Building for car parks

The building design addresses the challenge of repurposing car parks for housing by using prefabricated X-shaped support assemblies and ground beams for efficient load distribution, allowing rapid and minimally disruptive construction while maintaining car park capacity and ensuring safety and structural integrity.

GB2616994BActive Publication Date: 2024-12-04LARKFLEET GRP X HOUSE LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
GB2023008725
Authority / Receiving Office
GB · GB
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-10-18
Publication Date
2024-12-04
Estimated Expiration
2041-10-18

AI Technical Summary

Technical Problem

Existing car parks are underutilized and pose challenges when repurposed for housing due to the need for quick construction, minimal disruption to adjacent facilities, and maintaining car parking capacity while ensuring structural integrity and safety.

Method used

A building design featuring prefabricated X-shaped support assemblies and ground beams that distribute loads effectively, minimizing surface damage and allowing for rapid installation with prefabricated components, including pile foundations and a platform structure that can be erected on existing car parks with minimal disruption.

Benefits of technology

Enables quick and efficient construction of housing on car parks with minimal disruption to existing car park usage, maintaining car parking capacity, and ensuring structural integrity and safety, including fire-resistant access features.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000001_0000
    Figure 00000001_0000
  • Figure 00000002_0000
    Figure 00000002_0000
  • Figure 00000003_0000
    Figure 00000003_0000
Patent Text Reader

Abstract

A building 1 for a car park 3. The building includes a platform 5; at least one habitable structure 7 comprising a plurality of walls and a roof located on the platform and a platform support assembly 9. The platform support assembly includes a first ground beam 31 arranged to sit on the ground and a first support 37 mounted on the first ground beam, wherein the first support 37 is arranged to at least partly support the platform above the ground surface and to transfer loads from the platform to the first ground beam. The assembly further comprises a second ground beam 33 arranged to sit on the ground and a second support 41 arranged to partly support the platform above a car park and transfer loads from the platform and to the ground beam. A car park including the building and a method for construction the building is also disclosed.
Need to check novelty before this filing date? Find Prior Art

Description

The invention relates to a building that is suitable for installation on a car park, and typically a pre-existing car park; a car park including said building; and a method for constructing the building. 5 There are many pre-existing car parks available. For example, many supermarkets, railway stations, sports stadia, and airports have large car parks. Typically, the land used for parking cars is used for that purpose only, and may only be used during certain hours of the day, for example when a supermarket is open. At other times, the car park may be unused. 10 As the population grows, there is pressure to increase the housing stock available, but at the same time, due to environment concerns, it is not desirable to build on green field sites, but rather to make use of existing sites, where possible. The inventors have determined that it is possible to erect buildings on pre-15 existing car parks, or similar existing useable spaces, to provide additional housing, while at the same time allowing the space to continue to function as a car park, or its existing use. This increases the utilisation of the available space. Since many car parks are conveniently located adjacent facilities such as shops and railway stations, housing located on car parks 20 will be attractive to some people. For example, many car parks are located in town centres, which have numerous facilities close to hand. The inventors have determined that building on a pre-existing car park presents a unique set of challenges. For example, it is desirable to erect buildings as quickly as possible to minimise the amount of time that the car 25 park is closed to vehicles, and to minimise the impact that the building works has on any adjacent facilities, such as shops. It is also desirable to erect buildings in a manner that minimises damage to the car park surface, while at the same time provides sufficient load bearing capacity to adequately support the weight of the building and to deal with horizontal 22 02 24 loads, for example due to wind. Minimising the amount of damage to the car park reduces the amount of remedial work required to return the car park to a usable condition, and keeps building costs down. Additionally, buildings should be erected in a manner that does not significantly reduce 5 the number of car parking bays that are available, when compared with the number of car parking bays that were available prior to the building works commencing. It is highly likely that some parking spaces will be lost, however careful design of the buildings can keep the number of spaces lost to a minimum. Furthermore, buildings should be erected in a manner that 10 does not impede users of the car park from easily accessing and leaving the car parking bays, nor should the buildings make it difficult for users to exit and enter their cars when parked. Finally, it is known that cars occasionally can catch fire, for example due to design faults or poor maintenance, and therefore car park buildings should be designed with this risk in mind. 15 Accordingly, the invention seeks to provide a building for firm ground, such as a car park, a car park including said building, and a method for constructing a building on firm ground, such as a car park, that mitigates at least one of the afore-mentioned problems. According to one aspect, there is provided a building according to claim i. 20 The invention provides a building that is suitable for installation on firm ground, such as a car park, which can be erected quickly on site. The building causes little damage to the surface on which it is mounted, and therefore a car park surface would require little remedial work for it to be operational again. Since the installation is relatively quick, the car park 25 would not be closed for long periods of time, thereby reducing the impact on any nearby facilities such as shops and railway stations. The arrangement of the building distributes loads well, is sufficiently strong and stiff, and can adequately resist horizontal loads. In particular, the provision of ground beams helps to spread the load and resist horizontal loading. 22 02 24 Furthermore, the building has a relatively small footprint at ground level, which means that many of the car parking bays are retained. The first support can comprise a first X-shaped support. The X-shaped support provides adequate load bearing capacity and stiffness to the 5 platform support assembly. The first support and first ground beam can be formed as a prefabricated platform support sub-assembly. The first support can be located towards a first end of the first ground beam. The first ground beam can be located below a first peripheral portion of the 10 platform. The first peripheral portion can comprise a first lateral side of the platform. The first support can be connected to the first lateral side of the platform, for example by bolts. The platform support assembly includes a second ground beam. The second ground beam is arranged to sit on the ground. Providing a second ground 15 beam helps to distribute loads and resist horizontal loads. The platform support assembly includes a second support, such as a second X-shaped support. The second support can be mounted on the second ground beam. The second support is arranged to at least partly support the platform above a car park surface and to transfer loads from the platform to the second 20 ground beam. This increases the load bearing capacity of the platform support assembly and stiffens the assembly. The second support can be mounted towards a first end of the second ground beam. The second ground beam can be arranged parallel to the first ground beam. The second ground beam can be located below a second peripheral portion of the platform. The 25 second peripheral portion can comprise a second lateral side of the platform. The second support can be connected to the second lateral side of the platform, for example by bolts. The second support and second ground beam can be formed as a prefabricated platform support sub-assembly. The platform support 22 02 24 assembly can include a third ground beam. The third ground beam is arranged to sit on the ground. Providing a third ground beam helps to distribute loads and resist horizontal loads. The platform support assembly can include a third support, such as a third X-shaped support. The third 5 support can be mounted on the third ground beam. The third support can be arranged to at least partly support the platform above a car park surface and to transfer loads from the platform to the third ground beam. This increases the load bearing capacity of the platform support assembly and stiffens the assembly. The third ground beam can be arranged parallel to at 10 least one of the first and second ground beams. The third support can be mounted towards a first end of the third ground beam. The third ground beam can be located below a central portion of the platform, for example below a central support beam. The third support can be connected to the central support beam, for example by bolts. 15 The third support and third ground beam can be formed as a prefabricated platform support sub-assembly. The platform support assembly can include a further support, such as a further X-shaped support, mounted on the first ground beam. This increases the load bearing capacity of the platform support assembly and 20 stiffens the assembly. The further support can be arranged to at least partly support the platform above a car park surface and to transfer loads from the platform to the first ground beam. The further support can be located towards a second end of the first ground beam. The further support can be connected to the first lateral side of the platform, for example by bolts. 25 The first support, further support and first ground beam can be formed as a prefabricated platform support sub-assembly. The platform support assembly can include a further support, such as a further X-shaped support, mounted on the second ground beam. The further support can be arranged to at least partly support the platform 30 above a car park surface and to transfer loads from the platform to the 22 02 24 second ground beam. This increases the load bearing capacity of the platform support assembly and stiffens the assembly. The further support can be mounted towards a second end of the second ground beam. The further support can be connected to the second lateral side of the platform, 5 for example by bolts. The second support, further support and second ground beam can be formed as a prefabricated platform support sub-assembly. The platform support assembly can include a further support, such as a further X-shaped support, mounted on the third ground beam. The further 10 support can be arranged to at least partly support the platform above a car park surface and to transfer loads from the platform to the third ground beam. This increases the load bearing capacity of the platform support assembly and stiffens the assembly. The further support can be mounted towards a second end of the third ground beam. The further support can be 15 connected to the central support beam, for example by bolts. The third support, further support and third ground beam can be formed as a prefabricated platform support sub-assembly. Each X-shaped support can include first and second diagonal members. Each X-shaped support can be mounted on its respective ground beam in a 20 manner such that lower ends of each of the first and second diagonal members are mounted on to the respective ground beam. The X-shaped supports mounted on a ground beam can be aligned with a longitudinal axis of the ground beam. Each X-shaped support can be bolted to its respective ground beam. Each X-shaped support can be prefabricated off site, and can 25 be transported to the car park, for example by lorry. Each ground beam can be located on the car park surface. That is, it is not necessary to dig a trench to receive the ground beam. This speeds up the building process and minimises damage to the car park surface. 22 02 24 The building has a plurality of parking bays located beneath the platform. Typically, at least two car parking bays are located between the first and second ground beams. In some embodiments at least four car parking bays are located between the first and second ground beams, for example in a 5   2x2 array. Typically, at least two car parking bays are located between the second and third ground beams. In some embodiments at least four car parking bays are located between the second and third ground beams, for example in a 2x2 array. In some embodiments at least ten car parking bays are located beneath the platform. In some embodiments at least twelve car 10 parking bays are located beneath the platform. The building includes a first opening on a front side of the building and / or a second opening on a rear side of the building. The first opening is sufficiently large to enable at least one car to drive under the platform. The opening enables a driver to access the parking bays located beneath the 15 platform. The first opening can be located between the first and third ground beams. The second opening is sufficiently large to enable at least one car to drive under the platform. The opening enables a driver to access the parking bays located beneath the platform. The second opening can be located between located between the first and third ground beams. 20 The building can include a further opening on a front side of the building. The further opening is sufficiently large to enable at least one car to drive under the platform. The opening enables a driver to access the parking bays located beneath the platform. The further opening can be located between the second and third ground beams. 25 The building can include a further opening on a rear side of the building. The further opening is sufficiently large to enable at least one car to drive under the platform. The opening enables a driver to access the parking bays located beneath the platform. The further opening can be located between the second and third ground beams. 22 02 24 At least one ground beam can comprise a concrete beam. The building can include a plurality of ground beams comprising concrete beams. At least one ground beam can comprise a steel beam. The building can include a plurality of ground beams comprising steel beams. 5 At least one ground beam can comprise a steel beam and a concrete beam. This increases the mass of the ground beam for stability purposes. For example, the steel beam can be mounted on top of the concrete beam. The steel beam can be bolted to the concrete beam. At least one X-shaped support can be bolted to the steel beam. The building can include a plurality 10 of ground beams comprising a steel beam mounted on top of a concrete beam. At least one ground beam can comprise a concrete beam having a steel beam encased within the concrete beam. The encased steel beam can include at least one steel mounting plate that protrudes out of the concrete beam, and 15 may include a plurality of mounting plates. An X-shaped support can be bolted to at least one mounting plate. This type of ground beam provides a stable but manoeuvrable structure, which can be easily connected with a foundation option. It makes assembly of the platform easier. The building can include a plurality of ground beams comprising a steel beam encased in 20 a concrete beam. At least one ground beam can consist of a steel beam. Each X-shaped support can be bolted to the steel beam. This ground beam arrangement reduces the height (depth) of the ground beam, which can help the ground beam from interfering with car doors when opened. It also reduces the 25 overall weight of the ground beam. The building can include any suitable number of ground beams, according to the size of the building being constructed. 22 02 24 In some embodiments, at least some of the ground beams have a similar construction. Each ground beam can be prefabricated off site, and can be transported to the car park, for example by lorry. 5 The platform support assembly can comprise at least one sub-assembly that is prefabricated off site and that is transported to the car park. For example, a first sub-assembly can comprise the first ground beam and its respective supports, such as the respective X-shaped supports, mounted on the first ground beam. A second sub-assembly can comprise the second ground 10 beam and its respective supports, such as its respective X-shaped supports, mounted on the second ground beam. A third sub-assembly can comprise the third ground beam and its respective supports, such as its respective X-shaped supports, mounted on the third ground beam. The building can include foundations arranged to transfer loads from at 15 least one ground beam into the ground. In some embodiments, foundations are arranged to transfer loads from at least two of the first, second and third ground beams into the ground. In some embodiments, foundations are arranged to transfer loads from each of the first, second and third ground beams into the ground. 20 The foundations include at least one pile foundation. In some embodiments, the building can include a plurality of pile foundations. In some embodiments, a plurality of pile foundations are provided directly below or adjacent each ground beam. Each pile foundation can be connected to its respective ground beam. For example, each pile foundation 25 can include at least one of: a connector plate, a bracket and a channel at an upper end thereof. The connector plate, bracket and / or channel can be bolted to its respective ground beam. The pile foundations can include at least one pile assembly that includes a hub and a plurality of pile members that are each connected to the hub 22 02 24 towards one end. The pile members are distributed about the hub and each pile member is inclined to a vertical axis in the ground. The arrangement is such that ends of the pile members that are distal from the hub flare outwards from the hub. An example of this type of foundation is a 5 RapidRoot ™ foundation. The pile foundations can include a plurality of foundation assemblies. This type of foundation provides minimal damage to the car park surface. The foundations can include at least one helical pile foundation. The pile foundations can include a plurality of helical pile foundations. This type of 10 foundation provides minimal damage to the car park surface. The platform can be rectangular in plan. The platform can have a front side, a rear side, a first lateral side and a second lateral side. At least part of the first X-shaped support can be connected to the platform adjacent a front side of the platform. At least part of the further X-shaped support mounted 15 on the first ground beam can be connected to the platform adjacent a rear side of the platform. At least part of the second X-shaped support can be connected to the platform adjacent a front side of the platform. At least part of the further X-shaped support mounted on the second ground beam can be connected to the platform adjacent a rear side of the platform. At least 20 part of the third X-shaped support can be connected to the platform adjacent a front side of the platform. At least part of the further X-shaped support mounted on the third ground beam can be connected to the platform adjacent a rear side. The platform can include a frame. The frame can be metallic. The frame can 25 include steel and / or composite materials. The frame can include a front beam. The frame can include a rear beam. The frame can include a first lateral beam. The frame can include a second lateral beam. The frame can include a central beam. A first end of the central beam can be connected to the front beam. A second end of the central beam can be connected to the 30 rear beam. 22 02 24 The platform can include a floor mounted on the frame. For example, the floor can comprise a plurality of panels. Each panel can comprise concrete, steel and / or a composite construction. The frame can include a plurality of support formations. The panels can be mounted on to the support 5 formations. The platform frame can include bracing members. The bracing members stiffen the frame. The platform can be prefabricated off-site. The prefabricated platform can be delivered to the car park by lorry, and can be craned on to the support 10 assembly. The building can include a first stairway. The first stairway can be arranged to provide access to the platform from the car park. The first stairway can be located adjacent the first lateral side of the platform. This stairway can be attached to the platform to provide lateral stability to the building. The 15 first stairway can include a first set of stairs and a first frame arranged to support an upper end of the first set of stairs. The first frame provides a first landing adjacent the platform. The building can include a first fire-resistant barrier located adjacent the first stairway. The first fire-resistant barrier can be arranged to isolate the 20 first stairway from the parking bays located beneath the platform. The fire-resistant barrier helps to ensure that residents are able to leave the building via the first stairway in the event of a fire. The first fire-resistant barrier can include block work. The first fire-resistant barrier can include fire-resistant glazing. This enables natural light to illuminate the space under 25 the platform and helps to provide the feel of an open arrangement. The first fire-resistant barrier can include steel panels. The first fire-resistant barrier can be mounted on the first ground beam. This provides an efficient arrangement. 22 02 24 The building can include a second stairway. The second stairway can be arranged to provide access to the platform from the car park. The second stairway can be located adjacent the second lateral side of the platform. This stairway can be attached to the platform to provide lateral stability to 5 the building. The second stairway can include a second set of stairs and a second frame arranged to support an upper end of the second set of stairs. The second frame provides a second landing adjacent the platform. The building can include a second fire-resistant barrier located adjacent the second stairway. The second fire-resistant barrier can be arranged to isolate 10 the second stairway from the parking bays located beneath the platform. The fire-resistant barrier helps to ensure that residents are able to leave the building via the second stairway in the event of a fire. The second fire-resistant barrier can include block work. The second fire-resistant barrier can include fire-resistant glazing. The second fire-resistant barrier can 15 include steel panels. The second fire-resistant barrier can be mounted on the second ground beam. This provides an efficient arrangement. At least one of the stairways can be prefabricated off site. The stairways can be delivered to the car park by lorry, can be craned into place, and attached to the platform and / or platform support assembly, for example by bolts. 20 This helps to speed up the construction process. The at least one habitable structure can comprise a prefabricated unit. The habitable structure can be prefabricated off-site. The prefabricated unit can be delivered to the car park by lorry, and can be craned on to the platform. This helps to speed up the construction process. The habitable structures 25 can be connected to the platform. A plurality of habitable structures can be mounted on the platform. Any practicable number of habitable structures can be mounted on the platform. For example, 2 to 20 habitable structures can be located on the platform. Typically, the building includes at least 2 habitable structures, and may 30 include at least 4 habitable structures. Typically the building includes less 22 02 24 than or equal to 18 habitable structures, and may include less than or equal to 16 habitable structures. The prefabricated unit can comprise a prefabricated housing unit. Habitable structures other than housing units can be located on the platform, for example at least one of an office unit and a shop unit can be located on the platform. The platform can be arranged to overhang at least one X-shaped support in a frontwards, rearwards and / or lateral direction. The overhang provides a platform having a larger surface area to accommodate habitable structures having a larger footprint, without disrupting the flow of traffic around the car park. That is, the building footprint does not have to increase to accommodate a habitable structure having a larger footprint. According to another aspect, there is provided a car park including at least one building according to any configuration described herein. The car park can include a plurality of buildings according to any configuration described herein. The car park includes a plurality of parking bays located beneath the platform. The parking bays are typically defined by lines painted on to the car park surface. According to another aspect, there is provided a method for constructing a building according to claim 31. The method provides a building that is suitable for installation on firm ground, such as a car park, which can be erected quickly on site and that causes little damage to the car park surface, and therefore the car park surface requires little remedial work for it to be operational again. Since the installation is relatively quick, the car park would not be closed for long periods of time, thereby reducing the impact on any nearby facilities such as shops and railway stations. The arrangement of the building distributes loads well, is sufficiently strong and stiff, and can adequately resist 22 02 24 horizontal loads. In particular, the provision of ground beams helps to spread the load and resist horizontal loading. The car park can be a pre-existing car park. The car park can be an open-air car park. The car park can be a single storey car park. The building can 5 be located on firm ground that is not designated as a car park. The method includes prefabricating at least one of the following off site and transporting it to the building site: ground beams; supports; platform; platform support sub-assemblies each comprising a ground beam and at least one platform support; and habitable structures. 10 The method can include prefabricating at least one of the following off site and transporting it to the building site: platform frame; and stairways. The method includes installing a first set of pile foundations into the ground, for example beneath the car park surface. The method includes mounting the first ground beam, or a first support sub-assembly 15 comprising the first ground beam, on to the ground, mounting the first ground beam, or first support sub-assembly, on to the car park surface; and connecting the first ground beam to the first set of pile foundations. The first ground beam can be mounted over or adjacent the first set of pile foundations. 20 The method can include installing a second set of pile foundations into the ground, for example below the car park surface. The method can include mounting a second ground beam, or a second support sub-assembly comprising the second ground beam, on to the ground, for example mounting the second ground beam, or second support sub-assembly, on to 25 the car park surface, and connecting the second ground beam to the second set of pile foundations. The second ground beam can be mounted over or adjacent the second set of pile foundations. 22 02 24 The method can include installing a third set of pile foundations into the ground, for example below the car park surface. The method can include mounting a third ground beam, or a third support sub-assembly comprising the third ground beam, on to the ground, for example mounting the third 5 ground beam, or third support sub-assembly, on to the car park surface, and connecting the third ground beam to the third set of pile foundations. The third ground beam can be mounted over or adjacent the third set of pile foundations. The method can include mounting the supports on to the ground beams. 10 The method can include mounting the platform on top of the supports. The method can include mounting the prefabricated habitable structure on the platform, for example by means of a crane. Embodiments of the invention will now be described by way of example only with reference to the drawings, wherein: 15 Figure 1 is an isometric view of a building according to a first embodiment of the invention; Figure 2 is an isometric view of a platform, a platform support assembly and foundation arrangement of the embodiment of Figure 1; Figure 3 is an enlarged isometric view of a modular stairway of the 20 embodiment of Figure 1; Figure 4 is an isometric view of part of a platform support assembly of a second embodiment of the invention, which includes a fire barrier to protect the stairway; Figure 5 is an isometric view of a platform and a platform support 25 assembly according to a third embodiment of the invention; 22 02 24 Figure 6 is an isometric view of a platform and a platform support assembly according to a fourth embodiment of the invention; and Figure 7 is a side view of part of a building having a support assembly and a platform that overhangs the support assembly. 5 Figure 1 shows a building 1 for firm or compacted ground such as a car park 3 in accordance with a first embodiment of the invention. The building 1 includes: a platform 5, at least one habitable structure 7 mounted on the platform 5, and a platform support assembly 9 arranged to support the platform 5 above the car park 3 surface. 10 The platform 5 can be generally rectangular in plan, but can have alternative shapes. The platform 5 includes a frame 11. The frame 11 includes a front beam 13 shown in Figure 2, a rear beam 15 and a first lateral beam 17 and a second lateral beam 19. Each beam 13,15,17,19 comprises at least one steel member, and can comprise a plurality of steel members 15 connected together, for example by bolting or welding. Each steel member can comprise a rectangular hollow section (RHS), having end brackets that can be bolted together. The frame 11 includes a central beam 21, which extends from the rear beam 15 to the front beam 19. The central beam 21 is arranged parallel to the lateral beams 17,19. In the arrangement, the lateral 20 beams 17,19 and the central beam 21 each comprise a RHS member. The front beam 13 comprises first and second RHS members 13a,13b. The first RHS member 13a is bolted to the first lateral beam 17 and to the central beam 21. The second RHS member 13b is bolted to the central beam 21 and the second lateral beam 19. The rear beam 15 comprises first and second 25 RHS members 15a,15b. The first RHS member 15a is bolted to the first lateral beam 17 and to the central beam 21. The second RHS member 15b is bolted to the central beam 21 and the second lateral beam 19. Two additional RHS members 23a,23b are included in the frame 11. The first additional RHS member 23a is bolted to the first lateral beam 17 and the 30 central beam 21, and reinforces the frame 11. The first additional RHS 22 02 24 member 23a is arranged parallel with the RHS member 15a, and is spaced apart from the RHS member 15a, being located at a position that is approximately one third of the length of the central beam 21, starting from the RHS member 15a. The second additional RHS member 23b is bolted to 5 the second lateral beam 17 and the central beam 21, and reinforces the frame 11. The second additional RHS member 23b is arranged parallel with the RHS member isba, and is spaced apart from the RHS member 15b, being located at a position that is approximately one third of the length of the central beam 21, starting from the RHS member 15b. The first and 10 second additional RHS members 23a,23b are arranged substantially coaxially. Bracing members 25 are provided to tension the frame 11. Bracing members 25 tie the first lateral beam 17 to the central beam 21. Bracing members 25 tie the second lateral beam 19 to the central beam 21. 15 The lateral beams 17,19 and the central beam 21 include support formations 27, which are arranged to support a concrete floor 29. The concrete floor 29 is shown diagrammatically in Figure 1. The concrete floor 29 typically comprises an arrangement of pre-fabricated concrete panels. The concrete panels can be craned on to the frame 11 to create the floor. The habitable 20 structures 7 are mounted on to the concrete floor 29. The floor 29 has a larger surface area than the combined area of the habitable structures 7, which provides the platform 5 with a walkway adjacent the housing units. Optionally, a surface finish can be applied to the floor 29 in at least some areas in order to improve the aesthetic of the walkway and / or improve its 25 walkway function. A balustrade (not shown) can be fitted to the platform 5 for safety reasons. For example, the balustrade can be fitted adjacent at least some of the front, rear, and lateral sides of the platform 5. The platform 5, and hence everything mounted on the platform 5, is supported above the car park 3 surface by means of the platform support 30 assembly 9. The platform support assembly 9 includes first, second and 22 02 24 third ground beams 31,33,35. The ground beams 31,33,35 sit on top of the car park surface. Platform supports 37,39 are mounted on the first ground beam 31. The supports 37,39 can be X-shaped. The supports 37,39 and the first ground beam 31 can be in the form of a first prefabricated support sub-5 assembly to speed up assembly on site. The supports 37,39 are connected to platform 5, typically to the first lateral beam 17. Platform supports 41,43 are mounted on the second ground beam 33. The supports 41,43 can be X-shaped. The supports 41,43 and the second ground beam 33 can be in the form of a second prefabricated support sub-assembly to speed up assembly 10 on site. The supports 41,43 are connected to platform 5, typically to the second lateral beam 19. Platform supports 45,47 are mounted on the third ground beam 35. The supports 45,47 can be X-shaped. The supports 45,47 and the third ground beam 35 can be in the form of a third prefabricated support sub-assembly to speed up assembly on site. The supports 45,47 are 15 connected to platform 5, typically to the central beam 21. Each of the first, second and third ground beams 31,33,35 comprises a concrete beam 31a,33a,35a and a steel beam 31b,33b,35b, typically an RHS member, mounted on top of its respective concrete beam 31a,33a,35a, and is bolted thereto. Each steel beam 31b,33b,35b is arrange parallel to its 20 respective concrete beam 31a,33a,35a. Loads are transferred from the platform 5 to the ground beams 31,33,35 via the X-shaped supports 37-47. The ground beams 31,33,35 help to spread the loads received, and to resist any horizontal loading on the building 1. Each X-shaped support 37-47 comprises a first diagonal member 25 comprising a single piece of steel square hollow section (SHS) and a second diagonal member comprising two pieces of SHS butt welded to the first diagonal member. The angle subtended between central longitudinal axes of the first and second diagonal members is typically in the range 40 to 90 degrees. Each X-shaped support 37-47 can be bolted to its respective 30 ground beam 31,33,35, for example via a flat plate connector located towards the end of each diagonal member. Alternatively, each X-shaped 22 02 24 support 37-47 can be welded to its respective ground beam 31,33,35. Similarly, each X-shaped support 37-47 can be bolted to its respective platform beam 17,19,21, for example via a flat plate connector located towards the end of each diagonal member. Alternatively, each X-shaped 5 support 37-47 can be welded to its respective platform beam 17,19,21. The X-shaped supports 37-47 are mounted on their respective ground beams 31,33,35 such that lower ends of both the first and second diagonal members are attached to the respective ground beam 31,33,35. The X-shaped supports 37-47 are connected to their respective platform frame 10 members 17,19,21 such that upper ends of both the first and second diagonal members are attached to the platform frame members 17,19,21. Thus, the first ground beam 31, its respective X-shaped supports 37,39, and the first lateral beam 17 are arranged in a first vertical plane. The second ground beam 33, its respective X-shaped supports 41,43, and the second 15 lateral beam 19 are arranged in a second vertical plane. The third ground beam 35, its respective X-shaped supports 45,47, and the central beam 21 are arranged in a third vertical plane. The ground beams 31,33,35 shown in Figure 1, run from the front of the building to the rear of the building. The ground beams 31,33,35 are spaced 20 apart in the lateral direction. The building 1 has an open structure at the front. The building has first and second openings at the front. The first opening is located between the first and third ground beams 31,35. The second opening is located between the second and third ground beams 33,35- The building 1 has an open structure at the rear. The building has 25 third and fourth openings at the rear. The third opening is located between the first and third ground beams 31,35. The fourth opening is located between the second and third ground beams 33,35. In some embodiments, there is no barrier between first and third ground beams 31,35 that blocks passage of a vehicle under the platform 5, thus a driver is able to drive a 30 vehicle under the platform 5 through any one of the first and third openings and to drive out via the other one of the first and third openings. In some 22 02 24 embodiments, there is no barrier between second and third ground beams 31,35 that blocks passage of a vehicle under the platform 5, thus a driver is able to drive a vehicle under the platform 5 through any one of the second and fourth openings and to drive out via the other one of the second and 5 fourth openings. In other embodiments, barriers can be provided below the platform 5 to separate front parking bays from rear parking bays. Car parking bays 40 are located on the car park surface directly below the platform 5. There are at least two parking bays 40 located beneath the platform 5, between each pair of ground beams 31,33,35. Typically, there 10 are at least four parking bays 40 between each pair of ground beams 3^-,33,35, for example arranged in a 2x2 array. Figure 1 illustrates the parking bays 40 arranged in a 2x2 array by means of dashed lines 42. Since the building 1 has an open structure at the front and rear between each pair of ground beams 31,33,35, a driver is able to drive into the park bays via 15 any of the front and rear openings. Typically, the height between the underside of the platform 5 and the car park surface is typically in the range 2.2 to 2.8m, and typically around 2.4m. This provides sufficient clearance for most cars. Loads from the platform support assembly 9, shown in Figure 2, are 20 transferred into the ground beneath the car park by foundations 49. Appropriate foundations 49 are selected to suit the ground conditions. Particularly preferred foundations 49 are helical pile foundations 49a and RapidRoot ™ foundations 49b. Both of these types of foundations are made from metal, typically steel, and therefore do not require a concrete pour on-25 site. RapidRoot ™ foundations 49b have a hub including a connecting plate and several tubular members that are inserted into the ground in an angular fashion, such that the members flare outwards. Helical pile foundations 49a have a connecting plate, an elongate body and at least one helical formation mounted on the body. Helical pile foundations 49a are screwed vertically 30 into the ground. Both of these types of foundations 49a,49b are quickly and easily inserted into the ground, even in bad weather conditions, only P278207.GB.02 General v2                                                                                   21-Feb-24 22 02 24 causing minimal damage to the car park surface. The damage to the car park surface is localised to the foundation 49a,49b, that is only to the immediate area where the pile is inserted. Both types of foundation 49a,49b can be loaded under compression and tension. Load can be applied to the 5 foundations 493,49b immediately after installation, which is different from concrete piles, which have to set before a load can be applied. The foundations 49 are positioned into the ground directly below where each of the ground beams 31,33,35 will be located on the car park surface. The foundations 49 are distributed along the lengths of the first, second 10 and third ground beams 31,33,35. This is illustrated diagrammatically in Figure 2, which shows two RapidRoot ™ 49b foundations supporting the second ground beam 33 and two helical pile 49a foundations supporting the third ground beam 35. In Figure 2, foundations 49 are not shown below the first ground beam 31 for the purposes of clarity. The number and type of 15 foundations 49 for the building 1 will be determined by an engineer according to the ground conditions. For example, the foundations 49 can comprise only RapidRoot ™ 49b foundations. The foundations can comprise only helical pile 49a foundations. Alternatively, the foundations can comprise some RapidRoot ™ 49b foundations and some helical pile 49a 20 foundations. Typically, each ground beam 31,33,35 will have at least first and second foundations 49, for example the first foundation located towards a front end of the ground beam and the second foundation located towards a rear end of the ground beam. Each ground beam 31,33,35 can have at least one further foundation 49 located intermediately between the 25 first and second foundations. The foundations 49 are connected to their respective ground beams 31,33,35 by bolting, or welding at least one of the connector plates, brackets and channels to the foundation load points, and typically bolting to, or through, the ground beams. 22 02 24 As mentioned above, the building i includes at least one habitable structure 7 mounted on to the platform 5. Typically, the building 1 includes a plurality of habitable structures. The building 1 can include any practicable number of habitable structures 7, for example the building 1 can include 2 to 20 5 habitable structures 7. Some embodiments have 4 to 16 habitable structures 7. Figure 1 shows two habitable structures 7 mounted on to the platform 5. If a greater number of habitable structures 7 are mounted on to the platform 5, the dimensions of the platform 5, the arrangement of the platform support assembly 9, and the foundation assembly 11 are adjusted 10 accordingly. Each habitable structure 7 can comprise a pre-fabricated unit. Each pre-fabricated unit can be transported to the car park 3 on a lorry and can be lifted on to the platform 5 using a crane. For example, each habitable structure can comprise a pre-fabricated housing unit, such as a KODA® house supplied by Kodasema OU. Each habitable structure can have a 15 footprint of 28m2 or more, with a usable floor area of around 26m2. Exact dimensions can be adjusted to suit the particular car park and housing scheme. Each pre-fabricated unit can have a concrete structure, which weighs around 27 tonnes. Alternatively, lighter weight pre-fabricated units can be used, which have a wooden structure, or steel reinforced wooden 20 structure, these weigh around 10 tonnes. Approximate minimum habitable space dimensions are 7m x 4m x 4m, with alternative designs for larger units. The habitable structures 7 can be mounted on to the platform 5 side by side. The building 1 includes first and second stairways 51,53. The stairways 25   51,53 provide access from the car park to the platform 5. The first stairway 51 is located adjacent to the first lateral beam 17. The second stairway 53 is located adjacent to the second lateral beam 19. Figure 3 shows an enlarged, partially exploded view, of the first stairway 51. The stairway 51 includes the stairs 55 and a support structure 57. The support structure 57 is 30 typically made from steel, and includes an arrangement of welded RHS or SHS members. The support structure 57 includes four vertical members 22 02 24 57&-57d and a rectangular top frame 57e having transverse bracing members 57b The support structure 57 also includes diagonal bracing members 57g. One of the bracing members 57g braces a first pair 57a,57b of the vertical members. One of the bracing members 57g braces a second 5 pair 57b,57c of the vertical members. The second stairway 53 is similar to the first stairway 51 but is opposite handed to suit connection to the platform 5 adjacent the second lateral beam 19. Each stairway 51,53 can be pre-fabricated offsite and is transported to the 10 car park, for example on a lorry. This enables each stairway 51,53 to be installed quickly on site. Also, the arrangement of the stairways 51,53 means that they are suitably braced for transportation, without being damaged during transportation. Each stairway 51,53 is bolted to the platform support assembly 9 to provide stability in a transverse direction. 15 The first stairway 51 is mounted on, and is bolted to, additional ground beams 59,61, which can be connected to the first ground beam 31. The second stairway 53 is mounted on, and is bolted to, additional ground beams 59,61, which can be connected to the second ground beam 33. The X-shaped supports, particularly in combination with the stairways, 20 provide a good compromise for supporting static loads from the platform 5, horizontal loads applied to the building, and resisting torsional loads generated to prevent the building 1 from twisting. The method of constructing the building 1 on a pre-existing car park 3, such as an open-air single storey pre-existing car park, can include at least some 25 of the following steps: Prefabrication of components and subassemblies, including prefabricated support sub-assemblies having ground beams 31,33,35 and X-shaped supports 37-47; habitable structures 7; platform 5 components; and stairways 51,53- 22 02 24 Installing, first, second and third sets of pile foundations 49 beneath the car park 3 surface. Appropriate piling machines are used according to type of pile foundations used. Typically, each pile foundation is inserted with minimal disruption to the car park surface. 5 Transporting the prefabricated components and subassemblies to the car park. Installing the first prefabricated support sub-assembly such that the first ground beam 31 is laid on the car park surface above or adjacent to the first set of pile foundations 49, with the supports 37,39 oriented upwards. The 10 first ground beam 31 is connected to the first set of pile foundations 49, for example by bolts. Installing the second prefabricated support sub-assembly such that the second ground beam 33 is laid on the car park surface above or adjacent to the second set of pile foundations 49, with the supports 41,43 oriented 15 upwards. The second ground beam 33 is connected to the second set of pile foundations 49. Installing the third prefabricated support sub-assembly such that the third ground beam 33 is laid on the car park surface above or adjacent to the third set of pile foundations 49, with the supports 45,47 oriented upwards. The 20 third ground beam 33 is connected to the third set of pile foundations 49, for example by bolts. Mounting the platform 5 on top of the X-shaped supports 37-47. Optionally, the X-shaped supports 37-47 can be mounted on to their respective ground beams 31,33,35 on site in some circumstances. 25 Mounting the prefabricated habitable structures on to the platform, for example by a crane. 22 02 24 Attaching the stairways 51,53 to at least one of: the platform 5, one of the ground beams 31,35, and the platform support assembly 9. Figure 4 shows a building 101 for a car park 103 in accordance with a second embodiment of the invention. The building 101 of the second embodiment 5 is similar to the building 1 of the first embodiment, except that the first and second stairways are protected by respective fire-resistant barriers 180. The fire-resistant barriers 180 seal off the stairways to ensure that the stairways can be used as a means of escape for the residents in the event of a fire. Each fire-resistant barrier 180 can have several different arrangements, 10 depending on the specific needs of the site. For example, Figure 4 shows a fire-resistant barrier 180 adjacent the first stairway 151 comprising a section of blockwork 182 and first and second sections of glazing 184,186, which are sealed to the blockwork. The barrier 180 is used to seal off the first stairway 151. The blockwork 182 and sections of glazing 184,186 are 15 mounted on to the first ground beam 131, and extend upwards to the first lateral beam 117. The glazing 184,186, as well as providing a fire-resistant barrier, is transparent and therefore maintains an open feel to the structure. Typically, the first glazing section 184, is located adjacent to the first X-shaped support 137, and the second glazing section 186 is located 20 adjacent the second X-shaped support. The blockwork 182 is located between the first and second sections of glazing 184,186. A similar arrangement can be provided adjacent the second stairway. Any other suitable fire-resistant barriers 180 can be used. For example, each fire-resistant barrier 180 can comprise glazing along the full length of the 25 respective ground beam; blockwork along the full length of the respective ground beam; or light-gauge steel (LGS) studs. Cladding, boarding and / or paint can be applied to parts or all of the fire-resistant barrier 180 as required. Figure 5 shows a building 201 for a car park 103 in accordance with a third 30 embodiment of the invention. The building 201 can be arranged similarly to the building 1 of the first embodiment or the building 101 of the second 22 02 24 embodiment, except that the ground beams 231,233,235 have a different construction. In the first and second embodiments, each ground beam comprises a steel beam mounted on top of a concrete beam. In the third embodiment, each ground beam 231,233,235 comprises a steel beam (not 5 shown) encased within a concrete beam 2313,2333,2353. Esch enc3sed steel beam csn include steel mounting pistes thst protrudes out of the respective concrete besm 2313,2333,2353. E3ch of the X-sh3ped supports 3re bolted to their respective steel mounting pl3tes. The 3dv3nt3ge of this ground be3m 3rr3ngement is to provide 3 st3ble but m3noeuvr3ble structure to 10 connect to found3tion options, 3nd m3ke 3ssembly of the platform more str3ightforw3rd. This C3n help to gre3tly simplify the levelling of the supports 3nd pl3tform, without compromising the ability of the ground be3ms 231,233,235 to st3bilise the building 201. Figure 6 shows 3 building 301 for 3 car p3rk 103 in 3ccord3nce with 3 fourth 15 embodiment of the invention. The building 301 C3n be 3rr3nged simil3rly to the building 1 of the first embodiment or the building 101 of the second embodiment, except th3t the ground be3ms 331,333,335 h3ve 3 different construction. In the first 3nd second embodiments, e3ch ground be3m comprises 3 steel besm mounted on top of 3 concrete be3m. In the fourth 20 embodiment, e3ch ground be3m 231,233,235 comprises 3 steel be3m 231b,233b,235b only, th3t is no concrete beam is present 3t all. This reduces the weight of the overall structure, which m3y be useful for some ground conditions 3nd h3S the 3dv3nt3ge of reducing the overall height of the ground besms 231,233,235, which reduces the possibility of the ground 25 be3ms 231,233,235 from interfering with C3r doors when they 3re opened. In this arrangement, the steel besms 231b,233b,235b sre bolted directly to the foundstions, when used. It will be spprecisted by the skilled person thst modificstions csn be msde to the sbove embodiments thst fall within the scope of the invention, for 30 exsmple in some instsnces the ground conditions msy be such thst no foundstions 49 sre required for st lesst one of the ground besms, snd 22 02 24 possibly all of the ground beams. For some ground conditions, it may be possible to bolt the ground beams to the car park surface instead of using foundations. Any suitable number of X-shaped supports can be mounted on to the 5 ground beams. The number is typically selected according to the size of the platform and the number of habitable structures mounted thereon. For example, a ground beam can have one X-shaped support mounted thereon. A ground beam can have at least three X-shaped supports mounted thereon. Supports other than X-shaped supports can be mounted on to at least one 10 ground beam to support the platform above car park surface. The building may have a different number of ground beams. Any suitable number of ground beams can be used. The number is typically selected according to the size of the platform and the number of habitable structures mounted thereon. 15 Other types of foundations can be used for some embodiments in addition to the pile foundations, if the ground conditions require such foundations. In some embodiments, the platform may extend outwards beyond the X-shaped supports, thereby creating at least one overhang portion of the platform. This increases the area of the platform. For example, the platform 20 may overhang the X-shaped supports in a frontward direction. The platform may overhang the X-shaped supports in a rearward direction. The platform may overhang the X-shaped supports in at least one lateral direction. Having a platform that overhangs at least some of the X-shaped supports, in at least one direction, can be useful to accommodate larger sized 25 habitable structures on the platform without increasing the footprint of the car park building and without significantly disrupting the flow of traffic around the car park. It is envisaged, that at least some embodiments will overhang the X-shaped supports in both the frontwards and rearwards 22 02 24 directions. This is illustrated in Figure 7, which shows a platform 405 overhanging front and rear X-shaped supports 437,439. While the primary use for the building is for it to be constructed on a car park, it will be appreciated that the building can be constructed on firm / 5 compacted ground that is not a car park. The following description presents exemplary embodiments and, together with the drawings, serves to explain principles of the invention. However, the scope of the invention is not intended to be limited to the precise details of the embodiments or exact adherence with all method installation steps, 10 since variations will be apparent to a skilled person and are deemed also to be covered by the claims. Terms for components used herein should be given a broad interpretation that also encompasses equivalent functions and features. In some cases, several alternative terms (synonyms) for structural features have been provided but such terms are not intended to 15 be exhaustive. Descriptive terms should also be given the broadest possible interpretation; e.g. the term "comprising" as used in this specification means "including" such that interpreting each statement in this specification that includes the 20 term "comprising", features other than that or those prefaced by the term may also be present. Related terms such as "comprise" and "comprises" are to be interpreted in the same manner. Directional terms such as “vertical”, “horizontal”, “up”, “down”, “upper” and “lower” may be used for convenience of explanation usually with reference to the illustrations and 25 are not intended to be ultimately limiting if an equivalent function can be achieved with an alternative dimension and / or direction. The description herein refers to embodiments with particular combinations of configuration steps or features, however, it is envisaged that further 30 combinations and cross-combinations of compatible steps or features between embodiments will be possible. Indeed, isolated features may function independently as an invention from other features and not necessarily require implementation as a complete combination. Any feature from an embodiment can be isolated from that embodiment and included in any other embodiment. 22 02 24

Claims

1. A building arranged for construction on firm ground said building, including:a platform;at least one habitable structure located on the platform, the habitable structure comprising at least one wall and a roof; anda platform support assembly, including a first ground beam arranged to sit on the ground and a first support arranged to at least partly support the platform above the ground and to transfer loads from the platform to the first ground beam;a second ground beam arranged to sit on the ground, and a second support arranged to at least partly support the platform above the ground and to transfer loads from the platform to the second ground beam;foundations arranged to transfer loads from at least one ground beam into the ground, wherein the foundations include at least one pile foundation;a plurality of parking bays located on the ground beneath the platform;a first opening on a front side of the building, which is sufficiently large to enable at least one car to drive under the platform to access the parking bays; and / or a second opening on a rear side of the building, which is sufficiently large to enable at least one car to drive under the platform to access the parking bays.

2. A building according to claim 1, wherein the first support comprises a first X-shaped support, and the first support is connected to a first lateral side of the platform.22 02 243- A building according to any one of the preceding claims, wherein the second support comprises a second X-shaped support, and the second support is connected to a second lateral side of the platform.

4. A building according to claim 3, wherein the platform support assembly includes a third ground beam arranged to sit on the ground, and a third support mounted arranged to at least partly support the platform above a car park surface and to transfer loads from the platform to the third ground beam.

5. A building according to claim 4, wherein the third support comprises a third X-shaped support.

6. A building according to any one of claims 2 to 5, wherein the platform support assembly includes a further X-shaped support arranged to at least partly support the platform above a car park surface and to transfer loads from the platform to the first ground beam.

7. A building according to any one of claims 2 to 6, wherein the platform support assembly includes a further X-shaped support arranged to at least partly support the platform above a car park surface and to transfer loads from the platform to the second ground beam.

8. A building according to any one of claims 3 to 7, wherein the platform support assembly includes a further X-shaped support arranged to at least partly support the platform above a car park surface and to transfer loads from the platform to the third ground beam.

9. A building according to any one of claims 2 to 8, wherein each X-shaped support includes first and second diagonal members, wherein each X-shaped support is mounted on its respective ground beam in a manner such that lower ends of each of the first and second diagonal members are mounted on to the respective ground beam.22 02 24io. A building according to any one of the preceding claims, including a further opening located on a front side of the building, which is sufficiently large to enable at least one car to drive under the platform.n. A building according to any one of the preceding claims, including a further opening located on a rear side of the building, which is sufficiently large to enable at least one car to drive under the platform.

12. A building according to any one of the preceding claims, wherein at least one ground beam comprises a concrete beam and a steel beam mounted on top of the concrete beam.

13. A building according to any one of the preceding claims, wherein at least one ground beam comprises a concrete beam having a steel beam encased within the concrete beam.

14. A building according to any one of the preceding claims, wherein at least one ground beam comprises a steel beam.

15. A building according to any one of the preceding claims, wherein the pile foundations include at least one pile assembly that includes a hub and a plurality of pile members that are each connected to the hub at a proximal end, the pile members being distributed about the hub, wherein each plie member is inclined to a vertical axis in the ground such that distal ends of the pile members flare outwards from the hub.

16. A building according to anyone of the preceding claims, wherein the foundations include at least one helical pile foundation.

17. A building according to any one of the preceding claims, wherein the platform is rectangular in plan.

18. A building according to any one of the preceding claims, wherein the platform includes a frame.22 02 2419- A building according to claim 18, including a floor mounted on the frame.

20. A building according to claim 18 or 19, wherein the platform frame includes bracing members.

21. A building according to any one of the preceding claims, including a first stairway, which is arranged to provide access to the platform from the ground.

22. A building according to claim 21, including a first fire-resistant barrier located adjacent the first stairway, the first fire-resistant barrier is arranged to isolate the first stairway from the parking bays located beneath the platform.

23. A building according to claim 21 or 22, including a second stairway, which is arranged to provide access to the platform from the ground.

24. A building according to claim 23, including a second fire-resistant barrier located adjacent the second stairway, the second fire-resistant barrier is arranged to isolate the second stairway from the parking bays located beneath the platform.

25. A building according to any one of claims 21 to 24, wherein at least one of the stairways is prefabricated off site.

26. A building according to any one of the preceding claims, wherein the at least one habitable structure comprises a prefabricated unit.

27. A building according to claim 26, wherein the prefabricated unit comprise a prefabricated housing unit.

28. A building according to any one of the preceding claims, wherein at least one of the following is prefabricated off site: the supports; the ground beams; sub-assemblies comprising a ground beam and at least one support; the platform; and a platform frame.22 02 2429- A building according to any one of the preceding claims, wherein the platform overhangs at least one X-shaped support in a frontwards, rearwards and / or lateral direction.

30. A car park including at least one building according to any one of the preceding claims.

31. A method for constructing a building according to any one of the preceding claims on a pre-existing firm ground site, said method including: prefabricating at least one of the following off site: the platform supports; ground beams; platform support sub-assemblies each comprising a ground beam and at least one platform support; and habitable structures; and transporting the prefabrications to the site; and installing a first set of pile foundations beneath the car park surface; mounting a first ground beam, or a first support sub-assembly comprising the first ground beam, on to the car park surface; connecting the first ground beam to the first set of pile foundations.

32. A method according to claim 31, including installing a second set of pile foundations below the car park surface, mounting a second ground beam, or a second support sub-assembly comprising the second ground beam, on to the car park surface, and connecting the second ground beam to the second set of pile foundations.

33. A method according to claim 32, including installing a third set of pile foundations below the car park surface, mounting a third ground beam, or a third support sub-assembly comprising the third ground beam, on to the car park surface, and connecting the third ground beam to the third set of pile foundations.

34. A method according to any one of claims 31 to 33, including mounting the supports on to their respective ground beams.35- A method according to any one of claims 31 to 34, including mounting the platform on top of the supports.

36. A method according to claim 35, including mounting the prefabricated habitable structures on to the platform.

37. A method according to any one of claims 31 to 36, including prefabricating a stairway, transporting the stairway to the building site, and attaching the stairway to at least one of: the platform, one of the ground beams, and the platform support assembly.

38. A method according to any one of claims 31 to 37, wherein the firm ground site comprises a car park.22 02 24

Citation Information

Patent Citations

  • Modular buildings and modular fire stations

    CN106381928B

  • Building structure and method

    GB2547116A

  • Method and structure for increasing usable space in a parking lot

    US20200362550A1