energy management system

The energy management device addresses excess electricity demand by measuring consumption, limiting non-essential loads, and integrating renewable energy to maintain stable power supply for electric vehicles and other rechargeable equipment.

FR3148331A1Pending Publication Date: 2024-11-01PALAZZO FRANCK
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
FR2023004204
Authority / Receiving Office
FR · FR
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-26
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The rise of electrical equipment such as electric vehicles and bicycles has led to additional electricity consumption not accounted for in building networks, potentially causing network failures due to excess demand.

Method used

An energy management device that integrates with a building's electricity distribution network, measuring power consumption, authorizing one-off demands, limiting non-priority loads, and incorporating a renewable energy source to manage and balance power distribution.

Benefits of technology

Effectively manages electricity demand by limiting non-essential loads and utilizing renewable energy to prevent network overload, ensuring reliable power supply for rechargeable equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

The invention relates to an energy management device (10) comprising: - a first means (20) for drawing electricity; - connection means (80) to which rechargeable equipment can be connected; - a primary means (40) configured to measure the power actually consumed by loads connected to the electricity distribution network; - a secondary means (50) for collecting information relating to a momentary power demand of rechargeable equipment connected to the connection means (80); - switching means configured to allow power drawing at the distribution panel to meet the momentary demand; - a cut-off control element (70) configured to limit the power actually consumed by the loads; - a control means (60). Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

Title of the invention: energy management device FIELD OF THE INVENTION

[0001] The invention relates to the field of energy distribution in a building. In particular, the invention relates to an energy management device intended to ensure the charging of rechargeable equipment, and in particular rechargeable electric and / or hybrid vehicles. TECHNOLOGICAL BACKGROUND OF THE INVENTION

[0002] The recent boom in electrical equipment related to mobility, such as electric motor vehicles and electric bicycles, has been accompanied by additional constraints on the electrical distribution networks of buildings. More specifically, this electrical equipment needs to be regularly recharged. However, this latter aspect represents an additional source of consumption not taken into account when sizing the electricity distribution network of the building in question.

[0003] In other words, the consideration of an additional consumption source can generate excess electricity consumption and consequently cause the building's electricity distribution network to fail.

[0004] The present invention therefore aims to propose an energy management device which makes it possible to respond favorably to the aforementioned problem. BRIEF DESCRIPTION OF THE INVENTION

[0005] The present invention relates to an energy management device intended to be integrated into a building, said device comprising:

[0006] - a first means of drawing electricity at the level of a distribution board electricity supply from a building's electricity distribution network;

[0007] - connection means to which at least one item of equipment can be connected rechargeable;

[0008] - a main means configured to measure a power effectively consumed by loads likely to be connected to the building's electricity distribution network;

[0009] - a secondary means intended to collect information relating to a need for punctual power of rechargeable equipment capable of being connected to the connection means

[0010] - switching means configured to authorize the drawing of power at the distribution board level in order to meet the punctual demand as soon as said punctual demand is available at the distribution board level electricity;

[0011] - a cut-off control member configured to limit the effective power actively consumed by the loads likely to be connected to the building's electricity distribution network when the occasional demand is greater than the power actually available;

[0012] - a control means configured to program at a given time the recharge.

[0013] According to one embodiment, said energy management device also comprises a second means for drawing electricity from an additional energy source.

[0014] According to one embodiment, the additional energy source comprises a renewable energy source.

[0015] According to one embodiment, the main means comprises a current measuring means.

[0016] According to one embodiment, the cut-off control member is configured to limit the power actually consumed by loads defined as non-priority.

[0017] According to one embodiment, the control means comprises a graphical interface from which an operator can operate said energy management device.

[0018] According to one embodiment, said device further comprises an integrated protection device configured to ensure the safety of an operator operating the energy management device. Brief description of the drawings

[0019] Other characteristics and advantages of the invention will emerge from the detailed description which follows with reference to the appended figures in which:

[0020] [Fig-1] [Fig.l] is a schematic representation of a management device energy according to the present invention. DETAILED DESCRIPTION OF THE INVENTION

[0021] The present invention relates to an energy management device intended to be connected directly to the electrical distribution network of a building, and more particularly to the electricity distribution panel of said building.

[0022] In particular, the invention relates to an energy management device intended to be integrated into a building, said device comprising:

[0023] - a first means of drawing electricity at the level of a distribution board electricity supply from a building's electricity distribution network;

[0024] - connection means to which at least one piece of equipment can be connected rechargeable;

[0025] - a main means configured to measure a power effectively consumed by loads likely to be connected to the building's electricity distribution network;

[0026] - a secondary means configured to determine a power, called demand punctual, necessary for recharging at least one rechargeable device capable of being connected to the connection means;

[0027] - switching means configured to authorize the drawing of power at the distribution board level in order to meet the punctual demand as soon as said punctual demand is available at the electricity distribution board level

[0028] - a cut-off control member configured to limit the effective power actively consumed by the loads likely to be connected to the building's electricity distribution network when the occasional demand is greater than the power actually available;

[0029] - a control means configured to program at a given time the recharge.

[0030] Thus, in [Fig. 1], one can see an example of a schematic representation of an energy management device 10 according to the present invention.

[0031] It is understood that the energy management device comprises a housing 11 configured to be installed in a building, namely a house or a building.

[0032] For example, the box 11 can be installed in the garage of a single-family home.

[0033] The energy management device 10 comprises a first means 20 for drawing electricity from an electricity distribution network of the building. In particular, the first means 20 is connected to the distribution board 1 of the building.

[0034] The energy management device 10 also comprises connection means 30, for example electrical outlets, to which at least one rechargeable equipment can be connected. The rechargeable equipment may include an electric car, an electric bicycle, but also other types of rechargeable equipment such as gardening or DIY tools. The electrical outlets may be selective and / or specific to the rechargeable equipment considered.

[0035] Electrical outlets, depending on the source considered, can deliver direct current for some and alternating current for others.

[0036] The energy management device 10 further comprises a main means 40. In particular, the main means 40 is configured to measure a power actually consumed by loads likely to be connected to the network of building electricity distribution. It is understood that the aforementioned loads are standard equipment such as household appliances, electronic equipment, computers, a water heater, a heat exchanger, an air conditioning system. It is also understood that these loads draw the energy necessary for their operation directly from the building's electricity distribution network.

[0037] The main means 40 is more particularly configured to measure the power actually consumed at the level of the building's distribution panel and transmit the measured power to the energy management device 10.

[0038] The main means 40 may in particular comprise an ammeter intended to measure the current actually consumed by the loads.

[0039] The energy management device 10 comprises a secondary means 50. In particular, this secondary means 50 is a means intended to collect information relating to a specific power requirement of rechargeable equipment capable of being connected to the connection means 30. This information is dependent on the rechargeable equipment and possibly on its state of charge.

[0040] The energy management device 10 comprises a control means 60, provided with a graphical interface from which an operator can program the charging of rechargeable equipment according to predetermined parameters. Among the predetermined parameters, the cost of electricity, the charging time, the charging power, etc. may be mentioned.

[0041] Advantageously, the secondary means 50 is integrated into the control means 60. The design and implementation of the control means 60 and / or of the secondary means uses elements known to those skilled in the art and which are therefore not described in detail in the remainder of the statement.

[0042] The energy management device 10 also comprises a cut-off control member 70 configured to limit the power actually consumed by the loads likely to be connected to the electricity distribution network of the building when the punctual demand is greater than the power actually available.

[0043] In particular, the cut-off control member 70 communicates with the distribution board 1 and with the control means 60. The cut-off control member 70 is also connected, by wired connection or by radio connection, to receive the power actually consumed measured by the main means 40.

[0044] Based on the power actually consumed, and if the power requirement is greater than the power actually available, the cut-off control member 70 can control a limitation of the power consumed by the loads connected to the building's electricity distribution network. To this end, the distribution panel 1 can comprise members controlled by the member 70 and intended to be passing or non-passing in order to be able to isolate specific loads on command.

[0045] Advantageously, the cut-off control member 70 can be configured to limit the power actually consumed by loads defined as non-priority, in particular by the user.

[0046] It is understood that non-priority loads may be loads not necessary for the operation or use of the building. This may, for example, be a washing machine, a dishwasher, a television, a computer, etc.

[0047] Furthermore, according to the present invention, it may also be provided that the non-priority load status is only imposed for certain times of the day. For example, it may be agreed to give a washing machine a non-priority load status only from Monday to Friday and from eight o'clock in the morning to eight o'clock in the afternoon.

[0048] As soon as the available power reserve is sufficient to meet the power requirement, the cut-off control member 70 can allow the charging of rechargeable equipment capable of being connected to the connection means 30. This latter operation can then involve a cut-off member 80 (in particular its closing, it is made conductive) of the energy management device 10. In particular, the cut-off member 80, in other words a member having at least one switch function, interposed between the connection means 30 and the first sampling means 20, can be made conductive in order to authorize the passage of a current towards the connection means 30.

[0049] The management device 10 may also comprise a source inverter 90, interposed between the connection means 30 and the cut-off member 80.

[0050] The energy management device 10 may comprise a second means 100 for drawing electricity from an additional energy source 110, for example a renewable energy source. The energy produced by the additional source may be injected into the cut-off device which may be controlled to allow or not allow said energy to pass in order to charge rechargeable equipment connected to the connection means 30.

[0051] Finally, the energy management device 10 may comprise an integrated protection device 120 configured to ensure the safety of an operator operating the energy management device. The integrated protection device may in particular be interposed between the connection means 30 and the cut-off member 80, for example downstream or upstream of the source inverter 90.

[0052] Of course, the invention is not limited to the embodiments described and variant embodiments can be made without departing from the scope of the invention as defined by the claims.

Claims

Claims

1. Energy management device (10) intended to be integrated into a building, said device comprising: - a first means (20) for drawing electricity from an electricity distribution panel of an electricity distribution network of the building; - connection means (80) to which at least one rechargeable equipment item can be connected; - a main means (40) configured to measure a power actually consumed by loads capable of being connected to the electricity distribution network of the building; - a secondary means (50) intended to collect information relating to a punctual power requirement of a rechargeable equipment item capable of being connected to the connection means (80);- switching means configured to authorize the drawing of power at the distribution panel in order to meet the punctual demand as soon as said punctual demand is available at the electricity distribution panel; - a cut-off control member (70) configured to limit the power actually consumed by the loads likely to be connected to the electricity distribution network of the building as soon as the punctual demand is greater than the power actually available; - a control means (60) configured to program the recharging at a given time.;

2. Device according to claim 1, wherein said energy management device (10) also comprises a second means (110) for drawing electricity from an additional energy source (110).

3. A device according to claim 2, wherein the auxiliary energy source (110) comprises a renewable energy source.

4. Device according to one of claims 1 to 3, in which the main means (40) comprises a current measuring means.

5. Device according to one of claims 1 to 4, in which the cut-off control member (70) is configured to limit the power actually consumed by loads defined as non-priority.

6. Device according to one of claims 1 to 5, in which the control means (60) comprises a graphical interface from which an operator can operate said energy management device (10).

7. Device according to one of claims 1 to 6, wherein said device further comprises an integrated protection device (120) configured to ensure the safety of an operator operating on the energy management device (10).

Citation Information

Patent Citations

  • EVSE-based energy automation, management, and protection systems and methods

    US20160137087A1

  • Integrated home energy management and electric vehicle charging

    US20230120740A1