A method of installing a wind turbine with connection to a subsea power network
By pre-installing electrical power cables onshore for offshore wind turbines, the method simplifies and speeds up the installation process, reducing safety risks and costs by allowing connections to be made from a vessel, thus overcoming the challenges of adverse weather and complex offshore installations.
Patent Information
- Application Number
- GB2023006694
- Authority / Receiving Office
- GB · GB
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-05
- Publication Date
- 2024-11-06
AI Technical Summary
Offshore wind turbine installation is complex and challenging due to unpredictable variables and adverse weather conditions, requiring large crews and extensive equipment, leading to safety risks and significant delays.
The method involves pre-installing an electrical power cable on the wind turbine jacket or platform onshore, which is then transported and secured to the seabed, allowing for direct connection to the inter array cable from a vessel, reducing the need for personnel on the offshore structure and enabling connections during adverse weather conditions.
This approach minimizes health and safety risks, reduces installation time, and lowers costs by eliminating the need for extensive personnel and equipment, while allowing for faster and more flexible installation of offshore wind turbines.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
Technical Field The present disclosure relates to the installation of wind turbines, particularly methods of construction and installation of offshore wind turbines. Background Offshore wind turbine installation is generally an extremely complex operation. Given the large number of factors that need to be considered, and certain variables that can be difficult to predict, installing wind turbines offshore can be considerably more challenging than onshore installations. Current methods of installation, as exemplified within Figures 1 to 5, involve constructing platforms, jackets, monopile or gravity style bases upon which wind turbines can disposed offshore, in an onshore dock / workshop. Said bases are then transported offshore to the desired location and installed. Following installation of the of the wind turbine bases, the process of laying the subsea network of cables to connect the wind turbines to one and other, and then into the inter array cable to transfer the power generated by the wind turbines, is carried out. This comprises laying an inter array cable, terminating said cable, and pulling the terminated end of the inter array cable to the wind turbine base to which it is to be connected. The process is then continued by laying the next inter array cable between the next two turbine bases, terminating said cable, and pulling each terminated end of the cable to its respective wind turbine / wind turbine base. Wind turbines are then installed upon the wind turbine bases. Pulling cables to the platforms / jackets / monopiles of a wind farm has traditionally proven to be particularly challenging. For example pulling a subsea cable to one offshore platfrom / jacket / monopile may take in excess of 24 hours, with pulling operations also only taking place during daylight and with clement weather and sea conditions. Additionally a large crew of personnel is required to perform one pulling operation, including preparation teams, hang off teams, routing and cieating teams, termination teams and testing teams, with three persons per team, as standard; with large amounts of lifting equipment also required for each pulling operation. Such large amounts of personnel and equipment for each pulling operation also brings increased safety risks with installation of offshore wind turbines. Adverse weather may also be problematic with traditional methods of installing platforms / jackets / monopiles for offshore wind turbines, and cause additional delays. For example, personnel may have to wait until conditions improve before moving to the next location where a cable may need to lifted from subsea to the platform / jacket / monopile to which it is to be fixed; or adverse weather may cause cable pulling operations to be paused until conditions are improved, with up to 40% of the time taken to complete cable pulling operations being caused by weather delays. Therefore, it can be difficult to quickly and safely install offshore wind turbines using current methods. Summary According to a first aspect of the present invention there is provided a method of installing a wind turbine. The method comprises installing an electrical power cable on the jacket or platform at an onshore location, the power cable having a first end for connection to a wind turbine and a second end comprising a connector for direct connection to a complimentary connector of an inter array cable. The method further comprises transporting the jacket or platform to an offshore location and securing it to the seabed, affixing the wind turbine to the jacket or platform, including electrically coupling said first end of the power cable to a power output of the wind turbine, and, at said offshore location, and either before or after the step of fixing the wind turbine, directly connecting said second end of the power cable to the connector of the inter array cable either above or below sea level. Installation of a wind turbine according to this method is advantageous from a number of aspects. Firstly, as the electrical power cable is installed to the jacket or platform onshore (for example in a dock, yard or port) prior to being transported to its offshore location, the health and safety risks involved with pulling and connecting electrical cables to offshore wind turbine jackets or platforms, to connect a wind turbine to the subsea power network, are avoided. As will be described further below, traditionally the process of connecting an offshore wind turbine jacket or platform to an inter array cable of a subsea power network involves either lifting a terminated end of the subsea cable to the point of connection with the wind turbine itself (on the jacket or platform), or connecting a terminated end of a subsea inter array cable to the wind turbine (on the jacket or platform) from a vessel laying the subsea inter array cable. This process typically involves large teams, with many of the personnel of said teams having to be present on the wind turbine jacket or platform during lifting and connection operations. The method outlined above allows for an offshore wind turbine jacket or platform to be connected to an inter array cable of a subsea power network without the need for cable pulling and connection operations, thereby negating the need for large amounts of personnel on board the offshore wind turbine jacket or platform. Given that the wind turbine jacket or platform jacket or platform has an electrical power cable pre-installed (prior to transportation offshore), the second end of the electrical power cable of the wind turbine jacket or platform can simply be connected to a subsea inter array cable from an adjacent vessel, without the need for personnel on board of the jacket or platform, or with significantly minimised personnel numbers on board the jacket or platform. This reduction in personnel helps to minimise / remove the risks associated with boarding and unmanning offshore structures, and with conducting heavy pulling / lifting / connecting operations on board a wind turbine jacket or platform. Additionally, the rate at which offshore wind turbines may be connected into a subsea power network may be greatly increased. For example, with the proposed method, as the pre-installed electrical power cable may be connected to a subsea inter array power cable without the need to board and unman personnel from offshore wind turbine jackets or platforms, delays associated with boarding and unmanning processes can be avoided. For example, personnel may only be boarded and unmanned from offshore structure inclement weather. Therefore, adverse weather or sea conditions may cause significant delays when trying to install and connect offshore wind turbine jackets or platforms. Further, operations such as cable pulling operations to offshore jackets or platforms may also only be performed either during daylight hours, or during clement weather conditions. Therefore, adverse weather conditions and darkness may also cause significant delays in the installation process of offshore wind turbine jackets or platforms. As outlined above, the proposed method simply allows the pre-installed electrical power cable to be connected to a subsea inter array power cable from an adjacent vessel, significantly reducing the time to tie the installed wind turbines into a subsea power network. Such reductions in time needed to install these structures also provides significant cost reductions, given that installation equipment is not required for long periods of time (in comparison to traditional methods). Reduction in health and safety risks (such as those associated with boarding and unmanning personnel from offshore structures, or performing operations such as cable pulling on offshore structures) also provides significant cost benefits. Such reductions in the personnel required for installation of offshore wind turbines and jackets (given that an electrical power cable has been pre-installed on land) also provides significant cost savings. The step of installing the electrical power cable to the jacket or platform onshore (prior to transportation at the offshore location) may also provide greater flexibility with the manufacturing process. For example, electrical power cable installation may not need to take place during daylight hours, or during clement weather, if it is being performed onshore. Further, fewer personnel may be required to install the electrical power cable to the turbine jacket or platform in an onshore environment, compared to those required to pull an inter array cable to an offshore jacket or platform, and connect said inter array cable to the jacket or platform. The method may comprise installing an inter array cable as the electrical power cable. The method may comprise supporting the power cable in or on a leg or legs of the jacket or platform. Support for the power cable may be provided by any appropriate means within the understanding of the skilled person. Support for the power cable may prevent the electrical power cable flexing / twisting / bending in undesirable directions, which may cause undesirable stresses, strains or damage to the electrical power cable. Further, supporting the electrical power cable may also reduce the tension or stress put on the connection point between the first end of the electrical power cable and the wind turbine jacket or platform, which may also prevent damage to the electrical power cable. The support may comprise armouring or other protective means, to protect the cable from damage. For example, the support may provide protection means for the cable during transportation, or from lifting equipment during installation. The method may comprise supporting the power cable on or in a tubular support secured to the leg or legs. For example, the tubular support may comprise a J-tube. Alternatively, the tubular support may comprise a substantially straight tubing piece, such as an l-tube. The method may further comprise installing of the power cable by connecting the first end of the power cable to a switchgear of the jacket or platform, and electrically coupling the first end of the power cable to the power output of the wind turbine comprises coupling the power output to the switchgear. The provision of a switchgear intermediate the first end of the electrical power cable and the power output of the wind turbine may act as a circuit breaker or means of control of the power output from the wind turbine. This may allow power from the wind turbine to be isolated during repair works to the turbine or associated subsea network, or to allow for the power output of the wind turbine to be controlled based upon demand. The method may comprise testing the electrical coupling between the electrical power cable and the switchgear prior to transporting the jacket or platform to its offshore location. This will ensure that the connection is functioning as intended prior to installation of the wind turbine, and will ultimately save time during offshore installation operations. The method may comprise testing the functionality of the switchgear prior to transporting the jacket or platform to its offshore location. The method may comprise electrically coupling the switchgear to the power output of the wind turbine via one or more transformers. The method may further comprise releasably securing the first and or second end of the power cable to the jacket or platform structure, during installation of the power cable, such that the first and or second end is above sea level after the jacket or platform is secured to the sea bed. Releasably securing the second end of the electrical power cable to the jacket or platform allows the second end to be easily removed from the jacket or platform when it is required that the electrical power cable be connected to the subsea inter array cable. This helps to increase the speed / rate at which installation operations can be performed. Maintaining the second end of the electrical power cable above sea level also helps the installation process, as the second end of the electrical power cable is easily accessible to lifting equipment (of a cable laying or support vessel, for example) above sea level. The method may comprise lowering the second end of the electrical power cable to the seabed or a location close to the seabed and connecting the second end to the first mentioned inter array cable. Alternatively, the method may comprise lowering the second end of the electrical power cable to a desired depth, below sea level, for connection to the inter array cable, lifting the first mentioned inter array cable from the seabed to the depth of the second end of the electrical power cable, and connecting the electrical power cable to the inter array cable. The method may comprise connecting the second end of the electrical power cable to the first mentioned inter array cable using one or more remotely operated vehicles (ROV), and / or one or more divers. Performing the connection subsea with one or more ROVs or divers may also help to limit the personnel required when performing the connection between the electrical power cable and the inter array cable; thereby also limiting the health and safety risks associated with the installations of offshore wind turbines generally. The method may comprise lifting the first mentioned inter array cable from the seabed to above sea level and connecting the second end of the electrical power cable to the first mentioned inter array cable above sea level. This method may allow for a ‘dry’ connection to be made between the electrical power cable and the first mentioned inter array cable. Performing a ‘dry’ may be a far less complex method of connecting two electrical cables, as waterproofing at the connection point during connection of the two cables is not an issue. Additionally, the connection may be performed by personnel on board of a vessel. Said vessel, may also simultaneously be laying inter array cables subsea for the wind turbine to be connected to. Therefore, the cable being laid may be terminated on the vessel and connected to the electrical power cable of the wind turbine jacket or platform, with the connection point between the two cables then being lowered to the seabed. Performing the method in this way may also help to significantly reduce the time taken to install offshore wind turbines and their associated subsea power networks, also helping to significantly reduce installation costs. The method may further comprise; laying an inter array cable subsea, terminating the inter array cable at a termination end; and, directly connecting the second end of the electrical power cable to the termination end of the inter array cable either above or below sea level. This methodology also allows for a ‘dry’ connection to be made between the first mentioned inter array cable and the electrical power cable of the wind turbine jacket or platform; with the associated advantages as outlined above. As previously described, performing the installation of both subsea inter array cables and offshore wind jackets or turbines in this manner may help to significantly reduce the time taken for offshore wind farms to be installed, thereby also significantly reducing the costs associated with installation. The method may further comprise installing a second electrical power cable on the jacket or platform, the second electrical power cable having a first end for connection to a wind turbine and a second end comprising a connector for connection to a complimentary connector of a second wind turbine jacket or platform. This may allow for the installed wind turbine jacket or platform to be electrically connected or coupled to a second, adjacent wind turbine jacket or platform. This may allow for a plurality of the wind turbines to be connected in series, with the plurality of wind turbines feeding into a single connection point with a subsea inter array cable. Therefore, the method may further comprise installing a second wind turbine; installation of the second turbine comprising; constructing the second wind turbine jacket or platform; installing an electrical power cable on the second jacket or platform, the power cable having a first end for connection to a wind turbine and a second end comprising a connector for direct connection to a complimentary connector of the second power cable of the first wind turbine jacket or platform; transporting the second jacket or platform to a second offshore location and securing it to the seabed, prior to connecting the second end of the first electrical power cable of the first jacket or platform to the inter array cable; installing a wind turbine on the second jacket or platform, including electrically coupling said first end of the power cable to a power output of the wind turbine; and at said second offshore location, and either before or after the step of installing the wind turbine, connecting said second end of the power cable to the connector of the second electrical power cable of the first wind turbine jacket or platform either above or below sea level. The second end of the second electrical power cable of the first wind turbine may be connected to the second end of the first electrical cable of the second jacket or platform via an inter array cable. As will be clear to one skilled in the art, installing a plurality of wind turbines by this same method may lead to significant reduction in the time take to install an offshore wind farm, significant reduction in the health and safety risks to personnel involved in doing so, and therefore significant reductions in the overall costs of installation of the wind farm. The method may comprising transporting the first and second wind turbine jackets or platforms to the first offshore location at the same time. Transporting one or more jackets or platforms at one time may help to increase the efficiency of installation of a plurality of wind turbine jackets or platforms, with fewer transport vessel trips between the wind farm site and the jacket or platform production yard / workshop / port. According to a second aspect of the present invention there is provided a method of constructing a wind turbine jacket or platform onshore and comprising assembling a jacket or platform structure, and installing an electrical power cable on the jacket or platform structure, the electrical power cable having a first end for connection to a wind turbine and a second end comprising a connector for direct connection to a complimentary connector of an inter array cable. Constructing a wind turbine jacket or platform (including having an electrical power cable installed) onshore carries the same advantages as outlined above, with respect to the health and safety, construction and installation time savings, and cost reductions. The method may comprise electrically coupling the first end of the electrical power cable to a switchgear installed on the jacket or platform. The method may further comprise testing the electrical coupling between the electrical power cable and the switch gear, following installation of the electrical power cable. The method may comprise testing the functionality of the switchgear prior to transportation of the jacket or platform offshore. The method may further comprise supporting the power cable in or on a leg or legs of the jacket or platform. The method may further comprise supporting the power cable on or in a tubular support secured to the leg or legs. The method may further comprise releasably securing the first and or second end of the power cable to the jacket or platform structure, during installation of the power cable, such that the first and or second end will be above sea level after the jacket or platform is secured to the sea bed. The method may further comprise installing a second electrical power cable on the jacket or platform, the second electrical power cable having a first end for connection to a wind turbine and a second end comprising a connector for connection to a complimentary connector of a second wind turbine jacket or platform. According to a third aspect of the present invention there is provided an offshore wind turbine jacket or platform, comprising a jacket or platform structure, and an electrical power cable on the jacket or platform, the power cable having a first end for connection to a wind turbine and a second end comprising a connector for direct connection to a complimentary connector of an inter array cable. The jacket or platform may comprise a switchgear, wherein the first end of the electrical power cable is electrically coupled to the switchgear. The first and or second ends of the electrical power cable of the jacket or platform may be releasably connected to the jacket or platform. The jacket or platform may comprise a tubular electrical power cable support. Features defined in relation to one aspect may be provided in combination with any other aspect. Brief Description of the Drawings Figure 1 shows the first stage of a method of installation of offshore wind turbines, according to the state of the art; Figure 2 shows the second stage of a method of installation of offshore wind turbines, according to the state of the art; Figure 3 shows the third stage of a method of installation of offshore wind turbines, according to the state of the art; Figure 4 shows the fourth stage of a method of installation of offshore wind turbines, according to the state of the art; Figure 5 shows the fifth stage of a method of installation of offshore wind turbines, according to the state of the art; Figure 6 shows the sixth stage of a method of installation of offshore wind turbines, according to the state of the art; Figure 7 shows a wind turbine jacket according to an embodiment; Figure 8 shows a wind turbine platform according to an embodiment; Figure 9 shows a wind turbine jacket according to an embodiment; Figure 10 shows a wind turbine jacket according to an embodiment; Figure 11 shows the first stage of the method of installing offshore wind turbines, according to an embodiment; Figure 12 shows the second stage of the method of installing offshore wind turbines, according to an embodiment; Figure 13 shows the third stage of the method of installing offshore wind turbines, according to an embodiment; Figure 14 shows the fourth stage of the method of installing offshore wind turbines, according to an embodiment; Figure 15 shows the fifth stage of the method of installing offshore wind turbines, according to an embodiment; Figure 16 shows an alternative method of installation of offshore wind turbines; Figure 17 shows the second stage of the method of installation initially depicted within Figure 16; Figure 18 shows the final stage of the method of installation depicted in Figures 16 and 17. Figure 19 shows an alternative method of installation of offshore wind turbines; Figure 20 shows the second stage of the method of installation initially depicted within Figure 19; Figure 21 shows the third stage of the method of installation depicted in Figures 19 and 20; Figure 22 shows the fourth stage of the method of installation depicted in Figures 19 to 21; Figure 23 shows the fifth stage of the method of installation depicted in Figures 19 to 22; Figure 24 shows the final stage of the method of installation depicted in Figures 19 to 23; and, Figure 25 shows an alternative example of number of connected wind turbines connected. Detailed Description Figures 1 to 6 demonstrate a typical method of installing offshore wind turbine jackets, although the same (or at least only differing in immaterial details) technique may be used for the installation of offshore wind turbine platforms. Figure 1 shows a transport vessel 10 docked at the manufacturing and / or storage site 15 of wind turbine jackets 16. Also shown are partially constructed jackets 18. The transportation vessel 10 may be sized to transport a plurality of jackets 16. As shown, the jackets 18 comprise a simple structure, having a plurality of legs, a base 34 for the wind turbine, and bracings between the legs. The jackets 18 may be loaded on to the vessel 10 by an appropriate means, for example, a crane fixed to the dock 15 upon which the jackets 16 are stored, or a crane of a separate vessel (not shown). Figure 2 shows a plurality of offshore wind turbine jackets 16 on the transportation vessel 10. Also shown are a plurality of wind turbine jackets 16 that have been disposed at their offshore location. The feet 36 of these jackets 16 are fixed to the seabed 14, with the bases 34 upon which wind turbines will be disposed above sea level 12. The jackets 16 may have been unloaded from the transportation vessel by any means within the understanding of one skilled in the art, such as a sea-faring crane vessel (not shown). Following installation of the jackets 16, an electrical inter array cable 20 is laid from the cable reel 35 of a cable lay vessel 11 on the seabed 14. The inter array cable 20 is used to supply the electrical energy generated by each of the wind turbines of the wind farm back to the shore. Within Figure 4, the inter array cable has been terminated on or within the vicinity of the cable lay vessel 11, providing a termination point 22 for connection to a wind turbine jacket 16. Said termination point 22 may be created by cutting the inter array cable 22. Said termination point 22 may be provided with a special connection, such as a socket, plug, connector or the like, for connection to a wind turbine jacket 16. The termination end 22 of the electrical inter array cable 20 is then lifted / pulled towards its connection point (not shown) with the wind turbine jacket 16. This may be performed by a sea faring crane vessel, a crane disposed on the cable lay vessel 35, or by any other appropriate means within the understanding of one skilled in the art. The termination end 22 is lifted / pulled towards the wind turbine base 34for connection to the wind turbine jacket 16 at the wind turbine base 34. Here, the termination end 22 will be made available for connection to the power output of a wind turbine, once installed. Not shown are the personnel present within the jacket 16 to which the termination end 22 of the inter array cable 20 is being connected. Within this methodology, personnel are required on the jacket 16 to assist with lifting / pulling and connection operations, between the inter array cable termination end 22, and the jacket 16. Personnel may be required on the jacket 16 during lifting / pulling of the termination end 22 to the jacket for preparing the areas through which the inter array cable 20 is to be lifted and fixed, electrically connecting the inter array cable termination end 22 to the jacket 16, and testing the electrical connection between the inter array cable termination end 22 and the jacket 16 is functioning correctly. Prior to cable 20 lifting / pulling operations taking place, personnel need to be mobilised from the shore or a vessel to the jacket or platform to which the inter array cable 20 is to be connected, and demobilised once installation of the inter array cable 20 to the jacket 16 is complete. Following completion of connecting the termination end 22 of the inter array cable to the wind turbine jacket 16, the cable lay vessel then proceeds to lay a second inter array cable 21, between the first wind turbine jacket 16 and a second wind turbine jacket 16’ as depicted in Figure 5. The second inter array cable 21 comprises a first termination end 26, disposed adjacent the first wind turbine jacket 16. The first termination end 26 is connected to the first wind turbine jacket 16 in the same manner that the termination end 22 of the first inter array cable 20 was connected to the first wind turbine jacket 16. The second inter array cable 16’ is then terminated at a second termination point (not shown), and connected to the second wind turbine jacket 16’ in the same manner as the termination point 22 of the first inter array cable 20, and the first termination point 26 of the second inter array cable 21, were connected to the first wind turbine jacket 16. This process of laying inter array cable between adjacent wind turbines may be continued until a number of wind turbine jackets 16, 16’, 16” are connected in series, in a ‘daisychain’ like manner., as shown in Figure 6. Once all inter array cables have been connected to each of their respective jackets 16, 16’, 16”, wind turbines 50 are be assembled on the wind turbine base 34, 34’, 34” of each jacket 16, 16, 16”, and electrically connected to their respective inter array cables 20, 21,23 at the one or more inter array cable termination points attached to each jacket 16, 16, 16”. Wind turbine 50 assembly on each jacket may comprise initially erecting the wind turbine mast, installing the nacelle with the turbine on top of the mast, and then assembling rotor blades to a rotor hub disposed on the nacelle. Finally, it may also be appreciated that substantially the same method can traditionally be used for constructing, transporting and connecting floating offshore wind turbine platforms to an offshore location, and connecting said platforms to a network of subsea inter array cables. Figure 7 shows an offshore wind turbine jacket 160 for use with an improved method of installation. The jacket comprises a plurality of legs 162, with bracings 164 between adjacent legs 162. The platform shown comprises four legs 162, but any suitable number may be used (e.g. three legs). The jacket further comprises a wind turbine base 166, with a wind turbine mast support 172 disposed thereon. As will be appreciated, features such as the mast support 172 may be optional. An electrical cable 174 is connected to the platform, with its first end (not shown) connected in the vicinity of the wind turbine base 166. The first end of the electrical cable 174 is provided for connection to the power output of a wind turbine disposed on the jacket 160 of Figure 6. The electrical cable 174 is hung from the jacket, and further connected to the jacket at its second end 170, wherein the second end 170 is releasably connected to the jacket at connection point 168. Connection point 168 comprises a releasable connection that allows the second end 170 of the electrical power cable 174 to be held in place during transportation, manufacture and installation of each jacket 160, while also allowing the second end 170 to be lifted from the jacket 160 when connection to a subsea inter array cable or adjacent platform is required. The releasable connection 168 may be any suitable releasable connection within the understanding of one skilled in the art. The second end 170 of the electrical power cable 174 is held in such a manner that when the electrical power cable 174 is hung from the jacket 160, the second end 170 will be held above sea level when the jacket 160 is installed at its offshore location. In the example the second end 170 comprises a connector component, that is complimentary to a connector component of a subsea inter array cable or connector component of the electrical power cable of an adjacent jacket 160. Such connectors will be described in greater detail below. Figure 8 shows a wind turbine platform 260 that may be used with the method. As can be seen, the platform comprises three columns 262, connected to one and other by horizontal connecting members 264, 266. At least one of the columns also comprises a wind turbine base 268, upon which a wind turbine may be disposed. An electrical power cable 274 is installed through one of the columns 262, attached at its first end (not shown) in the vicinity of the wind turbine base 269, and releasably held at its second end 270 at connection point 268, in a similar manner in which the cable 174 of Figure 7 is connected to its jacket 160. As with the example of Figure 6, the electrical cable 274 is installed during construction of the platform 260, and prior to the platform 260 being transported to its offshore location. It will be appreciated that the platform may comprise any suitable number of vertical columns (e.g. four), and any suitable number of horizontal connection members 264, 266 between the columns 262. The columns 262 and / or the horizontal connecting members 264, 266 may provide floatation or ballast means for the platform 260. Each of the jacket or platform of Figures 7 and 8 respectively may also comprise a switchgear (not shown), to which the first end of the electrical power cable may be connected. When a wind turbine is installed to the jacket or platform, the power output of the wind turbine may be electrically coupled to the first end of the electrical power cable via the switchgear. The switchgear may allow the power output from the wind turbine to be regulated depending upon demand, or isolated to allow for repairs to the wind turbine, jacket or platform, or subsea power distribution network equipment. The method may comprise testing the switchgear and the electrical connection between the switchgear and the first end of the electrical power cable prior to transportation to the offshore location. Figure 9 shows an additional example of a wind turbine jacket 160 that may be used with the present method. The jacket 160 of Figure 9 is identical to that shown within Figure 6, with the addition a support 175 for the electrical power cable 164. The support 175 is attached to a leg 162 of the jacket 160, with the support 175 supporting the electrical cable 164 between its first and second ends 170. In this example, the support 175 is shown as a J-tube, but this may alternatively be a substantially straight piece of tubing, commonly known as an l-tube. During construction of the jacket 160, the electrical power cable 164 may be fed through the J-tube 175 to be connected to the jacket 160 at its first end. The support 175 may prevent unwanted bending and / or stresses being imposed on the cable 164 during manufacture, transportation and installation of the jacket 160. The support 175 may also comprise armouring or other protective means to prevent damage to the electrical cable 164 during manufacture, transportation or installation of the jacket 160. Even though a J-tube 175 is shown within this example, it will be appreciated by one skilled in the art that any suitable form of support 175 may be used to perform the aforementioned required functions. Figure 10 shows the jacket construction of Figure 7, but with an additional electrical power cable 174’ installed. A jacket such as this may be used in wind farm installations wherein a number of wind turbines are to be connected in series, i.e. in a daisy-chain configuration. It will be appreciated that a plurality of electrical power cables 174, 174’ can also be installed on a wind turbine platform, such as that shown in Figure 8. Figure 11 demonstrates one example of a method of installation of offshore wind turbine jackets. As can be seen a number of fully constructed jackets 160, or partially constructed jackets 165 have been assembled on a dock 175. The fully assembled jackets 160 are provided with one or more electrical cables 174 each, to be connected to a subsea inter array cable. The fully assembled jackets 160 may be loaded onto the transportation vessel 100 by any appropriate means, such as a crane at the dock 175, or a sea-faring crane or lifting mechanism. Figure 12 shows the carrier vessel 100 having transported a plurality of wind turbine jackets 160 to the offshore location. Some of the jackets have been installed on the seabed 114, with the wind turbine bases 166 and second end 170. 170’ of each of the electrical cables 174, 174’ of each of the jackets 160 remaining above sea level 112. Figure 13 shows a first subsea inter array cable 120 having been laid, with a termination point 167 of the inter array cable 120 having been located adjacent the wind turbine jacket 160. A second inter array cable 121 has also been laid, with a first termination point 166 also adjacent the wind turbine jacket, and a second termination point (not shown) adjacent a second wind turbine jacket (not shown). It will be appreciated that said second inter array cable 121 may be installed following connection of the first inter array cable 120 to the wind turbine jacket 160. As can be seen, the second end 170 of the first electrical power cable 174 may be released / lifted from its releasable connection 168. In this example, the second end 170 has been lifted by a sea-faring crane 130, but any suitable lifting means within the knowledge of one skilled in the art may be used. Figure 14 shows the second end of the first electrical power cable 174 being lowered below sea level 112, and down to the seabed 114. Although Figure 14 shows the second end 170 of the first electrical power cable 174 being lowered by the sea-faring crane 130, this may alternatively be lowered to the seabed 114 by any suitable means, such as a remotely operated vehicle (ROV), or the like. The second end 170 of the first electrical power cable 174 is placed next to the termination 167 of the first subsea inter array cable 120, and an electrical connection is formed between the second end 170 of the first electrical power cable and the termination 167 of the first subsea inter array cable 120. Said connection is performed by any suitable means, such as ROVs, divers, or the like. At least one of the second end 170 of the first electrical power cable 174 or termination end 167 of the first subsea inter array cable may comprise a waterproof housing for the electrical connection between the two. At least one of the second end 170 of the first electrical power cable 174 or termination end 167 of the first subsea inter array cable may comprise a mechanical means of gripping the cables disposed therein, thereby relieving / preventing any tension on the connection between the second end 170 of the electrical power cable 174 and the termination end 167 of the first subsea inter array cable. In this instance, the second end 170 of the first electrical power cable 174 is connected directly to the termination 167 of the first subsea inter array cable 120. In other examples, the second end 170 of the electrical power cable 174 may be disposed in the vicinity of the termination end 167 of the first subsea inter array cable 120, with a flying lead connection being used to electrically connect the two (a flying lead connection being one or more wires / leads / cables connected between a second end of an electrical power cable and a termination end of a subsea inter array cable). The electrical wires / leads / cables of the flying lead connection my comprise a ‘stab’ connection interface with a second end of an electrical power cable of a wind turbine jacket or platform and / or with a termination point of the subsea inter array cable (e.g. the flying leads may comprise a male component, to be stabbed into a corresponding female component of a second end of an electrical power cable of a wind turbine jacket or platform and / or a subsea inter array cable termination point). Such a connection may be performed by an ROV, one or more divers, or any other appropriate means within the understanding of one skilled in the art. Figure 15 finally shows each of the jackets 160 installed at the offshore location connected in series. As shown, second and third subsea inter array cables 121, 122 have been installed, with the wind turbines connected to said subsea inter array cables 121, 122 in accordance with the method described above. Wind turbines 150 are installed upon the jackets 160. Said wind turbines 150 may be installed by any means within the understanding of the skilled person. For example, a mast of the wind turbine may be installed to the support 172 upon the wind turbine base 164 of its respective jacket 160. Once installed, a nacelle including a turbine may be installed at the top of the mast, with rotor blades then being installed on a rotor hub of the nacelle. The wind turbine 150 may then be electrically coupled to the first end of the electrical power cable 174 of the wind turbine jacket 160. The electrical energy produced by the turbine 150 may then be transferred to the subsea inter array cable 120, and transported to shore. It will be appreciated that the subsea inter array cable 120 may be installed prior to, during or following installation of the wind turbine jackets 160. Further, it will be understood that wind turbines 150 may begin to be installed to their respective jackets 160 prior to installation of all required jackets 160 for the wind farm. Figure 16 shows a variance to the method described within Figures 11 to 15. It will be appreciated that in this example that a wind turbine platform 260 has been shown to demonstrate how the described methods may also be implemented with a floating offshore wind platform 260. Within Figure 16, a wind turbine platform 260 has been constructed and transported to its offshore location. Although not shown, the platform may be tethered to the seabed 214 by any suitable means. Within this example, a subsea inter array cable 220 has been laid on the seabed 214. The subsea inter array cable 220 is terminated at termination point 267, with termination point 267 shown as being lifted form the seabed 214 to a predetermined depth below sea level 212. In this example, said lifting of the termination end 267 of the inter array cable 220 is provided by a floatation device, but said lifting also may be performed by a sea-faring vessel with lifting capabilities. A second subsea inter array cable 221 with termination point 261 has also been laid between this first wind turbine platform 260 and a second wind turbine platform (not shown), with the second subsea inter array cable 221 also being terminated adjacent the second wind turbine platform. As with the example of Figures 11 to 15, the second end 270 of the first electrical power cable 274 is released and lifted from its releasable connection with the wind turbine platform 260. In this example, the lifting of the second end 270 of the first electrical power cable 274 is performed by a sea-faring lifting vessel 230, but it will be appreciated, that said lifting may be performed by any appropriate means within the understanding of one skilled in the art. The second end 270 of the electrical power cable 274 is then lowered 240 towards the termination point 267 of the subsea inter array cable 220. Figure 17 shows the connection being formed between the second end 270 of the first electrical power cable 274 and the termination point 267 of the inter array cable 220.The connection may be formed and configured in any of the same ways as described in relation to the method of Figures 11 to 15. Following connection of the second end 270 of the first electrical power cable 274 to the first termination point 267, the second electrical power cable 274’ is connected to the first termination point 261 of the second subsea inter array cable 221 in the same manner as described above. Connecting wind turbine platforms in this manner may allow a plurality of wind turbine platforms to be electrically connected in series, so all can pass the electrical energy they generate to shore. Within Figure 18, a wind turbine 250 has been assembled on the wind turbine platform 260. The turbine 250 may be assembled to the platform 260 in the same manner as described in relation to the method of Figures 11 to 15, or by any method within the knowledge of one skilled in the art. The electrical energy generated by the wind turbine 250 may be transferred to the electrical power cable 274, and to the subsea inter array cable 220 via the connection between the second end 270 of the electrical power cable 274 and the termination end 267 of the subsea inter array cable 220. The electrical power is then transmitted to shore via the subsea inter array cable 220. The Example of Figure 19 shows a variance of them method described within Figures 9 to 16. As shown, a plurality of wind turbine jackets 360 have been disposed at their offshore location, ready for connection to one or more subsea inter array cables. The second end 370 of the first electrical power cable 374, and the second end 370’ of the second electrical power cable 374’ the jacket 360 are disposed above sea level 312, for ease of access when connection to the network of subsea inter array cables is required. Also depicted within Figure 19 is a cable laying vessel 330, laying a first subsea inter array cable 320 on the seabed 314. The first inter array cable is being unreeled from the cable reel 335 of the cable laying vessel 330, and laid upon the seabed 314. Figure 20 shows the termination point 367 of the first subsea inter array cable 320 being created. This is created by cutting the first subsea inter array cable 320 from the cable still present upon the cable reel 335. This is performed above sea level 312. Prior to creation of the termination point 367, at the same time, or after this, the cable laying vessel 330 also lifts the second end 370 of the first electrical power cable 374 from the wind turbine jacket (in the same manner as described in relation to Figures 11 to 18), for connection with the termination point 367 of the subsea inter array cable 320. The connection between the second end 370 of the first electrical power cable 374 and the termination point 367 of the first subsea inter array cable 320 is then formed above sea level 312. As with Figures 11 to 18, the second end of the subsea connector 370 of the first electrical power cable 374, and the termination end 367 of the inter array cable may be directly connected to one and other, or may be connected via flying leads. Additionally, at least one of the second end 370 of the first electrical power cable 374 or termination point 367 of the first subsea inter array cable 320 may comprise a waterproof housing for the electrical connection between the two. At least one of the second end 370 of the first electrical power cable 374 or termination point 367 of the subsea inter array cable may comprise a mechanical means of gripping the cables disposed therein, thereby relieving / preventing any tension on the connection between the second end 370 of the electrical power cable 374 and the termination point 367 of the subsea inter array cable. Within Figure 21, the connection is then being lowered to the seabed 314, with connection between the termination point 367 of the first subsea inter array cable 320 and the second end 370 of the first electrical power cable 374 being complete. Figure 22 shows the second end 370’ of the second electrical power cable 374’ being lifted from the wind turbine jacket 360, in the same manner as described with all examples above. Prior to this, following this, or simultaneous to this, a second subsea inter array cable 321 is starting to be unreeled from the cable reel 335 of the cable lay vessel 330, to be laid on the seabed between two adjacent wind turbine jackets 360. Prior to laying the second inter array cable 321, a first termination point 361 of the second inter array cable 321 is created. The second end 370’ of the second electrical power cable 374’ is then connected to the first termination point 361 of the second inter array cable 321 in accordance with any of the methods as described above. Within Figure 23, the connection between the second electrical power cable 374’ and the second inter array cable 321 has been lowered to the seabed. The cable laying vessel 330 then continues to lay the second inter array cable 321 between the two adjacent wind turbine jackets 360. This second inter array cable 321 is then terminated at a second termination point prior to the next wind turbine jacket. This process is continued until all wind turbine jackets to be connected in series are connected to one and other. Figure 24 shows wind turbines 350 assembled on each of the wind turbine jackets 360, with the first and second electrical cables 374, 374’ of each wind turbine jackets 360 being connected to the adjacent subsea inter array cable, connected and laid in accordance with the process outlined above, so the electrical energy generated by each wind turbine 350 can be transported to shore. Figure 25 shows an example of a number of wind turbines connected in series, using flying lead connections 385, 386, as described above. It will be appreciated that when a number of wind turbines are connected in together, a mix of direct connections between electrical power cables of wind turbine jackets or platforms and subsea inter array cables, and flying lead connections, may be used dependent upon circumstance. Within all examples, certain sections of each electrical cable (e.g. the electrical cables of the wind turbine jackets or platforms and the subsea inter array cable) may comprise bend stiffeners in areas that may be subjected to the most stress during installation. Such bend stiffeners may prevent damage to the cables caused by stresses induced by bending cables too greatly, or repeatedly. It should be understood that the examples described herein are merely exemplary and that various modifications may be made thereto within the understanding of the skilled person, without departing from the scope of the present disclosure.
Claims
1. A method of installing a wind turbine, the method comprising:installing an electrical power cable on a jacket or platform at an onshore location, the power cable having a first end for connection to a wind turbine and a second end comprising a connector for direct connection to a complimentary connector of an inter array cable;transporting the jacket or platform to an offshore location;fixing the wind turbine to the jacket or platform, including electrically coupling said first end of the power cable to a power output of the wind turbine; andat said offshore location, and either before or after the step of fixing the wind turbine, directly connecting said second end of the power cable to the connector of the inter array cable either above or below sea level.
2. The method according to claim 1, wherein said electrical power cable is a second inter array cable.
3. The method according to any one of the preceding claims and comprising, during installing of the power cable, supporting the power cable in or on a leg or legs of the jacket or platform.
4. The method according to claim 3 and comprising supporting the power cable on or in a tubular support secured to the leg or legs.
5. the method according to claim 4, wherein the tubular support is a J-tube or an I-tube.
6. The method according to any one of the preceding claims, wherein installing of the power cable comprises connecting the first end of the power cable to a switchgear of the jacket or platform, and electrically coupling the first end of the power cable to the power output of the wind turbine comprises coupling the power output to the switchgear.
7. The method according to claim 6, comprising testing the electrical coupling between the power cable and the switchgear, prior to transporting the jacket or platform to the offshore location.
8. The method according to any preceding claim and comprising releasably securing the first and or second end of the power cable to the jacket or platform structure, during installation of the power cable, such that the first and or second end is above sea level after the jacket or platform is secured to the sea bed.
9. The method according to any one of the preceding claims comprising lowering the second end of the electrical power cable to the seabed or a location close to the seabed and connecting the second end to the first mentioned inter array cable.10 The method according to any one of claims 1 to 8, comprising lowering the second end of the electrical power cable to a desired depth, below sea level, for connection to the inter array cable, lifting the first mentioned inter array cable from the seabed to the depth of the second end of the electrical power cable, and connecting the electrical power cable to the inter array cable.
11. The method according to claim 9 or 10 and comprising connecting the second end of the electrical power cable to the first mentioned inter array cable using one or more remotely operated vehicles (ROV), and / or one or more divers.
12. The method according to any one of claims 1 to 8 and comprising lifting the first mentioned inter array cable from the seabed to above sea level and connecting the second end of the electrical power cable to the first mentioned inter array cable above sea level.
13. The method according to any one of claims 1 to 8, further comprising;laying an inter array cable subsea,terminating the inter array cable at a termination end; and, directly connecting the second end of the electrical power cable to the termination end of the inter array cable either above or below sea level.
14. The method according to any preceding claim, comprising installing a second electrical power cable on the on the jacket or platform, the second electrical power cable having a first end for connection to the wind turbine and a second end comprising aconnector for direct connection to a complimentary connector of a second wind turbine jacket or platform.
15. The method according to claim 14 comprising installing a second wind turbine; installation of the second turbine comprising;constructing the second wind turbine jacket or platform;installing an electrical power cable on the second jacket or platform, the power cable having a first end for connection to a wind turbine and a second end comprising a connector for direct connection to a complimentary connector of the power cable of the first wind turbine jacket or platform;transporting the second jacket or platform to a second offshore location and securing it to the seabed, prior to connecting the second end of the first electrical power cable of the first jacket or platform to the inter array cable;installing a wind turbine on the second jacket or platform, including electrically coupling said first end of the power cable to a power output of the wind turbine; andat said second offshore location, and either before or after the step of installing the wind turbine, directly connecting said second end of the power cable to the connector of the first wind turbine jacket or platform either above or below sea level.
16. The method according to claim 15, comprising transporting the first and second wind turbine jackets or platforms to the first offshore location at the same time.
17. A method of constructing a wind turbine jacket or platform onshore and comprising;assembling a jacket or platform structure; and,installing an electrical power cable on the jacket or platform structure, the power cable having a first end for connection to a wind turbine and a second end comprising a connector for direct connection to a complimentary connector of an inter array cable.
18. The method of claim 17 comprising electrically coupling the first end of the electrical power cable to a switchgear installed on the jacket or platform.
19. The method of claim 18, comprising testing the electrical coupling between the electrical power cable and the switch gear, following installation of the electrical power cable.
20. The method according to any one of claims 17 to 19 comprising, supporting the power cable in or on a leg or legs of the jacket or platform.
21. The method according to claim 20 and comprising supporting the power cable on or in a tubular support secured to the leg or legs.
22. the method according to claim 21, wherein the tubular support is a J-tube or an I-tube.
23. The method according to any one of claims 17 to 22 comprising releasably securing the first and or second end of the power cable to the jacket or platform structure, during installation of the power cable, such that the first and or second end will be above sea level after the jacket or platform is secured to the sea bed.
24. The method according to any one of claims 17 to 23 further comprising installing a second electrical power cable on the jacket or platform, the second electrical power cable having a first end for connection to the wind turbine and a second end comprising a connector for connection to a complimentary connector of a second wind turbine jacket or platform.
25. An offshore wind turbine jacket or platform, comprising:a jacket or platform structure; and,an electrical power cable on the jacket or platform, the power cable having a first end for connection to a wind turbine and a second end comprising a connector for direct connection to a complimentary connector of an inter array cable.
26. The jacket or platform according to claim 25, comprising a switchgear, wherein the first end of the electrical power cable is electrically coupled to the switchgear.
27. The jacket or platform according to any one of claims 25 or 26, wherein the first and or second ends of the electrical power cable are releasably connected to the jacket or platform.
28. The jacket or platform according to any one of claims 25 to 27, comprising a tubular electrical power cable support.
29. The jacket or platform of claim 28, wherein the tubular support is a J-tube or a 5 straight tubing section.
30. The jacket or platform according to any one of claims 25 to 29, further comprising a second electrical power cable on the jacket or platform, the second electrical power cable having a first end for connection to the wind turbine and a second end comprising10 a connector for connection to a complimentary connector of a second wind turbine jacket or platform.
Citation Information
Patent Citations
Offshore Electrical Plant Installation Method and System
US20140246232A1
Method for mounting electrical cable and cable protection apparatus to support
WO2013075973A2
Cable installation and / or protection system
WO2015071679A1