Apparatus and method for applying single-component or multi-component adhesive to a ballast bed

The device allows for efficient and flexible bonding of rail ballast by using a rail car with a boom and spray nozzles for precise adhesive application, addressing inefficiencies and disruptions in current methods, ensuring continuous train service and stable bonding.

EP4244426B1Active Publication Date: 2024-10-02HURLIMANN RAILTEC AG
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
EP2021839845
Authority / Receiving Office
EP · EP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2020-12-14
Filing Date
2021-12-14
Publication Date
2024-10-02
Estimated Expiration
2041-12-14

AI Technical Summary

Technical Problem

Current methods for bonding ballast in rail tracks are inefficient, requiring rail line closure, manual application with high variability, and limited flexibility, leading to disruptions in train services and environmental risks due to uneven adhesive distribution and potential component mismixing.

Method used

A device comprising a single rail car or light rail car equipped with a boom and spray nozzles that can travel parallel to the rail track, allowing for precise and continuous adhesive application without disrupting train traffic, using a controlled mixing and dispensing system with real-time monitoring and adjustable speed to ensure uniform penetration depth and mixing ratio.

Benefits of technology

Enables rapid, flexible, and precise bonding of ballast along rail tracks without rail closure, ensuring stable and uniform adhesive application, reducing environmental risks and maintaining continuous train service by allowing for quick deployment and operation of the adhesive application system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure IMGF0001
    Figure IMGF0001
  • Figure IMGF0002
    Figure IMGF0002
  • Figure IMGF0003
    Figure IMGF0003
Patent Text Reader

Abstract

The invention relates to an apparatus for applying single-component or multi-component adhesive to a ballast bed of a stretch of rails in a rail path, wherein the container(s) for the adhesive and the elements for conveying the adhesive for the purpose of application are mounted on a supply vehicle which can be driven on or adjacent to the rail path, and wherein the adhesive is guided from the supply vehicle via at least one hose to at least one nozzle (29), wherein the apparatus includes a trolley (1), which can be temporarily coupled and secured to a rail (16), and can be moved in a rail-bound manner on same at a selectable, uniform speed independently of the supply vehicle, wherein the trolley (1) supports a boom (22) on which at least one nozzle (29) is mounted, so that a defined depth of penetration of the adhesive can be maintained by means of the apparatus at a uniform running speed of the trolley (1) and defined flow rates of the adhesive depending on the characteristics of the ballast bed and spray pattern.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] The invention relates to a device for dispensing single-component or multi-component adhesive onto a granular mixture, in particular for dispensing single-component or multi-component adhesive onto the ballast of a railway track. For example, in the case of two-component adhesives, the two fluid components are conveyed from storage tanks via two separate supply lines by means of gear pumps at precisely controllable flow rates via a mixer unit, thereby producing a fluid, sprayable adhesive mixture. A spray unit with at least one spray nozzle or with a spray boom with multiple discharge nozzles serves to precisely discharge the adhesive mixture onto the ballast bed. However, single-component adhesives can also be applied and conveyed with such a device, with exactly the same structural features.Furthermore, the invention relates to a method for using this device for dispensing adhesives, both two-component and single-component, onto the ballast of a rail track.

[0002] Today, railways are an important component of infrastructure for both long-distance and local transport. The rail superstructure cannot always cope with increasing traffic loads. With increasing speeds, greater traffic loads, or greater intensity of use, the weaknesses of the various designs become apparent. In addition to regular maintenance, track renewals are necessary measures to cope with the increased stress. Ballasted track predominates as the base layer in long-distance transport. In urban transport, on bridges, or in tunnels, however, a slab track is found. Adhesive systems offer an efficient solution for both designs and for connecting different track surfaces. In ballasted track, the loosely laid track grid of rails and sleepers lies in this unbound, compacted ballast bed without any lateral fastening.The ballast bed can absorb considerable compressive forces, but can only be shifted within limits under tensile loads. Adhesive systems ensure quick and lasting stability in difficult areas such as rail joints or switches. During reconstruction and track renewal work on multi-track lines, special measures are necessary to secure the position of the ballast bed. Bonding the ballast shoulders with single-component adhesives, or even better, with two-component resin-hardener mixtures, has proven to be an effective method. Compared to conventional shoring measures, the use of a fast-curing adhesive system saves considerable time and money. A particularly challenging area for railway tracks is the integration of different construction types. Transitions between a ballasted superstructure and a slab track are problematic due to their different settlement behavior.Here, the gradual bonding of ballast has proven to be an effective measure for equalizing different elasticities. Adhesive systems offer particular advantages in this area, too, including short waiting times until load-bearing capacity and the adhesive system's excellent environmental compatibility. In urban public transport, it is primarily slab tracks and grass tracks that define the appearance of rail tracks. For these types of applications, too, the two-component mixtures offer efficient detailed solutions for stabilizing, sealing, and shaping track systems.

[0003] The bonding of granular aggregates is used in a wide variety of fields today. In track construction, coarse-grained riprap and gravel are primarily bonded, while in road construction, in addition to coarse-grained riprap, smaller-grained riprap and chippings are also used. Even finer aggregates are used, for example, in the bonding of decorative surface coverings. Despite the stabilization provided by bonding, the covering's water permeability and seepage capacity can be maintained. Bonding ballast is particularly important in track construction. Two-component polyurethane-based adhesives are commonly used for this purpose. Such multi-component polyurethane-based adhesives are well known in the art.Two-component mixtures can be adapted to the specific situation by varying the mixing ratio of resin and hardener during the curing time, achieving better bonding quality than single-component adhesives, which involve a certain compromise. However, single-component adhesives are easier to handle, as no mixer is required and only a single pump and line are needed for delivery. Devices for the controlled pumping, dosing, mixing, and dispensing of such adhesives, whether one- or two-component, are also known in principle, including those using gear pumps.

[0004] Bonding ballast in track construction achieves various positive effects. Among other things, it stabilizes the tracks and reduces joints at transitions between ballasted and slab track, for example, at tunnel entrances and exits. For this purpose, the ballast is usually bonded over the entire surface, including under the rails and sleepers. To reduce joints at the transitions between ballasted and slab track, the penetration depth of the bond is gradually increased toward the slab track. Bonding the ballast not only improves ride comfort but also improves the longevity of the tracks by preventing the stones from shifting.

[0005] Bonding the ballast bed at the edge of a railway line is often crucial when a trench needs to be dug near the railway line, or when material needs to be excavated alongside the railway line as part of a construction project, such as the laying of another parallel railway line or a building, a retaining wall, etc., or for other structural measures. To create a new railway line along an existing railway line, a channel several meters wide and, for example, 0.5 to 2 meters deep is excavated from the subsoil. Vehicles such as trucks, dump trucks, excavators, and other machinery used in the construction of the new railway line then travel along this channel.Because this so-called construction track runs close to the existing railway line, there is a risk of weakening the ballast bed of the adjacent railway line and jeopardizing its load-bearing capacity. To ensure that the railway line can remain in operation and that trains can run on it, the stability of its ballast bed is of paramount importance; otherwise, trains with their considerable weight would no longer be able to pass through this point. As a countermeasure, a deep bracing or a temporary wall could temporarily ensure stability so that the railway line could continue to be used. However, it proves much simpler to bond the ballast along the side where such structural changes are to be made, which would otherwise significantly weaken the ballast line. Thus, by bonding the ballast bed along a strip to the side of the main line, a stable ballast shoulder can be created extremely quickly.This shoulder proves advantageous when laying and maintaining control and signaling cables along the tracks, as a trench can easily be dug outside the bonded area. Thanks to the defined, stable shoulder of the ballast bed, the installed control and signaling cables can be easily exposed. After the cables have been replaced, the trench can be filled in again without affecting the basic shape of the ballast bed. The ballast bed shoulder stabilized by bonding remains passable under normal loads, despite the trench being dug directly next to the rail line. With a professionally bonded ballast line, it can be cut off sideways, so to speak, and excavation can be carried out directly next to the ballast bed, for example. Thanks to the bonding, the necessary stability of the ballast line for normal train traffic is maintained, which offers enormous advantages.Of course, the same equipment can also be used to reinforce the rail line across its entire width by bonding ballast.

[0006] Applying the adhesive to create such a stable bond requires that the adhesive penetrates the ballast bed to a precisely specified depth throughout, and that the amount of adhesive is applied at a precisely consistent rate per linear meter at a defined spray width. Multi-component adhesives must always be applied in the correct mixing ratio of the combined adhesive. Furthermore, such bonding must be able to be carried out quickly and reliably, not just over a few meters, but over larger sections.All necessary boundary conditions must be adhered to with utmost precision. For multi-component adhesives, these include the temperatures of the adhesive components and an absolutely consistent, continuously monitored mixing ratio. Furthermore, the adhesive must be applied evenly over the treatment section with a constant spray jet speed over the ballast to maintain a consistent penetration depth into the ballast bed. This is the only way to ensure that the ballast is bonded to a defined depth with a precisely defined amount of adhesive per ballast volume, depending on the size of the ballast stones and the desired penetration depth.Only if these specifications are strictly adhered to can such a bonding be certified in the sense that a railway train of a certain weight may continue to travel on a section of track, alongside which construction work is being carried out as mentioned above, i.e. trenches for pipeline construction or retaining walls or excavations of all kinds are being dug.

[0007] According to the state of the art, the application of adhesives can be carried out very professionally, as comprehensively described in document WO 2018 / 010860 A1, published on January 18, 2018. The device shown there allows the application of the adhesives at a dosage that sprays a very specific amount of adhesive onto the ballast bed per linear meter, thus ensuring a specific, pre-calculated penetration depth. Therefore, the process carried out with this device is now even certified by the Swiss Federal Railways (SBB), meaning its use guarantees that the rail bed will subsequently offer a certain desired load-bearing capacity and can therefore be used as usual by trains weighing several hundred tons. This is not the case if the application is carried out manually, as previously practiced, using watering cans or hand lances, with hand-operated or motor-operated pumps.For such manual application, the two basic components of a two-component adhesive are carried on a railway wagon, for example, and mixed on the wagon. The mixture is then poured into watering cans or fed directly to the hand lances via a pipe. To bond one m³ of ballast, 15 liters of adhesive mixture are required. When applied using a watering can, only approximately 4 m³ of ballast can be treated per hour. Furthermore, the application quality is highly uneven, as it depends on the dexterity of the person watering with the watering can or operating the hand lance while walking along the railway track.When applying the adhesive by hand, the application will inevitably be interrupted to refill a watering can or to advance the supply, i.e., the containers and machinery for pumping the adhesive to the lance, in stages. These containers and equipment are either carried on a railway wagon or transported by road and positioned alongside the track. If, for any reason, a malfunction occurs—for example, a pump malfunctions or breaks down—a single, individually toxic component can be sprayed in large quantities, which can have fatal consequences for the groundwater. The components of multi-component adhesives must only be thoroughly mixed and applied in the prescribed mixing ratio. This ensures that the mixture hardens reliably, and no individual component can penetrate the soil in isolation.

[0008] These problems were successfully overcome with the device and method according to WO 2018 / 010860 A1. However, the following limitation remains for the device according to WO 2018 / 010860 A1 and the method used with it: For the ballast bed to be bonded, a rail vehicle or at least one road vehicle that can optionally be driven on rails must always be operating on the track whose ballast bed is being bonded. This requires the track to be closed, and all work must therefore be closely coordinated with the control center. The device is therefore only suitable for applications where it is worthwhile to temporarily close a section of track to train traffic.

[0009] Bonding must always be done quickly and determines the penetration depth, as the applied adhesive flows downward through the ballast, and as it bonds and hardens quickly, the penetration depth is limited. Until now, application work has generally had to be carried out outside of traffic hours and often at night, and dry weather is also a prerequisite for applying the adhesive. It is clear that there are many constraints, resulting in the requirement for a uniform application with precisely defined specifications, reliably and very quickly on site using machines.

[0010] If bonding is to take place anywhere along a section of track, such as in a station, or in hard-to-reach places like bridges, underpasses, or overpasses, or generally in places where the track is not accessible from the side by vehicles, it is particularly challenging to ensure a uniform application quickly, ideally in a flash, and without any interruptions. Assuming approximately 15 liters of adhesive mix per m³ of track ballast to be treated, this is sufficient for 4 linear meters with a half-meter bed depth to be bonded and a half-meter bed width along the side of the rail. Two 200-liter drums are sufficient for just over 100 meters of track, because 3.75 liters per linear meter are required. If the bonding is to take place across the full ballast bed width of approximately 4 meters, only a section of approximately 13.3 meters can be bonded in one pass.The formula is: factor x depth x width, for example 1.5 x 5 m x 0.5 m = 3.75 liters / linear meter, or 1.5 × 5 m × 4 m = 30 liters / linear meter.

[0011] A particular challenge for the rapid and controlled dispensing of adhesive – with a perfect mix of components in the case of a multi-component adhesive – and with consistent penetration depth over long distances in a flash is the fact that the necessary machinery and storage containers require large quantities. Powerful pumps, for example, are essential. Furthermore, an independent power supply is required, both for the pumps and, depending on the situation, for tempering the adhesive to be dispensed or its components, which must be kept in stock in large quantities. Furthermore, all of this equipment should be movable along a track. It is possible to transport this equipment along a railway line on a truck, but this cannot be moved along the track so uniformly that a spray boom attached to it could reliably dispense the correct amount of adhesive per linear meter.Or a railway car could carry the adhesives and the equipment for their tempering, mixing and pumping separately, but the uniform application of the adhesives directly from a railway car is difficult to achieve because it has no drive and has a large dead mass.

[0012] Various devices for the controlled mixing of components to form a defined mixture are known in the prior art, and the method and device according to WO 2018 / 010860 A1 solves many problems convincingly and enables the controlled and precise application of adhesives for the purpose of bonding ballast beds along rail lines over many hundreds of meters in a flash, as long as the vehicle can stand on both rails and be driven on them for application.

[0013] In view of this state of the art, the object of the present invention is to create a device and a method which can be used even more quickly and flexibly, so that ballast bonding along a rail line can be carried out depending on the situation without blocking the rail line in question, i.e. that the time periods between the passing of trains can be used and regular train traffic can continue without disruption.

[0014] The solution to the problem is defined by a device having the features of claim 1, as well as by the method according to claim 12. This complete device can be transported by road or brought to the location on the track. In one embodiment, the vehicle with the entire device for providing and pumping the adhesive or the adhesive components for the adhesive mixture travels essentially parallel to the track, independent of train traffic or in such a way that regular train traffic is not impeded. For the regular application of adhesive, a single-rail car, monorail car, or a light rail car is placed on the rails within a very short time, approximately within seconds. This single-rail car or this rail car carries a boom with at least one spray nozzle.The single-rail carriage or this light rail carriage can be electrically powered and travel along the rail at a selectable uniform speed, whereby the boom mounted or integrally formed on this single-rail carriage or the rail carriage, with at least one spray nozzle attached to it, travels along the rail at exactly the same uniform speed. This ensures that an adjustable amount of adhesive with a defined spray pattern can be applied per linear meter of track, allowing a predefined penetration depth to be maintained. In practice, the single-rail carriage or this light rail carriage can be quickly placed on a rail and put into operation within a few seconds, and just as quickly removed from the rail to clear the way for a train. The single-rail carriage or the rail carriage is preferably controlled by remote control.The travel speeds and GPS coordinates can also be recorded or transmitted live and stored in a cloud. This, in conjunction with a state-of-the-art conveying and mixing system with data recording, enables verifiable and thus predictable and reliable ballast bonding. As an alternative, this single-rail wagon or this light rail wagon can be supplied by a railway wagon traveling on a parallel track or the same track instead of a truck traveling alongside the track. This wagon is then gradually pulled or pushed along with the spraying device by a light locomotive or trolley.Only the single rail carriage or this lightweight rail carriage ensures the even application of the adhesive. A defined amount of adhesive is dispensed precisely depending on the speed of the nozzles, thus ensuring a precisely defined penetration depth. Either a separate lightweight rail carriage or a single rail carriage acts as a spray carriage, moving steadily forward along the rail, or the spray nozzles can be moved back and forth on this rail carriage or spray carriage, ultimately ensuring a predefined penetration depth.

[0015] This device for bonding a granular mixture is presented and described with the aid of the drawings, and its functions are explained. The method for using this device is then described and explained in more detail. The drawings show an example embodiment of the device, and the task and purpose of the invention are also illustrated and explained with the aid of the illustrations.

[0016] It shows: Figure 1: A cut-out ballast track, stabilized by prior bonding, along which a train is currently passing; Figure 2: A cut-out, stabilized ballast track along a track in front of a tunnel portal; Figure 3: The single-rail carriage of the device according to the invention for dispensing adhesive onto an area next to a rail, viewed from an angle from above and placed on a single rail; Figure 4: The single-rail carriage of the device according to the invention in a front view and placed on a single rail; Figures 5a-d: Four snapshots during the rapid placement of the single-rail carriage onto the rail; Figure 6: The single-rail carriage of the device with the boom and a spray bar mounted on it; Figure 7: A self-contained single-rail carriage of the device with an electronic control unit, display and keypad integrated into the boom, as well as a battery in the single-rail carriage housing;Figure 8: The complete facility with its associated supply vehicle, for example, on which all elements for the electrical power supply and control for pumping, for the possible mixing of adhesive components, and for the controlled dispensing of the adhesive or the components of a multi-component adhesive via a hose connection to the boom are present; Figure 9: The complete facility with its associated supply vehicle, for example, here mobile on the rails, on which all elements for the mixing and controlled dispensing of the adhesive or the components of a multi-component adhesive via a hose connection to the boom are present; Figure 10: A light rail wagon on one rail, with a boom for support on the other rail, shown in an elevation. Unlike a single-rail wagon, this rail wagon does not have wheels rolling along the rail from below.Figure 11: The single rail wagon or the light rail wagon on one rail, with a boom for support on the other rail according to ; Figure 10 shown in perspective view; Figure 12: The single rail car or the light rail car on one rail, with a boom for support on the other rail according to Figure 10 in an enlarged view; Figure 13: A single-rail carriage for mounting on a single rail in an enlarged view; Figure 14: The single-rail carriage according to Figures 10 to 12 shown in an enlarged elevation; Figure 15: The single rail car according to Figures 10 to 12 alone, in elevation and enlarged; Figure 16: The single rail car according to Figures 10 to 12 alone, shown in a perspective view.

[0017] In Figure 1A bonded ballast bed layer is shown, namely a ballast cut just outside the perimeter of a railway line, which was previously bonded by spraying a two-component synthetic resin, forming a quasi-monolithic block. In this state, the ballast to be removed can be cut with an excavator bucket, as shown here, and the bonded ballast shoulder nevertheless remains stable, allowing vertical walls to be exposed without the passable ballast line losing any significant load-bearing capacity and stability. Whenever, for example, cables or pipes have to be laid along such a railway line, major challenges arise for maintaining the stability of the railway line if it is to continue to be used by trains, i.e., during the installation work for the cables and pipes.Without the possibility of stabilizing the route according to the present invention, the railway line would have to be closed to rail traffic, which would mean major restrictions and expensive downtimes for the railway operators.

[0018] The Figure 2shows another ballast track stabilized by bonding and then cut out along a railway line in front of a tunnel portal. As can be seen, a trench often has to be dug over considerable distances, and this poses the particular problem of how to stabilize a ballast track over longer distances so reliably and safely that it can be certified for use by trains with normal loads. When excavating by hand, no one can guarantee the homogeneity of the bond. In addition, bonding by hand is far too slow, labor-intensive, inaccurate and correspondingly expensive. This is where the present invention comes in, enabling ballast tracks to be bonded in a completely different dimension: much faster and more efficiently, and completely homogenously, with a precisely consistent, selectable bond width and with a precisely definable adhesive penetration depth over the entire bond.Only such a mechanical application of the adhesive can be carried out with such precision that the bonding and stabilization can be certified, so that a railway operator can be certain that trains can travel on this bonded route without any problems and are also permitted to do so from an insurance perspective.

[0019] The Figure 3shows a rail-mounted single-rail carriage 1 of the device according to the invention for mounting on a single rail and for dispensing adhesive onto an area adjacent to the rail. It is shown here in perspective, viewed obliquely from above, mounted on a single rail 16, thus in a rail-coupled or rail-bound state. The single-rail carriage 1 forms a frame 40 or box, inside which wheels 2, 3, 4 are mounted. First, two wheels 2 are arranged on the frame 40 or box such that they face the corner 7 between the rail head 8 and the rail web 9. For this purpose, in the example of the single-rail carriage 1 shown, the wheels 2 are mounted on a bevel 5 on one side of the frame 40. On the opposite side of the frame 40, at least one guide wheel 3 projects at right angles to the vertical frame part 6 towards the rail web 9 and rolls on this other side or flank of the rail head 8.Preferably, two guide wheels 3 are arranged opposite the wheels 2 on this side of the rail head 8. At least one drivable wheel 4 presses onto the rail head 8 from above in the frame 40. For this purpose, the wheel 4 can be pivotally mounted on the frame 40, for example by being mounted between two pivot arms 10, as shown here, which in turn can pivot on the frame 40 about a horizontal axis and here press downwards under spring load, thus pressing the wheel 4, when the single rail carriage 1 is attached, onto the top of the rail head 8. An electric motor 11 is arranged on top of the frame 40 of the single rail carriage 1, the output shaft 12 of which drives a sprocket 13 for a roller chain 14 or a gear for a toothed belt. The roller chain 14 or the toothed belt then drives an associated sprocket 15 or a gear next to the wheel 4, which is firmly connected to the same.This makes it possible to first push the single-rail carriage 1 upwards through the bearing force of the drive wheel 4, against the retaining force of the two guide wheels 2, while at least one outer guide wheel 3 runs on the side of the rail head 8 and, together with the guide wheels 2, secures the single-rail carriage 1 against pivoting in any direction. In the example shown, this single-rail carriage 1 is designed with two such guide wheels 3 for rolling on the side of the rail head 8. Their only degree of freedom of movement is displacement in the direction of the rail 16, on which their wheels 2-4 roll. With electronic control of the electric motor 11, it is possible to ensure a selectable uniform movement of this single-rail carriage 1 on a rail 16.

[0020] The Figure 4shows this single-rail carriage 1 of the device according to the invention in a front view and mounted on a single rail 16. Here one can clearly see how the wheels 2, 3, 4 roll on different surfaces of the rail 16. The wheels 2 point towards the corner 7 between the rail head 8 and the rail web 9. They are attached to the bevel 5 of the frame 40, whereby this bevel 5 is oriented inwards and at an oblique angle upwards and the wheels 2 are attached here below to the bevel 5. On the opposite side of the rail 16, at least one guide wheel 3 is guided here between two ears 17, 18 on an axle 19. This guide wheel 3 rolls here on one side of the rail head 8.For fine adjustment of this guide wheel 3, which acts as a support wheel, the two ears 17, 18 are adjustable here using the adjusting screws 42, as indicated by the double arrows, so that the guide wheel 3 can be adapted to any varying track head widths. At least one further wheel acts from above, which serves as the drive wheel 4 and which, here, rests and rolls on the top of the rail head 8 under spring load. For this purpose, in the example shown, it is held on the axle 20b between two pivot arms 10 attached to the frame 40, which are pivotally connected to an attachment 21 on the horizontal axle 20. On one side of the wheel 4, it is equipped with a sprocket 15 or a gear wheel. A roller chain 14 runs over this sprocket 15, which runs above over another sprocket 13, which in turn is driven by the output shaft 12 of the electric motor 11.Instead of a roller chain 14, a toothed belt or a gear transmission can be used to transmit the power of the electric motor 11 to the drive wheel 4. From this illustration, it can be seen that this single-rail carriage 1, i.e., its frame 40 or its housing, can be very quickly placed on a rail 16 or lifted off it again. From the position shown here, it can be lifted off the rail 16 and removed by lifting it on the left side and then unhooking the two wheels 2 by moving the bevel 5 or the frame 40 downwards and outwards. Conversely, the single-rail carriage 1 with its guide wheels 2 can be quickly hooked onto the rail 16 and brought into position. First, the two wheels 2 are brought into position with the frame 40 inclined relative to the rail 16 and then the frame 40 is pivoted down counterclockwise in the image shown until the drive wheel 4 rests on the top side of the rail head 8.Wheel 3 then rests on the other side of the rail head 8, and the single-rail carriage 1 is securely guided along the rail. All described wheels can be adapted in position, type, and shape to different rail profile types. The number of wheels 2, 3, and 4 can also vary, as long as they can fulfill the described function. Likewise, one or more tracks can be used in addition to or instead of wheels 2, 3, and 4, allowing the single-rail carriage 1 to be driven securely along the rail track 9.

[0021] In the Figures 5a to 5d The sequence of placing the single-rail carriage 1 on the rail 16 is shown in four consecutive sequence images. The single-rail carriage 1 is placed in a position according to Figure 5atilted around its longitudinal axis by approximately 30-40° and guided over the rail 16. Finally, the guide wheels 2 must be suspended from this position below the rail head 8, as indicated by the arrow, which shows their intended path. For this purpose, the single-rail carriage 1 is tilted in this position, as shown in Figure 5b shown, lowered until the guide wheels 2 are located below the rail head 8. Then, the wheels 2 are guided with their free side facing the interior of the frame 40 or box into the corner 7 between the rail head 8 and the rail web 9, as indicated by the arrow. In the next step, the single rail carriage 1 is pivoted about its longitudinal axis, as shown in Figure 5cshown and indicated by an arrow, until the drive wheel 4 rests on the top side of the rail head 8 and is then pressed onto the rail head 8 by the force of the spring acting on its pivot arms 10. In this state, with the drive wheel 4 resting upright on the rail head 8, the guide wheel 3 or - depending on the design, the guide wheels 3 - rests snugly against the side of the rail head 8 and the single rail carriage 1 is held securely against rotation in every direction and snugly on the rail 16, as shown in Figure 5dshown. The single-rail carriage 1 can now only roll back and forth along the rail 16. The removal of the single-rail carriage 1 from the rail 16 takes place in exactly the opposite order. The coupling and securing of the single-rail carriage 1 can thus take place without the need for any special adjustment of the single-rail carriage 1 to the rail 16. Rather, the single-rail carriage 1 is secured against twisting on the rail 16 in any direction and can be moved along the rails simply by being placed on the rail 16 as described. Likewise, the dismantling of the rail-bound and thus secured single-rail carriage 1 only requires it to be lifted off the rail 16 in the reverse order to its placement. This placing of the single-rail carriage 1 on the rail 16 or lifting of the single-rail carriage 1 off the rail 16 again takes a matter of a few seconds and usually requires no more than 5 seconds.It can preferably be performed by two workers, thus keeping the personnel requirements for commissioning the device according to the invention to a minimum. Immediately after being placed on the rail, the single-rail carriage 1 is ready to travel on the rail 16, either forward or backward. These features are now utilized for the application of adhesive, as described below.

[0022] In the Figure 6The single-rail carriage 1 is placed on the rail 16 and, to a certain extent, locked thereto, so that it can only be moved along the rail 16 by its guide wheels 2, 3 and the drive wheel 4 rolling along it. A boom 22 with a spray bar 28 and a swivel arm 23 extending in the direction of the rail 16 are now hinged to the single-rail carriage 1. A measuring wheel 24 with a rubber tread is mounted on the front end of this swivel arm 23. This measuring wheel 24 rests snugly on the top side of the rail head 8, and with every movement of the single-rail carriage 1 on the rail 16, this running wheel 24 rolls precisely along the rail 16, so that it can serve as a measuring wheel. Using this measuring wheel 24, every displacement of the single-rail carriage 1 on the rail 16 can be measured or recorded precisely, to the millimeter. Wheels 2, 3 and 4 can also serve as measuring wheels by attaching a tachometer.In this case, a separate measuring wheel 24 can be dispensed with.

[0023] The Figure 7shows an alternative embodiment of the single-rail carriage 1 with a boom 22. This is a self-contained single-rail carriage 1 in that it has its own, preferably rechargeable battery 42. In the example shown, this is inserted into a battery holder 43 within the frame 40 or housing of the single-rail carriage 1. Furthermore, the electronic control unit is housed within the boom 22, by means of which the drive of the single-rail carriage 1 as well as the pumping of the adhesive or the mixing of its components in the case of a mixed-component adhesive are controlled. The mixing of the adhesive components can also take place at the spray bar 28 by installing the mixing units therein.To operate the electronic control unit, a display 44 is built into the boom 22, with an associated keypad 45 for entering the desired values ​​for the travel speed, the travel path, and in the case of adhesives, the mixing ratio, and the start and stop of travel and pumping. Furthermore, a portable electronic device, such as a laptop, a tablet, or a smartphone, can be connected to the electronic control unit, preferably wirelessly. In this case, a display 44 and a keypad 45 are provided by the portable electronic device, and inputs can be made via these, thus achieving remote control and remote monitoring. Finally, the single-rail carriage 1 and its boom 22 are preferably equipped with handles 46, 47 so that the single-rail carriage 1 can be quickly placed on a rail 16 by just two workers, for example, and just as quickly removed from the rail 16 if necessary.For this purpose, the movements are as shown in . Figure 5a to 5d to perform.

[0024] Mounted on the outer side of the single-rail carriage 1 is the boom 22, which here has two legs. It projects diagonally upwards from the single-rail carriage 1 and carries a tube 27 in a holder 26 at its end 25. The tube 27 can be rotated in this holder 26 relative to the end 25 of the boom 22. At the bottom, this tube 27 carries a single spray nozzle 29 or, as shown here, a spray boom 28 that can be rotated about the tube axis. Ideally, the spray boom 28 is motor-controlled and can be moved horizontally and vertically and is mounted so that it can be pivoted in all directions. The spray boom 28 is equipped with one or more spray nozzles 29-31. Ideally, a plurality of nozzles are arranged on the spray boom 28 to produce various spray patterns. In the example shown, the spray boom 28 contains three spray nozzles 29-31.Depending on its rotational position, the ballast bed 32 can be sprayed with adhesive over a more or less large selected width, with the adhesive being supplied via one or more hoses 35 (. Figures 8, 9 ) is supplied to the spray nozzles 29-31. This one hose or these several hoses 35 come from the supply vehicle, which travels essentially parallel to the track for the operation of the single-rail car 1. This ballast bed 32 must be bonded to the side of the rails 16 to make it stable so that the terrain 38 outside the bonded ballast bed 32 can be vertically cut and removed in order to excavate a trench there, erect a structure, or lay another rail line, etc.

[0025] The Figure 8shows the overall situation from a greater distance. During the construction of a structure next to the track or a new parallel rail line next to the existing track, the subsoil 33 of the resulting trench, shown here, is often used as a so-called construction track after excavation. Trucks, dump trucks, excavators, or other machines then drive along this construction track to create the rail line. The supply vehicle 34, as shown here as an example in use, can now be used to bond the ballast bed 32 in its left-hand edge area. Such supply vehicles 34, with all the equipment for carrying adhesive or adhesive components, for precisely mixing them, and for pumping, are already known. In the case of multi-component adhesives, mixing is preferably carried out by static mixers using gear pumps, and the quantity is metered using mass flow meters.This entire device, as installed on such a vehicle, is comprehensively described and illustrated in WO 2018 / 010860 A1. Single-component adhesives can also be used immediately with the same device without any modifications.

[0026] In Figure 8one can see how the supply vehicle 34 travels along the construction track 33 along the rail line and supplies the single-rail carriage 1 with the boom 22 and the spray nozzles 29-31 via one or more hoses 35. Cables 36 for the electrical supply and control of the electric motor 11 of the drive wheel 4 inside the frame 40 or housing of the single-rail carriage 1 also lead from the supply vehicle 34 to the single-rail carriage 1. Further cables 37 lead from the optionally attached measuring wheel 24 or - if designed as measuring wheels - also from the wheels 2, 3, 4 to the electronic control unit, which is preferably carried on board the supply vehicle 34 or is provided by a portable electronic device. The hose connection 35 and the cables 36, 37 are guided here along a pivoting boom 39, which is removably hinged to the front of the supply vehicle 34. Towed behind the single rail car 1 you can see the measuring wheel 24 or.Depending on the design, the wheel 2, 3, 4 functions as a measuring wheel, which provides reliable data on the travel speed of the single-rail carriage 1 to the electronic control unit on the supply vehicle 34 or on the portable electronic device. The measuring wheel 24 could also be pushed in front of the single-rail carriage 1 instead of being towed. Based on this uniform speed, the previously calculated flow rates of the adhesive or adhesive components are calculated, and the pumps are then controlled accordingly using feedback from the mass flow meters.This makes it possible to apply a very precise amount of adhesive per linear meter, thereby ensuring a predetermined penetration depth into the ballast bed 32 – so reliable that this process can even be certified, with the aim of ensuring that a ballast bed shoulder 32 bonded in this way offers sufficient load-bearing capacity for trains of up to several hundred tons, depending on requirements. After bonding the ballast bed shoulder 32, the material 38 can be excavated and removed along the rail line. This area can thus be exposed safely while the adjacent rail 16 remains passable. Bonding the ballast bed shoulder should ultimately make it possible to cut out and remove the area 38 of the line (hatched here), while maintaining the necessary stability of the line for train passage.

[0027] It is obvious that the single-rail carriage 1 together with its boom 22 can be placed on a single rail 16 within a few seconds and can then be put into operation and, conversely, when a train is announced, this single-rail carriage 1 can just as quickly be taken off the rail 16 and removed so that a train can pass the work site unhindered.

[0028] The pumping equipment and spray material, as well as the power supply, etc., in other words, everything necessary to transport the adhesive or multi-component adhesive, cleanly mixed and in a controlled manner, via hose lines 35 to the single-rail carriage 1, can be transported not only on a vehicle 34 traveling parallel to the track. If there is no rush and the bonding does not have to be carried out in just a short time window, usually a few minutes in this case, i.e., if a rail is closed specifically for the bonding work, a railway carriage standing on the track and traveling alongside it can just as easily transport these equipment for supplying the single-rail carriage 1. This railway carriage can then be pushed behind or pulled ahead of the single-rail carriage 1 by a locomotive, a handcar, or a track excavator at a more or less constant distance from the single-rail carriage 1.It is equally understood that these devices can also be transported by a self-propelled road-rail vehicle, i.e., a vehicle that can be driven on both road and rail. This vehicle then supplies the single-rail car 1 with the already mixed adhesive or the adhesive components to be mixed via cables 36, 37 and hoses 35, in the same way as a road or off-road vehicle 34 traveling alongside the rail line.

[0029] Such a vehicle 48, which can be driven on rails, here with rail wheels 49 which can be lowered hydraulically when required, is in Figure 9shown as an example, and it can travel behind the single-rail car 1 or, alternatively, in front of the single-rail car 1. In exactly the same way, such a vehicle 48 can be replaced by a railway car, on which the entire device for tempering, pumping, and mixing the adhesive components is mounted. This railway car then also carries the components for the power supply, for example, an internal combustion engine with a generator and batteries for operating the electric pumps and for heating the adhesive to the ideal temperature. Alternatively, traction current can also be taken from the overhead line and made available for operating the device.Such a railway carriage can then run on a track parallel to the track on which the single-rail carriage 1 is mounted, which is supplied with conditioned adhesive via pump hoses 35, and is connected to the single-rail carriage via cables 36, 37 for control and power supply. It is gradually pushed or pulled along behind the single-rail carriage by a trolley or a light locomotive and therefore does not have to move exactly at the same speed as the single-rail carriage 1. If conditions permit, this railway carriage can also run on the same track on which the single-rail carriage 1 is mounted. The rail-compatible road vehicle in . Figure 9 can then simply be replaced by such a railway carriage.

[0030] The controlled mixing of the multiple adhesive components can optionally also take place on the single-rail carriage 1. For this purpose, the mixer, preferably a static mixer, in which the spray material is mixed, is attached directly to the single-rail carriage 1.

[0031] In the Figures 10 to 16an alternative design of the device is shown, which can also operate without wheels that roll from below on the rail head. This then involves a lightweight rail carriage that can be placed onto a track by hand. This offers the advantage that the single rail carriage 1 is not suspended from the rail, but can be lifted vertically upwards away from it. To improve stability, it can have a further chassis boom 50 opposite its boom 22 with the spraying device, which extends towards the opposite rail, on which this chassis boom 50 rests with one or more support wheels 55, thus forming a lightweight rail carriage.

[0032] The Figure 10shows an elevational view of a single-rail wagon designed as a two-track light rail wagon, with a chassis boom 50 for support on the other rail. This rail wagon does not have any wheels rolling along the rail from below and can therefore be lifted vertically upwards from the rail at any time. A further advantage of this rail wagon is that it can also roll over switches. The wheels 51, 52 rolling along the side of the rail head can be briefly lifted upwards, for example, pneumatically or electrically, and after passing the switch, are lowered back to their original position to roll along both sides of the rail head. The boom 22 is equipped with a device 53 for extending or shortening the boom 22, as well as with a device 54 for adjusting the height of the spray boom 28.These devices 53, 54 can be adjusted by electric motor, pneumatically, or hydraulically. At the outer end of the chassis boom 50, a support wheel 55 can be seen, with which the chassis boom 50 is supported on this opposite rail.

[0033] The Figure 11 shows this rail car after Figure 10 on a rail, with a chassis boom 50 for support on the opposite rail with, in the example shown, two support wheels 55 for the outer end of the chassis boom 50. The

[0033] Figure 12shows the rail carriage with its outrigger 22 and chassis outrigger 50 in an enlarged view. Here, the two wheels 51, 52 can be seen, which roll on either side of the rail head 8 and thus stabilize the rail carriage around its vertical axis, preventing it from twisting. The chassis outrigger 50, with its support on the opposite rail 57, ensures stabilization around the axis along the rail. In one variant, the spray bar 28 can also be installed on the rail carriage so that it can move. For example, it can be mounted on an outrigger that extends across the entire width of the rail carriage, whereby the spray bar 28 can be mounted on this outrigger so that it can be moved by a motor, for example, by means of an electric drive.In this case, with the railcar stationary or moving, the spray boom 28 can move uniformly back and forth across the entire width of the ballast bed of a rail line, ensuring a uniform penetration depth of the adhesive into the ballast bed. This boom can also be designed to pivot about a vertical axis, so that, for example, it no longer extends transversely across the rail line, but rather longitudinally, along the rail. With the railcar stationary, the spray boom 28 can then move uniformly back and forth along the boom, thus bonding a longitudinal section of the lateral ballast bed, i.e., a ballast bed shoulder, with a consistent penetration depth of the adhesive.

[0034] The Figure 13shows the part of the single rail car 1 or the rail car with the drive system, shown separately, in an enlarged and perspective view. The drive wheels 56 are housed inside, with which the rail car rests on the rail, so that their full weight ensures good adhesion. Between the two drive wheels 56, which can also function as measuring wheels, you can see the electric motor 11 that drives them.

[0035] The Figure 14 shows this single rail car 1 or rail car according to the Figure 11 and 12 shown in an elevation. One can see the electric motor 11 and to the left of it the front drive wheel 56, as well as the two guide wheels 51, 52, which roll on the two sides of the rail head 8. In Figure 15 is all enlarged, and in Figure 16shown in a perspective view. Here, you can see the drive belts or roller chains 14, via which the electric motor 11 drives the drive wheels 56. The drive wheels are equipped with a rubber tread 57 to ensure good adhesion.

[0036] Overall, the facility presented here and the procedure carried out with it allow the following: The controllable, traceable, real-time documented and adjustable dispensing speed, depending on all parameters; The controllable, traceable, real-time documented and adjustable dispensing quantity of adhesive per area; The controllable, traceable, real-time documented and adjustable dispensing width, depending on all parameters; In addition, the mixing accuracy is traceable and can be documented in real-time, and environmental damage can be ruled out at all times. Number directory

[0037] 1Single rail carriage, or monorail carriage in the style of a trolley 2Guide wheels for the corner of rail head / rail web 7 3Guide wheels on rail web 9 4Drive wheel of single rail carriage 1 5Fold for wheels 2 6Vertical frame section 7Corner of rail head 8 / rail web 9 8Rail head 9Rail web 10Pivoting arms for drive wheel 4 11Electric motor 12Output axle of electric motor 11 13Sprocket on output axle 12 14Roller chain 15Sprocket on drive wheel 4 16Rail 17Ear for axle 19 of guide wheel 3 18Ear for axle 19 of guide wheel 3 19Axle for guide wheel 3 20aAxle through pivot arm 10 20bAxle through pivot arm 10 and drive wheel 4 21 Attachment for swivel arms 10 22 Boom 23 Swivel arm for measuring wheel 24 24 Measuring wheel 25 End of boom 22 26 Bracket for pipe 27 27 Vertical pipe for spray nozzle / swivel boom 28 Spray boom 29 Spray nozzle 30 Spray nozzle 31 Spray nozzle 32 Gravel bed 33 Subsurface / construction track 34 Supply vehicle 35 Hoses for adhesive or adhesive components36Cable for electric motor 11 37Cable from measuring wheel 24 to control unit 38Area to be cut and removed 39Boom on supply vehicle 34 40Frame, box, housing of single rail carriage 1 41Adjusting screws for adjusting guide wheel 3 42Accumulator 43Accumulator holder in single rail carriage 1 44Display on boom 22 45Keypad for electronic unit and display 44 46Handles for carrying single rail carriage 1 47Handles on boom 22 for lifting it 48Vehicle movable on 16 rails 49Rail wheels hydraulically lowerable onto 16 rails 50Boom on single rail carriage towards the opposite rail 51Wheel rolling on the outside of the rail head 52Wheel rolling on the inside of the rail head 53Adjustment unit for boom length 22 54Adjustment unit for the height of the spray boom 28 55Support wheel on the boom 50 for the opposite rail 56Drive wheel 57Rubber tread of the drive wheels 56

Claims

1. Device for discharging single or multi-component adhesive onto a ballast bed (32) of a rail track of a rail line, including a supply vehicle (34, 48) which can be moved alongside the rail line and on which the container or containers for the adhesive and the elements for conveying for the purpose of discharging the adhesive are installed, and also a single rail carriage (1) which can be temporarily coupled to a single rail (16) and secured thereto, or a rail carriage which can be manually placed on the rails or assembled thereon, and both of which can be quickly lifted away from the rail and removed therefrom, for allowing a railway train to pass, and which can be supplied with adhesive from the supply vehicle (34, 48) via hose lines (35), at least one spray nozzle (29-31) being mounted on the single rail carriage (1) or on the rail carriage, so that a defined penetration depth of the adhesive into the ballast bed can be maintained by uniform travelling speed of the single rail wagon (1) or the rail wagon or by uniform movement of the spray nozzle (29-31) on this single rail wagon (1) or on the rail wagon by defined flow rates of the adhesive conveyed by the supply vehicle, depending on the nature of the ballast bed (32) and spray pattern.

2. Device according to claim 1, characterised in that the single-rail carriage (1) is rail-guided and can be moved independently of the supply vehicle (34, 48) with its own drive on the same (16) at a uniform, selectable speed, the single-rail carriage (1) carrying a boom (22) on which at least one spray nozzle (29-31) is mounted, and which is mounted so as to be horizontally and vertically displaceable and pivotable in all directions, so that a defined penetration depth of the adhesive can be maintained by means of the device at a uniform travelling speed of the single-rail carriage (1) and defined flow rates of the adhesive depending on the nature of the ballast bed (32) and spray pattern.

3. Device according to claim 1, characterised in that a boom (22) with a spray bar (28) is mounted on the rail carriage, which boom can be displaced horizontally and vertically by a motor drive and is mounted so as to be pivotable in all directions and which has a plurality of spray nozzles (29-31) for producing different spray patterns.

4. Device according to one of the preceding claims, characterised in that the single rail carriage (1) or the rail carriage can be driven by an electric motor (11) mounted thereon and can be moved on the rail (16) by remote control via a portable electronic device and the spray bar (28) can be adjusted vertically and horizontally and pivoted in all directions by remote control.

5. Device according to one of claims 2 to 4, characterised in that an electronic control unit is accommodated in the boom (22), as well as a display (44) with associated keypad (45) for inputs to the electronic control unit.

6. Device according to one of the preceding claims, characterised in that the single rail carriage (1) or the rail carriage are configured in such a way that they can be placed on the rail (16) from the side and, when placed on the rail (16), are secured against rotation on the rail (16) in any direction without further adjustment.

7. Device according to one of the preceding claims, characterised in that the single-rail carriage (1) has a chassis extension arm (50) which, when the single-rail carriage (1) is mounted on a rail, extends to the respective opposite rail (57) and can be supported there on the same by means of at least one support wheel (55), so that a rail carriage is formed, and in that the single-rail carriage has wheels (51, 52) which, when placed on a rail, roll on both sides of the rail head (8) and include at least one drive wheel (56) which bears the weight of the single-rail carriage and its support (22, 50) and rolls on top of the rail head (8).

8. Device according to one of the preceding claims, characterised in that the single-rail carriage (1) includes a frame (40) or a housing on which, in the state of the single-rail carriage (1) placed on the rail (16), guide wheels (2) directed obliquely to the rail (16) are mounted on its one underside, which guide wheels are intended for rolling in a corner (7) between the rail head (8) and the rail web (9) of the rail (16), while at least one guide wheel (3) is mounted on the opposite side of the frame (40) or housing, which is intended for rolling laterally of the rail head (8) when the single rail trolley (1) is mounted on the rail (16), and at least one drive wheel (4) is mounted on the frame (40) or housing between the aforementioned guide wheels (2, 3), which drive wheel is intended to roll on the rail head (8) and drive the single-rail carriage (1) when the single-rail carriage (1) is mounted on the rail (16).

9. Device according to one of the preceding claims, characterised in that, in the state of the single-rail carriage (1) or the rail carriage coupled to the rail (16), the extension arm (22) projects laterally with respect to the direction of travel of the single-rail carriage (1) and a tube (27) attached thereto and a spray bar (28) extending at the bottom transversely to the tube (27) are arranged, which spray bar is equipped with one or more spray nozzles (29-31) and is rotatable on the tube (27), is vertically adjustable in height and is mounted so as to be horizontally displaceable in its width, and wherein handles (46, 47) are moulded on the extension arm (22) and / or on the frame (40) or housing of the single-rail trolley (1) to facilitate lifting.

10. Device according to one of the preceding claims, characterised in that the single-rail carriage (1) or the rail carriage has its own battery (42), so that it can be moved autonomously by remote control, and in that the single-rail carriage (1) or the rail carriage is equipped with a measuring wheel (24), which is mounted on a swivel arm (23) articulated about a horizontal axis on the monorail carriage (1) or on the rail carriage or is integrated in the frame (40) or housing of the monorail carriage (1) or of the rail carriage and which is intended to roll on the rail (16) when the monorail carriage (1) or the rail carriage is placed thereon, and the measurement data recorded by the measuring wheel (24) can be transmitted electronically.

11. Device according to claim 10, characterised in that the single rail carriage (1) or the rail carriage have an electronic control unit which is mounted on them or can be controlled via a separate portable electronic device, by means of which control unit the travel speed for the movement along the rail (16) can be controlled on the basis of feedback from the measuring wheel (24).

12. Method for discharging single-component or multi-component adhesive with a device according to one of the preceding claims, wherein the supply vehicle (34) is positioned next to the rail track on a construction track or a rail track, then the single rail carriage (1) or the rail carriage is placed on the parallel rail (16) from the side and is moved in a rail-guided manner, for applying adhesive to the ballast bed (32), the supply vehicle (34) travelling next to the rail track within reach of the hose line (35), so that the at least one spray nozzle is supplied with adhesive from the supply vehicle (34) via the at least one hose line (35), wherein a defined penetration depth of the adhesive is maintained by means of the uniform travelling speed of the single rail wagon (1) or the rail wagon or by uniform movement of the spray nozzles on the travelling or stationary single rail wagon (1) or the travelling or stationary rail wagon and the defined flow rates depending on the nature of the ballast bed (32) and spray pattern, and when a train is approaching on the rail track, the movement of the single rail wagon (1) or the rail wagon is stopped and removed from the rail (16) within such short time intervals and thus the rail (16) is released for the train to pass so that regular train traffic can continue uninterrupted.

13. Method according to claim 12, wherein the single rail carriage (1) is moved on the rail (16) by previously being placed on the rail (16) by means of opposing guide wheels (2, 3), so that it is secured on the rail (16) against rotation in any direction.

Citation Information

Patent Citations

  • Device for discharging multi-component adhesives onto a granular mixture, discharging method, and use of the device

    WO2018010860A1