Semi-submersible floating foundation and method for constructing semi-submersible floating foundation

The semi-submersible floating foundation design with a steel center column and prestressed concrete beams addresses the complexity and weight issues of concrete foundations by fixing beam prestressing steel materials to steel fixing materials, improving workability and reducing construction time.

JP2024139150APending Publication Date: 2024-10-09TAISEI CORP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023049965
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-27
Publication Date
2024-10-09

AI Technical Summary

Technical Problem

Existing semi-submersible floating foundations made of concrete face complications in arranging prestressing steel materials, leading to increased complexity, weight, and construction time due to their intricate arrangement, especially at the joints between columns and beams.

Method used

A semi-submersible floating foundation design that incorporates a steel center column with a steel slab and prestressed concrete beams, where beam prestressing steel materials are fixed to steel fixing materials at the joints, reducing the complexity and weight by integrating a steel slab and using prestressed concrete for the main body parts.

Benefits of technology

This design simplifies the arrangement of prestressing steel materials, reduces weight, and enhances construction efficiency by minimizing the intertwining of steel materials, thereby reducing construction time and effort.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024139150000001_ABST
    Figure 2024139150000001_ABST
Patent Text Reader

Abstract

To propose a semi-submersible floating foundation that can improve workability by preventing PC steel materials from becoming entangled and can also be made lighter, and a method for constructing the semi-submersible floating foundation.SOLUTION: A semi-submersible floating foundation 2 for a wind power generation facility includes: a center column 3 that supports a support 12 of a wind turbine 11; three side columns 4, 4, 4 arranged at intervals from the center column 3; and a beam 5 that connects the center column 3 and the side columns 4. The center column 3 includes: a steel slab 31; and a cylindrical main body 32 that is erected on the slab 31. The beam 5 is made of prestressed concrete with beam PC steel materials 51 arranged thereon. The slab 31 includes: a slab bottom steel plate 33 that is provided on a bottom surface; a slab top steel plate 34 that is provided on a top surface; and an anchoring steel material 35 that is provided at a joint part with the beam 5 to anchor the beam PC steel material 51.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a semi-submersible floating foundation for an offshore wind power generation facility and a method for constructing a semi-submersible floating foundation. [Background technology]

[0002] Demand for renewable energy is increasing with the aim of reducing greenhouse gas emissions. Renewable energy sources include, for example, solar power generation, wind power generation, hydroelectric power generation, geothermal power generation, and biomass power generation. Wind power generation facilities are often installed in mountainous areas away from residential areas because the noise and vibrations caused by wind turbines can affect the living environment and the impact on living space, etc. must be fully considered. However, it is difficult to secure land for installing large wind turbines in mountainous areas, and it is also difficult to secure transportation routes to wind power generation facilities and install transmission lines, etc. For this reason, installation of wind power generation facilities on the sea (on water) is being considered. When constructing a structure on water, a floating structure may be used as the foundation. Floating foundation structures include semi-submersible, spar, purge, and TLP types. Of these, semi-submersible foundations (semi-submersible floating foundations) are made up of a center column, multiple side columns spaced apart around the center column, and beams (pontoons) that connect the center column and the side columns, and have a relatively good track record due to their excellent stability against waves and wind.

[0003] Semi-submersible floating foundations are often mainly made of steel members. However, if the semi-submersible floating foundation is constructed from concrete, costs can be reduced. For example, Patent Document 1 discloses a semi-submersible floating foundation whose main structural elements are made of concrete. Semi-submersible floating foundations made of concrete are typically constructed by integrating columns made of cylindrical precast reinforced concrete blocks with beams made of box-shaped precast reinforced concrete blocks using post-tensioning with PC steel. On the other hand, the columns mainly have prestressing tendons arranged vertically, while the beams have them arranged horizontally, and at the joints between the columns and beams, the prestressing tendons in the vertical direction and the horizontal direction are intertwined, resulting in a complex arrangement. This makes the arrangement of the prestressing tendons time-consuming. Also, at the joints between the columns and beams, the thickness of the slabs and sidewalls is increased in order to accommodate the intertwined prestressing tendons. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Special Publication No. 2015-513046 Summary of the Invention [Problem to be solved by the invention]

[0005] The objective of the present invention is to propose a semi-submersible floating foundation that prevents PC steel members from becoming entangled, thereby improving workability and enabling weight reduction, as well as a method for constructing this semi-submersible floating foundation. [Means for solving the problem]

[0006] The present invention, which aims to solve the above problems, provides a semi-submersible floating foundation for a wind power generation facility, comprising a center column supporting a support for a wind turbine, a plurality of side columns arranged at intervals from the center column, and a beam connecting the center column and the side columns. The center column comprises a steel slab and a cylindrical main body erected on the slab. The beam is made of prestressed concrete with beam prestressing steel members arranged therein. The slab comprises a bottom slab steel plate arranged on the bottom surface, a top slab steel plate arranged on the top surface, and an anchoring steel member arranged at the joint with the beam for anchoring the beam prestressing steel members. In addition, the method for constructing a semi-submersible floating foundation of the present invention includes a segment manufacturing process for manufacturing beam segments that constitute the beam, a beam forming process for placing the beam segments in predetermined positions to form the beam, and a beam connecting process for connecting the base end of the beam to the slab, and in the beam connecting process, the beam PC steel material is fixed to the anchoring steel material and tension is introduced into the beam PC steel material. According to this semi-submersible floating foundation and the construction method of the semi-submersible floating foundation, the slab of the center column is made of steel, which makes it lighter than a concrete slab and also reduces the amount of concrete used. In addition, the prestressing steel of the beam is fixed to the anchoring steel of the slab, which prevents the prestressing steel of the center column in the vertical direction from becoming entangled with the prestressing steel of the horizontal direction. This reduces the labor required during construction.

[0007] When the main body is made of prestressed concrete, penetrates the upper steel plate for the slab, and the lower end of the main body is in contact with the bottom steel plate for the slab, it is preferable that a frame member extending from the anchoring steel member to the outer surface of the main body is arranged along the lower surface of the upper steel plate for the slab and the upper surface of the bottom steel plate for the slab, and further, a tie member extending from the inner surface of the main body along the extension line of the frame member is arranged inside the main body, and the tie members are joined together at the center of the main body. In this way, even if the main body of the center column is made of concrete, the main body and the slab (bottom steel plate and upper steel plate) are made continuous (integrated), so that the required strength can be obtained at the ultimate limit state and the fatigue limit state.

[0008] The side column comprises a steel side column slab and a cylindrical side column main body erected on the side column slab, and the side column slab desirably comprises a bottom steel plate for side column slab provided on the bottom surface, an upper steel plate for side column slab provided on the top surface, and a side column anchoring steel material provided at the joint with the beam and capable of anchoring the beam prestressing steel material. In this way, the side column can also be made lighter by making the slab out of steel, and the prestressing steel material can be prevented from becoming entangled by anchoring the beam prestressing steel material to the side column anchoring steel material.

[0009] The anchoring steel has an insertion hole through which the beam prestressing steel can be inserted, and the end of the beam prestressing steel is preferably provided with a locking member that forms the beam prestressing steel inserted into the insertion hole into the anchoring steel. In this case, the locking member may be a member screwed to the beam prestressing steel, or a wedge-shaped member. If the locking member is a wedge-shaped member, a receiving member that engages with the locking member is provided on the anchoring steel. Effect of the Invention

[0010] The semi-submersible floating foundation and the method for constructing this semi-submersible floating foundation of the present invention make it possible to prevent the PC steel members from becoming entangled, thereby improving workability and also making it possible to reduce weight. [Brief description of the drawings]

[0011] [Figure 1] 1 is a perspective view showing an offshore wind power generation facility according to an embodiment of the present invention. [Diagram 2] FIG. 1 is a diagram showing a semi-submersible floating foundation according to an embodiment of the present invention, where (a) is a plan view and (b) is a cross-sectional view. [Diagram 3] A cross-sectional view showing the anchoring portion of the beam PC steel. [Figure 4] 1 is a flowchart showing a method for constructing a semi-submersible floating foundation. [Diagram 5]FIG. 11 is a perspective view showing a beam forming process. [Figure 6] FIG. 11 is a perspective view showing a beam connecting step. [Figure 7] FIG. 11 is a perspective view showing a main body forming step. [Figure 8] 13 is a cross-sectional view showing another form of the anchoring portion of the beam PC steel. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] In this embodiment, a foundation structure (semi-submersible floating foundation 2) of an offshore wind power generation facility (floor facility) 1 will be described. FIG. 1 is a perspective view of the offshore wind power generation facility 1. As shown in FIG. 1, the offshore wind power generation facility 1 has a wind turbine 11 and a pillar 12 that supports the wind turbine 11, and is provided at a position higher than the water surface via the semi-submersible floating foundation 2. The wind turbine 11 is rotatably provided on the upper end of the pillar 12. The pillar 12 is erected on the semi-submersible floating foundation 2. The semi-submersible floating foundation 2 comprises a center column 3 that supports the support pillars 12 of the wind turbine 11, three side columns 4, 4, 4 arranged at intervals from the center column 3, and beams 5, 5, 5 that connect the center column 3 and the side columns 4.

[0013] FIG. 2 shows the semi-submersible floating foundation 2. The beam 5 is made of prestressed concrete with beam prestressing steel 51. As shown in FIG. 2(a), one end of the beam 5 is connected to the slab 31 of the center column 3, and the other end of the beam 5 is connected to the side column 4. The beam 5 has a rectangular cylindrical shape. The beam 5 is formed by connecting a plurality of beam segments 53, 53, ... in the horizontal direction. The beam segment 53 is a precast member made of concrete. The beam 5 is also provided with beam prestressing steel 51. The beam prestressing steel 51 is arranged along the longitudinal direction of the beam 5 and penetrates the plurality of beam segments 53, 53, .... One end of the beam prestressing steel 51 is fixed to the side column 4, and the other end of the beam prestressing steel 51 is fixed to the center column 3 (anchoring steel 35).

[0014] As shown in FIG. 2( b ), the center column 3 includes a steel slab 31 and a cylindrical main body portion 32 standing on the slab 31 . The slab 31 includes a bottom steel plate 33 for slab provided on the bottom surface, an upper steel plate 34 for slab provided on the top surface, an anchoring steel material 35 provided at the joint with the beam 5, and a side wall steel plate 36 connecting the anchoring steel materials 35 to each other. The slab 31 is formed in a hexagonal shape in a plan view, and has an outer shape sufficiently larger than the outer shape of the main body part 32. The planar shape of the slab 31 is not limited, and may be, for example, a circle. A hole through which the main body part 32 can be inserted is formed in the center of the upper steel plate 34 for slab. The anchoring steel material 35 is made of a steel material having an outer shape equivalent to that of the beam 5 (a square shape in this embodiment). The anchoring steel material 35 has a strength capable of anchoring the beam PC steel material 51 (see FIG. 2(a)) inserted into the beam 5.

[0015] The main body 32 penetrates the center of the upper slab steel plate 34, and its lower end abuts on the bottom slab steel plate 33. The main body 32 is made of prestressed concrete, and prestressing steel members (not shown) are provided in the center of the thickness direction of the side wall portion. The prestressing steel members are arranged in the vertical direction of the main body 32. As shown in Figs. 2(a) and (b), inside the slab 31, a frame member 37 is arranged from the anchoring steel member 35 to the outer surface of the main body 32. The frame member 37 is arranged between the lower surface of the upper slab steel plate 34 and the upper surface of the bottom slab steel plate 33. The upper frame member 37 is a plate member (rib) arranged along the lower surface of the upper slab steel plate 34 and is joined to the lower surface of the upper slab steel plate 34. The lower frame member 37 is a plate member (rib) arranged along the upper surface of the bottom slab steel plate 33 and is joined to the upper surface of the bottom slab steel plate 33. Inside the main body 32, a tie member 38 is arranged extending from the inner surface of the main body 32 along the extension line of the frame member 37. The upper tie member 38 is a plate member (rib) arranged along the lower surface of the upper slab steel plate 34 and is joined to the lower surface of the upper slab steel plate 34. The lower connecting material 38 is a plate material (rib) arranged along the upper surface of the slab bottom steel plate 33, and is joined to the upper surface of the slab bottom steel plate 33. The connecting material 38 is joined to other connecting materials 38 at the center of the main body portion 32.

[0016] The anchoring steel material 35 has an insertion hole 35a through which the beam prestressing steel material 51 can be inserted. Fig. 3 shows the anchoring portion of the beam prestressing steel material 51. As shown in Fig. 3, a locking member 52 is provided at the end of the beam prestressing steel material 51 to lock the beam prestressing steel material 51 inserted into the insertion hole 35a of the anchoring steel material 35 to the anchoring steel material 35. The locking member 52 in this embodiment is made of a wedge-shaped member. The anchoring steel material 35 is provided with a receiving member 35b that engages with the locking member 52.

[0017] As shown in Figures 1 and 2(a), three side columns 4 are disposed around the center column 3. The intervals between adjacent side columns 4 are the same. The side columns 4 are connected to the center column 3 via beams 5. The side column 4 includes a steel side column slab 41 and a cylindrical side column main body 42 erected on the side column slab 41.

[0018] 2(a) and (b), the side column slab 41 has a horseshoe shape in plan view, and includes a bottom steel plate 43 for side column slab provided on the bottom surface, an upper steel plate 44 for side column slab provided on the top surface, a side column anchoring steel material 45 provided at the joint with the beam 5, a side column bone member 46 provided on the top surface of the bottom steel plate 43 for side column slab and the bottom surface of the upper steel plate 44 for side column slab, and a side column side wall 47 covering the side surface of the side column slab 41. The side column anchoring steel material 45 has a strength capable of anchoring the beam PC steel material 51 inserted into the beam 5. The details of the side column anchoring steel material 45 are the same as those of the anchoring steel material 35. The side column body 42 has a cylindrical shape. The side column body 42 is made of prestressed concrete, and a prestressing steel member (not shown) is provided in the center of the cylindrical side wall in the thickness direction. The prestressing steel member is disposed in the vertical direction of the side column body 42, and is fixed to the side column frame member 46 on the upper or lower side.

[0019] The method for constructing a semi-submersible floating foundation of this embodiment will be described. Figure 4 shows the steps of the method for constructing a semi-submersible floating foundation. As shown in Figure 4, the method for constructing a semi-submersible floating foundation includes a segment manufacturing process S1, a beam forming process S2, a beam connecting process S3, and a main body forming process S4. In the segment manufacturing process S1, the beam segments 53 that constitute the beam 5 are manufactured. The beam forming step S2 is shown in Fig. 5. In the beam forming step S2, as shown in Fig. 5, beam segments 53 are arranged in predetermined positions to form a beam 5. A water-stopping material (not shown) is interposed between the beam segments 53. At this time, the beam segments 53 are temporarily joined together by applying a compressive force using PC steel.

[0020] The beam connecting step S3 is shown in Fig. 6. As shown in Fig. 6, in the beam connecting step S3, the base end of the beam 5 is connected to the center column 3, and the tip end is connected to the side column 4. At this time, the beam prestressing steel material 51 is fixed to the anchoring steel material 35 and the side column anchoring steel material 45, and tension is introduced to the beam 5 (beam prestressing steel material 51) by the post-tensioning method. In other words, one end of the beam prestressing steel material 51 (multi-strand or single strand) through which the beam 5 has been inserted is fixed (anchored) to the center column 3, and the other end is fixed (anchored) to the side column 4. The main body forming step S4 is shown in Fig. 7. As shown in Fig. 7, in the main body forming step S4, the main body 32 of the center column 3 and the side column main body 42 are completed.

[0021] According to the semi-submersible floating foundation 2 and the method for constructing a semi-submersible floating foundation of this embodiment, by making the slab 31 of the center column 3 out of steel, it is possible to reduce the weight and the amount of concrete used compared to when the entire center column 3 is made out of concrete. In addition, since the PC steel members of the beam 5 are fixed to the anchoring steel members 35 of the slab 31, it is possible to prevent the PC steel members in the vertical direction and the PC steel members in the horizontal direction in the center column 3 from becoming entangled. This reduces the amount of work required during construction.

[0022] Furthermore, since the frame members 37 are provided within the slab 31, the strength of the slab 31 of the center column 3 is ensured. Since the beam prestressing steel members 51 of the beam 5 are fixed to the anchoring steel members 35, this method is easier to work with than fixing the beam prestressing steel members 51 to the center column 3. In other words, if the beam prestressing steel members 51 of the beam 5 are fixed to the center column 3 to which multiple beams 5 are connected, the beam prestressing steel members 51 would need to be crossed three times within the center column 3, which would cause the beam prestressing steel members 51 to become entangled. On the other hand, by fixing the beam prestressing steel members 51 to the adjacent anchoring steel members 35, it is possible to prevent the beam prestressing steel members 51 from becoming entangled. In addition, in the main body 32 of the center column 3, large cross-sectional forces are generated due to wind loads and inertial forces caused by the swaying of the beams 5, so that the number of vertical reinforcing bars is generally large. Therefore, when the beam prestressing steel members 51 are fixed to the main body 32, the beam prestressing steel members 51 and vertical reinforcing bars extending from each beam 5 are arranged in the main body 32, so that the arrangement of the reinforcing bars and the arrangement of the beam prestressing steel members 51 become complicated. As a result, the construction efficiency is poor. On the other hand, in the semi-submersible floating foundation 2 of this embodiment, the beam prestressing steel members 51 are fixed to the adjacent anchoring steel members, so that the reinforcing bars of the main body 32 and the beam prestressing steel members 51 do not interfere with each other.

[0023] Although an embodiment of the present invention has been described above, the present invention is not limited to the above-described embodiment, and each of the above-described components can be appropriately modified without departing from the spirit of the present invention. For example, in the above embodiment, the case where the main body 32 of the center column 3 is made of concrete has been described, but the main body 32 of the center column 3 may be made of steel. In the above embodiment, the beam 5 is formed by combining a plurality of beam segments 53, 53, . . . , but the beam 5 may be formed by cast-in-place concrete. In the above embodiment, the case where the number of side columns 4 is three has been described, but the number of side columns 4 is not limited, and may be, for example, four or more. In the above embodiment, the locking member 52 is a wedge-shaped member, but the configuration of the locking member 52 is not limited, and it may be, for example, a member (such as a nut) screwed onto the beam prestressing steel material 51 as shown in Fig. 8. In this case, the end of the beam prestressing steel material 51 is threaded in advance. [Explanation of symbols]

[0024] 1. Offshore wind power generation facilities 11 Windmill 12 pillars 2. Semi-submersible floating foundation 3 Center Column 31 Slab 32 Main body 33 Bottom steel plate for slab 34 Upper steel plate for slabs 35 Steel for anchoring 36 Side wall steel plate 37 Bone Members 38 Tie material 4 Side Column 41 Side column slab 42 Side column body 5 Beam 51 Beam prestressing steel 52 Locking member 53 Beam Segment

Claims

1. A center column supporting the wind turbine support; a plurality of side columns disposed at intervals from the center column; A semi-submersible floating foundation for a wind power generation facility comprising: a beam connecting the center column and the side columns, The center column includes a steel slab and a cylindrical main body portion erected on the slab, The beam is made of prestressed concrete in which beam PC steel is arranged, The slab is a semi-submersible floating foundation characterized in that it comprises a bottom steel plate for the slab provided on the bottom surface, an upper steel plate for the slab provided on the top surface, and an anchoring steel material capable of anchoring the PC steel material for the beam provided at the joint with the beam.

2. The main body is made of prestressed concrete and penetrates the upper steel plate for the slab. The lower end of the main body is in contact with the bottom steel plate for the slab, A frame member extending from the fixing steel material to the outer surface of the main body is disposed along the lower surface of the top steel plate for the slab and the upper surface of the bottom steel plate for the slab, 2. A semi-submersible floating foundation as described in claim 1, characterized in that inside the main body portion, connecting materials are arranged extending from the inner surface of the main body portion along the extension line of the frame member, and the connecting materials are joined to each other at the center of the main body portion.

3. The side column includes a steel side column slab and a cylindrical side column main body portion erected on the side column slab, 2. The semi-submersible floating foundation according to claim 1, characterized in that the side column slab comprises a bottom steel plate for side column slab provided on the bottom surface, an upper steel plate for side column slab provided on the upper surface, and a side column anchoring steel material provided at the joint with the beam and capable of anchoring the beam PC steel material.

4. The anchoring steel material has an insertion hole through which the beam PC steel material can be inserted, The semi-submersible floating foundation described in claim 1, characterized in that an engaging member is provided at the end of the beam PC steel material to engage the beam PC steel material inserted into the insertion hole to the anchoring steel material.

5. The locking member is a wedge-shaped member, 5. A semi-submersible floating foundation as claimed in claim 4, characterized in that the anchoring steel material is provided with a receiving material which engages with the locking member.

6. A method for constructing a semi-submersible floating foundation according to any one of claims 1 to 5, comprising the steps of: a segment manufacturing process for manufacturing beam segments that constitute the beam; a beam forming step of arranging the beam segments at predetermined positions to form the beam; and a beam connecting step of connecting a base end of the beam to the slab, A method for constructing a semi-submersible floating foundation, characterized in that in the beam connection process, the beam PC steel material is fixed to the anchorage steel material and tension is introduced into the beam PC steel material.

Citation Information

Patent Citations

  • Floating wind turbine platform and assembly method

    JP2015513046A