INSTALLATION FOR RINSING PARTS AND ASSOCIATED PROCESS
The electroplating rinsing installation addresses water consumption and tank congestion by employing misting and spraying phases with a closed-loop system, achieving reduced water use and tank count while maintaining effective rinsing.
Patent Information
- Application Number
- FR2022010987
- Authority / Receiving Office
- FR · FR
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2022-10-24
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2042-10-24
AI Technical Summary
Existing electroplating rinsing installations consume significant amounts of water and require multiple tanks, leading to congestion and inefficiency.
A rinsing installation using misting and spraying phases with a closed-loop system for rinsing liquid and air, combined with a recovery system for reused liquids, reduces water consumption and tank size.
Reduces water consumption by 50-75 m3/year and halves the number of tanks, maintaining effective rinsing quality and efficiency.
Smart Images

Figure 00000013_0000 
Figure 00000013_0001 
Figure 00000014_0000
Abstract
Description
Title of the invention: INSTALLATION FOR RINSING PARTS AND ASSOCIATED METHOD Field of invention
[0001] The present invention relates to the general field of electroplating, and more specifically, to an installation for rinsing parts treated by electroplating. The invention also relates to the associated rinsing method.
[0002] It is more particularly aimed at a rinsing installation with limited water consumption. Prior art
[0003] Electroplating is a technology that is now well known and mastered, which allows surface treatment of parts of any kind. Typically, it consists of using electrodeposition to cover an object with a thin layer of metal.
[0004] For this purpose, the parts to be coated are immersed in active, acidic or basic baths, and are conventionally rinsed in intermediate rinsing baths, said active baths being able to be at room temperature or, as required, at a higher temperature.
[0005] As examples of treatment, we can cite, in a non-exhaustive manner, anodic oxidation for aluminum, zinc plating, nickel plating, chrome plating, etc. for steel, passivation for stainless steel and the coating of precious metals in the field of electronics or goldsmithing.
[0006] The parts to be treated are traditionally hung or positioned on balances, or arranged within tools called, in the field considered, 'barrels', then immersed in each bath using a robot which circulates on rails located above the baths.
[0007] Although this technology has largely proven its worth, it does come with a major drawback in environmental terms: the water consumption required to effectively rinse the treated parts.
[0008] In general, after each treatment tank containing active products, the treated parts are immersed in two or more tanks containing rinsing products, typically water, the pollutant concentration of which decreases from one rinsing tank to the next. Effective rinsing of the products makes it possible to limit the spread of active products between two separate treatment tanks which may contain dangerously reactive products when they come into contact.
[0009] Today there are two techniques for rinsing using successive baths: cascade rinsing and static rinsing.
[0010] Cascade rinses are used for installations equipped with a treatment plant. In these rinsing installations, the last rinsing bath, i.e. the one furthest from the treatment tank, is supplied with water. The overflow water from this last rinsing bath flows into the previous rinsing tank and this, in reverse cascade, up to the first rinsing tank, i.e. the rinsing tank closest to the treatment tank. This first rinsing tank, in which the products are rinsed after treatment, is equipped with an overflow which flows into the treatment plant.
[0011] In static rinsing installations, the first rinsing tank is periodically emptied to store the grey water in a recovery tank. The first rinsing tank is then filled by the second tank, which is cleaner than the water contained in the first tank, and so on until the last rinsing tank, which is filled with clean water. When the grey water recovery tank is full, its contents should be transferred to an organization responsible for treating it.
[0012] Whatever the method of rinsing by successive baths used, it is always necessary to periodically recycle the water contained in the different rinsing tanks, thus resulting in significant water consumption when it is desired to dilute said rinsing tanks significantly.
[0013] To limit water consumption, it is known to multiply the number of rinsing tanks to increase the necessary dilution frequency of these tanks. For example, with six or seven rinsing tanks after each treatment bath, the water consumption of a rinsing installation would be limited.
[0014] However, the increase in the number of rinsing tanks poses a problem of space requirements and management of the process of transporting parts between the different treatment and rinsing baths, thus limiting the economic efficiency of these solutions.
[0015] Currently, a small workshop equipped with a rinsing line by passing through successive baths consumes on average 300 m3 of water per year.
[0016] The technical problem of the present invention is to obtain effective rinsing of the parts treated by electroplating while limiting the consumption of rinsing liquid required, and in particular water, as well as the size of the rinsing installation. Statement of the invention
[0017] In order to address this technical problem, the invention proposes to implement at at least one rinsing enclosure, in which the parts treated by electroplating can be rinsed, at least in part, by one or more misting phases, i.e. concomitant spraying of rinsing liquid and air, then draining, followed by several spraying phases of rinsing liquid.
[0018] Against all expectations, it has been found that the succession of misting and draining phases, by a mixture of air and rinsing liquid, for example water, then spraying makes it possible to obtain effective rinsing with lower water consumption for parts treated by electroplating. Indeed, it has been found that the projection of water and air makes it possible to create a mist which acts very quickly on the surfaces treated by electroplating to cause at least partial rinsing of the treatment products present on the surfaces of the treated parts, and consequently, to recover the runoff resulting from this misting, then particularly concentrated in treatment products.
[0019] Furthermore, alternating the draining phases with the misting phases makes it possible to improve the rinsing efficiency due to the mist thus generated.
[0020] Thus, according to a first aspect, the invention relates to an installation for rinsing parts treated by electroplating, comprising a treatment tank and a robot associated with at least one tool for gripping or receiving the parts so as to allow the immersion of the parts in the treatment tank.
[0021] The invention is characterized in that the installation further comprises: - at least one rinsing chamber provided with rinsing liquid and air misting nozzles, and rinsing liquid spray nozzles operating in a closed loop, the robot being configured to move the parts in the rinsing chamber so as to subject the parts to the action of said misting nozzles on the one hand, and of the spray nozzles on the other hand, and - a receptacle for collecting the liquid resulting from the misting of the rooms; - a plurality of receptacles for recovering the liquid resulting from the spraying, said receptacles being mounted in a closed loop with said spray nozzles.
[0022] The invention thus makes it possible to considerably limit the consumption of water used for rinsing parts treated by electroplating. Typically, for a workshop which uses on average 300 m3 of water per year with the solutions of the state of the art, the invention makes it possible to reduce the consumption of water between 50 and 75 m3 of water per year, with in addition a significantly reduced footprint, requiring half as many tanks.
[0023] Preferably, the installation further comprises at least one solenoid valve capable of successively connecting the various receptacles for recovering the liquid resulting from the spraying with the spray nozzles of the rinsing enclosure.
[0024] This embodiment makes it possible to reuse said liquids depending on their degree of pollution in treatment products and depending on the progress of the rinsing stage, the spraying phase of the final rinsing stage being carried out with the liquid with the least concentration of treatment product(s).
[0025] Furthermore, since the concentration of treatment product(s) in the liquid recovery receptacle resulting from the misting may be relatively high, its contents are likely to allow the repotting of the preceding treatment tank.
[0026] Alternatively, the liquid resulting from the misting is directed to a storage tank, for evacuation and treatment using conventional pollution control methods. In any event, this liquid does not participate in the sprinkling operations.
[0027] In order to obtain reduced space requirements and allow the grey water to be evacuated by gravity from the rinsing enclosure, the latter is preferably arranged above the receptacles collecting the rinsing liquids. Alternatively, a pump is installed to lift this grey water into a storage tank.
[0028] The rinsing enclosure can adopt different shapes suitable for the recovery of grey water, i.e. rinsing liquids after the spraying phases.
[0029] The receptacles for collecting the liquid resulting from the spraying phases are advantageously equipped with sensors, for example resistivity (or electrical conductivity) sensors, capable of measuring the concentration of pollutants in the liquid thus collected. The quality of the rinsing liquid sent to the spray nozzles can thus be controlled, and thus cause a deconcentration of said liquid so as to optimize the dilution without unnecessarily discharging water that has not reached a threshold value in terms of pollution.
[0030] Furthermore, to protect the robot and the personnel, the rinsing enclosure may include removable closing means, so that said enclosure is closed during the spraying and misting phases.
[0031] Preferably, the installation further comprises an automaton allowing an operator to configure the opening rate and / or the opening duration of the solenoid valves, in particular as a function of the geometry of the parts treated in the treatment tanks or baths, so as to adjust the flow rate of the liquid, in particular at the level of the spray nozzles, the pressure, as well as the duration of spraying and draining of the parts in the rinsing enclosure.
[0032] Advantageously, during these different misting and spraying phases, the parts handling robot is capable of abandoning said parts in the rinsing enclosure, then provided with means for receiving said parts, so as to allow said robot to carry out other tasks. Indeed, a production range consists of several treatments (degreasing, stripping, deposition, etc.) associated with their rinsing function. The robot can therefore take care of the other loads present on the chain, in doing so, the rinsing operation is carried out in hidden time during the entire electroplating treatment.
[0033] The automaton is notably programmed to implement a rinsing process.
[0034] Thus, according to a second aspect, the invention relates to a method for rinsing parts, in particular parts treated by electroplating, the process comprising the following steps: - movement of the parts, after immersion in a treatment tank or bath, into a rinsing enclosure equipped with misting nozzles and spray nozzles; - carrying out a first rinsing phase by misting comprising at least one misting step followed by a draining step; - collection of the liquid resulting from the misting in a recovery receptacle; - carrying out a second rinsing phase comprising a succession of steps of spraying the parts with liquid of less and less concentration in treatment product(s), implementing at least the following sub-steps: . feeding the spray nozzles by a first receptacle for collecting the liquid resulting from the spraying, with the highest concentration of treatment product(s); . supplying the spray nozzles by a second receptacle for collecting the liquid resulting from the spraying, the concentration of treatment product(s) in said second receptacle being lower than that of the first receptacle; . supply of the spray nozzles by a third receptacle for collecting the liquid resulting from the spraying, the concentration of treatment product(s) in said third receptacle being lower than that of the second receptacle, said third receptacle also being capable of receiving, at specific times, rinsing liquid free of any treatment product(s); and . draining of the parts in the rinsing chamber between each of the sub-steps of the second rinsing phase. Brief description of the figures
[0035] The manner in which the invention can be implemented and the advantages which result therefrom will emerge more clearly from the following example of embodiment, given for informational and non-limiting purposes, with the support of the appended figures.
[0036] [Fig.l] is a general schematic representation of the installation for rinsing parts treated by electroplating in accordance with the invention.
[0037] [Fig.2] is a schematic representation of an installation for rinsing parts treated by electroplating in accordance with the invention, illustrating a first stage of misting.
[0038] [Fig.3] is a view similar to [Fig.l], illustrating a second stage of misting.
[0039] [Fig.4][Fig.5][Fig.6] are views similar to Figures 2 and 3, illustrating the spraying steps.
[0040] [Fig. 7] is a view similar to Figures 4 to 6, illustrating a variant of the invention.
[0041] [Fig.8] is a schematic perspective representation of the installation of the invention in the misting phase.
[0042] [Fig.9] is a view similar to [Fig.8] in the spraying phase. Detailed description of the invention
[0043] [Fig.l] illustrates an installation for rinsing parts treated by electroplating. More precisely, it illustrates the installation of the invention according to a first misting step.
[0044] Indeed, according to the invention, once the parts 16 have been treated by electroplating in a bath or tank 3 incorporating the appropriate active product(s), they must be rinsed before undergoing a new treatment step in a subsequent bath. This treatment tank 3 may be heated or maintained at ambient temperature; it makes it possible to carry out all or part of the treatments necessary to obtain electroplating. Indeed, electroplating is conventionally obtained by several treatment tanks 3 incorporating distinct treatment products between which the parts 16 must be rinsed.
[0045] To do this, at least one robot 9 gripping or receiving the parts to be treated 16 is mounted movably above said at least one treatment tank 3. For example, the robot 9 can move on rails in order to carry out steps of gripping the parts 16 as well as steps of immersing said parts in several treatment tanks 3.
[0046] To obtain immersion in the treatment tank 3, the robot 9 may comprise vertical translation means 13 in order to allow a tool 12 for gripping the parts 16 to keep the latter immersed in the treatment tank 3. For example, the robot 9 may comprise an arm 8 moved vertically by a jack 13 or a mechanical system comprising a geared motor and a guide carriage. Preferably, the mechanical means of the robot 9 are placed sufficiently far from the treatment tank 3 so as to avoid being subjected to corrosive vapors likely to emanate from the treatment tank 3.
[0047] At the end of the electroplating treatment step in the treatment tank 3, the robot 9 is also configured to move the parts 16 into a rinsing enclosure 4. This enclosure 4 can take the form of a cylindrical or rectangular tank, at the bottom of which a liquid outlet 14 is provided. Inside this enclosure 4 or in the side walls thereof, misting nozzles 6 and spraying 20 are placed so as to respectively project a mixture of rinsing liquid and air, or only rinsing liquid onto the parts 16 when these are placed within said enclosure. It is thus possible to obtain rinsing of the parts 16 by successive phases of misting (mixture of water and air) then draining, and finally spraying in the rinsing enclosure 4.
[0048] The enclosure 4 may include means for closing its upper end to limit the splashing of rinsing liquid during the spraying phases.
[0049] Depending on the rinsing step considered, the rinsing liquid consists of clean water, i.e. free from pollution coming from the treatment baths or tanks 3 and from impurities in the case of misting, or water more or less loaded with pollutants, i.e. in concentration of products from the treatment tank 3 preceding the rinsing enclosure.
[0050] Thus, and according to a first rinsing step, called misting (see figures 2 and 3),
[0051] The parts 16 are subjected to the action of a mist generated by the nozzles 6 which emit a mixture of clean water and compressed air. Typically, the duration of the emission of this mist is between 5 and 15 seconds, the pressure of the water and the air being able to be of the order of 2 to 3 bars (2.105 to 3.105 Pa). After this mist phase, the parts 16 undergo a simple draining ([Fig. 3]), typically lasting around 40 seconds. The operation is repeated between 3 and 4 times, this notion however not being limiting.
[0052] The liquid resulting from this misting phase passes through the discharge orifice 14 of the rinsing tank 4 to a dedicated collection receptacle 11 (see arrow A). The liquid thus collected is particularly concentrated in pollutants, that is to say in treatment products initially contained in the treatment bath 3. However, the quantity of liquid thus collected within the receptacle 11 is relatively reduced due to the very notion of misting on the one hand, and the effective duration of these misting phases. In fact, the quantity of clean water used is itself reduced. On the other hand, said liquid is relatively concentrated in pollutants from the treatment bath 3.
[0053] It is understood that the recovery receptacle 11 is intended to recover the most polluted gray water, that is to say the gray water collected at the start of the rinsing process. Since this water is heavily loaded with pollutants, it can be used to replenish the treatment tank 3 (repotting). In [Fig.l], a lifting pump 19 is thus used to replenish the treatment tank 3 at the start of the rinsing process.
[0054] For this purpose, the receptacle 11 is equipped with a level controller 17, allowing, when the volume of gray water collected is sufficient, to supply, if necessary, the treatment tank 3.
[0055] The information resulting from this level controller 17 is preferably transmitted to an automaton 15 making it possible to manage the start-up phases of the lifting pump 19 taking into account the level of the treatment tank 3.
[0056] Once this first rinsing step has been carried out, intended to roughly eliminate the pollutants present on the parts 16, the latter remaining within the rinsing enclosure 4, are then subjected to a second rinsing step, intended to more thoroughly eliminate the various pollutants still present on their surface. This is the so-called continuous spraying step.
[0057] For this purpose, and according to a first phase ([Fig.4]), the spray nozzles 20 spray the parts 16. The nozzles 20 are supplied with gray water, relatively saturated with pollutants, by means of a solenoid valve 7b and a pump 7a drawing from a collection receptacle 5a. The return of this spray liquid is carried out by gravity in the receptacle 5a according to the arrow B.
[0058] According to a second phase ([Fig.5]), the spray nozzles 20 still spray the parts 16, but they are supplied with water less saturated with pollutants by means of a solenoid valve 7c and the pump 7a. The return of this spray liquid is carried out by gravity in the receptacle 5b according to the arrow C, while the plate 10 is oriented on the receptacle 5b. The gravity return of the effluents collected in the rinsing enclosure 4 must be directed into one of the recovery receptacles 11, 5a, 5b, 5c. Thus, rather than installing as many solenoid valves as there are recovery receptacles, the rotating plate 10 dispatches this gravity return of effluents into the receptacle concerned, said plate being provided with only one off-center tapping or evacuation orifice.
[0059] Finally, according to a third phase ([Fig.6]), the nozzles 20 spray the parts 16 and are supplied with grey water very little saturated with pollutants by means of a solenoid valve 7d and the pump 7a. The return of the spraying liquid is carried out by gravity in the receptacle 5c following the arrow D while the plate 10 is oriented on the receptacle 5c. The latter is regularly filled with clean water by means of a solenoid valve 18.
[0060] It is therefore understood that this second rinsing step operates in closed mode, that is to say without the addition of clean water, with the exception that it is necessary to regularly fill the receptacle 5c with clean water, in order to ensure the filling or refilling of the receptacles 5a and 5b. When the solenoid valve 18 opens to lower the conductivity threshold, and therefore the degree of pollution, the receptacle 5c is filled, which then overflows into the receptacle 5b, which in turn overflows into the receptacle 5a. An overflow system provided in the receptacle 5a allows the surplus grey water to be evacuated either into storage for external treatment, or into treatment plant, or even allows the repotting of the treatment tank 3.
[0061] In the example described, only three receptacles 5a, 5b, 5c have been illustrated. It should however be specified that this number can be greater as required.
[0062] Corollarily, it is also understood that as the rinsing steps progress, the rinsing liquid becomes less and less concentrated in pollutants, thus promoting the effective rinsing of the parts 16.
[0063] Preferably, the rinsing enclosure 4 is arranged above the receptacles 5a-5c and the recovery receptacle 11 so as to use gravity to transfer the gray water collected at the bottom of said enclosure 4 and to convey it to the recovery receptacle 11 or to the receptacles 5a-5c.
[0064] Typically, the respective sprinkling steps have a duration of approximately 2 minutes each, and are followed by a draining of approximately 30 seconds.
[0065] It results from this mode of operation that the two rinsing stages, respectively misting and spraying, have a separate rinsing liquid supply network and its dedicated nozzles.
[0066] All of these phases, whether misting or sprinkling, are in any case aligned with the transfer cycle of the gripping or receiving tools 12, also referred to in the field under consideration as swings.
[0067] Experience shows that the volume of soiled water, i.e. water not likely to be used for rinsing, and therefore typically coming from receptacle 5a, or even from receptacle 11 (in the event that tank 3 allows topping up) is at least four times less than for conventional installations known to date.
[0068] [Fig. 7] shows a variant of the invention, in which the rinsing enclosure 4 is filled with rinsing liquid, which may prove necessary in certain cases. In this configuration, the filling liquid consists of the contents of the collection receptacle 5c, or even clean water.
[0069] The automaton 15 is also configured to allow an operator to set the opening rate or the opening duration of the solenoid valves 7b-7d and the operation of the pump 7a for supplying the spray nozzles 20 as a function of the geometry of the parts 16, so as to adjust the flow rate of the rinsing liquid, the pressure as well as the duration of spraying and draining of the parts 16 in the rinsing enclosure 4.
[0070] Figures 8 and 9 show a schematic perspective view of an installation according to the invention, respectively in misting mode and in spraying mode. Typically, the four receptacles for collecting the rinsing liquids are distributed concentrically. Reference 21 represents the evacuation of the dirty water for the purpose of transporting it to a treatment plant.
[0071] We can understand the full interest of the present invention, which makes it possible to significantly reduce tively the necessary volume of water consumed, while maintaining the required rinsing quality and while containing the footprint of an electroplating installation.
Claims
Claims
1. Installation for rinsing parts (16) treated by electroplating, comprising at least one treatment tank (3) and a robot (9) associated with at least one gripping or receiving tool (12) for said parts (16) so as to allow the immersion of the parts in the treatment tank (3) then their transfer within the rinsing installation, comprising: - at least one rinsing enclosure (4) provided with nozzles (6) for misting rinsing liquid and air, and nozzles (20) for spraying rinsing liquid operating in a closed loop, the robot (9) being configured to move the parts in the rinsing enclosure (4) so as to subject the parts to the non-concomitant action of said misting nozzles (6) on the one hand, and of the spraying nozzles (20) on the other hand, and - a receptacle (11) for recovering the liquid resulting from the misting of the parts;- a plurality of receptacles (5a - 5c) for recovering the liquid resulting from the spraying, said receptacles being mounted in a closed loop with said spray nozzles (20).;
2. Installation for rinsing parts (16) treated by electroplating according to claim 1, further comprising at least one solenoid valve (7b - 7d) and a pump (7a) capable of successively connecting the different receptacles (5a - 5c) for recovering the liquid resulting from the spraying with the spraying nozzles (20) of the rinsing enclosure.
3. Installation for rinsing parts (16) treated by electroplating according to one of claims 1 and 2, in which the rinsing enclosure (4) comprises removable closing means, so that said enclosure is closed during the spraying and misting phases.
4. Installation for rinsing parts (16) treated by electroplating according to one of claims 2 and 3, further comprising an automaton (15) capable of managing and parameterizing the opening rate and / or the opening duration of the solenoid valves (7b - 7d) and the operation of the pump (7a), in particular as a function of the geometry of the parts treated in the treatment tank or bath (3), so as to adjust the flow rate of the liquid at the spray nozzles (20), the pressure as well as the duration of spraying and draining of the parts in the rinsing enclosure.
5. Method for rinsing parts (16), in particular parts (16) treated by electroplating, the method comprising the following steps: - moving the parts (16), after immersion in a tank or bath treatment (3), in a rinsing enclosure (4) equipped with misting nozzles (6) and spraying nozzles (20); - carrying out a first rinsing phase by misting comprising at least one misting step followed by a draining step; - collection of the liquid resulting from the misting in a recovery receptacle (11); - carrying out a second rinsing phase comprising a succession of steps of spraying the parts (16) with liquid of less and less concentration in treatment product(s), implementing at least the following sub-steps: . feeding the spray nozzles (20) by a first receptacle (5a) for collecting the liquid resulting from the spraying, of the highest concentration of treatment product(s); . supplying the spray nozzles (20) by a second receptacle (5b) for collecting the liquid resulting from the spraying, the concentration of treatment product(s) in said second receptacle (5b) being lower than that of the first receptacle (5a); . supplying the spray nozzles (20) by a third receptacle (5c) for collecting the liquid resulting from the spraying, the concentration of treatment product(s) in said third receptacle (5c) being lower than that in the second receptacle (5b), said third receptacle (5c) also being capable of receiving, at specific times, rinsing liquid free of any treatment product(s); and . draining of the parts in the rinsing chamber between each of the sub-steps of the second rinsing phase.
6. A method of rinsing parts (16) according to claim 5, wherein, during the first rinsing phase (misting), the liquid recovered by the recovery receptacle (11) is used to repot the treatment tank (3).