Human resource arrangement support system and program

The human resource allocation support system addresses the challenge of inappropriate personnel allocation by calculating compatibility between human resources and project positions, improving project success rates through objective and efficient staffing.

JP2024134533APending Publication Date: 2024-10-03TECH FUN CO LTD

Patent Information

Application Number
JP2024038065
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-20
Filing Date
2024-03-12
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

Existing human resource allocation systems lack the ability to appropriately allocate personnel to project positions, as they do not account for the compatibility between human resources and positions, leading to inefficiencies and subjectivity in staffing decisions.

Method used

A human resource allocation support system that calculates compatibility between human resources and project positions based on past performance and evaluation values, using a compatibility calculation unit to determine the best fit for each position, thereby enhancing project success rates.

Benefits of technology

The system enables objective and efficient allocation of personnel by considering compatibility, increasing the likelihood of project success through informed staffing decisions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024134533000001_ABST
    Figure 2024134533000001_ABST
Patent Text Reader

Abstract

To provide a human resource arrangement support system and program for supporting appropriate human resource arrangement in a project.SOLUTION: The human resource arrangement support system includes: a human resource result information DB 20 storing result information including at least roles performed by human resources in projects in which the human resources participated in the past and periods in which the roles were performed, and evaluation values obtained by evaluators evaluating the roles performed by the human resources; a position information DB 30 in which position information is stored, the position information including an association between a position that is a title assigned to a human resource and that constitutes a project and one or more predetermined roles performed by the human resource to which the position is assigned; and a compatibility calculation part 60 for calculating the compatibility between the human resources and the positions on the basis of the position information, the result information, and the evaluation values.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a personnel allocation support system that supports personnel allocation in various projects such as software development. Regarding. [Background technology]

[0002] For example, in projects such as software development, securing and allocating personnel is important, and appropriate personnel allocation has a large impact on the success or failure of the project. Traditionally, in order to allocate personnel, planners would refer to various information on personnel and consider various constraints on the project to determine personnel allocation. However, as the amount of information on personnel is constantly increasing, it is difficult for planners to organize and confirm all the information, and in particular, it is difficult to allocate personnel appropriately while considering the characteristics of the project. In addition, traditionally, personnel allocation was based on the experience and subjectivity of personnel allocation personnel, which led to a lack of objectivity, and the task of personnel allocation itself became personalized.

[0003] In view of these circumstances, systems that support personnel allocation have been emerging (see, for example, Patent Document 1). The system described in Patent Document 1 uses a competency model to grasp both employees and jobs and use it in personnel allocation planning. Competencies here refer to individual knowledge and abilities required to perform a job, and are set appropriately in terms of general abilities, specialized knowledge, qualifications, etc. Employees are evaluated for some or all of their competencies and assigned a level. In addition, a competency level required for each job is set. When a job is advertised for a specific job, employees who meet each competency level for that job are selected as candidates. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2001-167191 A Summary of the Invention [Problem to be solved by the invention]

[0005] In actual projects, projects often consist of multiple positions. Personnel allocation involves deciding which personnel to assign to each position that makes up the project. A position here means the title or status assigned to a person, and consists of at least one role. A role also means the work or duties expected or performed according to that position in the project.

[0006] For example, in a software development project, positions include "project manager (as a position)," "playing manager," and "business promotion manager."

[0007] Here, the position of "project manager (as a position)" is a position that specializes in overseeing the entire project. The role of "project manager (as a position)" is, for example, "project manager (as a role)." Here, the role of "project manager (as a role)" is the specific schedule adjustments and human resource adjustments within the project.

[0008] Additionally, the position of "playing manager" is one in which the person oversees the entire project and also handles practical tasks such as programming. There are three roles for a "playing manager," for example: "project manager (as a role)," "system engineer," and "programmer." Here, the role of a "system engineer" is software development and design. Additionally, the role of a "programmer" is software coding.

[0009] The position of "business promotion manager" is a position in charge of promoting the business related to the project. The role of the "business promotion manager" is, for example, "project manager" and "sales." Here, the role of "sales" is external negotiations and advertising.

[0010] Note that the positions are merely names and are freely set as appropriate depending on the scale and characteristics of the project. The roles that make up the positions are also freely set as appropriate depending on the scale and characteristics of the project.

[0011] As mentioned above, a human resource allocation plan is a plan for which human resources are to be allocated to each position constituting a project. On the other hand, in the plan described in Patent Document 1, since there is no concept of positions, it is difficult to allocate human resources appropriately to a project. In other words, even if the roles required of human resources to perform are the same, the abilities that the human resource can demonstrate often differ depending on the position assigned to the human resource. For example, even if a human resource is highly evaluated as a "project manager (as a role)" and can fully demonstrate his / her abilities in the position: playing manager, he / she often cannot fully demonstrate his / her abilities in the position: project manager (as a position).

[0012] The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a personnel allocation support system and program that support appropriate personnel allocation in a project. [Means for solving the problem]

[0013] The applicant has discovered that there is compatibility between positions and personnel, and that the success rate of a project is improved by assigning personnel who have a high degree of compatibility with a position that constitutes the project.

[0014] In order to achieve the above-mentioned object, the present invention provides a human resources allocation support system that supports the allocation of human resources in projects, comprising: a human resources performance information storage unit that stores performance information including at least the role performed by a human resources in projects in which the human resources have participated in the past and the period during which the role was performed, and an evaluation value evaluated by an evaluator for the role performed by the human resources; a position information storage unit that stores position information which is a title assigned to a human resources and includes an association between a position constituting a project and one or more specified roles performed by the human resources to which the position is assigned; and a compatibility calculation unit that calculates the compatibility between a human resources and a position based on the position information stored in the position information storage unit and the performance information and the evaluation value stored in the human resources performance information storage unit.

[0015] Furthermore, the present invention is characterized in that, in the above-mentioned personnel placement support system, it further comprises a project information storage unit which stores project information consisting of at least one or more positions, a personnel placement unit which places personnel to each position that constitutes the project, and a project success rate calculation unit which calculates a project success rate based on the compatibility between each position that constitutes the project and the personnel placed in that position, calculated by the compatibility calculation unit for each position that constitutes the project. Effect of the Invention

[0016] According to the present invention, since the compatibility between personnel and positions is calculated, it is possible to appropriately allocate personnel using the compatibility as one of the criteria. Also, according to the present invention, since the success rate of a project is calculated based on the compatibility, it is possible to easily allocate personnel in a way that increases the success rate of the project. [Brief description of the drawings]

[0017] [Figure 1] Network diagram explaining the services provided by the personnel placement support system [Diagram 2] Project structure [Diagram 3] Functional block diagram of the personnel placement support system [Figure 4] An example of the data structure of a human resources information DB [Diagram 5] An example of the data structure of the personnel performance information DB [Figure 6] An example of the data structure of the position information DB [Figure 7] An example of the data structure of the project information DB [Figure 8] An example of the data structure of the team information DB [Figure 9] The flow of how users consider personnel placement using the personnel placement support system [Figure 10] Functional block diagram of a personnel allocation support system according to a second embodiment [Figure 11] An example of a data structure of a human resources information DB according to the second embodiment [Figure 12] An example of a data structure of a position information DB according to the second embodiment [Figure 13] An example of a data structure of a project information DB according to the second embodiment [Figure 14] 13 is an example of a data structure of custom item information according to the second embodiment. [Figure 15] An example of a data structure of a condition information DB according to the second embodiment [Figure 16] 13 is an example of a custom item setting screen according to the second embodiment. [Figure 17] 13 is an example of a condition information setting screen according to the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0018] (First embodiment) A personnel allocation support system according to a first embodiment of the present invention will be described with reference to the drawings. Note that, for the sake of simplicity, only the gist of the present invention will be described here.

[0019] The personnel placement support system 1 according to this embodiment provides a personnel placement support service to a user. The user is a person who uses the personnel placement support system 1 to perform personnel placement. In this embodiment, the user is a personnel placement manager in the company or organization that is the main body of the project. If the project spans multiple companies or organizations, the user may be a personnel placement manager in the company or organization that is the main body of the project. The user may also be a person in charge of the company or organization that acquires various information from other companies or organizations, performs personnel placement using the personnel placement support system 1, and provides the results of personnel placement to the other companies or organizations.

[0020] As shown in Fig. 1, a personnel placement support system 1 is placed on a network 2 such as the Internet. A user accesses the personnel placement support system 1 using a user terminal 3 and receives personnel placement support services. The personnel placement support services provided to users by the personnel placement support system 1 include a service for supporting the placement of personnel for new projects and a service for evaluating existing projects and supporting changes in personnel placement as necessary.

[0021] In this embodiment, as shown in FIG. 2, a project is made up of one or more teams. Each team is made up of one or more positions. A position means a title or status assigned to a person, and is made up of at least one or more roles. A role means an operation or task expected or performed according to a position in a project. The teams that make up a project, the positions that make up a team, and the roles that make up a position are set arbitrarily by the user.

[0022] As shown in Figure 3, the human resources allocation support system 1 includes a human resources information DB10, a human resources performance information DB20, a position information DB30, a project information DB40, a team information DB50, a compatibility calculation unit 60, a project success rate calculation unit 61, a human resources allocation processing unit 62, an optimal human resources allocation search unit 63, and a user interface unit 70.

[0023] The personnel placement support system 1 is configured with a well-known information processing device such as a server device. The implementation form of the personnel placement support system 1 is not important, and for example, each part of the personnel placement support system 1 may be distributed and implemented on a plurality of hardware devices. In this embodiment, the personnel placement support system 1 is implemented on a cloud server deployed on the Internet. The personnel placement support system 1 is implemented, for example, by installing a program on a computer.

[0024] An example of the data structure of the human resources information DB 10 is shown in Fig. 4. The human resources information DB 10 stores various information related to human resources, and in the example of Fig. 4, stores human resource attribute information such as a human resources ID that uniquely identifies the human resources, the human resources' names, and information on the companies to which the human resources belong.

[0025] An example of the data structure of the talent performance information DB20 is shown in FIG. 5. The talent performance information DB20 stores the performance information of the talent in the projects in which the talent participated in the past and the evaluation value for the performance. In the example of FIG. 5, the talent performance information DB20 stores the talent ID, the project ID that uniquely identifies the project in which the talent participated, the position ID that uniquely identifies the position assigned to the talent in the project, the period during which the position was performed (start date and end date), the role, process, and technical element in charge of the position, and the evaluation value for them as the performance information. Here, there may be multiple roles, processes, and technical elements for one position. In addition, depending on the position and role, there may be cases where there are no processes, technical elements, and evaluation values ​​for them. In addition, the evaluation value for each of the roles, processes, and technical elements is input by the user after the end of the project or the end of the performance period of the role, process, and technical element. In this embodiment, each evaluation value is expressed by a natural number from 1 to 10, and the higher the evaluation value, the higher the evaluation.

[0026] An example of the data structure of the position information DB30 is shown in Fig. 6. The position information DB30 stores information about positions in a project. In the example of Fig. 6, the position information DB30 stores information that defines a position, such as a position ID that uniquely identifies the position, the name of the position, and the role, process, and technology field that the position is responsible for. It should be noted that there may be multiple roles, processes, and technology fields for one position. It should also be noted that, depending on the position and role, there may be no processes or technology elements and no evaluation values ​​for them.

[0027] An example of the project information DB 40 is shown in Fig. 7. The project information DB 40 stores various information related to projects, and in the example of Fig. 7, stores a project ID that uniquely identifies a project, a project name, a project period (start date and end date), etc.

[0028] An example of the team information DB 50 is shown in Fig. 8. The team information DB 50 stores information about the teams that make up a project, and in the example of Fig. 8, stores a team ID that uniquely identifies the team, the name of the team, the project ID of the project to which the team belongs, the position ID of one or more positions that make up the team, the period of the position (start date and end date), etc.

[0029] The compatibility calculation unit 60 calculates the compatibility between a talent and a position based on the position information stored in the position information DB 30 and the performance information and evaluation value stored in the talent performance information DB 20.

[0030] Specifically, first, the compatibility calculation unit 60 calculates the evaluation value for each evaluation target element based on the performance information and evaluation value stored in the talent performance information DB 20 for the talent A to be calculated, and obtains an element-by-element evaluation aggregate value. Here, an evaluation target element is the smallest unit in the role, process, and technical field that constitutes a position. For example, the evaluation target element is "role: PM", "process: requirements definition", and "technical element: JAVA". The element-by-element evaluation aggregate value for talent A's element X is calculated by the following formula 1.

[0031]

number

[0032] As shown in the above formula 1, when calculating the element-by-element evaluation aggregate value for element X of human resource A, the average evaluation value of element X is calculated for each project in which human resource A participated, and weighted using the number of days elapsed from the end of the project to the calculation time. In other words, the evaluation value is weighted so that the evaluation value closer to the calculation time has a greater influence on the compatibility degree. Specifically, the inverse of the number of days elapsed from the end of the project to the calculation time is used as the weighting. Then, this is totaled for all projects in which human resource A participated, and finally normalized by dividing by the total number of days elapsed. The element-by-element evaluation aggregate value may be calculated each time a compatibility degree calculation request is made, or may be calculated in advance for all human resources by regular batch processing. In the latter case, the calculated element-by-element evaluation aggregate value may be stored in a separate DB.

[0033] Next, the compatibility calculation unit 60 refers to the position information of the position P stored in the position information DB 30 and extracts the evaluation target element X constituting the position P. Then, the compatibility calculation unit 60 calculates the average value of the element-by-element evaluation aggregate value of the human resource A for each type of evaluation target element for each evaluation target element X constituting the position P as shown in the following formula 2, and sets this calculated value as the compatibility degree by type. Here, the type of evaluation target element is either "role", "process", or "technical element" in this embodiment. Therefore, in this embodiment, the compatibility degree by type is calculated for each of "role", "process", and "technical element".

[0034]

number

[0035] Then, the compatibility calculation unit 60 calculates the compatibility between the position P and the human resource A by tallying up the compatibility for each type, as shown in the following formula 3.

[0036]

number

[0037] Here, α1, α2, and α3 are arbitrary constants for weighting, and can be determined arbitrarily, for example, for each user, for each company to which the user belongs, or for each project.

[0038] The project success rate calculation unit 61 refers to the project information DB 40 and the team information DB 50 to calculate the success rate of a certain project when personnel are assigned to each position in the project. Specifically, the project success rate calculation unit 61 calculates the success rate of each team constituting the project, and calculates the average value of the success rates of each team, which is the success rate of the project PJ. The success rate of each team is calculated by calculating the success rate of each position constituting the team, and calculating the average value of the success rates of each position, which is the success rate of the team. The success rate of each position is calculated by calculating the average value of the compatibility between each personnel and the position for one or more personnel assigned to the position, which is the success rate of the position. Note that each success rate is not limited to an arithmetic average, and various statistical methods can be used. In addition, weighting can be appropriately performed when calculating each success rate.

[0039] The personnel allocation processing unit 62 refers to the project information DB 40 and the team information DB 50 and performs a process of allocating personnel to each position constituting a certain project. The personnel allocation process can be performed by input from the user via the user interface unit 70. At that time, the personnel allocation processing unit 62 can calculate the compatibility between the position and the personnel using the compatibility calculation unit 60 and present the compatibility to the user via the user interface unit 70. Similarly, the personnel allocation processing unit 62 can calculate the project success rate using the project success rate calculation unit 61 and present the project success rate to the user via the user interface unit 70. This has the advantage that the user can easily perform appropriate personnel allocation that increases the project success rate.

[0040] The optimal personnel allocation searching unit 63 automatically controls the personnel allocation to each position by the personnel allocation processing unit 62 so as to maximize the project success rate calculated by the project success rate calculation unit 61. The personnel allocation processing by the optimal personnel allocation searching unit 63 can use various existing optimization algorithms, AI, etc. The processing by the optimal personnel allocation searching unit 63 is executed according to a user's instruction via the user interface unit 70.

[0041] The user interface unit 70 is an interface that provides the user with various functions of the personnel allocation support system 1. In this embodiment, the user interface unit 70 is implemented as a so-called Web interface using HTTP or the like. The user interface unit 70 provides the user with functions such as updating and viewing each of the DBs 10 to 40. In particular, the user interface unit 70 provides an interface for inputting the evaluation value of the personnel. The user interface unit 70 also provides an interface for calculating and presenting the compatibility between the personnel and the position using the compatibility calculation unit 60. The user interface unit 70 also provides an interface for calculating and presenting the success rate of an existing project using the project success rate calculation unit 61. The user interface unit 70 also provides an interface for performing personnel allocation in a new project or updating the personnel allocation of an existing project using the compatibility calculation unit 60, the project success rate calculation unit 61, the personnel allocation processing unit 62, and the optimal personnel allocation search unit 63.

[0042] Next, referring to FIG. 9, a flow of a user's consideration of personnel allocation using the personnel allocation support system 1 will be described. Here, it is assumed that the user has input necessary information into each DB10-40. The personnel allocation support system 1 calculates an element-by-element evaluation aggregate value for each personnel (step S101). The user assigns personnel to each position constituting a project via the user interface unit 70 (step S102). The personnel allocation support system 1 calculates the compatibility between the personnel and the position in the personnel allocation screen using the compatibility calculation unit 60, and presents this compatibility to the user (step S103). Note that automatic personnel allocation by the optimal personnel allocation search unit 63 may be appropriately used in the personnel allocation process in step S102. When the personnel allocation to each position constituting a project is completed, the personnel allocation support system 1 calculates the project success rate of the project and presents it to the user via the user interface unit 70 (step S104). The user considers the suitability of personnel allocation using this project success rate as an index (step S105). If the user determines that the personnel allocation is not appropriate, the user performs the personnel allocation again. On the other hand, if the personnel allocation is appropriate, the personnel allocation support system 1 stores the pair of each position and the personnel allocated to that position as the personnel allocation result in a predetermined storage device, and also stores it in the personnel performance information DB 20.

[0043] As described above in detail, the personnel placement support system 1 according to the present embodiment calculates the compatibility between personnel and positions, so that appropriate personnel placement can be performed using the compatibility as one of the criteria. Also, the personnel placement support system 1 according to the present embodiment calculates the success rate of a project based on the compatibility, so that personnel placement that increases the project success rate can be easily performed.

[0044] (Second embodiment) A personnel allocation support system according to a second embodiment of the present invention will be described with reference to the drawings. Note that, for the sake of simplicity, only the gist of the present invention will be described here.

[0045] The difference between the personnel placement support system of this embodiment and the first embodiment is in the logic for calculating the compatibility. The other points are the same as in the first embodiment, so the differences will be explained here. Note that the same reference numerals are used for the same components as in the first embodiment.

[0046] As shown in FIG. 10, the human resources allocation support system 1a relating to the second embodiment includes a human resources information DB 10a, custom item information 12, condition information DB 14, human resources performance information DB 20, position information DB 30a, project information DB 40a, team information DB 50, compatibility calculation unit 60a, project success rate calculation unit 61, human resources allocation processing unit 62, optimal human resources allocation search unit 63, and a user interface unit 70a.

[0047] The personnel placement support system 1a is configured with a well-known information processing device such as a server device. The implementation form of the personnel placement support system 1a is not limited, and for example, each part of the personnel placement support system 1a may be distributed and implemented on a plurality of hardware devices. In this embodiment, the personnel placement support system 1a is implemented on a cloud server deployed on the Internet. The personnel placement support system 1a is implemented, for example, by installing a program on a computer.

[0048] An example of the data structure of the human resources information DB 10a is shown in FIG. 11. The human resources information DB 10a stores various information related to human resources, and in the example of FIG. 11, similar to the first embodiment, stores human resource attribute information such as a human resource ID that uniquely identifies the human resource, the human resource's name, and information on the company to which the human resource belongs. The human resources information DB 10a according to this embodiment further allows the user to set one or more custom items, which are optional additional items. In the example of FIG. 11, two custom items are set. The custom items are set by a custom item setting unit 71, which will be described later, included in the user interface unit 70.

[0049] An example of the data structure of the position information DB 30a is shown in FIG. 12. The position information DB 30a stores information about positions in a project. In the example of FIG. 12, the position information DB 30a stores information defining a position, such as a position ID that uniquely identifies the position, the name of the position, and the role, process, and technical field that the position is responsible for, as in the first embodiment. The position information DB 30a according to this embodiment further allows the user to set one or more custom items, which are optional additional items. In the example of FIG. 12, two custom items are set. The custom items are set by a custom item setting unit 71, which will be described later, included in the user interface unit 70.

[0050] An example of the project information DB 40a is shown in FIG. 13. The project information DB 40 stores various information related to the project, and in the example of FIG. 13, similar to the first embodiment, stores a project ID that uniquely identifies the project, the name of the project, the project period (start date and end date), etc. The project information DB 40a according to this embodiment further allows the user to set one or more custom items, which are optional additional items. In the example of FIG. 13, one custom item is set. The custom item is set by a custom item setting unit 71, which will be described later, included in the user interface unit 70.

[0051] An example of the custom item information 12 is shown in Fig. 14. The custom item information 12 stores information about the custom items set in the human resources information DB 10a, the position information DB 30a, and the project information DB 40a, i.e., definition information of the custom items. In the example of Fig. 14, the custom item information 12 stores a custom item ID that uniquely identifies a custom item, a DB in which the custom item is set, the name of the custom item on the DB, an item name that is the name of the custom item for the user, a data type of data stored in the custom item, and detailed information about the data stored in the custom item.

[0052] Here, the data type included in the custom item information 12 is the data type of the field that stores the custom item in each DB, or the data type of the field in the input form for editing the custom item of each DB via the user interface unit 70a. Examples of data types include "numeric value," "text," "radio button," "checkbox," and "date."

[0053] The detailed information included in the custom item information 12 consists of constraint conditions for data input and data definition information according to the data type of the custom item. For example, if the data type is "numeric", the constraint conditions include upper and lower numerical limits. For example, if the data type is "text", the constraint conditions include the number of character strings and the character string type. For example, if the data type is "radio button" or "check box", the definition information is a set of values ​​(character strings, numeric values, etc.) corresponding to each button or box. For example, if the data type is "date", the constraint conditions include the date range that can be entered.

[0054] As in the first embodiment, the user interface unit 70a is an interface that provides the user with various functions of the personnel allocation support system 1. In this embodiment, the user interface unit 70a is implemented as a so-called Web interface using HTTP or the like. The user interface unit 70a provides the user with functions such as updating and viewing the DBs 10a, 20, 30a, 40a, and 50.

[0055] Here, when a DB to be updated, viewed, or the like includes a custom item, the user interface unit 70a refers to the custom item information 12 for that custom item and performs data updating, viewing, or the like for the user. For example, for the name of the custom item, the item name of the custom item included in the custom item information 12 is displayed. Also, the data of the custom item is updated, viewed, or the like in a mode corresponding to the data type and detailed information included in the custom item information 12.

[0056] The condition information DB14 stores condition information including the correspondence between the custom items of the human resource information DB10a and the custom items of the position information DB30a or the project information DB40a. This condition information is used in the calculation process of the additional compatibility degree included in the calculation process of the compatibility degree described later. A single project can include multiple pieces of condition information.

[0057] An example of the condition information DB 14 is shown in Fig. 15. As shown in Fig. 15, the condition information DB 14 stores a condition ID that uniquely identifies the condition information, the name of the condition information, a custom item in the human resources information DB 10a, the name of a DB in which the custom item corresponding to the custom item in the human resources information DB 10a is stored, a custom item in the DB that corresponds to the custom item in the human resources information DB 10a, and a calculation type. In the following description, the custom item in the human resources information DB 10a is called a first custom item, and the custom item in the position information DB 30a or the project information DB 40a that corresponds to the first custom item is called a second custom item.

[0058] The calculation type is information that specifies what kind of calculation is performed when a calculation is performed using the first custom item and the second custom item in the process of calculating the additional compatibility level described below. This calculation type can take on different values ​​depending on the combination of the data type of the first custom item and the data type of the second custom item. Furthermore, when the calculation content is expressed as a Japanese sentence, the calculation type can be expressed as a proposition such as "The value of the first custom item 'is' the value of the second custom item {calculation type}."

[0059] For example, when the data type of each custom item is "text", the operation type can take any one of the values ​​"equal to", "not equal to", "contains", and "contained in".

[0060] For example, if the data type of each custom item is “numeric”, the operation type can take one of the following values: “equal to”, “not equal to”, “less than”, “less than”, “greater than”, “greater than”, “close to”, or “far from”.

[0061] For example, if the data type of each custom item is "radio button" or "checkbox," the operation type can take one of the following values: "equal to," "not equal to," "contains," "contained in," "has a value in common with," "has no value in common with," "many values ​​in common with," or "few values ​​in common with."

[0062] For example, if the data type of each custom item is “date”, the operation type can take one of the following values: “equal to”, “not equal to”, “before”, “earlier”, “after”, “later”, “closer to”, or “farther from”.

[0063] The user interface unit 70a is provided with a custom item setting unit 71 that sets custom items for the human resources information DB 10a, the position information DB 30a, and the project information DB 40a based on input from the user, and also sets each piece of condition information in the condition information DB 14.

[0064] 16 shows an example of a custom item setting screen 110 for setting custom items in the human resource information DB 10a by the custom item setting unit 71. In the example of FIG. 16, the custom item setting screen 110 includes a custom item name input section 111, a data type selection section 112, and a detailed information input section 113 according to the data type. Here, the detailed information input section 113 switches the input content and method according to the data type selected in the data type selection section 112. In the example of FIG. 16, when the data type "checkbox" is selected in the data type selection section 112, the detailed information input 113 switches so that the values ​​of each box of the checkboxes are edited.

[0065] Fig. 17 shows an example of a condition information setting screen 120 for setting each piece of condition information in the condition information DB 14 by the custom item setting unit 71. In the example of Fig. 17, the condition information setting screen 120 includes a first custom item setting unit 121, a second custom item setting unit 122, an operation type setting unit 123, a first custom item reference unit 124, and a second custom item reference unit 125.

[0066] Here, the first custom item setting unit 121 refers to the custom item information 12, extracts and presents information on each custom item in the human resource information DB 10a, and allows the user to select one of the custom items. Similarly, the second custom item setting unit 122 refers to the custom item information 12, extracts and presents information on each custom item in the position information DB 30a and the project information DB 40a, and allows the user to select one of the custom items. Furthermore, the calculation type setting unit 123 refers to the custom item information 12 to extract the data types of the custom item selected in the first custom item setting unit 121 and the custom item selected in the second custom item setting unit 122, and presents a set of calculation types corresponding to the pair of data types as options, and allows the user to select one of the calculation types. In the example of FIG. 17, a drop-down menu is used as a user interface to allow the user to select a value in the first custom item setting unit 121, the second custom item setting unit 122, and the calculation type setting unit 123.

[0067] Furthermore, when a custom item is selected by first custom item setting unit 121, if the data type of the custom item is "checkbox" or "radio button", first custom item reference unit 124 references detailed information in custom item information 12 and displays options available for the custom item as reference information. Similarly, when a custom item is selected by second custom item setting unit 122, if the data type of the custom item is "checkbox" or "radio button", second custom item reference unit 125 references detailed information in custom item information 12 and displays options available for the custom item as reference information.

[0068] Similar to the first embodiment, the compatibility calculation unit 60a calculates the compatibility between the personnel and the position based on the position information stored in the position information DB 30a and the performance information and the evaluation value stored in the personnel performance information DB 20. The compatibility calculation unit 60a also includes an additional compatibility calculation unit 60b that calculates an additional compatibility based on the contents of the custom items stored in the personnel information DB 10a, the contents of the custom items stored in either or both of the position information DB 30a and the project information DB 40a, and the condition information including the correspondence relationship of the custom items stored in the condition information DB 14. When calculating the compatibility, the compatibility calculation unit 60a calculates the overall compatibility based on the main compatibility and the additional compatibility, using the compatibility calculated from the position information, the performance information, and the evaluation value as the main compatibility.

[0069] Specifically, the compatibility calculation unit 60a calculates the evaluation value for each evaluation target element based on the performance information and evaluation value stored in the talent performance information DB 20 for the talent A to be calculated, and obtains the element-by-element evaluation total value. This process is the same as in the first embodiment, so the explanation will be omitted.

[0070] Next, the compatibility calculation unit 60a refers to the position information of the position P stored in the position information DB 30, extracts the evaluation target elements X that constitute the position P, calculates the average value of the evaluation total value of the talent A for each type of evaluation target element for each evaluation target element X that constitutes the position P, and sets the calculated value as the compatibility degree for each type. This process is the same as in the first embodiment, so a description will be omitted.

[0071] Then, the compatibility calculation unit 60a calculates the compatibility between the position P and the human resource A by tallying up the compatibility for each type and calculating and tallying the additional compatibility, as shown in the following formula 4.

[0072]

number

[0073] Here, α1, α2, α3, and α4 are arbitrary constants for weighting. α1, α2, α3, and α4 can be arbitrarily determined, for example, for each user, for each company to which the user belongs, or for each project. Note that the coefficient at the beginning of the formula is changed to 1 / 3 if the additional compatibility (A, P, PJ) is not calculated.

[0074] The additional compatibility (A, P, PJ) is calculated by the additional compatibility calculation unit 60b. The additional compatibility calculation unit 60b calculates the additional compatibility (A, P, PJ) based on the value of the custom item (first custom item) of the human resource A, the value of the custom item (second custom item) of the position P or the project PJ, and the calculation type, based on the condition information in the condition information DB14. If no condition information is stored in the condition information DB14, the additional compatibility calculation unit 60b does not calculate the additional compatibility. The process of the additional compatibility calculation unit 60b will be described in detail below.

[0075] The additional compatibility calculation unit 60b refers to the condition information, and when the proposition "the value of the first custom item is the value of the second custom item {operation type}" is true, the additional compatibility (A, P, PJ) is set to 1, and when the proposition is false, the additional compatibility (A, P, PJ) is set to 0. Note that depending on the operation type, the determination of the truth or falsity of the proposition may be ambiguous. For example, the operation type may be "close to". In such a case, the additional compatibility calculation unit 60b calculates the likelihood (0 or more and 1 or less) that the proposition is true, and sets the calculated likelihood as the additional compatibility (A, P, PJ). When there are multiple pieces of condition information in the condition information DB 14 for one project, the additional compatibility calculation unit 60b sets the average value of the additional compatibility calculated based on each piece of condition information as the additional compatibility (A, P, PJ).

[0076] An example of how the additional compatibility degree (A, P, PJ) is calculated will be described below. First, an example will be described in which the data type of the first custom item and the second custom item is "text". Here, the case where the operation type is "equal to" will be described. This operation type can determine whether a proposition is true or false, so if the character string that is the value of the first custom item and the character string that is the value of the second custom item completely match, the additional compatibility degree (A, P, PJ) will be set to 1, and otherwise the additional compatibility degree (A, P, PJ) will be set to 0. When the data type is "text", the proposition can be determined to be true or false for all operation types, so similar processing can be performed for other operation types.

[0077] Next, an example will be described in which the data type of the first custom item and the second custom item is "numeric value." If the operation type is "equal to," "not equal to," "less than or equal to," "less than," "greater than or equal to," or "greater than," the proposition can be determined as true or false, so if it is true, the additional compatibility degree (A, P, PJ) should be set to 1, and if it is false, the additional compatibility degree (A, P, PJ) should be set to 0.

[0078] On the other hand, when the calculation type is “close to”, the likelihood is calculated based on the distance (deviation) between the value of the first custom item and the value of the second custom item, with the numerical range of the likelihood set to 0 to 1, so that the likelihood is larger the closer the distance is to zero and smaller the greater the distance, and this likelihood is set as the additional compatibility (A, P, PJ).

[0079] The likelihood is not an absolute value of the distance, but a relative value calculated by a statistical method from the distance between the value of the first custom item and the value of the second custom item for all talents stored in the talent information DB10a. Specifically, first, for all talents, the distance (deviation) between the value of the first custom item and the value of the second custom item (custom item of position P or custom item of project PJ) is calculated, and the maximum and minimum values ​​of the distance are obtained. Then, when the distance (deviation) for talent A is the minimum value, the additional compatibility (A, P, PJ) is set to 1, and when the distance (deviation) is the maximum value, the additional compatibility (A, P, PJ) is set to 0, and the likelihood is calculated so that the relationship between the distance and the likelihood is linear. The calculation formula is shown in the following formula 5. In the formula, "ABS" is a function that calculates the absolute value.

[0080]

number

[0081] The likelihood may be calculated based on the distribution of distances for each human resource so that the relationship between the distance and the likelihood is nonlinear.

[0082] When the calculation type is "far from", the likelihood can be calculated in the same manner as the calculation logic for "close to" described above. Specifically, the calculation formula is obtained by removing "1-" from the above formula 5.

[0083] Next, an example will be described in which the data type of the first custom item and the second custom item is "radio button" or "checkbox." When the operation type is "equal to," "not equal to," "contains," "is included in," "has a value in common with," or "does not have a value in common with," the proposition can be determined as true or false, so if it is true, the additional compatibility degree (A, P, PJ) can be set to 1, and if it is false, the additional compatibility degree (A, P, PJ) can be set to 0. Note that when the data type is "radio button" or "checkbox," the value of each custom item is a set of one or more option values. Therefore, when the operation type is "equal to" or "not equal to," it is important to note that when the sets are compared and the sets are determined to be equal if they are a perfect match, and unequal if they are not a perfect match.

[0084] On the other hand, when the calculation type is "many values ​​in common with", the ratio of the number of values ​​(options) included in the intersection of the first custom item and the second custom item to the number of values ​​(options) of the second custom item is calculated as the likelihood, and this likelihood is taken as the additional compatibility (A, P, PJ). Similarly, when the calculation type is "few values ​​in common with", the ratio of the number of values ​​(options) included in the intersection of the first custom item and the second custom item to the number of values ​​(options) of the second custom item is calculated, and then the ratio is subtracted from 1 to calculate the likelihood, and this likelihood is taken as the additional compatibility (A, P, PJ).

[0085] Next, an example will be described in which the data type of the first custom item and the second custom item is "date." In this case, the additional compatibility (A, P, PJ) can be calculated using the same calculation logic as for "numeric value" described above.

[0086] The project success rate calculation unit 61, the personnel allocation processing unit 62, and the optimal personnel allocation search unit 63 are the same as those in the first embodiment. The user interface unit 70a has the same functions as those in the first embodiment. Furthermore, the flow when a user considers personnel allocation using the personnel allocation support system 1a is also the same as that in the first embodiment.

[0087] According to the personnel placement support system 1a of this embodiment, as in the first embodiment, the compatibility between personnel and positions is calculated, so that appropriate personnel placement can be performed using the compatibility as one of the criteria. Also, according to the personnel placement support system 1a of this embodiment, the success rate of a project is calculated based on the compatibility, so that personnel placement that increases the project success rate can be easily performed.

[0088] In particular, according to the personnel allocation support system 1a of the present embodiment, it is possible to calculate additional compatibility using custom items that can be added by the user, and to calculate compatibility taking this additional compatibility into account. This makes it possible to calculate an appropriate compatibility according to the characteristics of the project and the desires of the user, which is highly convenient for the user.

[0089] In this embodiment, information regarding custom items in the human resources information DB 10a, the position information DB 30a, and the project information DB 40a is stored as custom item information 12 separately from each DB, but it may also be stored in each DB.

[0090] In addition, the data types of the custom items described in this embodiment are merely examples and may include other data types. Furthermore, the calculation types and calculation methods described in this embodiment are merely examples and may include other calculation types and calculation methods.

[0091] Although one embodiment of the present invention has been described in detail above, the present invention is not limited to the above embodiment, and various improvements and modifications may be made without departing from the spirit and scope of the present invention.

[0092] For example, the data structures of the DBs 10 to 50 in the above embodiment are merely examples, and the present invention can be implemented with other data structures. For example, in the above embodiment, both performance information and evaluation values ​​are stored in the personnel performance information DB 20, but the performance information and evaluation values ​​may be stored in different DBs.

[0093] In addition, in the above embodiment, role, process, and technical element are given as examples of the types of elements that make up a position, but it is sufficient to include at least a role, and the other elements such as process and technical element are optional and may also include other elements.

[0094] Furthermore, the algorithm for calculating the compatibility between a talent and a position in the above embodiment is merely an example, and the compatibility between a talent and a position may be calculated using other algorithms.

[0095] In addition, although a software development project is illustrated as an example of a project in Fig. 2 of the above embodiment, the personnel placement support system according to the present invention can be applied to other projects, such as construction projects, various construction projects, game development projects, event management projects, and video production projects. [Explanation of symbols]

[0096] 1,1a…Human Resource Allocation Support System 10,10a…Human Resources Information DB 20…Human Resources Performance Information DB 30,30a…Position information DB 40,40a…Project Information DB 50…Team information DB 60, 60a…Compatibility calculation section 60b…Additional compatibility calculation section 61…Project Success Rate Calculation Department 62…Human Resources Placement Department 63…Optimal Personnel Placement Search Department 70, 70a...User interface section 71…Custom item setting section

Claims

1. A human resource allocation support system for supporting human resource allocation in a project, comprising: a human resource performance information storage unit that stores performance information including at least the role performed by the human resource in a project in which the human resource participated in the past and the period during which the role was performed, and an evaluation value evaluated by an evaluator for the role performed by the human resource; a position information storage unit that stores position information including an association between a position that is a title assigned to a human resource and that constitutes a project and one or more predetermined roles that the human resource to which the position is assigned performs; a compatibility calculation unit that calculates a compatibility between a talent and a position based on the position information stored in the position information storage unit and the performance information and the evaluation value stored in the talent performance information storage unit. A personnel allocation support system characterized by:

2. The compatibility calculation unit weights the evaluation values ​​so that the evaluation values ​​closer to the time of calculation have a greater influence on the compatibility.

2. The personnel allocation support system according to claim 1.

3. The performance information further includes the processes and technical elements that the human resource was responsible for in the role that the human resource performed, The evaluation value further includes an evaluation value evaluated by an evaluator for the process and the technical element, The position information further includes a process and a technical element associated with the position.

2. The personnel allocation support system according to claim 1.

4. a project information storage unit that stores project information composed of at least one position; A human resources placement department that assigns personnel to each position that constitutes the project; a project success rate calculation unit that calculates a project success rate based on the compatibility between each position constituting a project and a human resource assigned to the position, the compatibility calculated by the compatibility calculation unit.

4. The personnel allocation support system according to claim 1, wherein:

5. a personnel placement control unit that controls the personnel placement unit to place personnel in each position so as to maximize the project success rate calculated by the project success rate calculation unit; 5. The personnel allocation support system according to claim 4.

6. the position information storage unit and the project information storage unit are each capable of setting one or more optional additional items by a user; moreover, a human resources information storage unit that stores human resources information related to human resources, the human resources information storage unit allowing a user to set one or more optional additional items; a correspondence relationship storage unit that stores a correspondence relationship between the additional items of the human resource information storage unit and the additional items of the position information storage unit or the project information storage unit, The compatibility calculation unit includes an additional compatibility calculation unit that calculates an additional compatibility based on the contents of the additional items stored in the human resources information storage unit and the contents of the additional items stored in either one or both of the position information storage unit and the project information storage unit, the additional compatibility calculation unit being included in the correspondence relationship of the additional items.

5. The personnel allocation support system according to claim 4.

7. an additional item information storage unit configured to store, for each additional item set in the human resources information storage unit, the position information storage unit, and the project information storage unit, type information of information to be input into the additional item; The additional compatibility calculation unit calculates the additional compatibility using a calculation processing method corresponding to the type information of the additional item stored in the additional item information.

7. The personnel allocation support system according to claim 6.

8. an additional information setting unit that sets additional items in the personnel information storage unit, the position information storage unit, and the project information storage unit based on input from a user, and sets correspondence relationships between the additional items to be stored in the correspondence relationship storage unit; 7. The personnel allocation support system according to claim 6.

9. A computer is caused to function as each part of the personnel allocation support system according to claim 1. A personnel placement support program characterized by:

Citation Information

Patent Citations

  • Device and method for managing information on human resources

    JP2001167191A

Cited By

  • Talent information processing method and system based on occupational attainment and big data analysis

    CN119784346A

  • Apparatus for optimizing work assignment to developers based on performance measurement and method therefor

    KR102891346B1