The power provision plan creation system addresses market complexity by prioritizing markets and optimizing power provision, ensuring compliance and profit through market-specific planning.
Patent Information
- Application Number
- JP2023050662
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-27
- Publication Date
- 2024-10-09
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Consumers face difficulty in determining which market and how much adjustment power to provide due to varying market conditions, leading to potential penalties for non-compliance or insufficient power provision.
A power provision plan creation system that collects market information, prioritizes markets based on response time and priority, and generates a plan to optimize power provision across multiple markets, ensuring compliance with higher-priority markets.
The system enables the creation of an appropriate power provision plan that maximizes compliance with priority markets, prevents penalties, and allows for profit-making by providing surplus power.
Smart Images

Figure 2024139628000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a power supply plan creating system and a program for creating a power supply plan. [Background technology]
[0002] In recent years, a market has been established for consumers to provide adjustment power (reducing demand and supplying power) in order to adjust the supply and demand balance of the power grid managed by the general power transmission and distribution company. In order to supply adjustment power to such a market, consumers need to create a supply and demand plan. For example, Patent Document 1 proposes a supply and demand planning device that creates a supply and demand plan that calculates the controllable amount of power demand, taking into account the benefits that can be obtained by responding to the control request of a virtual power plant. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2020-027383 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, there are multiple markets in which consumers can provide balancing power, such as capacity markets and supply-demand balancing markets, and each market has different conditions, such as response time. Therefore, even if consumers provide balancing power to these markets, it is very difficult to determine how much balancing power they should provide to each market. Furthermore, if consumers fail to provide the electricity they are obligated to provide, they may be subject to serious penalties, such as the suspension of trading, and if they try to avoid such penalties as much as possible, they will not be able to provide sufficient balancing power, which is a problem.
[0005] The present invention has been made to solve the above-mentioned problems, and provides a power supply plan creation system and program that can create an appropriate power supply plan even if there are multiple markets to which electricity can be supplied. [Means for solving the problem]
[0006] In order to achieve the above-mentioned objective, the power supply plan creation system disclosed below comprises a memory unit that stores market information, which is information on each of a plurality of markets in which electricity to be provided in response to a supply command is traded, and command information, which is information on electricity traded in the plurality of markets and for which a supply command has been received, and a calculation processing unit that creates a power supply plan, which is a plan to provide electricity to the plurality of markets, based on the market information and the command information, wherein the market information includes the priority order of each of the plurality of markets, and when providing electricity in response to a supply command of a certain market, the calculation processing unit creates the power supply plan that does not comply with the supply command of the lower market if it is unable to provide electricity in response to a supply command of a market with a lower priority than the market in question. Effect of the Invention
[0007] According to the above-mentioned power supply plan creation system, the calculation processing unit determines a response to a supply command for each market based on the priority order set for the multiple markets in which the power to be provided in response to the supply command is traded. Therefore, even if there are multiple markets in which power can be provided, an appropriate power supply plan can be created. [Brief description of the drawings]
[0008] [Figure 1] FIG. 1 is a block diagram showing an example of the configuration of a power supply plan creation system 1 according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a diagram illustrating an example of market information. [Diagram 3] FIG. 3 is a graph showing an example of a method for creating a power supply plan by the power supply plan creating system 1. In FIG. [Figure 4] FIG. 4 is a graph showing an example of a method for creating a power supply plan by the power supply plan creating system 1. In FIG. [Diagram 5]FIG. 5 is a graph showing an example of a method for creating a power supply plan by the power supply plan creating system 1. In FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] An embodiment of the present invention will be described below with reference to the drawings. The present invention is not limited to the following embodiment, and appropriate design changes can be made within the scope of the configuration of the present invention. In the following description, the same parts or parts having similar functions are commonly designated by the same reference numerals in different drawings, and repeated description thereof will be omitted. The configurations described in the embodiment and the modified examples may be appropriately combined or modified. In order to make the description easier to understand, the configurations are shown simplified or schematic, or some of the configurations are omitted in the drawings referred to below.
[0010] First, a mechanism by which consumers provide electricity to a market will be described. For example, when consumers provide electricity to a capacity market or a supply-demand adjustment market, the amount of electricity to be provided in a certain future period is traded (bid and awarded) in advance in these markets. After trading the amount of electricity, when the period arrives and the consumer receives an instruction (hereinafter referred to as a "supply instruction") from an institution that operates the market to supply electricity, the consumer provides electricity in response to the supply instruction. Specifically, after receiving the supply instruction, the consumer supplies electricity to the power grid in accordance with the supply instruction. In addition, rules such as the bidding deadline, the time from receiving the supply instruction to responding, and whether or not the consumer is obligated to comply with the supply instruction (whether or not a serious penalty is incurred for not responding to the supply instruction) may differ depending on the market, and there are also markets in which electricity to be provided voluntarily is traded without receiving a supply instruction, such as the electricity market.
[0011] Next, an example of the configuration of a power supply plan creation system according to an embodiment of the present invention will be described with reference to the drawings. Fig. 1 is a block diagram showing an example of the configuration of a power supply plan creation system 1 according to an embodiment of the present invention. Note that the power supply plan creation system 1 described below creates a power supply plan in the case where a storage battery connected to a power grid discharges and provides power, and the storage battery does not provide power to anything other than the power grid (does not provide power to loads owned by consumers).
[0012] As shown in FIG. 1, the power supply plan creation system 1 includes a storage unit 11, a calculation processing unit 12, and a communication unit 13. The storage unit 11 is configured with a non-volatile storage device such as a hard disk drive (HDD) or a solid state drive (SSD), or a volatile storage device such as a random access memory (RAM). The calculation processing unit 12 is configured with a calculation processing device such as a central processing unit (CPU). The communication unit 13 is configured with a communication device such as a router or a hub for connecting to a network such as the Internet or an intranet. For example, the storage unit 11 and the calculation processing unit 12 are configured as part of a personal computer or a server computer. The storage unit 11 may be configured with a plurality of storage devices, and may be configured by combining a non-volatile storage device and a volatile storage device, for example. Also, a part of the storage unit 11 and the calculation processing unit 12 may be configured as a part of a server or the like installed at a location away from the other parts, and information may be exchanged via the communication unit 13 or other communication devices.
[0013] The memory unit 11 stores market information, which is information on each of a plurality of markets in which electricity to be provided in response to a supply command is traded, and command information, which is information on supply commands received from a plurality of markets. The command information is information indicating the period for which electricity is to be provided and the amount of electricity to be provided, and is acquired via the communication unit 13 and stored in the memory unit 11. The market information is information indicating rules, etc. for bidding on the market to provide electricity. The memory unit 11 also stores other information (e.g., a program for creating a power supply plan) required for the calculation processing unit 12 to create a power supply plan.
[0014] The market information will be described in detail with reference to FIG. 2. FIG. 2 is a diagram showing an example of market information, and illustrates market information including the capacity market and the primary adjustment capacity and tertiary adjustment capacity 1 (officially circled "1") of the supply and demand adjustment market. The market information illustrated in FIG. 2 includes the bidding deadline, response confirmation time, response refusal, and priority order. In addition to the above, the supply and demand adjustment market also includes secondary adjustment capacity 1 and 2 (officially circled "1" and "2"), tertiary adjustment capacity 2 (officially circled "2"), etc., but is not limited to these, and if new markets are established in the future, those markets may also be included in the market information.
[0015] The bidding deadline is a deadline by which a bid must be submitted to the market prior to a certain period in the future when electricity is to be provided. The response confirmation time is a minimum period from the issuance of a supply command to the arrival of the period for providing electricity when electricity is requested by a supply command. The response refusal is indicated as "not possible" when a consumer who has received a supply command is obligated to follow the supply command, and as "possible" when a consumer is not obligated to provide electricity even if a supply command is received and can choose not to provide electricity. The priority order is information that the calculation processing unit 12 refers to when creating an electricity supply plan. As will be described later with a specific example, when electricity can be provided only to either a market with a higher priority order or a market with a lower priority order, the calculation processing unit 12 creates an electricity supply plan to provide electricity to the higher priority market. The market information includes at least the priority order, and may not include other information. In addition, in FIG. 2, only information on markets in which electricity provided in response to a supply command is traded, such as a capacity market and a supply and demand adjustment market, is described, but the transaction price of the electricity market may be included.
[0016] The calculation processing unit 12 creates a power supply plan based on the command information and market information stored in the storage unit 11. For example, the calculation processing unit 12 may create a power supply plan whenever the situation changes, such as when a supply command is input, whenever an instruction is received from the user, or may create a power supply plan at regular time intervals. The storage unit 11 may also store the created power supply plan.
[0017] The communication unit 13 accepts the supply command and transmits the power supply plan created by the calculation processing unit 12 to a decision maker who has the authority to make the final decision on the power supply plan of the consumer and to the device that controls the operation of the storage battery. Note that the communication unit 13 may transmit only the power supply plan approved by the decision maker to the device that controls the operation of the storage battery. The communication unit 13 may also transmit the power supply plan (or a response contact based on the power supply plan) directly to an organization required to respond to the supply command, without transmitting the power supply plan to the decision maker.
[0018] Next, a specific example of a method for creating a power supply plan by the arithmetic processing unit 12 will be described with reference to the drawings. Each of Fig. 3 to Fig. 5 is a graph showing an example of a method for creating a power supply plan by the power supply plan creation system 1. Note that in the graphs shown in Fig. 3 to Fig. 5, the horizontal axis represents time, and the vertical axis represents the remaining capacity of the storage battery and the trading price in the electricity market, with the remaining capacity of the storage battery being shown by a solid line and the trading price in the electricity market being shown by a dashed line.
[0019] Fig. 3 is an example of a power supply plan in the case where a supply command for the supply and demand adjustment market (primary control reserve) is received to supply power between time T11 and time T12. In the example shown in Fig. 3, no other supply command is received other than to supply power between time T11 and time T12.
[0020] In this case, the calculation processing unit 12 creates an electric power supply plan that provides electric power in response to a supply command in the supply and demand adjustment market (primary adjustment capacity) while discharging and charging the storage battery at a timing that maximizes profits, within a range that does not prevent the response to the supply command in the supply and demand adjustment market (primary adjustment capacity). For example, the calculation processing unit 12 creates an electric power supply plan that starts discharging the storage battery at a timing when the transaction price becomes high after T12, and starts charging after the transaction price falls. In this way, by creating an electric power supply plan that provides electric power to a market that trades electric power to be provided arbitrarily, such as an electricity market, within a range that does not prevent the response to the supply command, it is possible to provide surplus electric power and obtain profits while responding to the supply command to the maximum extent possible.
[0021] Figure 4 is an example of a power supply plan in a case where a capacity market provision command is received to provide power between time T21 and time T22, and a supply and demand adjustment market (primary adjustment capacity) provision command is received to provide power between time T23 and time T24.
[0022] In this case, the calculation processing unit 12 creates an electric power supply plan to provide electric power between time T21 and time T22, and to provide electric power to the supply and demand adjustment market (primary adjustment capacity) between time T23 and time T24. However, in order to secure the amount of electric power to be provided in response to a supply command from the supply and demand adjustment market (primary adjustment capacity) between time T23 and time T24, the calculation processing unit 12 creates an electric power supply plan to charge the storage battery by selecting a time period between time T22 and time T23 when the transaction price is cheap.
[0023] Furthermore, between time T22 and time T23, after the battery is fully charged, the transaction price is high so that discharging the battery would be profitable, but since it is necessary to provide electricity to the supply and demand adjustment market (primary adjustment capacity) immediately afterwards, discharging is refrained from here. In this way, by charging the battery to secure the amount of power to respond to supply commands, it is possible to provide electricity in response to more market supply commands.
[0024] Figure 5 is an example of a power supply plan in a case where a capacity market provision command is received to provide power between time T31 and time T32, and a supply and demand adjustment market (primary adjustment capacity) provision command is received to provide power between time T33 and time T34.
[0025] In this case, the calculation processing unit 12 attempts to create an electric power supply plan so as to provide electric power to the capacity market between time T31 and time T32, and to the supply and demand adjustment market (primary control reserve) between time T33 and time T34. However, because the time between time T32 and time T33 is short, even if the storage battery is charged during this time, the amount of electric power to be provided in response to a supply command from the supply and demand adjustment market (primary control reserve) cannot be secured.
[0026] Therefore, the calculation processing unit 12 creates a power supply plan by providing power in response to a supply command in the capacity market, which has a higher priority (first place), but not responding to a supply command and not providing power in the supply and demand adjustment market (primary adjustment capacity), which has a lower priority (second place). In this way, by determining whether or not to respond to a supply command based on the remaining capacity of the storage battery, it is possible to prevent failure to respond to a supply command due to insufficient remaining capacity of the storage battery.
[0027] Furthermore, the calculation processing unit 12 creates a power supply plan that supplies power in response to a capacity market provision command between time T31 and time T32, and starts charging after the transaction price drops after time T32, as shown by the dashed-dotted line in Fig. 5. Note that if there is a possibility that a capacity market provision command will be received after time T32, and if it would be difficult to respond to the provision command if the power supply plan is re-created and the storage battery is charged after receiving the provision command, the power supply plan may be created to start charging the storage battery even before the transaction price drops.
[0028] As described above, in the power supply plan creation system 1 according to the embodiment of the present invention, the calculation processing unit 12 determines a response to a supply command based on the priority order set for multiple markets in which the power to be provided in response to the supply command is traded. Therefore, even if there are multiple markets in which power can be provided, an appropriate power supply plan can be created.
[0029] Furthermore, in the power supply plan creation system 1, the priority of markets that are obligated to comply with supply orders, such as the capacity market, is set to be higher than the priority of markets that can refuse supply orders, such as the supply and demand adjustment market. This makes it possible to prevent serious penalties, such as suspension of trading, from being incurred due to violating obligations by not complying with supply orders.
[0030] 3 to 5, the calculation processing unit 12 creates a one-day power supply plan, but the period for which the plan is created is not limited to this example and may be a half-day, a few days, or even longer. For example, for the purpose of determining whether or not bidding is necessary for the capacity market or the supply and demand adjustment market, virtual command information may be input to the power supply plan creation system 1 to create a virtual long-term power supply plan.
[0031] In addition, taking into consideration deterioration of the storage battery due to charging and discharging, a restriction on the charge and discharge control of the storage battery may be set when the calculation processing unit 12 creates a power supply plan, such as limiting complete discharge to once a day. Also, in accordance with deterioration of the storage battery, the capacity of the storage battery may be reduced when creating a power supply plan.
[0032] In addition, the priority level included in the market information is fixed in principle, but if, for example, there is a limit to the number of times that a response refusal can be made in response to a supply command, the priority level may be increased as the number of times that a response refusal can be made decreases.
[0033] The above-described embodiment is merely an example for carrying out the present invention. The present invention is not limited to the above-described embodiment, and the above-described embodiment can be appropriately modified and carried out without departing from the spirit of the present invention.
[0034] For example, in the above embodiment, it is assumed that the power provided is the power discharged from a storage battery, but a power source other than a storage battery, such as a fuel cell, may be used. However, if the power source is capable of providing a constant or planned amount of power regardless of the magnitude of the load on the consumer, this is preferable because it can prevent a situation in which, even if the power supply is operated according to the power supply plan, the amount of power that can be provided decreases due to an increase in the load, and the power supply fails to respond to a supply command.
[0035] The above-mentioned power supply plan creating system can be explained as follows.
[0036] The system includes a storage unit that stores market information, which is information on each of a plurality of markets in which power to be provided in response to a supply command is traded, and command information, which is information on supply commands received from the plurality of markets, and a calculation processing unit that creates a power supply plan, which is a plan to provide power in response to the supply commands of the plurality of markets, based on the market information and the command information, the market information includes the priority order of each of the plurality of markets, and when power is provided in response to a supply command of a certain market and power cannot be provided in response to a supply command of a market with a lower priority order than the said market, the calculation processing unit creates the power supply plan that does not comply with the supply command of the lower market (first configuration). According to this configuration, the calculation processing unit determines a response to the supply command of each market based on the priority order set for the plurality of markets in which power to be provided in response to the supply command. Therefore, even if there are a plurality of markets in which power can be provided, an appropriate power supply plan can be created.
[0037] In the first configuration, the storage unit may store the market information in which the priority of a market that is obligated to comply with a provision command is set to be higher than the priority of a market that can refuse a provision command (second configuration). With this configuration, it is possible to prevent a serious penalty such as a suspension of trading due to a violation of an obligation by not complying with a provision command.
[0038] In the first or second configuration, the calculation processing unit may create the power supply plan to supply power to a market that trades power to be arbitrarily provided, within a range that does not prevent responses to supply commands from the multiple markets (third configuration). With this configuration, it is possible to obtain profits by providing surplus power while responding to supply commands to the maximum extent possible.
[0039] In any one of the first to third configurations, the arithmetic processing unit creates a plan for providing power discharged from a storage battery as the power supply plan, and may determine whether or not to respond to supply commands from the multiple markets based on the remaining charge of the storage battery (fourth configuration). With this configuration, when a storage battery is used as a power source, it is possible to prevent failure to respond to a supply command due to insufficient remaining charge of the storage battery.
[0040] In the fourth configuration, the calculation processing unit may create the power supply plan for charging the storage battery so as to be able to respond to supply commands from the multiple markets (fifth configuration). With this configuration, when a storage battery is used as a power source, power can be supplied in response to supply commands from more markets.
[0041] Furthermore, the program used in the above-mentioned power supply plan creation system is a program that causes a computer to execute a first process of reading market information, which is information on each of a plurality of markets in which electricity to be provided in response to a supply command is traded, and command information, which is information on electricity traded in the plurality of markets and for which a supply command has been received, and a second process of creating an electricity supply plan, which is a plan to provide electricity to the plurality of markets, based on the market information and the command information, wherein the market information read in the first process includes the priority order of each of the plurality of markets, and the second process creates the electricity supply plan that does not comply with the supply command of a market that has a lower priority than the market in question, if electricity is provided in response to a supply command of a certain market and it is not possible to provide electricity in response to a supply command of the lower market (sixth configuration). [Explanation of symbols]
[0042] 1...power supply plan creation system, 11...storage unit, 12...arithmetic processing unit, 13...communication unit
Claims
1. A storage unit that stores market information, which is information on each of a plurality of markets in which electricity to be provided in response to a supply command is traded, and command information, which is information on the supply command received from the plurality of markets; a calculation processing unit that creates a power supply plan that is a plan to provide power in response to supply commands from the multiple markets based on the market information and the command information, the market information includes a priority order for each of the plurality of markets; The power supply plan creation system, wherein when the calculation processing unit provides power in response to a supply command from a certain market, if it is unable to provide power in response to a supply command from a market with a lower priority than the certain market, creates the power supply plan that does not comply with the supply command from the lower market.
2. 2. The power supply plan creation system according to claim 1, wherein the memory unit stores the market information in such a manner that a priority of a market that is obligated to comply with a supply command is set higher than a priority of a market that can refuse a supply command.
3. The power supply plan creation system according to claim 1 , wherein the calculation processing unit creates the power supply plan for providing power to a market that trades power to be arbitrarily provided, within a range that does not impede responses to supply commands from the multiple markets.
4. The power supply plan creation system according to any one of claims 1 to 3, wherein the calculation processing unit creates a plan for providing power discharged from a storage battery as the power supply plan, and determines whether or not to respond to supply commands from the multiple markets based on the remaining charge of the storage battery.
5. The power supply plan creating system according to claim 4 , wherein the calculation processing unit creates the power supply plan for charging the storage battery so as to be able to respond to supply commands from the plurality of markets.
6. A first process of reading market information, which is information on each of a plurality of markets in which the electricity to be provided in response to a supply command is traded, and command information, which is information on the supply command received from the plurality of markets; A second process of creating an electric power supply plan, which is a plan to provide electric power in response to a supply command of the plurality of markets, based on the market information and the command information, The market information read in the first process includes a priority order for each of the plurality of markets; The second process is a program for creating an electricity supply plan that does not comply with the supply commands of a market that has a lower priority than the market in question, when the market in question provides electricity in response to a supply command of the market in question and it becomes impossible to provide electricity in response to a supply command of the market in question that has a lower priority than the market in question.
Citation Information
Patent Citations
Energy management system, energy management method, and computer program
JP2016131434A
Plan adjustment system and plan adjustment method
JP2017116984A
Storage battery control system, method and program
JP2017224208A
Method and system for facilitating audit of power generation and allocation to consuming loads - Patents.com
JP2019525270A
Bid plan determination device and bid plan determination method
JP2021047519A