sufficient accuracy for the method according to the invention, that the heat generated in the heat source has been completely or almost completely transferred to the heat storage tank. A temperature profile can also be determined relatively easily by retrofitting temperature sensors if no suitable heat meter is available in the heat source or the charging circuit, or if its values cannot be read by a processing unit or the control system of the hot water system.
[0032] These above criteria for ending the run-on phase or charging phase and / or switching off the heat transfer from the charging circuit to the heat storage can be used both in pure hot water systems (without an additional heating system connected to the heat source) and in a hot water system with a heating system connected to the heat source with at least one heating circuit for heating the building. In the case of a connected heating system according to the invention, a flow temperature in the heating circuit is also used as a criterion for switching off the heat transfer or ending the charging phase or run-on phase in the hot water system. T HK During the charging phase and / or the run-on phase, the temperature profiles of a flow temperature T VL in the charging circuit and a flow temperature in the heating circuit T HKdetected, and the heat transfer is switched off when the difference between the flow temperature T VL in the heat storage and flow temperature T HK in the heating circuit are less than (or less than or equal to) a specified threshold value.
[0033] This criterion is expressed mathematically as T VL − T HK ≤ Δ T VL − HK , min , where T HK the flow temperature in the heating circuit (in the case of several heating circuits: in particular the highest flow temperature of all heating circuits) and the threshold value Δ T VL-HK , min for switching off the charging circuit, the minimum excess temperature of the flow temperature in the charging circuit or the flow temperature in the heat source compared to T HK (e.g. 2K). The threshold value Δ T VL-HK , min is preferably configurable and variable according to the invention.
[0034] This criterion ensures a particularly smooth transition from the operation of the heating system or heat source for hot water preparation to the operation of the heating system or heat source for building heating, because when this condition is met, the flow temperature of the heat source exactly matches the flow temperature in the heating circuit (or its setpoint). The heat preparation phase (heating phase) then transitions seamlessly into the building heating phase.
[0035] According to a particularly preferred embodiment of the invention, it can be provided that the heat transfer is switched off or turned off if one of the criteria described above is met, ie T VL − T RL ≤ Δ T Lad , min or T VL − T WW ≤ Δ T VL , min
[0036] The switching off of the heat generation proposed according to the invention can preferably take place precisely when the heat stored in the heat source and the charging circuit during the charging phase, ie the residual heat stored in the system, is just or exactly sufficient to reach the hot water target temperature T WW , Should without additional heat input. This minimizes the energy input required for hot water preparation and thus optimizes energy efficiency.
[0037] In this context, a preferred embodiment of the invention provides that the switch-off temperature T WW , out of for switching off heat generation in the charging phase when the switch-off temperature is reached T WW , out of by a measured hot water temperature T WW from the temperature curve of the measured hot water temperature T WWone or more previous hot water preparations. This can be done, for example, by determining the maximum of the temperature curve of the measured hot water temperature T WW , max after switching off the heat generator and a differential temperature Δ T to the hot water target temperature T WW , Should is formed, ie Δ T = T WW , Should - T WW , max . The stripping temperature T WW , out of can then be calculated, for example, by adding the difference temperature Δ T (if necessary by applying a weighting) to correct T WW , aus neu : = T WW , aus alt + Δ T , Where weighting was not applied in the example shown. The person skilled in the art can easily find other possibilities for adaptive adjustment of the switch-off temperature T WW , out ofwithin the scope of his expertise. Through iterative application in successive hot water preparations, the switch-off temperature T WW , out of optimized iteratively. The difference temperature Δ T For example, to smooth out and reduce the weighting of outliers, an average value from several previous temperature differences Δ T By re-determining the stripping temperature T WW , out of After each hot water preparation or at specified intervals, e.g. every nth hot water preparation or after a certain number of days, the switch-off temperature T WW , out of adaptive and automatically adapts to changing operating conditions.
[0038] A specific algorithm offers the possibility of an adaptive adjustment of the switch-off temperature T WW , out offor consecutive hot water preparations n specifying a starting temperature for the first hot water preparation n = 1 and then further hot water preparations n > 1 (adaptive learning procedure): T WW , aus n = T WW , Soll − T WW , max n − 1 − T WW , Soll − T WW , Soll − T WW , aus n − 1 = T WW , Soll − T WW , max n − 1 + T WW , aus n − 1
[0039] T WW , Should corresponds to the setpoint value set in the controller for the temperature to be reached in the heat storage (e.g. 60°C), and T WW , aus 0 = T WW , Should set as a start condition for the procedure.
[0040] To determine the correct end time for heat generation within the adaptive learning process, the temperature of the heat storage T WW during the first charging phase, which begins when T WW , Shouldand the associated shutdown of the heat source, and - for reasons explained below - optionally the flow temperature in the charging circuit can be monitored. During the run-on phase and at the beginning of the subsequent cooling phase, if applicable, the maximum reached heat storage temperature is T WW , max which is then used to adapt the switch-off temperature during the next hot water preparation T WW , out of is used.
[0041] An optimization of the process can consist in taking the actual flow temperature into account and incorporating its value into the determination of the switch-off point or the switch-off temperature T WW , out of This takes into account the fact that the flow temperature of the heat source does not have to be constant. If the flow temperature is lower than average, the switch-off temperatureT WW , out of slightly increased and vice versa. For this purpose, the flow temperature of the heat source can be advantageously T VL recorded during the charging phases and an average value, e.g. a moving average over a specified number of hot water preparations, is calculated.
[0042] The invention also relates to a water heating system according to the preamble of claim 9. The control device, which in particular comprises a computing unit, is designed according to the invention to carry out the method described above.
[0043] According to the invention, the hot water preparation system has a flow temperature sensor for measuring the flow temperature in the charging circuit, and can further have a return temperature sensor for measuring the return temperature in the charging circuit and / or a heat meter for determining the amount of heat released in the charging circuit. The charging circuit is a closed circuit between the heat source and the heat storage tank, in which the heat transfer medium circulates, whereby the flow of the charging circuit is the branch of the charging circuit in which heat transfer medium heated in the heat source is fed to the heat storage tank, and the return of the charging circuit is the branch of the charging circuit in which the heat transfer medium is returned to the heat source after the heat has been released in the heat storage tank. A circulation pump, also referred to as a storage tank charging pump, can be provided for the circulation of the heat transfer medium in the charging circuit.Furthermore, the hot water heating system can include a hot water temperature sensor for measuring the hot water temperature in the heat storage tank. As described above, the heat storage tank can be designed, in particular, as a hot water storage tank or buffer tank for an instantaneous water heater.
[0044] The control device is preferably connected directly or indirectly to the flow temperature sensor, the return temperature sensor, the heat meter, the circulation pump, and / or the hot water temperature sensor. With a direct connection, the control device is directly connected to the aforementioned components and can access their measured values. In this case, the control device controls the entire hot water heating system, including basic control of the hot water heating system or the charging circuit, i.e., in particular, the control of the flow temperature in the charging circuit, the switching on and off of the heat source, and / or the switching on and off of the circulation pump, and the optimization implemented within the framework of the method proposed according to the invention.
[0045] In another embodiment, the control device proposed according to the invention and configured to implement the method has an interface (in particular a communications interface) to a controller for basic control of the hot water system. The control device can transmit control commands to the controller for implementing the method according to the invention and retrieve measured values from temperature sensors, in particular from the hot water temperature sensor. Access to components mediated by the controller is understood as indirect access of the control device to the components.
[0046] Preferably, the control device is connected at least directly to the flow temperature sensor for measuring the flow temperature in the charging circuit, the return temperature sensor for measuring the return temperature in the charging circuit, and / or the heat meter for determining the amount of heat released in the charging circuit. Depending on the appropriate combination of devices and the design of the method, the method proposed by the invention can be implemented using the measured values of these components. Control commands and measured values from other components can then be sent to and / or received from the controller via the interface.
[0047] For this purpose, the controller is preferably connected to a circulation pump in the charging circuit in order to switch the circulation of the heat transfer medium in the charging circuit, and thus the heat transfer, on and off by switching the circulation pump on and off. The controller is set up to issue corresponding control commands to the circulation pump, e.g. by switching a power supply on and off or via a bus control. The controller can also be connected to the hot water temperature sensor for measuring the hot water temperature in the heat storage tank in order to read out the current hot water temperature. This is measurement data and control commands for controlling the hot water preparation, as already described at the beginning. These are usually required and used by a control system for the basic control of a hot water system, whereby the control system also switches the heat source on and off as required. For this purpose, the control system is also connected to the heat source or integrated into it.
[0048] In an alternative embodiment, the control device can be connected to the circulation pump and the hot water temperature sensor. The control device can then directly access the measured values of the hot water temperature sensor and control the circulation pump directly by switching it on and off. A connection to the controller is then established via the interface, allowing the controller to switch the heat source on and off as needed. In this embodiment, it is particularly advantageous if the control device has a control input connected to a control output of the controller for connection to the circulation pump, and a measured value output connected to a measured value input of the controller for connection to the hot water temperature sensor.The control device can then not only read the measured value from the hot water temperature sensor, but also output a simulation value to the controller via the measured value output, thus influencing the controller so that the method according to the invention is carried out, in particular, the heat source is switched off. For this purpose, the simulation value must be set, for example, when the switch-off temperature is reached. T WW , out of in the heat storage tank, measured by the hot water temperature sensor, output a simulation value that corresponds to the preset hot water target temperature T WW , Should The controller then switches off the heat source, i.e., it ends the charging phase. The control unit can then control the run-on phase directly via the directly connected circulation pump by switching it on and off, independent of the signal output at the controller's control output.
[0049] In a combined hot water and heating system, at least one heating circuit can be connected to the hot water system, via which the heat transfer medium is fed to the building's heating surfaces. For this purpose, a flow of the heating circuit is connected to the flow of the charging circuit, and a return of the heating circuit is connected to a return of the charging circuit. The flow and return of the heating circuit are connected via a mixing valve to adjust the flow temperature in the heating circuit. T HK A heating circuit flow temperature sensor can be provided in the heating circuit flow for this purpose.
[0050] According to a further aspect of the invention, a control device for a hot water preparation system with an interface and a computing unit according to the preamble of claim 15 is described. The interface has a first control connection for connection to a heat source and a second control connection for connection to a circulation pump in the charging circuit of a hot water preparation system and / or a communication connection for connection to a controller for basic control of the hot water preparation system, as well as a first sensor connection for connection to a heat meter, to a flow temperature sensor in the charging circuit, to a heating circuit flow temperature sensor, and to a return temperature sensor in the charging circuit. According to the invention, the computing unit of the control device is configured to carry out the method described above.This control device can be easily connected to existing hot water systems via the provided interface, allowing the energy-efficient hot water system proposed by the invention to be retrofitted even in existing systems. A second sensor connection to a hot water temperature sensor can be connected indirectly via the controller or directly to the hot water temperature sensor. Furthermore, as already described in connection with another embodiment of the invention, the control device according to the invention can have a control input connected to a control output of the controller for connection to the circulation pump, and a measured value output connected to a measured value input of the controller for connection to the hot water temperature sensor.
[0051] The above-described (separate) control device, when connected to a above-described hot water preparation system, also forms a hot water preparation system within the meaning of the invention.
[0052] Further advantages, features, and possible applications of the invention will become apparent from the following description of exemplary embodiments and the drawings. All described and / or illustrated features, together or in any combination deemed reasonable by a person skilled in the art, are part of the subject matter of the invention, regardless of their combination in the described or illustrated exemplary embodiments or in the claims.
[0053] They show: Fig. 1 schematically shows a first control device that can be connected to a hot water preparation system according to the invention; Fig. 2 schematically shows a second control device that can be connected to a hot water preparation system according to the invention; Fig. 3 schematically shows a third control device that can be connected to a hot water preparation system according to the invention; Fig. 4 schematically shows a fourth control device that can be connected to a hot water preparation system according to the invention; Fig. 5 schematically shows an embodiment of a control device according to the invention and a hot water preparation system according to the invention; Fig. 6 a flow chart of hot water preparation according to a method known from the prior art with a fixed run-on phase after switching off the heat source; Fig.Fig. 7 shows a graph showing the hot water preparation process according to a method known from the prior art, showing the return temperature in the hot water charging branch and a fixed run-on phase after the heat source is switched off; Fig. 8 shows a graph showing the hot water preparation process with a variable run-on phase after the heat source is switched off; Fig. 9 shows a graph showing the hot water preparation process according to an embodiment of the invention, with a variable run-on phase after the heat source is switched off, taking into account the flow temperature of an existing heating circuit; Fig. 10 shows a graph showing the hot water preparation process with a variable run-on phase after the heat source is switched off.
[0054] In the following described Fig. 1 to 5Various embodiments of hot water preparation systems 1a, 1b, 1c, 1d, 1e are shown, each of which has control devices 50a, 50b, 50c, 50d, 50e. The control devices 50a, 50b, 50c, 50d, 50e each have a computing unit (not shown) that is configured to carry out the inventive method for preparing hot water in a building. Various aspects of the inventive method are illustrated by means of graphs according to Fig. 8 to Fig. 10 explained. Fig. 5 a water treatment plant 1e according to the invention with a connected heating circuit 20 and Fig. 9 a corresponding graph according to the invention with a heating circuit flow temperature THK. The remaining figures show partial aspects of the invention according to preferred embodiments.
[0055] The trend graphs according to Fig. 6 and Fig. 7 show processes for hot water preparation according to the company's internal state of the art.
[0056] The same components of the hot water preparation systems 1a, 1b, 1c, 1d, 1e, the control devices 50a, 50b, 50c, 50d, 50e and the same process steps in the Fig. 5 to 10 For the sake of simplicity, they are provided with the same reference numerals and will be explained in detail only once. The corresponding description applies to all embodiments in the same way.
[0057] The Fig. 1The hot water preparation system 1a shown comprises a heat source 2, a heat storage tank 3, and a charging circuit 4 for transferring heat from the heat source 2 to the heat storage tank 3. The charging circuit 4 is a closed circuit between the heat source 2 and the heat storage tank 3, in which a heat transfer medium, for example water, circulates. The heat transfer medium is heated in the heat source 2 and fed from the heat source 2 to the heat storage tank 3 via a flow line 5 of the charging circuit 4, and is returned to the heat source 2 via a return line 6 of the charging circuit 4 after the heat has been released in the heat storage tank 3. For this purpose, a heat exchanger (not shown) is provided in the heat storage tank 3, via which heat exchanger the water in the heat storage tank 3 is heated. Cold water is fed to the heat storage tank via a cold water inlet 7, and heated to a desired temperature in the heat storage tank 3 and stored for an extended period of time.Particularly preferably, the heat storage unit 3 is not a continuous flow heater, but rather serves to heat and store hot water for extended periods, which can be drawn from the heat storage unit at any time. Consumers can then access the hot water from the heat storage unit 3 via a distribution line 8 as needed, for example, by drawing water from a faucet. The hot water temperature is measured by a hot water temperature sensor 9.
[0058] The circulation of the heat carrier in the charging circuit 4 is achieved by a circulation pump 10 that can be switched on and off.
[0059] In the Figure 1 In the embodiment shown, the hot water preparation system 1a is controlled by a control device 50a belonging to the hot water preparation system 1a. The control device comprises a Fig. 1not separately shown controller 11a, which in this embodiment coincides with the control device 50a. The functions of the controller 11a (or the control device 50a in this embodiment) include the basic control of the hot water preparation system 1a with the
[0060] Switching the heat source 2 on and off, regulating the flow temperature in the charging circuit 4, and switching the circulation pump 10 on and off, all depending on the hot water temperature measured in the heat storage tank 3 by the hot water temperature sensor 9. If this temperature falls too low in the hot water storage tank, hot water preparation is activated as part of the basic control until the hot water in the heat storage tank is sufficiently heated (as already described).
[0061] For this purpose, the control device 50a is provided with an interface (not shown in detail), which has a first control connection for connection to the heat source 2 and a second control connection for connection to the circulation pump 10 in the charging circuit 4, as well as a second sensor connection to the hot water sensor 9. All connections in this exemplary embodiment are shown as dashed lines, which can symbolize either a cable connection or a wireless connection.
[0062] Furthermore, the computing unit (not shown) of the control device 50a is configured to implement the method according to the invention, which has already been described in detail at the beginning and will be briefly described again later using process graphics. For this purpose, the interface of the control device has a first sensor connection, which is connected to a heat meter 12 and a flow temperature sensor 13 in order to obtain further measured values required for implementing the method according to the invention. Other embodiments provide a flow temperature sensor 13 and a return temperature sensor 14 instead of the combination of heat meter 12 and flow temperature sensor 13 described here. This combination is interchangeable between the embodiments.
[0063] The Fig. 2The embodiment of the hot water preparation system 1b and the control device 50b shown is fundamentally similar to the previously described embodiment. The essential difference is that the controller 11b for basic control is directly assigned to the heat source 2 and is directly connected to the circulation pump 10 and the hot water temperature sensor 9. The control device 50b configured to carry out the method according to the invention is connected to the controller via a communication link 15 and, via this, indirectly to the circulation pump 10 and the hot water temperature sensor 9. The control device 50b is thus provided separately from the controller 11b.
[0064] The hot water system 1c in Fig. 3 corresponds to the hot water system 1b from Fig. 2with the difference that instead of the heat meter 12 in the return 6 of the charging circuit 4, a return temperature sensor 14 is provided on the return 6, analogous to the flow temperature sensor 13 on the flow 5 of the charging circuit 4.
[0065] The design of the hot water system 1d in Fig. 4 differs from the hot water system 1c ( Fig. 3) in that the control device 50d cannot be connected to the controller 11d, i.e., there is no communication connection between the control device 50d and the controller 11d. Instead, it is provided that the control device 50d has a control input connected to a control output of the controller 11d for connection 16 to the circulation pump 10, and a measured value output connected to a measured value input of the controller for connection 17 to the hot water temperature sensor 9. The control device 50d is then connected directly to the circulation pump 10 and the hot water temperature sensor 9.
[0066] In this case, the circulation pump 10 and the hot water temperature sensor are disconnected from the controller 11d and connected directly to the control device 50d. The controller 11d receives the resistance value for the temperature measurement from the control device 50d as a simulation value instead of from the hot water temperature sensor 9, which can thereby achieve premature shutdown of the heat source 2 by simulating a suitable resistance value. The circulation pump 10 is also directly controlled by the control device 50d, so that the run-on phase can be extended or shortened as needed.
[0067] The Fig. 5 The hot water preparation system 1e according to the invention shown corresponds to the hot water preparation system 1a according to Fig. 1with the difference that the hot water preparation system 1e is part of a heating system. For this purpose, a heating circuit is connected to the charging circuit 4, via which the heat transfer medium is fed to the building heating surfaces (not shown). A flow 21 of the heating circuit 20 is connected to the flow 5 of the charging circuit 4 and a return 22 of the heating circuit 20 is connected to a return 6 of the charging circuit 4, whereby the flow 21 and the return 22 of the heating circuit 20 are connected via a mixing valve 23 in order to adjust the flow temperature. T HK in heating circuit 20. A heating circuit flow temperature sensor 24 is provided in the flow 21 of heating circuit 20 for this purpose.
[0068] The following is a description of the temperature curve according to the Fig. 5 to Fig. 10 The effect of the application of the method according to the invention is explained. The starting points are the temperature profiles of known methods from an internal state of the art, which is described in the Figures 5 and 6 is explained.
[0069] In the trend graph after Fig. 5 Typical temperature curves T over time t for a conventional hot water preparation are shown, namely the flow temperature in the charging circuit 4 and the hot water temperature T WW in the heat storage tank 3, as measured by the hot water temperature sensor 9.
[0070] Hot water preparation begins at time t=0 with the heating of the water in the heating phase 100 by increasing the flow temperature after switching on heat source 2 up to a maximum flow temperature of approximately 80 °C in the example shown. This charging phase 101 lasts until the hot water temperature T WW the hot water setpoint T WW , Shouldat time t=1. As can be seen, the contents of the heat storage tank 3 continue to heat up after the end of the charging phase 101 (switching off of the heat source 2). This is followed by a predefined run-on phase 102 until time t=2, in which the hot water temperature is increased to a maximum temperature due to the heat stored in the charging circuit 4 and the heat source 2. T WW , max which is greater than the hot water target temperature T WW , Should . In the example shown, the maximum temperature is reached during the run-on phase 102; however, this point may also be reached only after the run-on phase has ended (after the cooling phase 103 has begun). The energy input is not used efficiently.
[0071] Fig. 7illustrates another problem. In this example, the run-on phase 120 is too short to completely transfer the heat contained in heat source 2 and charging circuit 4 to the heat storage tank. The cooling phase 103 begins, in which part of the heat stored in the heat transfer medium (compared to the hot water temperature T WW significantly increased flow temperature and return temperature T RL ) cools down unused. This consumes unnecessary energy.
[0072] How Fig. 8 for a hot water system a1, 1b, 1c, 1d according to Fig. 1 to 4 shows, the teaching of the invention is not to end the run-on phase 102 after a fixed period of time, but to end the run-on phase 102 (time t=2) when no significant heat output is released from the charging circuit 4 into the heat storage 3. This state can be recognized by the fact that the hot water temperature T WWas well as the flow temperature and the return temperature T RL in charging circuit 4 have approximately equalized. Different criteria for ending the run-on phase were already explained in detail at the beginning. A similar situation can arise if charging phase 101 is terminated under the defined conditions.
[0073] If the heat output is very low, as shown here at time t=2, it is not worthwhile to continue operating charging circuit 4, as this requires electrical drive energy for the circulation pump 10. Depending on the conditions in heat source 2 and charging circuit 4 and the operating conditions, the run-on phase 102 can be shortened or lengthened compared to the fixed time of a conventional controller. Additionally, a maximum duration can also be defined to avoid undesirably long run times.
[0074] In the case of a combined hot water system 1e with heating system, as in Fig. 5 As shown, it may be energetically advantageous to end the run-on phase 102 at time t=2 when the flow temperature in the charging circuit 4 is approximately equal to a flow temperature T HK in the heating circuit, as in Fig. 9 This ensures that the warming phase 100 transitions seamlessly into a heating phase 104.
[0075] According to a further aspect of the efficient use of the energy input, the invention proposes to generate heat before the target temperature is reached T WW , Should for the hot water temperature T WW in the heat storage 3. This corresponds to a shortening of the charging phase 101, so that T WW , Should is only reached during the follow-up phase 102 and T WW , Should = T WW , maxThe corresponding temperature curve is given by Fig. 10 . List of reference symbols:
[0076] 1a, 1b, 1c, 1d, 1eHot water heating system 2Heat source 3Heat storage tank 4Charging circuit 5Charging circuit flow 6Charging circuit return 7Cold water inlet 8Distribution line 9Hot water temperature sensor 10Circulation pump, also called storage tank charging pump 11a, 11b, 11c, 11d, 11eController for basic control of the hot water heating system 12Heat meter 13Flow temperature sensor 14Return temperature sensor 15Communication connection 16Control connection for connection to the circulation pump 17Measured value input for connection to the hot water temperature sensor 20Heating circuit 21Heating circuit flow 22Heating circuit return 23Mixing valve 24Heating circuit flow temperature sensor 50a, 50b, 50c, 50d, 50e control device 100Heating phase 101Charging phase 102Running phase 103Cooling phase 104Heating phase
Claims
1. A method for preparing hot water in a building by means of a hot water preparation system (1a, 1b, 1, 1d, 1e) with a heat source (2), a hot water tank (3), a charging circuit (4) for transferring heat from the heat source (2) into the hot water tank (3) and a heating circuit (20) hooked up to the heat source (2) for building heating, wherein the method involves heating up the hot water in a heating phase (100), in which heat is transferred from the heat source (2) into the hot water tank (3) and in which the heat source (2) at least temporarily generates heat, wherein the transfer of heat present in the heat source (2) takes place in a charging phase (101) during the generation of heat by the heat source (2) or in a follow-up phase (102) after deactivating the heat generation of the heat source (2) until such time that the heat generated in the heat source (2) has been transferred into the hot water tank (3), characterized in that, at least during the charging phase (101) and / or the follow-up phase (102), the temperature progressions of a flow temperature (TVL) in the charging circuit (4) and a flow temperature (THK) in the heating circuit (20) are acquired, and the heat transfer is deactivated if the difference between the flow temperature (TVL) in the charging circuit (4) and flow temperature (THK) in the heating circuit (20) is less than a preset threshold value.
2. The method according to claim 1, characterized in that the charging phase (101) or follow-up phase (102) is ended once the current heat output (Qcurrent) emitted in the charging circuit (4) is less than a weighted average heat output (QMW) during preceding charging phases (101) or follow-up phases (102).
3. The method according to claim 1 or 2, characterized in that, at least during the charging phase (101) and / or the follow-up phase (102), the temperature progressions of a flow temperature (TVL) in the charging circuit (4) and a return flow temperature (TRL) in the charging circuit (4) and / or a hot water temperature (TWW) in the hot water tank (3) are acquired, and the heat transfer is deactivated if the difference between the flow temperature (TVL) and return flow temperature (TRL) and / or between the flow temperature (TVL) and hot water temperature (TWW) is less than a respective preset threshold value.
4. The method according to one of the preceding claims, characterized in that heat generation by the heat source (2) in a charging phase (101) is deactivated before a preset desired hot water temperature (TWW, desired) in the hot water tank (3) has been reached.
5. The method according to claim 4, characterized in that heat generation is deactivated once the heat stored in the heat source (2) and the charging circuit (4) during the charging phase (101) is sufficient to reach the desired hot water temperature (TWW, desired).
6. The method according to one of claims 4 or 5, characterized in that a switch-off temperature (TWW, off) for deactivating heat generation in the charging phase (101) is determined when the switch-off temperature (TWW, off) is reached by a measured hot water temperature (TWW) from the temperature progression of the measured hot water temperature (TWW) in the hot water tank (3) of one or several preceding hot water preparations.
7. The method according to claim 6, characterized in that heat generation by the heat source (2) in the charging phase (101) is deactivated as soon as the measured hot water temperature (TWW) in the hot water tank (3) reaches the switch-off temperature (TWW).
8. The method according to claim 6 or 7, characterized in that the actual flow temperature (TVL) of the heat source (2) is considered when determining the switch-off temperature (TWW, off).
9. A water heating system with a heating source (2), a hot water tank (3), a charging circuit (4) for transferring heat from the heat source (2) into the hot water tank (3), a heating circuit (20) hooked up to the heat source (2) for building heating, a control device (50a, 50b, 50c, 50d, 50e), a flow temperature sensor (13) for measuring the flow temperature (TVL) in the charging circuit (4) and a heating circuit flow temperature sensor (24) provided in a flow (21) of the heating circuit (20), characterized in that the control device (50a, 50b, 50c, 50d, 50e) is set up to implement the method according to one of claims 1 to 8.
10. The water heating system according to claim 9, characterized in that the hot water preparation system (1a, 1b, 1c, 1d, 1e) has a regulator (11a, 11b, 11c, 11d, 11e) for basic control, and the control device (50a, 50b, 50c, 50d, 50e) comprises an interface that can be connected with the regulator (11a, 11b, 11c, 11d, 11e) for basic control.
11. The water heating system according to claim 10, characterized in that the control device (50a, 50b, 50c, 50d, 50e) is hooked up to the flow temperature sensor (13) for measuring the flow temperature (TVL) in the charging circuit (4), a return flow temperature sensor (14) for measuring the return flow temperature (TRL) in the charging circuit (4) and / or a heat counter (12) for determining the heat quantity emitted in the charging circuit (4).
12. The water heating system according to claim 11, characterized in that the regulator (11a, 11b, 11c, 11d, 11e) is hooked up to a circulation pump (10) in the charging circuit (4) and to a hot water temperature sensor (9) for measuring the hot water temperature (TWW) in the hot water tank (3).
13. The water heating system according to claim 11, characterized in that the control device (50a, 50b, 50c, 50d, 50e) is hooked up to the circulation pump (10) and the hot water temperature sensor (9).
14. The water heating system according to claim 13, characterized in that the control device (50a, 50b, 50c, 50d, 50e) has a control input, which is hooked up to a control output of the regulator (11a, 11b, 11c, 11d, 11e) for connection with the circulation pump (10), and a measured value output that is set up at a measured value input of the regulator (11a, 11b, 11c, 11d, 11e) for connection with the hot water temperature sensor (9).
15. A control device for a hot water preparation system (1a, 1b, 1c, 1d, 1e) with an interface and a computing unit, wherein the interface has a first control port for connection with a heat source (2) and a second control port for connection with a circulation pump (10) in the charging circuit (4) of a hot water preparation system (1a, 1b, 1c, 1d, 1e) and / or a communication port for connection with a regulator (11a, 11b, 11c, 11d, 11e) for basic control of the hot water preparation system (1a, 1b, 1c, 1d, 1e) as well as a first sensor port for connection with a heat counter (12), with a flow temperature sensor (13) in the charging circuit (4), with a heating circuit flow temperature sensor (24) provided in a flow (21) of a [unclear German] on the heat source (2) of the heating circuit (20) and with a return flow temperature sensor (14) in the charging circuit (4), characterized in that the computing unit of the control device (50a, 50b, 50c, 50d, 50e) is set up to implement the method according to one of claims 1 to 8.
