Extreme temperature hydrogen tank cycling installation
The low temperature cycling installation addresses issues of pressure losses and energy consumption by using separate fluid circuits and precise temperature control, improving the efficiency and reliability of hydrogen tank cycling tests.
Patent Information
- Application Number
- FR2023003303
- Authority / Receiving Office
- FR · FR
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-03
- Publication Date
- 2024-10-04
- Estimated Expiration
- 2043-04-03
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
Title of the invention: Installation for cycling a hydrogen tank at extreme temperatures Technical field
[0001] The content of the application relates to installations and devices for cycling a hydrogen tank. Prior art
[0002] A hydraulic cycling bench for a gaseous hydrogen storage tank is intended, as its name indicates, to carry out pressure cycling of a hydrogen tank in order to check its mechanical strength capabilities. This type of installation must allow a cycling test of a tank under temperature conditions varying from -40°C to +85°C.
[0003] Currently, several installations exist and generally comprise a fluid circuit comprising at least one multiplier making it possible to increase the fluid pressure in the circuit to the reservoirs. These installations generally operate with a first oil fluid coming from a hydraulic power station and supplying the multiplier at low pressure and a second working fluid generally consisting of glycolated water circulating in the high pressure part of the circuit. The choice of glycolated water results from the possibility of carrying out cycling tests at all temperatures and more specifically at negative temperatures.
[0004] This type of installation presents several difficulties. Firstly, glycol water leads to significant pressure losses in the circuit, resulting in greater difficulty in controlling the pressure variations necessary for cycling. Thus, when it is desired to test a tank at ambient temperature or at low temperature, the high-pressure glycol water circuit is used indifferently.
[0005] Furthermore, cycling a tank with glycolated water leads to significant heating of the fluid, which requires the addition of additional heat exchangers to lower the temperature so that cycling cases at ambient temperature are carried out with a good set temperature.
[0006] It is also noted that handling a multiplier of the prior art is delicate since assembly / disassembly is delicate. Indeed, in use, a multiplier is arranged in a vertical position for an obvious saving of space and to ensure uniform wear of the sealing parts in operation. However, maintenance must be carried out in a horizontal position which proves complicated since it is necessary to have an installation allowing the multi to be tilted between the horizontal and vertical position, this type of installation being generally bulky. In addition, the sealing between the low pressure and high pressure parts must be checked and undergo maintenance operations which are also complicated.
[0007] Cold cycling proves to be very energy-consuming; the same cycling installation is used for both ambient temperature cycling and low temperature cycling, so that it is necessary to cool the entire glycol water circuit which extends from the multiplier(s) to the tank tested in cycling.
[0008] It is also noted that the filling of the hydrogen tanks and multipliers is done manually and the fluid connection circuit to the tank is done manually, which is tedious and also does not allow one to ensure that the circuit is free of air bubbles that could interfere with the cycling test of the tank. The presence of air in the circuit can disrupt the tests and the proper functioning of the installation. In addition, air pockets disrupt the control instruments. Summary
[0009] This document thus relates to a low-temperature cycling test installation for a hydrogen tank comprising: - A primary circuit for circulating a primary fluid having a melting point close to 0°C, - A secondary circuit for circulating a secondary fluid with a melting point of at most -40°C, - At least one fluid separator allowing the pressure of the primary fluid to be transmitted to the secondary fluid, - An enclosure fully housing the secondary circuit as well as the separator, - Means of cooling and controlling the temperature in the enclosure and the secondary fluid.
[0010] According to another characteristic, the installation can comprise at least two separators.
[0011] According to another characteristic, the installation may be such that a part of the primary circuit is housed in the enclosure and comprises means for thermal insulation of the primary circuit, these means of thermal insulation comprising for example heating means.
[0012] According to yet another characteristic, the cooling and temperature control means may comprise a heat exchanger surrounding a portion of the secondary circuit intended to be connected to a tank to be tested.
[0013] The heat exchanger may comprise a coil arranged around said portion of the secondary circuit.
[0014] The heat exchanger can be connected to a cryostat.
[0015] In a preferred assembly, the low-temperature test installation is integrated into a system comprising a low-pressure tertiary circuit for circulating a tertiary fluid and in which a hydraulic pressure generation unit is arranged, the primary fluid having a viscosity less than the viscosity of the tertiary fluid, at least one multiplier being arranged at the junction of the primary fluid and the tertiary fluid. Brief description of the drawings
[0016] Other characteristics, details and advantages will appear on reading the detailed description below, and on analyzing the attached drawings, in which:
[0017] [Fig. 1] illustrates a room temperature and cold cycling installation according to this document;
[0018] [Fig.2] schematically illustrates the installation of [Fig.l];
[0019] [Fig.3] illustrates the pressurization unit of the cycling installation of [Fig.l], this unit comprising at least one multiplier, and in the example shown it comprises two;
[0020] [Fig.4] illustrates the pressurization unit connected to the first circuit, to the second circuit as well as a feeding circuit supplied with a second fluid;
[0021] [Fig.5] illustrates an extreme temperature cycling unit of the installation of [Fig.l];
[0022] [Fig.6] illustrates a multiplier according to the present document;
[0023] [Fig.7] illustrates a sectional view of a shutter according to one end of the second cylindrical body part of the multiplier of [Fig.6];
[0024] [Fig.8] illustrates a perspective view of the shutter;
[0025] [Fig.9] comprises three parts A, B and C respectively named figure 9A, 9B and 9C in the detailed description below which illustrate the successive steps of dismantling the shutter shown in figures 7 and 8;
[0026] [Fig. 10] comprises three parts A, B and C respectively named figure 10A, figure 10B and figure 10C in the detailed description below, figure 10A illustrating a multiplier according to the present document and in a vertical position, a sealing cartridge being visible at an upper end of the multiplier and in a disassembly position for maintenance, figures 10B and 10C being larger scale views of the area delimited by dotted lines in figure 10A and according to two different orientations around a longitudinal axis of the multiplier;
[0027] [Fig. 11] illustrates a schematic perspective view of the disassembly of the sealing cartridge of [Fig. 10];
[0028] [Fig. 12] comprises three parts A, B and C respectively named figure 12A, 12B and 12C in the detailed description below which illustrate the successive stages of dismantling the constituent parts of the cartridge. Detailed description
[0029] In the detailed description, the primary circuit comprising the primary fluid is understood to be the second circuit comprising the second fluid, the secondary circuit comprising the secondary fluid is understood to be the third circuit comprising the third fluid and the tertiary circuit comprising the tertiary fluid is understood to be the first circuit comprising the first fluid.
[0030] Reference is first made to [Fig. 1] which represents a test installation 8 for cycling a hydrogen tank comprising: - a first low-pressure circuit 10 for circulating a first fluid having a first viscosity, preferably, the first circuit comprises a fluid for protecting the components from corrosion. It also facilitates the sealing of the equipment, thanks to its suitable viscosity, and promotes good hydraulic efficiency. Preferably, the first fluid will be an oil of a particular type as described below, - a second high-pressure circuit 12 for circulating a second fluid having a second viscosity lower than the viscosity of the first fluid, the second circuit 12 and the first circuit 10 can be arranged in the same enclosure at ambient temperature, - a third high-pressure circuit 14 for circulating a third fluid having a melting point lower than that of the first fluid and preferably at most -40°C, - at least one multiplier Ml, M2 arranged at the junction of the first circuit and the second circuit.
[0031] The principle of cooperation connection of the three fluid circuits is illustrated in [Fig.2]. The combination of three fluid circuits which are liquid here, makes it possible to properly manage the thermal performance of the installation. In particular, the addition of a second circuit 12 whose fluid has a viscosity lower than that of the first fluid and which is separate from the first fluid and the third fluid makes it possible to reduce the pressure losses. In particular, in an exemplary embodiment, the first fluid may be an oil having for example a grade of at least 46, the second fluid may be water and the third fluid may be glycolated water, for example monopropylene glycol. This third fluid makes it possible to withstand very cold temperatures necessary during very low temperature cycling tests.The second fluid inserted in the circuit between the first circuit and the third circuit, in that it is the second fluid which ensures the transmission of the initial pressure provided by the first. circuit, allows the length of the glycol water circuit to be reduced and therefore the pressure losses.
[0032] More specifically, the installation comprises a plurality of units: - A U1 hydraulic power unit comprising a CH hydraulic unit installed in the first circuit and more particularly housed in a machine room; - A pressurization multiplication unit U2 (figures 1 and 3) comprising at least one multiplier and in this case at least two multipliers M1, M2 and more particularly exactly two as illustrated in the figures, each multiplier M1, M2 comprising a cylindrical body formed of a first low pressure cylindrical body part 100 and a second high pressure cylindrical body part 102, the first cylindrical body part 100 housing a piston 108 separating a first chamber 104 formed in a lower part of the first cylindrical body part 100 and a second chamber 106 formed in an upper part of the first cylindrical body part 100 ([Fig.6]). The other characteristics of the multiplier M1, M2 are described later. - A U3 unit for managing the second fluid, - A U4 unit for managing the third fluid, - A U5 unit comprising a temperature chamber that can be controlled over a temperature range from at least -40°C to +85°C and fully housing the third circuit, this chamber allowing tests at extreme temperatures but also tests at ambient temperature, - A U6 air generation and treatment unit for controlling the controlled valves of units U3 and U4 mainly, - A U7 unit intended for example to carry out cycling tests at room temperature which can be carried out using the second circuit, the third circuit not being necessary.
[0033] The hydraulic power unit provides the energy needed to fill the hydrogen tanks up to a maximum pressure of 350 bars and allows cycling from 0 to 350 bars. The CH hydraulic power unit comprises at least one motor-pump group, preferably at least two, connected to distributor heads allowing the recirculation of the first fluid in a tank of at least 1000 liters, preferably at least 1200 liters and which is equipped with valves, pressure filters, return pressure filters.
[0034] The first circuit comprises a first conduit equipped with a first piloted valve VI which connects the hydraulic supply unit, more particularly a first motor-pump group, to the lower part of the first multiplier ML. The first conduit may include a pressure sensor PI. The first circuit includes a second conduit equipped with a second pilot-operated valve V2 which connects the lower part of the second multiplier M2 to the hydraulic supply unit, more particularly a second motor-pump unit. The second conduit C2 may include a pressure sensor P2. The first conduit and the second conduit are connected to each other by a third conduit equipped with a third pilot-operated valve V3. If the third valve V3 is open, the two multipliers M1 and M2 operate simultaneously. The first valve VI and the second valve V2 cannot be in the open state (authorization of fluid passage) at the same time unless the third valve V3 is open.
[0035] A master sensor can be arranged near the tank and is used to control the hydraulic unit and regulate the pressure in the hydrogen tank according to the cycles defined by the operator with the man / machine interface.
[0036] As can be seen in [Fig.l], the hydraulic unit may comprise a fourth conduit C4 comprising a fourth valve V4 and a fifth conduit comprising a fifth valve V5. The fourth conduit connects the second chamber of the first multiplier to the hydraulic unit and the fifth conduit connects the second chamber of the second multiplier to the hydraulic unit CH. The fourth conduit C4 may comprise a pressure sensor P4 and the fifth conduit C5 may comprise a pressure sensor P5.
[0037] The hydraulic power unit operates in a closed circuit by means of the first, second, third, fourth and fifth conduits described above with a common return circuit and a separation for the low pressure return of each multiplier M1, M2 using the fourth V4 and fifth valves V5. A cold fluid circuit 15 may be provided to cool the hydraulic unit CH in operation. This cold fluid circuit may have a temperature lower than 10°C, preferably of the order of 7°C. The fluid of this cold fluid circuit may be water. Heat exchange means may be arranged so as to cool the first fluid leaving the hydraulic unit and destined for the first chambers 104 of the multipliers M1, M2. These heat exchange means may comprise at least a portion of the cold fluid circuit and may be arranged between the first valve VI and the second valve V2.In this way, the first fluid reaches a controlled temperature in the first chambers 104.
[0038] The pressure multiplication unit makes it possible to transform the pressure in the first fluid supplied by the hydraulic unit CH into a higher pressure in the second circuit in the second fluid.
[0039] Each multiplier comprises two distinct parts which are sealed relative to each other, namely a first cylindrical body part receiving the first fluid and a second cylindrical body part receiving the second fluid.
[0040] The volume of the low pressure part may be at least 80 liters, for example 95 liters. The inner diameter of the first cylindrical body part may be approximately 275 mm. The volume of the second cylindrical body part may be at least 20 liters, for example 23 liters. The inner diameter of the second cylindrical body part may be 150 mm. Each multiplier may have a height of several meters, for example 4 meters. Using the full stroke of a multiplier makes it possible to generate a second fluid pressure of at least 900 bar and for example up to 1050 bar when the full volume of the second cylindrical body is used. The ratio of the sections of the first cylindrical body part allowing cycles from 0 to 350 bar to be carried out and the second cylindrical body part allowing cycles from 0 to 1050 bar to be carried out is 3.The multipliers M1, M2 are positioned vertically to minimize wear on the seals. The precise structure of the multiplier will be described later with reference to Figures 6 to 12. These multipliers M1, M2 are preferably identical and can operate simultaneously. The main advantage of coupling the hydraulic power unit with at least two multipliers is that it is possible, thanks to the reduced dimensions of each multiplier and the damping on the multiplier side, to: . - to program precise pressure variation cycles (the curves of minimum pressure peaks and maximum pressure peaks are regular and reproducible), - to vary the speed of pressure rise and fall, i.e. the flow rate and to have constant pressure rise or pressure fall speeds during the cycles, and - to use multipliers M1, M2 having a useful volume in the second part of the cylindrical body 102 which can be two times smaller than the variation in volume of the tested tank. Thus, the size is minimized and the precision is maintained.
[0041] Each multiplier can be associated with a retention or recovery tank B1, B2 intended to recover any leaks of the first fluid and / or the second fluid. Each retention tank B1, B2 can be associated with a level sensor N1, N2, for example an optical sensor, making it possible to detect the presence of liquid in the tank and consequently the existence of at least one leak. Each sensor can be connected to the human / machine interface and / or lead to an automatic shutdown of the cycling installation.
[0042] A fluidic tapping 105 is produced in the second chamber 106 of the first cylindrical body part 100 and makes it possible to measure the position of the rod of the multiplier M1, M2 by measuring the level of the first fluid in the tapping pipe.
[0043] The installation includes a feeding circuit allowing filling in such a way as to automatically the second part of the cylindrical body of each multiplier and to ensure that the second circuit is perfectly fluidly connected to the second part of the cylindrical body, without any air bubbles in the second circuit.
[0044] As indicated previously, the cycling installation comprises a unit U3 for managing the second fluid and which is configured to allow the management of a high-pressure fluid. This unit U3 comprises a reservoir R3 of second fluid, which may be water. This unit U3 may be supplied with cold water by a general supply of the building housing the installation. This unit U3 is fluidically connected to the multipliers M1, M2. More particularly, the reservoir R3 of second fluid is connected by a pipe C6 to a connecting pipe C7 which connects the multipliers M1, M2 to the unit U5 with a controllable temperature enclosure.
[0045] The U3 unit provides at least one of the following functions: - Supply of second fluid to the second circuit, - Filling of the high-pressure circuit with second fluid, - Protection against overpressure, - Safety by pressure purge, - Draining of the second circuit with second fluid, - Management of the variation of the volume of the second fluid in the second circuit, this variation in volume being linked to temperature variations and is managed by means of a 5L accumulator at 30 bar, - the overpressure of the iced water for the consumption of the heat exchangers
[0046] The cycling installation also comprises a unit U4 for managing the third fluid inside the hydrogen tank to be tested within the enclosure of the unit U5 with a controllable temperature enclosure. This unit U4 comprises a tank R4 of several hundred liters intended to be filled with the third fluid, for example approximately 400 liters.
[0047] The U4 unit allows the following functions: - The supply of third fluid to the hydrogen tank to be tested which is housed in the temperature-controlled enclosure of the U5 unit, - The third fluid feeding of the third circuit and the tank to be tested as well as the EPI, EP2 separators (described later), - Protection against overpressure, - Safety by pressure purge of the third circuit, - Draining of the third circuit, - Management of fluid volume variations by a 25L 30 bar accumulator.
[0048] The U5 unit is described later with reference to [Fig.5].
[0049] The U6 air treatment unit of the building housing the installation. This unit includes a compressed air network at a few bars, around 6 to 7 bars.
[0050] The U7 unit for testing a tank 11 at ambient temperature is housed in a dedicated enclosure and comprises a tank bypass device comprising three valves V15, V16 and V17.
[0051] As illustrated in [Fig.4], the second circuit comprises the conduit C7 for connecting the multipliers to the third circuit and more precisely to pressure exchangers E1, E2. The conduit C7 is divided into two conduits C7-1 and C7-2 for fluid connection with the interior of the second cylindrical body part of the multipliers M1, M2. The conduit C7 comprises two heat exchangers EC1, EC2. The exchangers EC1, EC2 can be supplied with cooling fluid from the cold fluid circuit 15 described previously. The second circuit has two valves V6 and V7, the valve V7 being arranged between the two heat exchangers EC1, EC2 arranged in the conduit C7. The valve V6 is arranged so that this first connection point RI of the conduits C7-1 and C7-2 to the conduit C7 is placed between the valves V6 and V7. Heat exchanger El can be arranged between this connection point and a portion of conduit C7-3 connecting conduits C7-1, C7-2 to conduit C7.A conduit C8 includes valve V6 and connects a lower end of tank XX to the first connection point RL. Conduit C7-1 includes an eighth valve V8 and conduit C7-2 includes a ninth valve V9.
[0052] The circuit for feeding or filling the multipliers with a second fluid comprises a ninth conduit C9 connecting the upper end of the reservoir to the multipliers M1, M2, more precisely to the high-pressure chambers 103, this conduit extending to the second-fluid reservoir of the unit U3. A tenth conduit C10 comprises a fourteenth valve V14 connecting the reservoir to the conduit C7 and to a second connection point R2 arranged between the first connection point RI and the valve V7. Each multiplier M1, M2 is connected to the ninth conduit C9 via a conduit C9-1, C9-2 allowing the fluid connection with the interior of the second cylindrical body part of the multipliers M1, M2. The conduit C9-1 comprises a tenth valve V10 and the conduit C9-2 comprises an eleventh valve VI1.The ninth conduit C9 comprises a twelfth valve V12 arranged between the reservoir and conduits C9-1 and C9-2 and comprises a thirteenth valve V13 arranged between conduits C9-1 and C9-2 and the second fluid reservoir. The tenth conduit comprises a fourteenth valve CIO.
[0053] The tenth valve V10, the eleventh valve V11 and the twelfth valve V12 are three-way valves comprising an air vent and are arranged substantially at the same high point of the second circuit. The other valves are two-way valves.
[0054] To fill the high pressure parts of the multipliers M1 and M2, the procedure is as follows: - The first VI and second V2 valves are opened and the first chamber 104 of each multiplier M1, M2 is pressurized; - In a second step, the fourth valve V4 and the fifth valve V5 are open when the piston is in the high position so as to allow a flow of the first fluid into an oil reservoir RH of the unit U1 via the fourth conduit C4 and the fifth conduit C5. - the seventh valve V7, the eighth valve V8, the ninth valve V9, the thirteenth valve V13 being in the closed position and the tenth valve V10, the eleventh valve VI1, the fourteenth valve V14 and the fifteenth valve V15 or bypass valve being in the open position, the second fluid stored in the tank of the unit U3 is pumped into the tenth conduit CIO, so as to circulate the second fluid through the tenth conduit CIO, the eighth conduit C8, the tank of the unit U7, the ninth conduit C9, the conduits C9-1, C9-2. When the second fluid flows through the vents of the valves VIO, VI1, and V12, the procedure for filling or feeding the second cylindrical body part is completed.
[0055] This feeding procedure makes it possible to fill the high pressure parts of the multipliers M1, M2 while being certain of not having air in the multipliers.
[0056] It is observed that closing valves V8 and V9 makes it possible to isolate conduits C7-1 and C7-2 during feeding or maintenance operations, which explains why it is not necessary to refill them after a phase operation.
[0057] We now refer to [Fig.5] which represents the U5 cycling unit at tem extreme temperatures. As can be seen in [Fig.5], the seventh conduit C7 of the second circuit passes through the enclosure 50 and extends inside it. The conduit C7 divides into two conduits C7-3 and C7-4 each in fluid communication with a first chamber 52 of a pressure exchanger EPI, EP2. Each pressure exchanger EPI, EP2 comprises a second chamber 54 opposite the first chamber 50 with respect to a piston 56 and comprising the third fluid. The second chambers 54 are connected to an eleventh conduit C11 intended to be fluidically connected to the inlet of a tank to be tested.
[0058] The cycling installation comprises means 58 for cooling and controlling the temperature in the enclosure 50 and the temperature of the third fluid in order to prevent the third fluid from heating up and leading to invalid cycling tests.
[0059] The enclosure 50 is thus thermally insulated from the outside by insulation means arranged on the internal and / or external faces of the enclosure 50. The unit U5 comprises cooling means 58 and / or heating means 59 which are connected to blowing means 61. In this way, it is possible to carry out tests at extreme temperatures within the U5 unit enclosure, i.e. at low temperature and high temperature.
[0060] More particularly, to avoid heating the portion of the seventh conduit C7 of the second circuit which extends inside the enclosure, it is possible to provide means for thermally insulating this portion of the conduit C7. These means may comprise heating means which may for example comprise heating cables (not shown).
[0061] Furthermore, at each cycle, heating occurs at the inlet neck of the hydrogen tank as a result of the venturi effect created at the neck by the reduction in the passage section followed by an increase. Thus, at each cycle, a temperature rise of the order of a few degrees occurs depending on the cycling parameters and the size of the neck of the tank tested. In practice, heating of approximately 7 degrees has already been observed. To avoid this increase in temperature, a heat exchanger 60 is added to the third circuit and thus lower the temperature of the third fluid. This exchanger 60 can surround a portion of the third circuit intended to be connected to the tank 62 to be tested. In order to have an optimal cold source, it is possible to use a cryostat 64 connected to the heat exchanger 60, the heat exchanger comprising a coil surrounding, for example, a portion of the eleventh conduit C11.
[0062] We now refer to Figures 6 to 12 which concern a multiplier. According to the present document, in operation the multipliers M1, M2 are used in a vertical position which makes it possible to avoid asymmetrical wear of the sealing parts.
[0063] In the description we will describe a multiplier M1, M2. The characteristics described apply to one and / or the other of the multipliers.
[0064] Each multiplier comprises a longitudinal axis L and comprises a first longitudinal body portion 100 intended to receive the first low-pressure fluid and a second longitudinal body portion 102 intended to receive the second high-pressure fluid. Thus, it is observed that the internal section of the first longitudinal body portion 100 is greater than the internal section of the second longitudinal body portion 102. The first cylindrical body portion 100 comprises a first lower chamber 104 and a second upper chamber 106 separated from each other by a piston 108 which is connected to a piston rod 110 extending slidably in the second part of the cylindrical body 102.The second part of the cylindrical body 102 internally comprises a chamber 103 delimited by a removable cartridge 116 and a closure member 118. The ratio between the two sections as well as the displacement stroke of the piston determine the pressure multiplication ratio between the first part of the cylindrical body 100 and the second part of the cylindrical body 102.
[0065] The piston rod 110 comprises a first end 112 connected to the piston 108 and a second end 114 carrying the removable cartridge 116 capable of sliding in a sealed manner in the second cylindrical body part 102, more particularly on the internal surface of the second cylindrical body part 102 delimiting the chamber 103. It is observed that the end of the second cylindrical body part 102 comprises an open end which can be closed by the closing member 118 which is removable so as to allow simple and rapid access to the sealing cartridge and to ensure its maintenance as will appear clearly in the following.
[0066] The closure member illustrated in [Fig.7] in section along a transverse section plane and in perspective in [Fig.8] comprises two longitudinally extending through channels 119, one of which is connected to the conduit C7-1, C7-2 and C9-1, C9-2 (see [Fig.4]) for, respectively, the transmission 119 of the pressure in operation and the feeding of the multiplier M1, M2 as mentioned previously.
[0067] The closure member may comprise, as shown in Figures 7 and 8, an annular rim 120 engaged in support in a first direction L1 of the longitudinal axis on a corresponding annular shoulder 122 of the second part of the cylindrical body 102.
[0068] The closure member may comprise a first cylindrical part 124 and a second cylindrical part 126 separated from each other by the annular rim 120 of the closure member 118.
[0069] The first cylindrical part 124 may comprise an external thread 124a allowing it to be screwed onto a corresponding thread on the internal surface of the second cylindrical body part 102. In order to provide sealing between the shoulder 122 and the annular rim 120 of the closure member, a first annular seal 126, preferably an O-ring, for example made of Teflon, may be arranged between the thread 124a and the annular rim 120 of the closure member 118.
[0070] A second annular seal 128 can be clamped between the annular rim 120 of the closure member 118 and an internal cylindrical surface of the second part of the cylindrical body 102, this second annular seal 128 being for example made of thermoplastic.
[0071] When the closure member 118 is screwed in a tightened position onto the shoulder 122 of the second cylindrical body part 102, the latter can be locked in position, i.e. in translation, in a second direction L2 of the longitudinal direction L, by an annular yoke 130 screwed onto a thread of an internal surface of the second part of the cylindrical body 102. The yoke is illustrated in FIG. 9A. FIG. 9B illustrates the disassembly of the yoke using means for fixing a member for tightening / loosening the yoke. These fixing means are here orifices allowing the coupling of the member or tool with the yoke to allow the tightening or loosening. Figure 9C illustrates the closure member in the tightened position, the cylinder head being dismantled and therefore not being shown.
[0072] [Fig. 10] illustrates the cartridge which is in the extended position relative to the second cylindrical body part 102. This position can be obtained by moving the piston to the high position by means of pressure applied in the first chamber of the multiplier M1, M2.
[0073] As illustrated in Figures 10b and 10C, the cartridge may comprise locking means on the free end of the piston rod, these locking means may comprise a pin device. An orifice 129 may be formed at the end 114 of the rod 110 intended to be placed opposite an orifice 131 of the cartridge 116, a pin 133 being mounted in the orifices 129, 131. The cartridge 116 may comprise a first cylindrical part 132 connected by a radial annular shoulder to a second cylindrical part 134 whose end opposite the first cylindrical part 132 comprises an external thread 136 ([Fig. 11]).
[0074] The second cylindrical body part 134 can receive two annular rings 138 between which is interposed an annular seal 140, for example with a double lip. An annular ring 138 is screwed onto the external thread 136 in order to block the assembly of the two rings and the seal on the second cylindrical part 134 of the cartridge 116. Figures 12A, 12B and 12C illustrate the successive disassembly of the annular ring 138 screwed onto the second cylindrical part 134 (figure 12B) then of the annular seal 140 (figure 12C).
Claims
Claims
1. Installation (U5) for testing a hydrogen tank in low-temperature cycling, comprising: - A primary circuit (12) for circulating a primary fluid having a melting point close to 0°C, - A secondary circuit (14) for circulating a secondary fluid having a melting point of at most -40°C, - At least one fluid separator (EPI, EP2) for transmitting the pressure of the primary fluid to the secondary fluid, - An enclosure fully housing the secondary circuit and the separator, - Means for cooling and controlling the temperature in the enclosure and of the secondary fluid.
2. Installation according to claim 1, in which it comprises at least two separators (EPI, EP2).
3. Installation according to one of the preceding claims, in which a part of the primary circuit is housed in the enclosure (50) and comprises means for thermal insulation of the primary circuit, these means for thermal insulation comprising for example heating means.
4. Installation according to one of the preceding claims, in which the cooling and temperature control means comprise a heat exchanger (60) surrounding a portion of the secondary circuit intended to be connected to a tank to be tested.
5. Installation according to claim 4, in which the heat exchanger (60) comprises a coil arranged around said portion of the secondary circuit.
6. Installation according to claim 4 or 5, in which the heat exchanger (60) is connected to a cryostat.
7. Installation according to one of the preceding claims, in which it comprises a low pressure tertiary circuit for circulating a tertiary fluid and in which a hydraulic pressure generation unit is arranged, the primary fluid having a viscosity less than the viscosity of the tertiary fluid, at least one multiplier (M1, M2) being arranged at the junction of the primary fluid and the tertiary fluid.
Citation Information
Patent Citations
Component test equipment capable of repeated test under extreme temperature and repeated test method under extreme temperature
KR1020140074507A
