State monitor / management system of installation machinery and railway vehicle using installation machinery in railway vehicle factory
The condition monitoring and management system addresses the challenge of managing wheel diameter changes and detecting flat portions in railway vehicles by integrating a flat detection device and lathe, enhancing maintenance efficiency and reducing manual input and disassembly.
Patent Information
- Application Number
- JP2023047863
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-24
- Publication Date
- 2024-10-04
Smart Images

Figure 2024136677000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a status monitoring and management system for equipment machinery and railway cars using equipment machinery in a railway car factory, and in particular to a status monitoring and management system for equipment machinery related to the maintenance and inspection of railway car wheels. [Background technology]
[0002] Patent Document 1 describes a diagnostic system that analyzes the deterioration of equipment mounted on a railway vehicle. The diagnostic system described in Patent Document 1 calculates the amount of deterioration indicating the degree of deterioration of equipment mounted on the railway vehicle corresponding to each of a plurality of dates and times based on measurement data measured at each of the plurality of dates and times. The diagnostic system described in Patent Document 1 further uses route information indicating the route on which the railway vehicle has traveled to analyze the deterioration of the equipment. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] International Publication No. 2021 / 079438 Summary of the Invention [Problem to be solved by the invention]
[0004] However, in the maintenance and inspection of railroad vehicle wheels, the wheels may be turned using a lathe. Although turning the wheels allows the parts deteriorated due to wear to be removed, the wheel diameter of the wheels becomes smaller than the wheel diameter of the wheels before turning. The wheel diameter affects the acceleration and deceleration of the railroad vehicle and the height of the vehicle. Therefore, in the maintenance and inspection of railroad vehicle wheels, it is necessary to not only analyze the deterioration but also to manage the wheel diameter of the wheels.
[0005] The present disclosure aims to provide a condition monitoring and management system for equipment machines and railway cars using equipment machines in a railway car factory, which enables efficient maintenance of railway cars using the equipment machines. [Means for solving the problem]
[0006] A status monitoring and management system according to one embodiment of the present disclosure is a status monitoring and management system for equipment machines and railway vehicles using equipment machines in a railway vehicle factory. The status monitoring and management system includes an information acquisition unit, a storage unit, a monitoring unit, and a communication unit. The information acquisition unit acquires an operating status from the equipment machines in the railway vehicle factory. The storage unit manages monitoring information based on the operating status. The monitoring unit monitors the equipment machines based on the monitoring information. The communication unit communicates with the railway vehicle to be inspected and repaired by the equipment machines. The information acquisition unit includes a conversion unit that converts the operating status into the monitoring information. The operating status includes information indicating a wheel diameter of the railway vehicle. The communication unit notifies the railway vehicle of the wheel diameter of the railway vehicle.
[0007] A status monitoring and management system according to another aspect of the present disclosure is a status monitoring and management system for equipment machines and railway cars using equipment machines in a railway car factory. The status monitoring and management system includes an information acquisition unit, a storage unit, and a monitoring unit. The information acquisition unit acquires an operating state from the equipment machines in the railway car factory. The storage unit manages monitoring information based on the operating state. The monitoring unit monitors the equipment machines based on the monitoring information. The equipment machines include a flat detection device and a lathe device. The flat detection device detects whether or not the wheels of the railway car have a flat portion on an outer periphery. The lathe device turns the wheels of the railway car. When the flat detection device detects the flat portion of the wheels of the railway car, the monitoring unit causes the information acquisition unit to notify the lathe device that the wheels of the railway car have the flat portion. Effect of the Invention
[0008] According to the condition monitoring and management system for the equipment machines and railway cars using the equipment machines in a railway car factory according to the above aspect, the maintenance of the railway cars can be efficiently performed using the equipment machines. [Brief description of the drawings]
[0009] [Figure 1] FIG. 1 is a functional block diagram showing an overview of a railway vehicle monitoring system including a status monitoring management system according to an embodiment. [Diagram 2] FIG. 2 is a functional block diagram showing an overview of a railway vehicle in the above railway vehicle monitoring system. [Diagram 3] FIG. 3 is a functional block diagram showing an overview of equipment machines in the above railcar monitoring system. [Figure 4] FIG. 4 is a flowchart showing an automatic input operation of wheel diameter information in the above railway vehicle monitoring system. [Diagram 5] FIG. 5 is a flowchart showing an operation of outputting information on flat portions of wheels of the above railway vehicle monitoring system. [Figure 6] FIG. 6 is a flowchart showing a failure prediction operation of the wheel load lathe of the above-mentioned railway vehicle monitoring system. [Figure 7] FIG. 7 is a flowchart showing a railway vehicle failure prediction operation of the railway vehicle monitoring system. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] Hereinafter, a status monitoring and management system 10 according to one embodiment of the present disclosure will be described with reference to the drawings. In this embodiment, the status monitoring and management system 10 corresponds to a status monitoring and management system for equipment machines and railway cars using equipment machines in a railway car factory.
[0011] 1. Overall configuration of railway vehicle monitoring system FIG. 1 is a functional block diagram showing an overview of a railway vehicle monitoring system 100 including a status monitoring management system 10 according to an embodiment.
[0012] As shown in Fig. 1, the railway vehicle monitoring system 100 includes a condition monitoring management system 10 and a plurality of (two in the illustrated example) facility machines 60. The railway vehicle monitoring system 100 further includes an inspection and repair system 1 and a plurality of (two in the illustrated example) railway vehicles 2. Incidentally, the railway vehicle monitoring system 100 including a plurality of railway vehicles 2 means that the railway vehicle monitoring system 100 includes a plurality of trains of railway vehicles 2. A train is a combination of a plurality of vehicles or a single vehicle, and is operated as a single train.
[0013] The equipment machine 60 is a device for performing maintenance work necessary for the operation of the railway vehicle 2. The equipment machine 60 includes a wheel lathe 610 and a flat detection device 620. Although FIG. 1 shows one wheel lathe 610 and one flat detection device 620, the equipment machine 60 may include a plurality of wheel lathes 610 and may include a plurality of flat detection devices 620. The number of wheel lathes 610 and the number of flat detection devices 620 included in the equipment machine 60 do not need to be the same. The wheel lathe 610 is a lathe that can turn the wheels while the wheels are attached to the railway vehicle 2. The flat detection device 620 is a device that detects flat parts of the wheels while the wheels are attached to the railway vehicle 2. Here, the flat parts of the wheels refer to non-curved parts that occur on the outer circumferential surface (running surface) of the wheels due to wear. More specifically, the flat portion of the wheel is a portion of the wheel that has been worn into a flat shape, which occurs when the railcar 2 runs with the wheel sliding on the rail. Here, the state in which the wheel slides on the rail includes slipping and sliding. Slipping is a state in which the wheel rotates excessively with respect to the moving speed of the railcar 2, such as when the wheel rotates but the railcar 2 is not moving. Skidding is a state in which the railcar 2 moves at an excessive speed with respect to the rotation of the wheel, such as when the wheel does not rotate but the railcar 2 is moving.
[0014] The condition monitoring management system 10 acquires the operating status from each of the equipment machines 60 and manages monitoring information based on the operating status. The condition monitoring management system 10 monitors the equipment machines 60 based on the monitoring information. The condition monitoring management system 10 also outputs the inspection results of the railway vehicle 2 based on the monitoring information to the inspection and repair system 1. The condition monitoring management system 10 also acquires the vehicle status from the railway vehicle 2. The vehicle status is, for example, the status of the bogies of the railway vehicle 2. Furthermore, the condition monitoring management system 10 notifies the inspection and repair system 1 and the railway vehicle 2 of the maintenance work results and the status of the equipment machines 60. The maintenance work results include, for example, the wheel diameter.
[0015] 2. Components of the Railway Vehicle Monitoring System (1) Inspection and repair system The inspection and repair system 1 is a system that manages inspections and repairs necessary for the operation of the railway vehicle 2. More specifically, the inspection and repair system 1 records and manages the implementation dates and inspection results of regular inspections necessary for the operation of the railway vehicle 2. The inspection and repair system 1 also outputs the results of the regular inspections using a prescribed format. The inspection and repair system 1 includes a control unit 11, a memory unit 12, a communication unit 13, an input unit 14, and an output unit 15.
[0016] The control unit 11 receives the inspection results of the railway vehicle 2 from the condition monitoring management system 10 via the communication unit 13. The control unit 11 stores the inspection results of the railway vehicle 2 received from the condition monitoring management system 10 in the storage unit 12. The inspection results of the railway vehicle 2 include, for example, the size and diameter (wheel diameter) of the wheels attached to the bogie of the railway vehicle 2. More specifically, the size and diameter of the wheels refer to the diameter of the wheels on the running surface. Note that the running surface of the wheels is generally not cylindrical and the diameter is not a single value, so the size and diameter of the wheels is a combination of multiple diameters corresponding to multiple positions of the wheels. Note that the size and diameter of the wheels may be, for example, a single value indicating the diameter at a specific position of the wheel. The control unit 11 substitutes the results of the regular inspection of the railway vehicle 2 for the inspection results of the railway vehicle 2 acquired from the condition monitoring management system 10. The control unit 11 also outputs the results of the regular inspection from the output unit 15 using a predetermined format.
[0017] The control unit 11 acquires the results of the regular inspection of the railway vehicle 2 from the input unit 14 and stores the results in the memory unit 12. More specifically, the control unit 11 acquires the results of the regular inspection of the railway vehicle 2 from a person in charge of inspecting and repairing the railway vehicle 2.
[0018] The storage unit 12 is a database that holds the results of regular inspections of the railway vehicle 2 and the vehicle status of the railway vehicle 2 as a substitute for the results of the regular inspections.
[0019] The communication unit 13 includes an interface for communicating with the status monitoring management system 10. The communication unit 13 includes an interface that can be connected to, for example, Ethernet.
[0020] The input unit 14 is an input device that accepts input from a person in charge of inspecting and repairing the railcar 2, and is, for example, a keyboard and a mouse.
[0021] The output unit 15 is a device that outputs the results of the regular inspection in a predetermined format, and is, for example, a display and a printer.
[0022] The inspection and repair system 1 includes a computer system. The computer system is mainly composed of a processor and a memory as hardware. The function of the inspection and repair system 1 in the present disclosure is realized by the processor executing a program recorded in the memory of the computer system. The program may be pre-recorded in the memory of the computer system, may be provided through an electric communication line, or may be provided by being recorded in a non-transitory recording medium such as a memory card, an optical disk, or a hard disk drive that can be read by the computer system. The processor of the computer system is composed of one or more electronic circuits including a semiconductor integrated circuit (IC) or a large-scale integrated circuit (LSI). The integrated circuits such as IC or LSI referred to here are called by different names depending on the degree of integration, and include integrated circuits called system LSI, VLSI (Very Large Scale Integration), or ULSI (Ultra Large Scale Integration). Furthermore, a field-programmable gate array (FPGA) that is programmed after the manufacture of the LSI, or a logic device that can reconfigure the connection relationship inside the LSI or reconfigure the circuit partition inside the LSI, can also be adopted as a processor. The electronic circuits may be integrated in one chip or distributed across multiple chips. The multiple chips may be integrated into one device, or may be distributed across multiple devices. The computer system referred to here includes a microcontroller having one or more processors and one or more memories. Therefore, the microcontroller is also composed of one or more electronic circuits including a semiconductor integrated circuit or a large-scale integrated circuit.
[0023] Furthermore, it is not essential for the inspection and repair system 1 that multiple functions are concentrated in one housing, and the components of the inspection and repair system 1 may be distributed across multiple housings. Furthermore, at least some of the functions of the inspection and repair system 1, for example, some of the functions of the storage unit 12, may be realized by the cloud (cloud computing) or the like.
[0024] (2) Railway vehicles The railway vehicle 2 is a vehicle that is inspected and repaired by the inspection and repair system 1 and maintained and operated by the facility machine 60.
[0025] The railcar 2 is, for example, a train that receives power from an overhead line and runs on a motor provided on a bogie. As shown in FIG. 2, the railcar 2 includes a control unit 21, a drive unit 22, a communication unit 23, and an input / output unit 24.
[0026] The drive unit 22 includes a bogie, a motor, a drive circuit, and a braking device. The bogie is attached to the car body. The bogie includes an axle and wheels. In addition, a motor is attached to the bogie and operates as a power source for the wheels. The motor is, for example, an induction motor. The braking device is a device that reduces the rotational speed of the wheels to slow down and stop the railway vehicle 2. The braking device includes, for example, brake pads and a drive device that presses the brake pads against the wheels.
[0027] The control unit 21 controls the drive unit 22 to run the railway vehicle 2. The control unit 21 includes a computer system and a drive circuit. The drive circuit is a circuit that drives the motor to generate acceleration, such as acceleration or deceleration, in the railway vehicle 2. More specifically, the drive circuit is a circuit that controls the voltage and frequency of the power supplied to the motor, and is, for example, an inverter. When the master controller in the driver's seat is operated by the driver, the control unit 21 generates a predetermined acceleration in the railway vehicle 2 based on the master controller operation. More specifically, when the master controller operation is an acceleration instruction, the control unit 21 supplies power from the drive circuit to the motor so that the acceleration set for each notch of the acceleration instruction is generated in the railway vehicle 2. Also, when the master controller operation is a braking instruction, the control unit 21 operates the drive circuit or operates the braking device so that the railway vehicle 2 decelerates at the acceleration set for each notch of the braking instruction.
[0028] Here, the control unit 21 holds information on the size and diameter (wheel diameter) of each wheel. The reason for this is that the manner of operation of the control unit 21 may change depending on the size and diameter of the wheel. For example, even if the rotational moment transmitted from the motor to the wheel is the same, if the size and diameter of the wheel are different, the acceleration generated in the railway vehicle 2 will be different. Similarly, even if the force with which the brake pad presses the wheel is the same, if the size and diameter of the wheel are different, the acceleration generated in the railway vehicle 2 will be different. Therefore, the control unit 21 changes the voltage and frequency of the power output by the drive circuit according to the size and diameter of the wheel, and also changes the operation of the braking device. In addition, when the control unit 21 acquires the running speed of the railway vehicle 2 based on the angular velocity of the axle, if the actual size and diameter of the wheel do not match the information on the size and diameter of the wheel held by the control unit 21, the control unit cannot accurately acquire the running speed of the railway vehicle 2. Therefore, the control unit 21 needs to hold accurate information on the size and diameter of the wheel. Similarly, when the railcar 2 is a diesel railcar, a hybrid diesel railcar, an electric locomotive, or a diesel locomotive, the control unit 21 of the railcar 2 needs to hold accurate wheel size and diameter information.
[0029] The communication unit 23 communicates with the condition monitoring management system 10 and the inspection and repair system 1 to acquire data indicating the wheel diameter. The communication unit 23 also outputs a traveling log to the condition monitoring management system 10. The traveling log includes, for example, the current consumption of the motor. The communication unit 23 has an interface for connecting to, for example, a public communication network such as a fourth generation mobile communication system (4G) or a fifth generation mobile communication system (5G), a wireless or wired LAN (Local Area Network), or the like. The communication unit 23 may have multiple interfaces, and may have, for example, a 5G-compatible interface and a Wi-Fi (registered trademark)-compatible interface.
[0030] The input / output unit 24 is an input / output device that presents information to crew members such as the driver and the conductor, and to a maintenance worker for the railcar 2, and also accepts the input of information, and includes, for example, a touch panel that is a dual-purpose input / output device. Note that the input / output unit 24 may include an input device such as a keyboard and an output device such as a monitor, instead of the dual-purpose input / output device. The input / output unit 24 also includes a master controller, a brake lever, switches, and buttons.
[0031] (3) Equipment and machinery The equipment machinery 60 is equipment for performing maintenance work necessary for the operation of the railway car 2. The equipment machinery 60 is provided in a railway car factory. The equipment machinery 60 includes, for example, a lathe device for turning the wheels, and an overhead crane for hoisting and moving the car body. In the railway car monitoring system according to the embodiment, the equipment machinery 60 includes a wheel positioning lathe 610 and a flat detection device 620.
[0032] (3.1) Wheel Lathe The in-place wheel lathe 610 is a lathe device capable of turning a wheel while the wheel remains attached to the railway vehicle 2. The in-place wheel lathe 610 includes a control unit 611, an operation unit 612, a communication unit 613, and an input / output unit 614, as shown in FIG.
[0033] The operating unit 612 includes a movable rail, a wheel holding unit, and a turning device. The movable rail holds one bogie of the railcar 2, and includes, for example, a pair of rails. The operating unit 612 may include, for example, a plurality of pairs of rails. A guide rail is connected to the movable rail, and the railcar 2 travels on the guide rail, thereby allowing the bogie to be guided onto the movable rail. The wheel holding unit holds the bogie in a state in which the wheel to be turned is separated from the movable rail. The wheel holding unit holds the wheel to be turned in a rotatable state. The wheel holding unit has a roller that controls the rotation of the wheel. The turning device includes a cutting tool for turning the wheel, and a movable unit that presses the cutting tool against the wheel. The movable unit includes, for example, a servo motor.
[0034] The control unit 611 operates the operation unit 612 to control the operation unit 612 based on the target value of the wheel diameter, and turns the wheels of the railway vehicle 2. The target value of the wheel diameter is determined, for example, by a maintenance worker of the railway vehicle 2 and inputted to the wheel turning machine 610. The control unit 611 also outputs an operation log of the wheel turning machine 610 to the communication unit 613. The operation log includes, for example, information for identifying the railway vehicle 2 and information for identifying the bogie having the wheel to be turned. The operation log also includes, for example, a target value of the wheel diameter set by the maintenance worker. The operation log also includes, for example, a measured value of the wheel diameter. Note that the wheel has a larger diameter at a position closer to the flange, and a smaller diameter at a position farther from the flange. Therefore, the operation log includes, for example, a plurality of diameters measured at different positions as the wheel diameter. More specifically, the operation log includes, for example, seven diameters corresponding to seven positions spaced apart from each other in the extension direction of the axle, as the wheel diameters (the wheel's name and diameter). The control unit 611 includes, for example, a computer system.
[0035] The communication unit 613 outputs an operation log to the condition monitoring management system 10. More specifically, the communication unit 613 outputs an operation log of the wheel lathe 610 to the first communication unit 42 of the information acquisition device 40 included in the condition monitoring management system 10. The operation log includes the wheel size and diameter of the railcar 2. The communication unit 613 includes an interface capable of communicating with the first communication unit 42 of the information acquisition device 40. The communication unit 613 communicates with the first communication unit 42 of the information acquisition device 40, for example, by Modbus TCP, which performs serial communication on TCP / IP. Note that the interface of the communication unit 613 may be, for example, Modbus RTU, or may be another interface such as serial communication, parallel communication, or packet communication.
[0036] The input / output unit 614 is an input / output device that presents information to a maintenance worker and receives information from the maintenance worker, and includes, for example, a touch panel that is a dual-purpose input / output device. The input / output unit 614 receives, for example, an input of a target value for the wheel diameter from the maintenance worker. The input / output unit 614 also displays, for example, the results of the wheel turning work to the maintenance worker. The results of the wheel turning work include, for example, the measured value of the wheel diameter, power consumption of the servo motor, and the like. Note that the input / output unit 24 may include an input device such as a keyboard and an output device such as a monitor instead of the dual-purpose input / output device.
[0037] When the railcar 2 travels on the guide rail and stops with one bogie on the movable rail, the wheel lathe 610 turns the wheels attached to the bogie on the movable rail. The wheel lathe 610 holds the wheel with the wheel holder and then moves the movable rail so as to separate from the wheel. Next, the wheel lathe 610 turns the wheel by rotating the roller of the wheel holder and operating the turning device to press the bit against the wheel. When turning is completed, the wheel lathe 610 moves the movable rail to its original position and moves the wheel holder so as to separate from the wheel. This allows the railcar 2 to travel on the guide rail and the bogie on which the wheel turning has been completed to be moved onto the guide rail. That is, the wheel lathe 610 turns the wheels of the railcar 2 without disassembling the bogie of the railcar 2 and while maintaining the state in which it can travel on the rail.
[0038] (3.2) Flat detector The flat detection device 620 is a device that detects a flat portion of a wheel while the wheel remains attached to the railway vehicle 2. The flat detection device 620 includes a control unit 621, a detection unit 622, and a communication unit 623, as shown in FIG.
[0039] The detection unit 622 includes, for example, a vehicle detection sensor and a vibration detection sensor. The vehicle detection sensor is provided on the running rail and detects the position of the railway vehicle 2 on the running rail. The vibration detection sensor is provided on the running rail and detects the flat part of the wheel on the running rail. As described above, the flat part of the wheel is a non-curved part that occurs on the running surface of the wheel due to wear. That is, the diameter of a wheel having a flat part changes suddenly at the flat part. Therefore, when a railway vehicle 2 with a wheel having a flat part runs on the running rail, when the flat part comes into contact with the running rail and leaves it, vibrations and sounds different from those when a part other than the flat part of the wheel comes into contact with the running rail are generated. In addition, when a wheel having a flat part runs on the running rail, the flat part comes into contact with the running rail every time the wheel makes one revolution, so vibrations and sounds are generated periodically.
[0040] The control unit 621 detects whether or not a flat portion exists for each wheel of the railway vehicle 2 based on the detection result of the detection unit 622. The control unit 621 detects the position of the wheel based on the position detection of the railway vehicle 2 by the vehicle detection sensor, for example, and determines the presence or absence of a flat portion of the wheel based on the vibration detection result by the vibration detection sensor.
[0041] The communication unit 623 outputs information as to whether or not each wheel of the railway vehicle 2 has a flat portion to the wheel position lathe 610 via the condition monitoring management system 10. More specifically, the communication unit 623 outputs information as to whether or not each wheel of the railway vehicle 2 has a flat portion to the communication unit 33 of the monitoring server 30 included in the condition monitoring management system 10.
[0042] The running rail of the flat detection device 620 may be connected to a guide rail of the wheel turning machine 610. With this arrangement, the presence or absence of a flat part of the wheel can be detected immediately before the wheel of the railway vehicle 2 is turned by the wheel turning machine 610, so that the turning amount of the wheel turning machine 610 can be appropriately set.
[0043] (4) Condition monitoring and management system The condition monitoring management system 10 acquires the operating status from each of the equipment machines 60 and manages monitoring information based on the operating status. The condition monitoring management system 10 monitors the equipment machines 60 based on the monitoring information. The condition monitoring management system 10 also outputs inspection results of the railway cars 2 based on the monitoring information to the inspection and repair system 1. The condition monitoring management system 10 also acquires the vehicle status from the railway cars 2. Furthermore, the condition monitoring management system 10 notifies the railway cars 2 of the maintenance work results. The maintenance work results include, for example, wheel diameter information.
[0044] As shown in FIG. 1, the status monitoring management system 10 includes a monitoring server 30, an information acquisition device 40, and a terminal device 50.
[0045] The monitoring server 30 manages monitoring information based on the operating state of the equipment machinery 60, and detects abnormalities and predicts failures. In addition, the monitoring server 30 manages the inspection results of the railway cars 2 obtained from the equipment machinery 60, thereby improving the efficiency of maintenance work for the railway cars 2 and reducing the labor required for inspection and repair of the railway cars 2.
[0046] The information acquiring device 40 acquires operation information from the equipment machine 60 and converts it into monitoring information managed by the monitoring server 30. In addition, the information acquiring device 40 notifies the railway vehicle 2 of the results of the maintenance work on the railway vehicle 2 stored in the monitoring server 30 via the monitoring server 30.
[0047] The terminal device 50 is a terminal through which the maintenance worker of the railway car 2 checks monitoring information of the facility machine 60 and maintenance information of the facility machine 60 based on the monitoring information. The maintenance information of the facility machine 60 is, for example, failure prediction information of the facility machine 60. The terminal device 50 is also a terminal through which the maintenance worker of the railway car 2 inputs inspection results of the railway car 2.
[0048] (4.1) Information acquisition device The information acquiring device 40 is an information converting device that acquires an operating status from the equipment machine 60, converts it into monitoring information, and transmits it to the monitoring server 30. In this embodiment, the information acquiring device 40 corresponds to an information acquiring unit. As shown in FIG. 1, the information acquiring device 40 includes a control unit 41, a first communication unit 42, and a second communication unit 43.
[0049] The first communication unit 42 acquires operation information from the existing wheel lathe 610 of the equipment machine 60. The operation information is an operation log of the existing wheel lathe 610. The first communication unit 42 includes an interface capable of communicating with the communication unit 53 of the existing wheel lathe 610. The interface is, for example, Modbus TCP that operates on Ethernet.
[0050] The control unit 41 converts the operation information of the wheel-equipped lathe 610 acquired by the first communication unit 42 into monitoring information managed by the monitoring server 30. More specifically, the control unit 41 analyzes the operation log of the wheel-equipped lathe 610 and converts the format into one record of the monitoring information. In this embodiment, the control unit 41 corresponds to a conversion unit.
[0051] One record of the monitoring information includes, for example, information identifying the equipment machine 60 and the acquisition time of the record. Furthermore, one record of the monitoring information includes at least one of the operating state of the equipment machine 60 and maintenance information of the railway vehicle 2. The operating state of the equipment machine 60 is, for example, the voltage value and current value of the motor that rotates the wheels in the wheel turning lathe 610. Furthermore, the maintenance information of the railway vehicle 2 is, for example, information on the wheel size and diameter of the railway vehicle 2, information identifying the railway vehicle 2, and information identifying the position of the wheels.
[0052] The second communication unit 43 transmits monitoring information based on the operation log of the standing wheel lathe 610 to the communication unit 33 of the monitoring server 30. The second communication unit 43 uploads the records of the monitoring information created by the control unit 41 as a CSV (comma separated value) file to the communication unit 33 by FTP (file transfer protocol) using a 4G line, for example, at regular intervals. The regular interval is, for example, every 5 minutes. The second communication unit 43 includes an interface that can be connected to a public communication network such as 4G or 5G.
[0053] The second communication unit 43 may transmit the monitoring information to the communication unit 33 of the monitoring server 30, for example, every time the control unit 41 generates one record of the monitoring information. The data format for transmitting the monitoring information to the communication unit 33 of the monitoring server 30 is not limited to a CSV file, and may be tab-delimited text or a compressed format of these. The method for transmitting the monitoring information to the communication unit 33 of the monitoring server 30 is not limited to FTP, and may be, for example, HTTP.
[0054] Furthermore, when the second communication unit 43 receives a message addressed to the wheel lathe 610 from the communication unit 33 of the monitoring server 30, the second communication unit 43 transmits the message from the first communication unit 42 in a format that can be received by the wheel lathe 610. The message addressed to the wheel lathe 610 is, for example, information indicating whether or not the wheels of the railcar 2 have flat portions.
[0055] (4.2) Monitoring Server As shown in FIG. 1, the monitoring server 30 includes a control unit 31, a storage unit 32, and a communication unit 33.
[0056] The storage unit 32 is a database that holds operation information based on operation information of the facility machines 60. The storage unit 32 holds monitoring information in units of records corresponding to one piece of operation information for one facility machine 60. The storage unit 32 is also a database that holds information of the railway vehicle 2 based on the operation information of the facility machines 60 and information acquired from the railway vehicle 2.
[0057] The control unit 31 manages monitoring information based on the operating state of the equipment machine 60, and performs abnormality detection and failure prediction. In this embodiment, the control unit 31 corresponds to a monitoring unit. More specifically, the control unit 31 stores the monitoring information received by the communication unit 33 from the information acquisition device 40 or the terminal device 50 in the storage unit 32. Furthermore, when the monitoring information indicates an abnormality in the equipment machine 60, the control unit 31 notifies the terminal device 50 of the abnormality in the equipment machine 60 to a maintenance worker.
[0058] Furthermore, the control unit 31 monitors the state of the facility machine 60 based on the monitoring information, and predicts a failure. For example, when the current value of the motor that rotates the wheels in the existing wheel lathe 610 changes over time (increases or decreases depending on the passage of time), it can be predicted that a failure may occur in the part of the operating unit 612 arranged in the wheel holding unit. Furthermore, the control unit 31 predicts the time when maintenance work is required for the parts that require periodic maintenance such as part replacement based on the monitoring information in the facility machine 60. For example, when the change over time (increase or decrease) of the current value of the motor that rotates the wheels is greater than a reference change amount for the bearings of the rollers that rotate the wheels of the existing wheel lathe 610, and replacement is required, the control unit 31 predicts the time when the bearings will need to be replaced based on the change over time in the current value of the motor that rotates the wheels.
[0059] Furthermore, the control unit 31 manages data necessary for the inspection and maintenance of the railway vehicle 2 based on monitoring information based on the operating state of the equipment machine 60 and information acquired from the railway vehicle 2. The data necessary for the inspection and maintenance of the railway vehicle 2 is, for example, information on the wheel diameter of the railway vehicle 2. The control unit 31 outputs, for example, information on the wheel diameter of the railway vehicle 2 after turning by the existing wheel lathe 610 to the inspection and repair system 1. This allows the inspection and repair system 1 to use the information on the wheel diameter of the railway vehicle 2 after turning output by the existing wheel lathe 610, instead of, for example, inspecting the wheel diameter of the railway vehicle 2 in a regular inspection. Also, the control unit 31 outputs, for example, information on the wheel diameter of the railway vehicle 2 after turning by the existing wheel lathe 610 to the railway vehicle 2. Also, the control unit 31 monitors the state of the railway vehicle 2 based on, for example, the information of the railway vehicle 2, and predicts a failure. For example, if the motor voltage, voltage frequency, current, etc. required for the railway vehicle 2 to obtain a constant acceleration change over time (increase or decrease), the control unit 31 determines that the axle bearings are deteriorated and predicts when they will need to be replaced.
[0060] The communication unit 33 includes an interface capable of communicating with the equipment machinery 60 or the information acquisition device 40, the terminal device 50, the inspection and repair system 1, and the railway vehicle 2. The communication unit 33 includes an interface capable of connecting to a public communication network such as 4G or 5G. The communication unit 33 acquires an operating state from the equipment machinery 60, or acquires monitoring information based on the operating state of the equipment machinery 60 from the information acquisition device 40. The communication unit 33 also outputs data required for the inspection and maintenance of the railway vehicle 2 to the inspection and repair system 1. The communication unit 33 also acquires a traveling log from the railway vehicle 2, and outputs wheel size and diameter information to the railway vehicle 2.
[0061] The monitoring server 30 includes a computer system. The computer system is mainly composed of a processor and a memory as hardware. The function of the monitoring server 30 in the present disclosure is realized by the processor executing a program recorded in the memory of the computer system. The program may be pre-recorded in the memory of the computer system, may be provided through an electric communication line, or may be recorded and provided in a non-transitory recording medium such as a memory card, an optical disk, or a hard disk drive that can be read by the computer system. The processor of the computer system is composed of one or more electronic circuits including a semiconductor integrated circuit or a large-scale integrated circuit. Furthermore, an FPGA that is programmed after the manufacture of an LSI, or a logic device that can reconfigure the connection relationship inside the LSI or reconfigure the circuit partition inside the LSI, can also be adopted as a processor. The multiple electronic circuits may be integrated in one chip or distributed among multiple chips. The multiple chips may be integrated in one device or distributed among multiple devices. The computer system here includes a microcontroller having one or more processors and one or more memories. Therefore, the microcontroller is also composed of one or more electronic circuits including a semiconductor integrated circuit or a large-scale integrated circuit.
[0062] Furthermore, it is not essential for the monitoring server 30 that multiple functions are concentrated in one housing, and the components of the monitoring server 30 may be distributed across multiple housings. Furthermore, at least some of the functions of the monitoring server 30, for example, some of the functions of the storage unit 32, may be realized by the cloud (cloud computing) or the like.
[0063] Conversely, in the embodiment, at least some of the functions of the condition monitoring management system 10 that are distributed among multiple devices may be consolidated in one housing. For example, some of the functions of the condition monitoring management system 10 that are distributed among the monitoring server 30 and the information acquisition device 40 may be consolidated in one housing.
[0064] (4.3) Terminal Equipment The terminal device 50 is an interface that enables a maintenance worker of the railcar 2 to use the condition monitoring management system 10, and is, for example, a notebook computer, a tablet terminal, or a smartphone. The terminal device 50 includes a control unit 51, an input / output unit 52, and a communication unit 53. The input / output unit 52 includes, for example, a display device such as a liquid crystal display or an organic EL display, and an input device such as a keyboard or a slide pad. The input / output unit 52 may also be, for example, a touch panel that serves as both a display device and an input device.
[0065] The control unit 51 acquires monitoring information related to the equipment machine 60 from the control unit 31 of the monitoring server 30 and displays it on the input / output unit 52. The control unit 51 acquires, for example, monitoring information related to the existing wheel lathe 610 from the input / output unit 52 and displays a list on the input / output unit 52. When the control unit 51 is notified of monitoring information indicating an abnormality in the equipment machine 60 from the monitoring server 30, for example, the control unit 51 displays the information on the input / output unit 52 to notify the maintenance worker. The control unit 51 transmits to the monitoring server 30 the inspection results of the railway vehicle 2 and the equipment machine 60 input from the input / output unit 52 by the maintenance worker of the railway vehicle 2. The inspection results of the railway vehicle 2 are, for example, the results of a visual inspection, a hammering inspection, or the like, that are performed without using the equipment machine 60. The inspection results of the equipment machine 60 are, for example, the results of a visual inspection, or the like, that are not included in the operation information of the equipment machine 60.
[0066] The communication unit 53 is an interface that communicates with the communication unit 33 of the monitoring server 30. The communication unit 53 includes an interface that can be connected to a public communication network such as 4G or 5G.
[0067] 3. Operation of the condition monitoring management system (1) Automatic input of wheel diameter information The operation of the condition monitoring management system 10 will be described below when the wheel diameter information acquired from the on-board wheel lathe 610 is automatically input to the inspection and repair system 1 and the railway vehicle 2. FIG.
[0068] First, the first communication unit 42 of the information acquisition device 40 acquires an operation status from the wheel turning machine 610 (step S11). The operation status is an operation log of the wheel turning machine 610. The operation log of the wheel turning machine 610 includes a vehicle number which is information for identifying the railway car 2, a bogie number which indicates the position of the bogie, a target value of the wheel diameter in turning the wheels, and information on the wheel diameter after turning.
[0069] Next, the control unit 41 of the information acquisition device 40 converts the operation status acquired from the wheel turning machine 610 in step S11 into monitoring information (step S12). The control unit 41 converts the operation log of the wheel turning machine 610 into monitoring information, which is a record for each time. The record of the monitoring information includes the acquisition time of the operation log. Furthermore, when the record of the monitoring information indicates the turning operation result, the record of the monitoring information includes the vehicle number, which is information for identifying the railway vehicle 2, the bogie number indicating the position of the bogie, the target value of the wheel diameter in turning the wheels, and information on the wheel diameter after turning. The control unit 41 holds the monitoring information as a file. The file containing the monitoring information is, for example, a csv file. The control unit 41 holds a file in which one record of the monitoring information is one line, and information items included in one record are separated by commas.
[0070] Next, the second communication unit 43 of the information acquisition device 40 transmits the monitoring information generated by the control unit 41 in step S12 to the monitoring server 30 (step S13). The second communication unit 43 transmits the file generated and held by the control unit 41 in step S12 to the monitoring server 30. The second communication unit 43 transmits the file held by the control unit 41 to the communication unit 33 of the monitoring server 30 by FTP, for example, via a public communication network.
[0071] Next, the control unit 31 of the monitoring server 30 holds the monitoring information acquired from the information acquisition device 40 in the storage unit 32 (step S14). The control unit 31 saves the record of the monitoring information included in the file received by the communication unit 33 in step S13 as a record in the storage unit 32, which is a database.
[0072] Next, the control unit 31 of the monitoring server 30 transmits the inspection results of the railway vehicle 2 contained in the monitoring information to the inspection and repair system 1 (step S15). The inspection results of the railway vehicle 2 include information on the wheel diameter after turning by the existing wheel lathe 610. The control unit 31 of the monitoring server 30 transmits the information on the wheel diameter after turning by the existing wheel lathe 610 to the inspection and repair system 1.
[0073] Next, the control unit 31 of the monitoring server 30 transmits the maintenance work result to the railway vehicle 2 (step S16). The maintenance work result includes information on the wheel diameter after turning by the existing wheel lathe 610. The control unit 31 of the monitoring server 30 transmits the information on the wheel diameter after turning by the existing wheel lathe 610 to the railway vehicle 2. As a result, the railway vehicle 2 changes the display of the speedometer and performs acceleration control and deceleration control based on the information on the wheel diameter after turning.
[0074] By the above operation, the railway vehicle 2 holds information on the wheel diameter after turning measured by the real-time wheel lathe 610. In addition, the inspection and repair system 1 holds a record of turning the wheels and information on the wheel diameter after turning, which is the inspection result. Therefore, according to the condition monitoring and management system 10 according to the embodiment, it is possible to reduce the labor required for recording the maintenance work using the real-time wheel lathe 610 and for reflecting the results of the maintenance work in the railway vehicle 2. As a result, for example, it is not necessary to input the record of the maintenance work using the real-time wheel lathe 610 to the inspection and repair system 1 and then input the wheel diameter after turning to the railway vehicle 2. Specifically, if the real-time wheel lathe 610, the inspection and repair system 1, and the railway vehicle 2 are not connected to each other, when the wheels of the railway vehicle 2 are turned using the real-time wheel lathe 610, a maintenance worker needs to measure the wheel diameter as a regular inspection and input the result to the inspection and repair system 1. In addition, another worker needs to input the wheel diameter to the railway vehicle 2 based on the regular inspection result output from the inspection and repair system 1. In contrast, according to the status monitoring management system 10 according to the embodiment, these operations are not necessary.
[0075] (2) Wheel flat area information output A description will be given of the operation of the condition monitoring management system 10 when outputting wheel flat portion information acquired from the flat detection device 620 to the wheel position lathe 610. FIG.
[0076] First, the control unit 31 of the monitoring server 30 acquires flat part information of the wheels from the flat part detection device 620 via the communication unit 33 (step S21). The flat part detection device 620 detects the presence or absence of a flat part of the wheels by having the railway car 2 run over the flat part detection device 620. The flat part detection device 620 outputs the flat part information of the wheels from the communication unit 623 to the monitoring server 30. The flat part information of the wheels includes the vehicle number which is information identifying the railway car 2, the bogie number which indicates the position of the bogie, information which indicates the position of the wheels within the bogie, and the presence or absence of a flat part of the wheels.
[0077] Next, the control unit 31 of the monitoring server 30 outputs the wheel flat portion information to the existing wheel lathe 610 via the communication unit 33 (step S22). More specifically, the control unit 31 of the monitoring server 30 transmits the wheel flat portion information to the second communication unit 43 of the information acquisition device 40 via the communication unit 33. The information acquisition device 40 outputs the wheel flat portion information to the existing wheel lathe 610 from the first communication unit 42.
[0078] Through the above operation, the wheel lathe 610 can obtain information on the presence or absence of flat parts on the wheels of the railway car 2 from the flat detection device 620. Therefore, the wheel lathe 610 can increase the amount of turning in advance for wheels that have flat parts. This can reduce cases where flat parts remain on the wheels after turning due to insufficient amount of turning in the wheel lathe 610.
[0079] In step S22, the control unit 31 of the monitoring server 30 may output a target value of the wheel diameter of each wheel to the wheel lathe 610 so that the turning amount of the wheel having a flat portion is larger than the turning amount of the wheel without a flat portion. This reduces the burden on the maintenance worker.
[0080] (3) Prediction of malfunctions in existing wheel lathes An explanation will be given of the operation of predicting a failure of the existing wheel lathe 610 based on the operating state of the existing wheel lathe 610 in the condition monitoring management system 10. FIG.
[0081] First, the first communication unit 42 of the information acquisition device 40 acquires an operation state from the wheel lathe 610 (step S11). The operation state is an operation log of the wheel lathe 610. The operation log of the wheel lathe 610 includes, for example, the applied voltage and the passing current to each motor included in the operation unit 612 of the wheel lathe 610.
[0082] Next, the control unit 41 of the information acquisition device 40 converts the operating status acquired from the wheel-ready lathe 610 in step S11 into monitoring information (step S12). The control unit 41 converts the operation log of the wheel-ready lathe 610 into monitoring information, which is a record for each time. The record of the monitoring information includes, for example, the acquisition time of the operation log. Furthermore, when the record of the monitoring information indicates the operating status of the wheel-ready lathe 610, the record of the monitoring information includes information for identifying the motor, the voltage applied to the motor, the current passing through the motor, and the target value of the wheel diameter. The control unit 41 holds the monitoring information as a file. The file including the monitoring information is, for example, a csv file. The control unit 41 holds a file in which one record of the monitoring information is one line, and information items included in one record are separated by commas.
[0083] Next, the second communication unit 43 of the information acquisition device 40 transmits the monitoring information generated by the control unit 41 in step S12 to the monitoring server 30 (step S13). The second communication unit 43 transmits the file generated and held by the control unit 41 in step S12 to the monitoring server 30. The second communication unit 43 transmits the file held by the control unit 41 to the communication unit 33 of the monitoring server 30 by FTP, for example, via a public communication network.
[0084] Next, the control unit 31 of the monitoring server 30 holds the monitoring information acquired from the information acquisition device 40 in the storage unit 32 (step S14). The control unit 31 saves the record of the monitoring information included in the file received by the communication unit 33 in step S13 as a record in the storage unit 32, which is a database.
[0085] Next, the control unit 31 of the monitoring server 30 performs failure prediction of the operating unit 612 of the wheel lathe 610 based on the monitoring information (step S31). The control unit 31, for example, learns the relationship between the motor output and the load (for example, the amount of cut, the number of rotations) in the medium to long term. Then, the control unit 31 transmits a warning message to the terminal device 50 when, for example, the difference between the motor output and the motor output predicted from the load is large. In addition, the control unit 31 predicts the day when the difference between the motor output and the motor output predicted from the load will be equal to or greater than a threshold value when, for example, the difference between the motor output and the motor output predicted from the load is expanding over time, and transmits the prediction to the terminal device 50. Note that the relationship between the motor output and the load is an example of failure prediction, and for example, by combining an index indicating the operating status of the parts of the operating unit 612 and an index indicating the load of the work to be performed by the operating unit 612 and learning in the same manner, failure prediction can be performed for any part other than the motor.
[0086] Through the above operations, the maintenance person can grasp the status of the operating part 612 of the standing wheel lathe 610, and can immediately perform maintenance work or plan maintenance work as necessary.
[0087] (4) Railway vehicle failure prediction An explanation will be given of the operation of the condition monitoring management system 10 for predicting a failure of the railway vehicle 2 based on the operating state of the wheel positioning lathe 610 and information on the railway vehicle 2. FIG.
[0088] First, the first communication unit 42 of the information acquisition device 40 acquires an operation status from the wheel turning machine 610 (step S11). The operation status is an operation log of the wheel turning machine 610. The operation log of the wheel turning machine 610 includes, for example, a vehicle number which is information for identifying the railcar 2, a bogie number which indicates the position of the bogie, a target value of the wheel diameter in turning the wheels, and information on the wheel diameter after turning.
[0089] Next, the control unit 41 of the information acquisition device 40 converts the operation status acquired from the wheel turning machine 610 in step S11 into monitoring information (step S12). The control unit 41 converts the operation log of the wheel turning machine 610 into monitoring information, which is a record for each time. The record of the monitoring information includes the acquisition time of the operation log. When the record indicates the turning operation result, the record of the monitoring information includes the vehicle number, which is information identifying the railway vehicle 2, the bogie number indicating the position of the bogie, the target value of the wheel diameter in turning the wheels, and information on the wheel diameter after turning. The control unit 41 holds the monitoring information as a file. The file containing the monitoring information is, for example, a CSV file. The control unit 41 holds a file in which one record of the monitoring information is one line, and information items included in one record are separated by commas.
[0090] Next, the second communication unit 43 of the information acquisition device 40 transmits the monitoring information generated by the control unit 41 in step S12 to the monitoring server 30 (step S13). The second communication unit 43 transmits the file generated and held by the control unit 41 in step S12 to the monitoring server 30. The second communication unit 43 transmits the file held by the control unit 41 to the communication unit 33 of the monitoring server 30 by FTP, for example, via a public communication network.
[0091] Next, the communication unit 23 of the railway vehicle 2 transmits a traveling log to the monitoring server 30 (step S41). The traveling log includes, for example, a vehicle number which is information for identifying the railway vehicle 2, the speed of the railway vehicle 2 at each time, input from the master controller in the driver's seat, the voltage applied to the motor, the current passing through the motor, and an operation record of the braking device.
[0092] Next, the control unit 31 of the monitoring server 30 holds the monitoring information acquired from the information acquisition device 40 and the traveling log acquired from the railway vehicle 2 in the storage unit 32 (step S42). The control unit 31 saves records of the monitoring information and the traveling log as records in the storage unit 32, which is a database.
[0093] Next, the control unit 31 of the monitoring server 30 performs a failure prediction for the railway vehicle 2 based on the monitoring information and the traveling log (step S43). For example, when there is a large change over time in the motor current value, voltage value, or voltage frequency, the control unit 31 determines that the wheel bearings are deteriorated, and outputs the result from the terminal device 50.
[0094] Through the above operations, the maintenance worker can grasp the status of the railway vehicle 2 and, if necessary, can immediately carry out maintenance work or can plan maintenance work.
[0095] 4.Effects The condition monitoring management system 10 according to the embodiment includes an information acquisition device 40, a storage unit 32, a control unit 31, and a communication unit 33. The information acquisition device 40 acquires an operating state from equipment machines 60 in a railway vehicle factory. The storage unit 32 manages monitoring information based on the operating state. The control unit 31 monitors the equipment machines 60 based on the monitoring information. The communication unit 33 communicates with a railway vehicle 2 inspected and repaired by the equipment machines 60. The information acquisition device 40 includes a control unit 41 that converts an operating state into monitoring information. The operating state includes information indicating the wheel diameter of the railway vehicle 2. The communication unit 33 notifies the railway vehicle 2 of the information on the wheel diameter of the railway vehicle. As a result, the condition monitoring management system 10 acquires information indicating the wheel diameter of the railway vehicle 2 from the equipment machines 60 that inspect and repair the railway vehicle 2 and notifies the railway vehicle 2 of the information. That is, information required by the railway vehicle 2 when operating the railway vehicle 2 is efficiently notified to the railway vehicle 2. Therefore, the efficiency of maintenance of the railway vehicle 2 can be improved. Specifically, if the in-position wheel lathe 610, the inspection and repair system 1, and the railway vehicle 2 were not connected to one another, when the wheels of the railway vehicle 2 were turned using the in-position wheel lathe 610, a maintenance worker would need to measure the wheel diameter as a regular inspection and input the result into the inspection and repair system 1. Also, another worker would need to input the wheel diameter into the railway vehicle 2 based on the regular inspection result output from the inspection and repair system 1. In contrast, according to the condition monitoring and management system 10 according to the embodiment, these tasks are not necessary.
[0096] In addition, in the condition monitoring management system 10 according to the embodiment, the equipment machine 60 includes a flat detection device 620 and a shape wheel lathe 610. The flat detection device 620 detects whether or not the wheels of the railway vehicle 2 have a flat portion on the outer periphery. The shape wheel lathe 610 turns the wheels of the railway vehicle 2. When the flat detection device 620 detects the flat portion of the wheels of the railway vehicle 2, the control unit 31 causes the information acquisition device 40 to notify the shape wheel lathe 610 that the wheels of the railway vehicle 2 have a flat portion. As a result, the shape wheel lathe 610 can increase the amount of turning when the wheels of the railway vehicle 2 have a flat portion. Therefore, it is possible to make the procedure for maintaining the wheels of the railway vehicle 2 more efficient.
[0097] Furthermore, in the condition monitoring management system 10 according to the embodiment, when the flat detection device 620 detects a flat portion of the wheel of the railway vehicle 2, the control unit 41 causes the wheel turning machine 610 to increase the amount of turning of the wheel compared to when the flat detection device 620 does not detect a flat portion of the wheel of the railway vehicle 2. This allows the wheel turning machine 610 to use an amount of turning that is appropriate for each of the cases where the wheel has a flat portion and the wheel does not have a flat portion. This makes it possible to further streamline the procedure for maintaining the wheels of the railway vehicle 2.
[0098] Furthermore, in the condition monitoring and management system 10 according to the embodiment, the in-place wheel lathe 610 can turn the wheels while they are attached to the railway vehicle 2. Therefore, there is no need to disassemble the bogie of the railway vehicle 2 each time the wheels are turned, which can improve the efficiency of maintenance of the railway vehicle 2. Furthermore, in the condition monitoring and management system 10 according to the embodiment, the amount of turning of the wheels of the railway vehicle 2 by the in-place wheel lathe 610 can be appropriately set, which can further improve the efficiency of the procedure for maintaining the wheels of the railway vehicle 2.
[0099] Furthermore, in the condition monitoring management system 10 according to the embodiment, the control unit 41 predicts failures in the equipment machine 60 by using monitoring information based on the operating state acquired from the equipment machine 60. Therefore, the maintenance of the equipment machine 60 can be made more efficient.
[0100] Furthermore, in the condition monitoring management system 10 according to the embodiment, the terminal device 50 can display monitoring information based on the operating status acquired from the equipment machinery 60. Therefore, it is possible to reduce the travel time of personnel for maintenance work on the railway cars 2 and the equipment machinery 60, thereby making the work more efficient.
[0101] Furthermore, in the condition monitoring management system 10 according to the embodiment, the control unit 41 outputs information about the railway vehicle 2 based on the operating state acquired from the equipment machinery 60 to the inspection and repair system 1. Therefore, the information about the railway vehicle 2 based on the operating state acquired by the inspection and repair system 1 from the equipment machinery 60 can be used as a substitute for regular inspection of the railway vehicle 2. This makes it possible to omit inspections that overlap with maintenance work that has already been carried out for the railway vehicle 2 in the regular inspection of the railway vehicle 2, thereby making it possible to improve the efficiency of inspection of the railway vehicle 2.
[0102] Furthermore, in the condition monitoring management system 10 according to the embodiment, the control unit 41 predicts a failure in the railway vehicle 2 by using monitoring information based on the operating state acquired from the equipment machine 60. Therefore, the maintenance of the railway vehicle 2 can be made more efficient.
[0103] (Other Modifications of the Embodiment) (1) In the embodiment, the flat detection device 620 transmits the flat portion information of the wheels to the present wheel lathe 610 via the monitoring server 30 and the information acquisition device 40. However, for example, the monitoring server 30 may transmit the flat portion information of the wheels directly to the present wheel lathe 610 without going through the information acquisition device 40. Also, for example, the flat detection device 620 may transmit the flat portion information of the wheels to each of the monitoring server 30 and the present wheel lathe 610, and the monitoring server 30 may not transmit the flat portion information of the wheels to the present wheel lathe 610. In other words, as long as the flat detection device 620 transmits the flat portion information of the wheels to the present wheel lathe 610, the form of the communication may be any configuration.
[0104] (2) In the embodiment, the wheel positioning lathe 610 receives the flat portion information of the wheel from the flat detection device 620. However, for example, the terminal device 50 may be provided near the wheel positioning lathe 610, and the terminal device 50 may receive and display the flat portion information of the wheel. Even with this configuration, the maintenance worker who inputs the target value of the wheel diameter to the wheel positioning lathe 610 can be notified of whether or not there is a flat portion on the wheel of the railway vehicle 2. Therefore, the maintenance worker can appropriately set the target value of the wheel diameter in the wheel positioning lathe 610.
[0105] (3) In the embodiment, the flat detection device 620 detects whether or not the wheel has a flat portion. However, for example, the control unit 21 of the railcar 2 may have a flat detection function. More specifically, for example, the railcar 2 is provided with a sensor that detects vertical movement on the axle of the bogie. When the wheel has a flat portion, the axle on which the wheel is attached vibrates up and down every time the flat portion of the wheel comes into contact with the rail. Here, the vertical movement of the axle occurs periodically with a period that depends on the rotation speed of the axle. Therefore, the control unit 21 of the railcar 2 can detect that the wheel attached to the axle has a flat portion when the axle moves up and down periodically with a period that depends on the rotation speed of the axle. In this case, instead of the flat detection device 620, the control unit 21 of the railcar 2 transmits flat portion information of the wheel to the monitoring server 30. Note that the railcar may be provided with a sensor that detects sound instead of the sensor that detects vertical movement. The sensor detects sound that occurs periodically every time the flat portion of the wheel comes into contact with the rail.
[0106] (4) In the embodiment, the existing wheel lathe 610 and the flat detection device 620 are given as examples of the equipment machine 60, but the equipment machine 60 may include other equipment such as a traverser. In this case, the equipment machine 60 may communicate with the monitoring server 30 via the information acquisition device 40, or the equipment machine 60 may communicate directly with the monitoring server 30. When the information acquisition device 40 is used, the monitoring server 30 and the equipment machine 60 do not need to communicate directly, so the monitoring server 30 can easily acquire the operation information of the equipment machine 60 regardless of the configuration of the control unit of the equipment machine 60. Note that, when the monitoring server 30 can directly acquire the operation information of the equipment machine 60, the equipment machine 60 communicates directly with the monitoring server 30, eliminating the need to use the information acquisition device 40, and simplifying the configuration of the condition monitoring management system 10.
[0107] (Aspect) A condition monitoring and management system (condition monitoring and management system 10) according to a first embodiment of the present disclosure is a condition monitoring and management system for an equipment machine (60) and a railway vehicle (2) using the equipment machine (60) in a railway vehicle factory. The condition monitoring and management system (condition monitoring and management system 10) includes an information acquisition unit (information acquisition device 40), a storage unit (32), a monitoring unit (control unit 31), and a communication unit (33). The information acquisition unit (information acquisition device 40) acquires an operating state from the equipment machine (60) in the railway vehicle factory. The storage unit (32) manages monitoring information based on the operating state. The monitoring unit (control unit 31) monitors the equipment machine (60) based on the monitoring information. The communication unit (33) communicates with a railway vehicle (2) to be inspected and repaired by the equipment machine (60). The information acquisition unit (information acquisition device 40) includes a conversion unit (control unit 41) that converts the operating state into a monitoring response. The operating state includes information indicating the wheel diameter of the railway vehicle (2). The communication unit (33) notifies the railway vehicle (2) of the wheel diameter of the railway vehicle (2).
[0108] According to the condition monitoring and management system (condition monitoring and management system 10) of the above aspect, the condition monitoring and management system (condition monitoring and management system 10) acquires information indicating the wheel diameter of the railway vehicle (2) from the facility machine (60) that inspects and repairs the railway vehicle (2), and notifies the railway vehicle (2). In other words, information required by the railway vehicle (2) when operating the railway vehicle (2) is efficiently notified to the railway vehicle (2). Therefore, the efficiency of maintenance of the railway vehicle (2) can be improved.
[0109] A condition monitoring and management system (condition monitoring and management system 10) according to a second embodiment of the present disclosure is a condition monitoring and management system for an equipment machine (60) and a railway vehicle (2) using the equipment machine (60) in a railway vehicle factory. The condition monitoring and management system (condition monitoring and management system 10) includes an information acquisition unit (information acquisition device 40), a storage unit (32), and a monitoring unit (control unit 31). The information acquisition unit (information acquisition device 40) acquires an operating state from the equipment machine (60) in the railway vehicle factory. The storage unit (32) manages monitoring information based on the operating state. The monitoring unit (control unit 31) monitors the equipment machine (60) based on the monitoring information. The equipment machine (60) includes a flat detection device (620) and a lathe device (standing wheel lathe 610). The flat detection device (620) detects whether or not the wheels of the railway vehicle (2) have a flat portion on the outer periphery. The lathe device (positioned wheel lathe 610) turns the wheels of the railway vehicle 2. When the flat detection device 620 detects a flat portion of the wheel of the railway vehicle 2, the monitoring unit (control unit 31) causes the information acquisition unit (information acquisition device 40) to notify the lathe device (positioned wheel lathe 610) that the wheel of the railway vehicle 2 has a flat portion.
[0110] According to the condition monitoring and management system (condition monitoring management system 10) of the above embodiment, the lathe device (wheel turning lathe 610) can increase the amount of turning when the wheels of the railway vehicle (2) have flat parts. Therefore, it is possible to improve the efficiency of the maintenance procedures for the wheels of the railway vehicle (2).
[0111] In the condition monitoring and management system (condition monitoring management system 10) according to the third aspect of the present disclosure, in the second aspect, when the flat detection device (620) detects a flat portion of the wheel of the railway vehicle (2), the monitoring unit (control unit 41) instructs the lathe device (standing wheel lathe 610) to increase the amount of turning of the wheel compared to when the flat detection device (620) does not detect the flat portion of the wheel of the railway vehicle (2).
[0112] According to the condition monitoring and management system (condition monitoring management system 10) of the above embodiment, the lathe device (positional wheel lathe 610) can use a turning amount appropriate for each of the cases where the wheel has a flat portion and the wheel does not have a flat portion. Therefore, it is possible to further improve the efficiency of the procedure for maintaining the wheels of the railway vehicle (2).
[0113] In a condition monitoring and management system (condition monitoring management system 10) according to a fourth aspect of the present disclosure, in the second or third aspect, the lathe device (in-place wheel lathe 610) is a lathe device (in-place wheel lathe 610) capable of turning the wheels while they are attached to the railway vehicle (2).
[0114] According to the condition monitoring and management system (condition monitoring and management system 10) of the above aspect, it is not necessary to disassemble the bogie of the railway vehicle (2) each time the wheels are turned, and it is possible to improve the efficiency of maintenance of the railway vehicle (2). Furthermore, in the condition monitoring and management system (condition monitoring and management system 10) of the above aspect, the amount of turning of the wheels of the railway vehicle (2) by the lathe device (in-place wheel lathe 610) can be appropriately set, so that it is possible to further improve the efficiency of the procedure for maintaining the wheels of the railway vehicle 2. [Explanation of symbols]
[0115] 10 Condition monitoring and management system (condition monitoring and management system for equipment machinery and railcars using equipment machinery in railcar factories) 31 Control section (monitoring section) 32 Storage section 33 Communications Department 40 Information acquisition device (information acquisition unit) 41 Control unit (conversion unit) 60 Equipment and Machinery 610 Wheel lathe (lathe device) 620 Flat Detector 2. Railway vehicles
Claims
1. A condition monitoring and management system for equipment machines and railway cars using equipment machines in a railway car factory, comprising: an information acquisition unit that acquires operating conditions from equipment machines in the railway vehicle factory; a storage unit for managing monitoring information based on the operating state; a monitoring unit that monitors the facility machine based on the monitoring information; A communication unit that communicates with the railway vehicle to be inspected and repaired by the facility machine; Equipped with the information acquisition unit includes a conversion unit that converts the operation status into the monitoring information, the operating state includes information indicating a wheel diameter of the railway vehicle, The communication unit notifies the railway vehicle of a wheel diameter of the railway vehicle. Condition monitoring and management system.
2. A condition monitoring and management system for equipment machines and railway cars using equipment machines in a railway car factory, comprising: an information acquisition unit that acquires operating conditions from equipment machines in the railway vehicle factory; a storage unit for managing monitoring information based on the operating state; a monitoring unit that monitors the facility machine based on the monitoring information; Equipped with The facility machine includes: a flat detection device for detecting whether or not the wheel of the railway vehicle has a flat portion on an outer periphery thereof; a lathe device for lathing the wheels of the railway vehicle, When the flat detection device detects the flat portion of the wheel of the railway vehicle, the monitoring unit causes the information acquisition unit to notify the lathe device that the wheel of the railway vehicle has the flat portion. Condition monitoring and management system.
3. When the flat detection device detects the flat portion of the wheel of the railway vehicle, the monitoring unit causes the lathe device to increase the amount of turning of the wheel compared to when the flat detection device does not detect the flat portion of the wheel of the railway vehicle. The condition monitoring and management system according to claim 2 .
4. The lathe device is an in-place wheel lathe capable of turning the wheel while the wheel is attached to the railway vehicle. The status monitoring and management system according to claim 2 or 3.
Citation Information
Patent Citations
Diagnosis system and diagnosis method
WO2021079438A1
