Leakage inspection device and method using mixed gas

The method and device address helium concentration maintenance issues in leak testing by using a mixed gas of helium and air, achieving efficient and reliable leak testing through recycling and concentration adjustment, reducing helium consumption.

JP2024140291APending Publication Date: 2024-10-10MARUNAKA
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2023051364
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-28
Publication Date
2024-10-10

AI Technical Summary

Technical Problem

Existing leak testing devices using helium gas face challenges in maintaining helium concentration due to air contamination during recovery, requiring frequent replacement of high-concentration helium, especially when test objects cannot be evacuated, leading to inefficiencies and increased helium consumption.

Method used

A leak testing method and device that uses a mixed gas of helium and air, recycling and adjusting the helium concentration within a specified range by partial purification and recursive mixing, allowing for continuous reuse of helium gas.

Benefits of technology

Significantly reduces helium consumption and ensures reliable leak testing by maintaining helium concentration within a specified range, enabling repeated and efficient leak tests on mechanical and automobile parts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024140291000001_ABST
    Figure 2024140291000001_ABST
Patent Text Reader

Abstract

To provide a leakage inspection device and method using mixed gas as probe gas, the mixed gas being formed of part of helium gas and most of air components, for always adjusting helium concentration in the probe gas to a regulated concentration range and repeatedly reusing the helium gas.SOLUTION: A leakage inspection device extracts part of low concentration helium probe gas in a first pressure accumulation tank 26, for purifying the low concentration helium probe gas in a purification cylinder 35 for making the same into high concentration helium probe gas. Then, in an intermediate tank 24, the high concentration helium probe gas is mixed to original low concentration helium probe gas which is transferred from the first pressure accumulation tank 26 through an agitation valve 41, then the high concentration helium probe gas is pumped to the first pressure accumulation tank 26 and is expanded, these steps are partial purification / recurrence mixing / agitation processes, the partial purification / recurrence mixing / agitation processes being repeated, and the helium concentration in the low concentration helium probe gas is set to set concentration and is reused for leakage inspection for a next text object 11.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a leak inspection device and a leak inspection method using a mixed gas as a detection gas, and more specifically, to a leak inspection device and a leak inspection method using a mixed gas "composed of a part of helium gas and a majority of air" as a detection gas, in which the helium concentration in the detection gas is constantly adjusted to within a specified concentration range while the helium gas can be repeatedly reused. [Background technology]

[0002] The vacuum chamber method is widely used for leak testing of test objects that require airtightness, such as machine parts and automobile parts. In this vacuum chamber method, a probe gas is introduced and sealed inside the test object placed under vacuum in a vacuum chamber, and the probe gas leaking from the test object into the vacuum chamber is detected by a probe gas detector.

[0003] Helium gas, an inert gas with the second smallest molecular weight after hydrogen, is generally used as the detection gas in the vacuum vessel method. Since helium gas is a rare gas and expensive, it is desirable to recover and reuse the helium gas used as the detection gas in the vacuum vessel method. For this reason, leak inspection devices that recover and reuse helium gas have been disclosed (see, for example, Patent Documents 1 and 2).

[0004] Furthermore, when many leak tests are performed in which helium gas is recovered and reused, the concentration of the recovered helium gas decreases. This is because air is mixed into the probe gas during the recovery process. A leak test device has been disclosed that purifies this reduced-concentration helium gas using a separation membrane and introduces the purified helium gas into a return tank, thereby introducing a constant concentration of helium gas into the test object (see, for example, Patent Document 3).

[0005] It is believed that a leak inspection device that recovers helium gas or recovers and refines helium gas in this way can perform leak inspections while significantly reducing the amount of scarce and expensive helium gas used. In particular, the leak inspection device described in Patent Document 3 introduces refined high-purity helium gas, ensuring concentration compensation and being a more practical means. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] Japanese Patent Application Publication No. 10-311770 [Patent Document 2] JP 2019-35608 A [Patent Document 3] JP2017-142096A Summary of the Invention [Problem to be solved by the invention]

[0007] In the vacuum chamber leak test, in which a probe gas is introduced into the inside of the test object, the inside of the test object is generally evacuated to a vacuum and the probe gas is introduced into the inside of the test object. Since the time for evacuating the test object is short, it is difficult to completely remove the air from inside the test object, and air remains in narrow parts, various valves, and long piping inside the test object.

[0008] For this reason, even if a leak test is performed using the helium gas recovery means described in Patent Documents 1 and 2, the concentration of the recovered helium gas will decrease slightly (for example, about 0.1% to 0.5%), and it will become necessary to replace the existing helium gas with new high-concentration helium gas after every few dozen repeated tests. For example, if the decrease is 0.1% per test, the helium gas concentration will decrease to 95% after 50 tests. In this case, it will become necessary to replace it with high-concentration (for example, 99.5%) helium gas.

[0009] The reason for replacing the existing helium gas with high-concentration helium gas in this way is that even when refilling existing helium gas with high-concentration helium gas, the increase in helium gas concentration is not large. For example, even if the same amount of 99.5% high-concentration helium gas is refilled with 95% low-concentration helium gas, the helium concentration is only about 97%, and the increase in helium gas concentration is small. Therefore, replacement with new high-concentration helium gas is necessary. In leak inspections at manufacturing sites for mechanical parts and automobile parts, multiple inspections are performed 500 times per day (500 times per day x 1 minute per time = 500 minutes per day = approximately 8 hours per day), so in a leak inspection device equipped with a helium gas recovery means, replacement with new high-concentration helium gas is required about 10 times per day or more.

[0010] On the other hand, the leak detection device described in Patent Document 3 purifies the recovered low-concentration helium gas in a purification tube to produce high-concentration helium gas, which is then reused as the detection gas, in order to avoid a decrease in the concentration of the recovered helium gas.

[0011] However, the separation membrane used in the purification column does not have very high gas separation performance, so when high-concentration helium gas (e.g. 95%) is purified using the separation membrane, several tens of percent of the helium gas ends up being exhausted along with other gases.

[0012] In addition, some test specimens are not capable of evacuating the inside (low rigidity test specimens). In such test specimens, it is necessary to replace the air with the probe gas as it passes through the inside of the test specimen. The probe gas that passes through the inside of the test specimen is dumped into the atmosphere together with the air.

[0013] The leak inspection devices described in the above Patent Documents 1 to 3 do not disclose means for recovering and purifying helium gas when the test object cannot be evacuated to a vacuum inside.

[0014] Furthermore, the leak inspection devices of Patent Documents 1 to 3 use high-concentration (e.g., 99.5%) helium gas as the detection gas. In particular, the leak inspection device of Patent Document 3 takes into consideration that the concentration of the recovered helium gas gradually decreases due to a small amount of air remaining in the evacuated inspection target component, and measures the amount of helium gas leaking from a separate leak master with a helium leak detector before supplying the gas into the inspection target component.

[0015] Furthermore, in the leak inspection device of Patent Document 3, when the helium gas concentration is below a predetermined value, the helium gas in the return tank is supplied to a separation membrane while being pressurized by a compressor, purified, and recovered in a vacuum tank, and the recovered helium gas is sucked in by a vacuum pump and charged into the return tank while being pressurized by the compressor. In other words, the purification of helium gas is achieved by supplying the helium gas in the return tank to the separation membrane while being pressurized by the compressor.

[0016] Therefore, the leak detection device of Patent Document 3 takes time to perform a leak detection, and also takes time to purify the helium gas when its concentration is below a predetermined value.

[0017] Therefore, the present invention has been made in consideration of the problems of the conventional technology described above, and its purpose is to provide a leak inspection device and a leak inspection method that uses a mixed gas "composed of some helium gas and most of the air" as the detection gas used in leak inspection of test objects such as mechanical parts and automobile parts that require airtightness, and that repeatedly reuses the helium gas while constantly adjusting the helium concentration in the detection gas to within a specified concentration range, thereby significantly reducing the consumption of helium gas, and that can repeatedly perform highly reliable leak inspections in which the helium concentration in the detection gas is constantly maintained within a specified concentration range. [Means for solving the problem]

[0018] In order to achieve the above-mentioned object, the leak testing method using a mixed gas according to the present invention is a leak testing method in which a detection gas is filled inside a test object (11, 11') placed in a predetermined vacuum environment, and the detection gas leaking from the test object (11, 11') is detected, and the detection gas is repeatedly used in the form of a mixed gas "consisting of a part of the detection target gas (He) and most of the remaining gas (Air)". After the leak test is completed, the detection gas filled in the test object (11, 11') is recovered in a first tank (22) and then transferred from the first tank (22) to a second tank (26) to measure the concentration of the detection target gas (He) in the detection gas. If the concentration of the detection target gas (He) in the detection gas is equal to or lower than the lower limit of a specified concentration range, the detection gas is detected in the second tank (26). A portion of the low concentration probe gas "in which the concentration of the target gas (He) is equal to or lower than the lower limit of a specified concentration range" is extracted and transferred to a purification section (35) which "concentrates the concentration of the target gas (He)", while the remainder of the low concentration probe gas is transferred to a third tank (24), in which the high concentration probe gas "in which the concentration of the target gas (He) transferred from the purification section (35) is concentrated" is recurrently mixed with the low concentration probe gas transferred from the second tank (26) in the third tank (24), and the gas is pumped into the second tank (26) for expansion. While repeatedly carrying out this partial purification, recurrent mixing, and stirring process, the concentration of the target gas (He) in the low concentration probe gas is adjusted to a specified concentration and the gas is reused for leak testing of the next test specimens (11, 11').

[0019] In the above configuration, the detection gas is repeatedly used in the form of a mixed gas "composed of a part of the detection target gas (He) and the majority of the remaining gas (Air)". In particular, when the concentration of the detection target gas (He) in the detection gas falls below the lower limit of the specified concentration range, only a portion of the low-concentration detection gas is extracted, the extracted portion of the low-concentration detection gas is purified, and the purified high-concentration detection gas is mixed back into the original low-concentration detection gas, so that the concentration of the detection target gas (He) is constantly adjusted to the specified concentration. In other words, the concentration adjustment of the entire detection gas can be achieved by purifying a portion (a small amount) of the detection gas. In this way, the detection target gas (He) is used in the form of a mixed gas with the majority of the remaining gas (Air) and the concentration adjustment of the detection target gas (He) is achieved by purifying a portion of the detection gas, so that it is possible to significantly reduce the consumption of the detection target gas (He) used for leak testing, and it is possible to perform a highly reliable leak test in which the concentration of the detection target gas (He) in the detection gas is constantly adjusted to the specified concentration.

[0020] A second feature of the leak detection method using a mixed gas according to the present invention is that the concentration of the target gas (He) in the detection gas in the second tank (26) and the concentration of the target gas (He) in the high concentration detection gas transferred from the purification section (35) to the third tank (24) are measured, and the flow rate (v1) of the low concentration detection gas partially extracted from the second tank (26) and the flow rate (v3) of the waste gas separated and exhausted from the purification section (35) are adjusted, respectively, to adjust the concentration of the target gas (He) in the low concentration detection gas to a specified concentration.

[0021] In the above configuration, when the concentration of the target gas (He) in the detection gas falls below the lower limit of the specified concentration range, the amount of target gas (He) discarded in the purification section (35) is reduced to zero or to a minimum, and the amount of remaining gas (Air) required for concentration adjustment is exhausted, making it possible to efficiently adjust the concentration of the target gas (He) in the low concentration detection gas to the specified concentration.

[0022] A third feature of the leak detection method using a mixed gas according to the present invention is that the concentration of the target gas (He) in the low concentration detection gas is adjusted to a specified concentration by separately replenishing the high concentration detection gas and the low concentration detection gas that are recurrently mixed in the third tank (24) with a residual gas (Air) or a target gas (He).

[0023] In the above configuration, by separately replenishing the residual gas (Air) or the detection target gas (He), it is possible to prevent a decrease in the total amount of the detection gas due to exhaust of the residual gas (Air) in the purification section (35). This makes it possible to always ensure the total amount of the detection gas in which the concentration of the detection target gas (He) used in leak testing is adjusted to a specified concentration.

[0024] The fourth feature of the leak testing method using mixed gas according to the present invention is that when the test object (11') cannot be evacuated, a search gas is supplied into the test object (11'), and the search gas flowing out from the test object (11') is recovered in the first tank (22) after air has been removed from it in a separate purification section (18), and the partial purification, recurrent mixing, and stirring process is repeated as necessary to fill the test object (11') with the search gas.

[0025] In the above-described configuration, even if the test object (11') cannot be evacuated, the inside of the test object (11') can be filled with a probe gas.

[0026] A fifth feature of the leak testing method using a mixed gas according to the present invention is that air is supplied into the inside of the test body (11'), and the probe gas flowing out from the inside of the test body (11') is recovered in the first tank (22) after the air is removed in the purification section (18), and the partial purification, recurrent mixing, and stirring process is repeated as necessary to recover the probe gas from the inside of the test body (11').

[0027] In the above-described configuration, even if the test object (11') cannot be evacuated, the probe gas can be collected from inside the test object (11').

[0028] A sixth feature of the leak testing method using a mixed gas according to the present invention is that the specified concentration of the target gas (He) in the detection gas supplied to the inside of the test object (11, 11') is 10% or less.

[0029] With the above configuration, the consumption of the detection target gas (He) during leak testing can be significantly reduced.

[0030] A first feature of the leak testing device using a mixed gas according to the present invention for achieving the above object is a leak testing means (10, 10') having a vacuum container (12) capable of accommodating a test object (11, 11') under a predetermined vacuum environment, a detection gas detector (14) for detecting the detection target gas (He) in a detection gas "consisting of a part of the detection target gas (He) and a large part of the remaining gas (Air)" leaking from the test object (11, 11'), a first tank (22) for storing the detection gas recovered from the test object (11, 11'), a third tank (24) for adjusting the concentration of the detection target gas (He) in the detection gas, a second tank (26) for storing the detection gas to be supplied to the test object (11, 11'), and a detection gas detector (14) for detecting the detection target gas (He) in the detection gas. The detection gas purification means (30) has a first flow control valve (33) for adjusting a flow rate (v1) of the detection gas introduced from the second tank (26) to the purification column (35), and a second flow control valve (38) for adjusting a flow rate (v3) of the waste gas separated and exhausted from the purification column (35). The detection gas purification means (40) has a return path (41a) for transferring the detection gas in the second tank (26) to the third tank (24), and a second gas concentration meter (42) for measuring the concentration of the detection gas (He) in the second tank (26).

[0031] With the above configuration, the first feature of the leak inspection method using the mixed gas can be suitably implemented.

[0032] A second feature of the leak inspection device using a mixed gas according to the present invention is that the detection gas purification means (30) includes a first gas concentration meter (37) for measuring the concentration of the detection target gas (He) in the high concentration detection gas transferred from the purification column (35) to the third tank (24), a first flow meter (33) for measuring the flow rate (v1) of the low concentration detection gas introduced from the second tank (26) to the purification column (35), and a second flow meter (34) for measuring the flow rate (v2) of the low concentration detection gas introduced from the purification column (35) to the third tank (24). The system further comprises a second flow meter (36) for measuring a flow rate (v2) of the high concentration exploration gas being transferred to the third tank (24), a third flow meter (39) for measuring a flow rate (v3) of the waste gas exhausted from the purification tube (35), and a control device (43) for individually controlling the first flow control valve (33) and the second flow control valve (38) based on the measurement value of the first gas concentration meter (37) and the measurement values ​​of the flow meters (33, 36, 39).

[0033] With the above configuration, the second feature of the leak inspection method using the mixed gas can be suitably implemented.

[0034] A third feature of the leak testing device using mixed gas according to the present invention is that the detection gas stirring means (40) has a residual gas supply means (44, 45) or a detection target gas supply means (46, 47) for supplying a residual gas (Air) or a detection target gas (He) to the third tank (24).

[0035] With the above configuration, the third feature of the leak inspection method using the mixed gas can be suitably implemented.

[0036] A fourth feature of the leak testing device using mixed gas according to the present invention is that the leak testing means (10') is provided with another purification tube (18) in series between the test body (11') and the first tank (22) for concentrating the concentration of the target gas (He) in the detection gas recovered from inside the test body (11').

[0037] With the above configuration, the fourth feature of the leak inspection method using the mixed gas can be suitably implemented.

[0038] A fifth feature of the leak testing device using mixed gas according to the present invention is that the leak testing means (10') is provided with a residual gas introduction mechanism (19) for introducing residual gas (Air) into the inside of the test object (11') in parallel between the test object (11') and the supply tank (28).

[0039] With the above configuration, the fifth feature of the leak inspection method can be suitably implemented.

[0040] A sixth feature of the leak inspection device using a mixed gas according to the present invention is that the specified concentration of the detection target gas (He) in the detection gas is 10% or less.

[0041] With the above configuration, the sixth feature of the leak inspection method using the mixed gas can be suitably implemented. Effect of the Invention

[0042] According to the leak testing method and leak testing device of the present invention, when testing test objects such as mechanical parts and automobile parts that require airtightness, a mixed gas "composed of a portion of the target gas and most of the remaining gas" is repeatedly reused as the detection gas, significantly reducing the consumption of the target gas, and it is possible to repeatedly perform highly reliable leak tests in which the concentration of the target gas in the detection gas is always maintained at a specified concentration. [Brief description of the drawings]

[0043] [Figure 1] 1 is an explanatory diagram showing a configuration of a main part of a leak test device according to a first embodiment of the present invention; [Diagram 2] FIG. 2 is a conceptual diagram showing a partial purification, recurrent mixing, and stirring process by the leak test device according to the first embodiment of the present invention. [Diagram 3] 2 is a conceptual diagram showing a process of refilling a detection gas by the leak test device according to the first embodiment of the present invention. FIG. [Figure 4]FIG. 2 is a process diagram showing a leak inspection process using the leak inspection device according to the first embodiment of the present invention. [Diagram 5] FIG. 2 is a process diagram showing recovery, mixing, and partial purification of a probe gas in a leak detection process using the leak detection device according to the first embodiment of the present invention. [Figure 6] FIG. 1 is a flow diagram showing the control of a control device in the process of recovering, mixing, and partially refining the probe gas using a leak detection device. [Figure 7] FIG. 1 is a flow diagram showing the control of a control device in the process of recovering, mixing, and partially refining the probe gas using a leak detection device. [Figure 8] FIG. 5 is an explanatory diagram showing the configuration of a main part of a leak test device according to a second embodiment of the present invention. [Figure 9] FIG. 6 is a process diagram showing a leak inspection process using a leak inspection device according to a second embodiment of the present invention. [Figure 10] 1 is an explanatory diagram showing the correlation between the "flow rate of the probe gas introduced into the purification column" and the "helium concentration in the amount of waste gas or regeneration gas" in the leak detection device of the present invention. [Figure 11] 1 is an explanatory diagram showing the correlation between the "flow rate of the probe gas introduced into the purification column" and the "waste rate in the purification column" in the leak inspection device of the present invention and the helium regeneration rate. [Figure 12] FIG. 2 is a conceptual diagram showing the actual partial purification, recurrent mixing, and stirring process using the leak inspection device of the present invention. [Figure 13] FIG. 2 is a conceptual diagram showing the actual process of refilling the detection gas using the leak detection device of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0044] The present invention will now be described with reference to the accompanying drawings.

[0045] (First embodiment) FIG. 1 is an explanatory diagram showing the configuration of the main parts of a leak test device 100 according to a first embodiment of the present invention. This leak test device 100 uses a mixed gas "consisting of a part of helium gas (gas to be detected) and most of the air (residual gas)" as the detection gas in the vacuum vessel method that is widely used in the airtightness test of mechanical parts, for example, automobile parts, and is configured so that the detection gas used is recovered after the leak test is completed and can be repeatedly supplied to the next leak test. In particular, when the helium concentration in the recovered detection gas falls below the lower limit of a specified concentration range (for example, a range of 105% to 95% of the set concentration), the concentration of the helium gas is adjusted by purifying a part of the detection gas, and the recovered detection gas is repeatedly reused for the leak test of the next test object 11. As a result, it is possible to significantly reduce the consumption of helium gas in the leak test, and it is possible to repeatedly perform a highly reliable leak test in which the helium concentration in the detection gas is always maintained within the specified concentration range.

[0046] In this embodiment, the "set concentration (set value) of the helium concentration in the exploration gas" is, for example, 10%. Therefore, the "prescribed helium concentration range" in this embodiment means that the helium concentration in the exploration gas is within the range of 10.5% to 9.5%. Also, the "lower limit value of the prescribed helium concentration range" in this embodiment means 9.5% when the set concentration is 10%.

[0047] In addition, the detection gas recovered from the test specimen 11 is first recovered in a recovery tank 22, then transferred to an intermediate tank 24 by a recovery pump 23, and then transferred to the first accumulator tank 26 by a gas compressor 25, after which the helium concentration in the detection gas in the first accumulator tank 26 is constantly measured by a second gas concentration meter 42.

[0048] Although details will be described later, when the helium concentration in the exploration gas in the first accumulator tank 26 falls below the lower limit of the specified concentration range, the purification valve 31 opens and a part of the exploration gas in the first accumulator tank 26 is transferred to the purification tube 35 equipped with a "separation membrane with gas separation function." Meanwhile, the remaining part of the exploration gas is transferred to the intermediate tank 24 as the agitation valve 41 opens. Therefore, the remaining part of the exploration gas is constantly agitated between the intermediate tank 24 and the first accumulator tank 26.

[0049] Then, in the intermediate tank 24, the probe gas with a concentrated helium concentration transferred from the purification tube 35 (hereinafter also referred to as "high-concentration helium probe gas") and the probe gas with a helium concentration below the lower limit of the specified concentration range transferred from the first accumulator tank 26 (hereinafter also referred to as "low-concentration helium probe gas") are mixed recurrently, and the recurrent mixed gas is transferred from the intermediate tank 24 to the first accumulator tank 26 by the gas compressor 25, where it is expanded and agitated in the first accumulator tank 26. By repeatedly carrying out this partial purification, recurrent mixing, and agitation process, the low-concentration helium probe gas in the first accumulator tank 26 becomes a probe gas with a helium concentration adjusted to a set concentration (10%) within the specified concentration range (hereinafter also referred to as "specified concentration helium probe gas").

[0050] Note that "partial purification" here means extracting a portion of the probe gas (the original low-concentration helium probe gas) in the first accumulator tank 26 and regenerating it into high-concentration helium probe gas in the purification column 35. Also, "recurrent mixing" means returning the "high-concentration helium probe gas" regenerated in the purification column 35 to the original "low-concentration helium probe gas" and mixing it. Also, "mixing" here means homogenizing the helium concentration in the recurrent mixed gas by repeatedly pressurizing the recurrent mixed gas of high-concentration helium probe gas and low-concentration helium probe gas and expanding it in the first accumulator tank 26.

[0051] The leak inspection device 100 is configured to include a "leak inspection section 10" that creates a vacuum state inside and outside the test object 11 and detects helium gas (detection gas) leaking from the test object 11, a "detection gas recovery and supply cycle 20" that supplies the detection gas to the test object 11 and recovers the detection gas from the test object 11 after the leak inspection is completed, a "helium gas purification cycle 30" that extracts a part of the low-concentration helium detection gas to make it a high-concentration helium detection gas when the helium concentration in the detection gas falls below the lower limit of a specified concentration range, and recurrently mixes it with the original low-concentration helium detection gas, and a "gas mixing cycle 40" that pressurizes the mixed gas of the high-concentration helium detection gas and the high-concentration helium detection gas and mixes it while returning it to the first accumulator tank 26, and adds air or helium gas to the mixed gas as necessary to store a specified amount of the specified-concentration helium detection gas required for the leak inspection. Each component will be described in further detail below.

[0052] First, the leak inspection section 10 is configured to include a vacuum vessel 12 for housing the test specimen 11 in a vacuum environment, a first vacuum pump 13 for evacuating the inside of the vacuum vessel 12, a first vacuum valve 13a for disconnecting / allowing communication between the vacuum vessel 12 and the first vacuum pump 13, a detection gas detector 14 for detecting detection gas (helium gas) leaking from the test specimen 11, a second vacuum valve 15 for disconnecting / allowing communication between the test specimen 11 and a second vacuum pump 16, and the second vacuum pump 16 for evacuating the inside of the test specimen 11.

[0053] The internal volume of the test object 11 is, for example, 4 L (liters). The detection gas used for leak testing is a mixed gas composed of helium gas with a concentration of 10% and air with a concentration of 90%. Therefore, the set helium concentration in this embodiment is 10%, the specified concentration range of the helium concentration is 9.5% to 10.5%, and the lower limit of the specified concentration range of the helium concentration is 9.5%.

[0054] The internal pressure of the test specimen 11 during evacuation for supplying and recovering the detection gas is set to, for example, 2000 Pa (1 / 50 of atmospheric pressure). In this 2000 Pa vacuum environment, the amount of detection gas remaining inside the test specimen 11 is estimated to be 0.08 NL based on the equation of state for the detection gas. Here, "NL (normal liter)" represents the volume of gas converted to standard conditions (0°C, 1 atm). Incidentally, since the pressure of the detection gas inside the test specimen 11 during a leak test is 0.5 MPa, the amount of detection gas used in one leak test is 4 L x 0.5 / 0.1 = 20 NL (∵1 atm = 0.1 MPa).

[0055] Next, the probe gas recovery and supply cycle 20 is configured with a recovery valve 21 for cutting off / allowing the flow of the probe gas recovered from inside the test object 11, a recovery tank 22 for temporarily storing the recovered probe gas, a recovery pump 23 for sucking the probe gas inside the test object 11, an intermediate tank 24 for recurrently mixing the "high concentration helium probe gas" transferred from the purification tube 35 and the "low concentration helium probe gas" transferred from the first accumulator tank 26, and a pump 25 for recurrently mixing the "high concentration helium probe gas" transferred from the first accumulator tank 26 and the "low concentration helium probe gas" transferred from the intermediate tank 24. The test specimen 11 is equipped with a gas compressor 25 that pressurizes the probe gas recurrently mixed within the first accumulator tank 26 to a first accumulator tank 26, a first accumulator tank 26 that temporarily stores the probe gas recovered from the test specimen 11, a first supply valve 27 that disconnects / allows communication between the first accumulator tank 26 and the second accumulator tank 28, a second accumulator tank 28 that stores a specified concentration helium probe gas to be supplied to the test specimen 11, and a second supply valve 29 that disconnects / allows communication between the inside of the test specimen 11 and the second accumulator tank 28.

[0056] The probe gas capacity of the first accumulator tank 26 can be set to, for example, 25 L in volume and 0.8 MPa in pressure in order to make it larger than the amount of probe gas used in one time, 20 NL. That is, the probe gas capacity of the first accumulator tank 26 can be set to 200 NL (>20 NL of probe gas used in one time). On the other hand, the second accumulator tank 28 immediately before the leak inspection unit 10 can be set to have an internal volume of 12.5 L and a pressure of 0.8 MPa. That is, the probe gas capacity of the second accumulator tank 28 can be set to 100 NL (>20 NL of probe gas used in one time). The probe gas in the first accumulator tank 26 is constantly stirred by the gas stirring cycle 40 to make the helium concentration uniform. The helium concentration in the probe gas recovered from the test specimen 11 is monitored by the second gas concentration meter 42.

[0057] With the above equipment settings, the detection gas was repeatedly collected and supplied to perform multiple leak tests, and the number of leak tests required for the helium concentration in the detection gas to drop from the set concentration of 10% to the lower limit of the specified concentration range of 9.5% was investigated. The inside of the test specimen 11 was evacuated by the second vacuum pump 16, and the detection gas was collected after the test was completed by the collection pump 23. The investigation was carried out 10 times. As a result, the number of leak tests was 125 on average. The time required for each leak test was 1 minute, including the work of replacing the test specimen 11.

[0058] The cause of the decrease in the helium concentration in the retrieved probe gas is believed to be that the helium gas contained in the probe gas remaining inside the test specimen 11 after recovery is discarded to the outside by replacing the test specimen 11. Incidentally, regarding the amount of helium gas discarded in one test, since the amount of probe gas remaining inside the test specimen 11 is 0.08NL, the amount of helium gas discarded per leak test is estimated to be 0.08NL x 10% = 0.008NL = 8NmL.

[0059] Assuming that 500 leak tests are performed per day, the amount of wasted helium gas is 4 NL / day (= 0.008 NL / test x 500 tests / day). This amount of wasted helium gas is approximately 1 / 8 of the total amount of helium gas, 30 NL, which is the sum of the "20 NL (= 200 NL x 10%) helium gas amount in the first accumulator tank 26 (= 200 NL)" and the "10 NL (= 100 NL x 10%) helium gas amount in the second accumulator tank 28 (= 100 NL)."

[0060] Next, the above-mentioned helium gas purification cycle 30 is configured to include a purification valve 31 that cuts off / allows communication between the first accumulator tank 26 and the purification column 35, a pressure reducing valve 32 that reduces the pressure of the low-concentration helium probe gas partially extracted from the first accumulator tank 26, a first variable flow valve 33 that adjusts the flow rate of the low-concentration helium probe gas introduced into the purification column 35, a first flow meter 34 that measures the flow rate of the waste gas separated and discharged from the purification column 35, the purification column 35 that regenerates the low-concentration helium probe gas into a high-concentration helium probe gas, a second flow meter 36 that measures the flow rate of the high-concentration helium probe gas, a first gas concentration meter 37 that measures the helium concentration in the high-concentration helium probe gas, a second variable flow valve 38 that adjusts the flow rate of the waste gas separated and discharged from the purification column 35, and a third flow meter 39 that measures the flow rate of the waste gas.

[0061] As described above, the number of leak tests required for the helium concentration in the probe gas in the first accumulator tank 26 to reach the lower limit of the specified concentration range, 9.5%, from the set concentration of 10% was 125. Therefore, in this leak test device 100, purification of the probe gas is required for every 125 leak tests. Specifically, a part of the probe gas in the first accumulator tank 26 is introduced into the purification column 35, where it is regenerated into a high-concentration helium probe gas. The high-concentration helium probe gas is then recurrently mixed with the original low-concentration helium probe gas transferred from the first accumulator tank 26 in the intermediate tank 24, and is compressed and expanded by the gas compressor 35 into the first accumulator tank 26. By repeatedly carrying out the partial purification, recurrent mixing, and stirring process, the helium concentration in the probe gas in the first accumulator tank 26 is purified to the set concentration of 10%.

[0062] As will be described in detail later, the flow rate of the low-concentration helium exploration gas introduced into the purification column 35 is adjusted by a first variable flow valve 33, which is controlled by a control device 43 based on the measurement signal of a first flow meter 34. On the other hand, the amount of waste gas separated and exhausted from the purification column 35 is adjusted by a second variable flow valve 38, which is controlled by a control device 43 based on the measurement signals of a third flow meter 39, a second flow meter 36, and a first gas concentration meter 37.

[0063] Next, the gas mixing cycle 40 is configured to include an mixing valve 41 that cuts off / allows the transfer of the exploration gas from the first accumulator tank 26 to the intermediate tank 24, a second gas concentration meter 42 that measures the helium concentration in the exploration gas stored in the first accumulator tank 26, a control device 43 that controls the helium concentration in the exploration gas to be within a specified concentration range, a first mass flow controller 44 that controls the mass flow rate of air added from the air line 45 to the mixed gas in the intermediate tank 24, an air line 45 that supplies air, a second mass flow controller 46 that controls the mass flow rate of helium gas added from the helium gas cylinder 47 to the mixed gas in the intermediate tank 24, and a helium gas cylinder 47 that supplies helium gas.

[0064] The control device 43 can be configured, for example, by a PLC (Programmable Logic Controller). The control device 43 takes in the measured values ​​of the helium concentrations of the first gas concentration meter 37 and the second gas concentration meter 42, and controls the valves 27, 31, 41, the variable flow valves 32, 38, and the mass flow controllers 44, 46, respectively, so that the helium concentration in the low-concentration helium probe gas converges to a specified concentration range. An example of the control of the helium concentration in the probe gas by the control device 43 will be described later with reference to Figures 6 and 7.

[0065] FIG. 2 is a conceptual diagram showing the partial purification, recursive mixing and stirring process performed by the leak test apparatus 100 according to the first embodiment of the present invention. First, Fig. 2(A) shows the state in which the detection gas used in the leak test has been collected in the first accumulator tank 26. For convenience of explanation, the amount of detection gas in the intermediate tank 24 is set to zero [NL], the amount of low-concentration helium detection gas in the first accumulator tank 26 is set to V0 [NL], and the helium concentration is set to d0, which is below the lower limit of the specified concentration range. In this case, the amount of helium is d0V0 [NL]. Incidentally, this low-concentration helium detection gas is repeatedly circulated between the first accumulator tank 26 and the intermediate tank 24 by the gas compressor 25 and the return path 41a.

[0066] FIG. 2(B) shows the extraction of a portion of the detection gas. A portion of the detection gas (low-concentration helium detection gas) in the first accumulator tank 26 is extracted and introduced into the purification tube 35. The extraction ratio a of the detection gas can be determined by the ratio of the amount v1 introduced into the purification tube 35 to the total amount V0 of the detection gas. As described later, the extraction ratio a is uniquely determined from the waste ratio b, the set concentration d1 of the helium concentration, and the specified concentration lower limit d0. Therefore, the amount v1 introduced into the purification tube 35 is also uniquely determined from the waste ratio b, the set concentration d1 of the helium concentration, and the specified concentration lower limit d0. In this case, the amount v1 of the detection gas introduced into the purification tube 35 is aV0 [NL] and is adjusted by the first variable flow valve 33. In addition, the helium concentration in the introduced detection gas is d0. Therefore, the amount of helium introduced into the purification tube 35 is ad0V0 [NL].

[0067] FIG. 2(C) shows the waste gas ratio b of the exploration gas introduced into the purification column 35. The waste gas ratio b can be determined by the ratio of the waste gas amount v3 to the amount introduced into the purification column 35 v1 (= regenerated gas amount v2 + waste gas amount v3). The waste gas ratio b can be determined, for example, so that the amount of helium contained in the regenerated gas amount v2 is maximum and the amount of regenerated air contained in the regenerated gas amount v2 is minimum (zero). The maximum amount of helium contained in the regenerated gas amount v2 is ad0V0[NL]. In addition, the amount of regenerated helium contained in the regenerated gas amount v2 is cv2=ca(1-b)V0[NL], where c is the helium concentration in the regenerated gas amount v2. Therefore, it is sufficient that this regenerated helium amount is equal to the maximum value ad0V0[NL]. Therefore, from ca(1-b)V0=ad0V0, the helium concentration c in the regenerated gas amount when the regenerated helium amount is maximum can be obtained as c=d0 / (1-b).

[0068] On the other hand, the amount of regeneration air contained in the regeneration gas amount v2 is (1-c)a(1-b)V0[NL], so by substituting the above helium concentration c into the left equation, we can rearrange it. Therefore, the amount of regeneration air is (1-b-d0)aV0[NL]. Therefore, the discard rate b that makes the amount of regeneration air zero can be calculated as 1-b-d0=0, that is, b=1-d0. Therefore, when the helium concentration d0 in the low-concentration helium exploration gas is the lower limit of the specified concentration range = 0.095 (9.5%), the discard rate b can be calculated as 1-0.095=0.905.

[0069] Meanwhile, the remainder of the low-concentration helium probe gas in the first accumulator tank 26 is transferred to the intermediate tank 24. The remaining amount of the low-concentration helium probe gas is (1-a)V0[NL], and the helium concentration in the probe gas is d0.

[0070] FIG. 2(D) shows the recurrent mixing of the high-concentration helium exploration gas transferred from the purification tube 35 and the low-concentration helium exploration gas transferred from the first accumulator tank 26. The regenerated gas volume v2 of ad0V0[NL] is transferred to the intermediate tank 24, while the air of abV0[NL] is exhausted to the outside as the waste gas volume v3. When the waste ratio b=0.905, the amount of helium in the regenerated gas volume v2 is ad0V0[NL], and the helium concentration c is 100%. In this case, the amount of helium in the intermediate tank 24 is ad0V0+d0(1-a)V0=d0V0[NL]. The total amount of the recurrent mixed gas in the intermediate tank 24 is ad0V0+(1-a)V0[NL].

[0071] 2(E) shows the mixing of the recurrently mixed gas in the intermediate tank 24. The mixing is performed by repeatedly pressurizing the mixed gas with the gas compressor 25, transferring it to the first accumulator tank 26, and expanding it. After mixing, the total amount of the exploration gas becomes V1=ad0V0+(1-a)V0[NL].

[0072] Therefore, the helium concentration d1 in the first accumulator tank 26 is d1=d0V0 / {ad0V0+(1-a)V0}=d0 / (ad0-a+1). If the helium concentration d1 is set to a set concentration of 0.1 (=10%) and the lower limit of the specified concentration range of the helium concentration is d0=0.095 (=9.5%), then 0.095 / (a×0.095-a+1)=0.1 gives a=0.06. In other words, when the waste ratio b=0.905 in FIG. 2(C), the extraction ratio a in FIG. 2(B) is uniquely determined from the set concentration d1 (=10%) of the helium concentration d1 and the lower limit d0 (=9.5%) of the specified concentration range.

[0073] As shown in Figure 2(C) above, since the amount of waste gas a(1-d0)V0[NL] is discharged externally, the total amount of exploration gas V1 is reduced by the amount of waste gas v3 a(1-d0)V0[NL] compared to the total amount of exploration gas V0 before partial purification.

[0074] Therefore, as shown in FIG. 3, by replenishing an amount of helium of d1×a(1-d0)V0[NL] from the second mass flow controller 46 and the helium gas cylinder 47, and replenishing an amount of air of (1-d1)×a(1-d0)V0[NL] from the first mass flow controller 44 and the air line 45, it is possible to maintain the total amount of search gas at the original amount V0[NL] while maintaining the helium concentration at the set concentration d1.

[0075] FIG. 4 is a process diagram showing a leak inspection process using the leak inspection device 100 according to the first embodiment of the present invention. First, in process P1, the test object 11 is set inside the vacuum container 12. All valves are closed.

[0076] Next, in process 2, the first vacuum valve 13a is opened and the inside of the vacuum vessel 12 is evacuated by the first vacuum pump 13. When the inside of the vacuum vessel 12 reaches a predetermined vacuum level (e.g., 2000 Pa), the first vacuum valve 13a is closed and the operation of the first vacuum pump 13 is stopped.

[0077] Next, in process P3, the second vacuum valve 15 is opened and the inside of the test object 11 is evacuated by the second vacuum pump 16. When the inside of the test object 11 reaches a predetermined vacuum level (e.g., 2000 Pa), the second vacuum valve 15 is closed and the operation of the second vacuum pump 16 is stopped.

[0078] Next, in process P4, the detection gas detector 14 determines whether there is any helium leakage inside the vacuum vessel 12.

[0079] Next, in process P5, the probe gas is introduced from the second accumulator tank 28 into the test object 11, and the amount of helium gas leaking from the test object 11 is determined by the probe gas detector 14.

[0080] Next, in process P6, the probe gas is collected, mixed, and partially purified from the test specimen 11. If the helium concentration in the probe gas is below the lower limit of the specified concentration range of 9.5%, the probe gas is partially purified so that the helium concentration in the probe gas is equal to the set concentration of 10%. This partial purification of the probe gas will be described later with reference to FIG. 5.

[0081] Next, in process P7, after the detection gas is collected, the vacuum vessel 12 is exposed to the atmosphere and the test specimen 11 is removed. After that, processes P1 to P7 are repeatedly performed for all test specimens 11.

[0082] FIG. 5 is a process diagram showing collection, mixing, and partial purification of the probe gas in the leak detection process by the leak detection device 100.

[0083] First, in process P6-1, the probe gas in the test specimen 11 is transferred to the first accumulator tank 26. In this case, the recovery valve 21 is opened and the recovery pump 23 is driven. The probe gas in the test specimen 11 is transferred to the intermediate tank 24 by the recovery pump 23. The probe gas transferred to the intermediate tank 24 is compressed by the gas compressor 25 and pumped to the first accumulator tank 26.

[0084] Next, in process P6-2, the exploration gas in the first accumulator tank 26 is agitated. In this case, the exploration gas in the first accumulator tank 26 is pressurized by the gas compressor 25. Therefore, when the agitation valve 41 is opened, the exploration gas in the first accumulator tank 26 passes through the agitation valve 41 and is automatically transferred to the intermediate tank 24, which has a lower pressure.

[0085] The exploration gas returned to the intermediate tank 24 is again pressurized by the gas compressor 25 to the first accumulator tank 26. In this way, the exploration gas transferred to the first accumulator tank 26 is repeatedly circulated through the agitation valve 41 → intermediate tank 24 → gas compressor 25 → first accumulator tank 26 → agitation valve 41 → ..., and is suitably agitated in the intermediate tank 24 and the first accumulator tank 26. This allows the helium gas to be uniformly diffused in the exploration gas, resulting in a uniform helium concentration distribution.

[0086] Next, in process P6-3, the helium concentration in the probe gas being stirred is measured by the second gas concentration meter 42.

[0087] Next, in process P6-4, it is determined whether the helium concentration in the detection gas is equal to or lower than the lower limit of the specified concentration range. If the helium concentration in the detection gas is equal to or lower than the lower limit of the specified concentration range (YES), process P6-5 is executed. On the other hand, if the helium concentration in the detection gas is higher than the lower limit of the specified concentration range (NO), process P6-6 is executed.

[0088] Next, in process P6-5, the purification valve 31 is opened to partially purify the exploration gas. The exploration gas is purified by introducing the exploration gas in the first accumulator tank 26 into the purification column 35 and separating and exhausting the air in the exploration gas in the purification column 35. The flow rate of the exploration gas introduced into the purification column 35 (amount v1 introduced into the purification column 35) is adjusted by the first variable flow valve 33, while the flow rate of the air separated and exhausted from the exploration gas (amount v3 of waste gas) is adjusted by the second variable flow valve 38. The first variable flow valve 33 and the second variable flow valve 38 are controlled by the control device 43 based on the measured values ​​of the first flow meter 34, the second flow meter 36, the third flow meter 39, and the first gas concentration meter 37.

[0089] The pressure of the probe gas flowing out of the purification valve 31 is reduced, for example, from 0.8 MPa to 0.5 MPa by the pressure reducing valve 32. The flow rate of the probe gas introduced into the purification column 35 (the amount of probe gas introduced into the purification column 35, v1, divided by the processing time) is adjusted by the first variable flow valve 33 so as to be equal to 15.4 NL / min, for example. The first variable flow valve 33 is controlled by the control device 43 while receiving the measurement signal from the first flowmeter 34.

[0090] On the other hand, the flow rate of the air separated and exhausted from the purification column 35 (waste gas volume v3 divided by processing time) is adjusted by the second variable flow valve 38 so as to be equal to, for example, 4.8 NL / min. The second variable flow valve 38 is controlled by the control device 43 while receiving the measurement signal from the third flowmeter 39. As a result, the flow rate of the refined exploration gas flowing out from the purification column 35 is automatically adjusted to 10.6 (= 15.4 - 4.8) NL / min. The lower the flow rate of the exploration gas introduced into the purification column 35, the higher the helium recovery rate can be expected.

[0091] Incidentally, it took 3 minutes and 3 seconds for the helium concentration in the exploration gas in the first accumulator tank 26 to rise from 9.5% to 10%. At this time, the amount of helium gas introduced into the purification column 35 was 4.70 NL, and the amount of refined helium gas was 4.69 NL. From this, the amount of helium gas separated and exhausted from the purification column 35 in one purification was 10(=(4.70-4.69)×10 3 ) NmL, and the helium regeneration rate of purification column 35 is estimated to be 99.8% (= 4.69 / 4.70 × 100%). Assuming that leak tests are performed 500 times per day, the number of leak tests that will change the helium concentration from 10% to 9.5% is 125, so exploration gas will be refined four times per day. From this, it can be seen that the amount of helium gas exhausted from purification column 35 is extremely small at 40 (= 10 × 4) NmL.

[0092] In process P6-6, the refining valve 31 is closed, the first supply valve 27 is opened, and the exploration gas is transferred to the second accumulator tank 28. The operation of the control device 43 in the exploration gas recovery, mixing, and partial purification process will be described below.

[0093] 6 and 7 are flow diagrams showing the control of the control device 43 in the process of recovering, mixing, and partially purifying the probe gas by the leak inspection device 100. For the sake of convenience, the waste ratio b in the purification column 35 is determined so that the amount of regenerated air in the regenerated gas amount v2 is zero [NL] and the amount of waste helium in the waste gas amount v3 is zero [NL]. Furthermore, the amount of probe gas remaining inside the test object 11 is zero [NL].

[0094] First, in step S1, it is detected whether or not the leak test has been completed for each test object 11. The completion of the leak test can be recognized by the control device 43, for example, by an electrical signal related to the stop of measurement by the detection gas detector 14.

[0095] In step S2, the recovery valve 21 is opened, and the recovery pump 23 and the gas compressor 25 are driven. As a result, the amount of detection gas (20 NL) inside the test specimen 11 is pumped to the first accumulator tank 26 via the recovery tank 22 → intermediate tank 24 → first accumulator tank 26.

[0096] In step S3, the agitation valve 41 is opened. As a result, the probe gas in the first accumulator tank 26 passes through the agitation valve 41 and is returned to the intermediate tank 24, and is repeatedly circulated between the intermediate tank 24 and the first accumulator tank 26.

[0097] In step S4, the measurement signal of the second gas concentration meter 42 is acquired.

[0098] In step S5, it is determined whether the helium concentration in the detection gas is equal to or lower than the lower limit of the specified concentration range of 9.5%. If the helium concentration in the detection gas is equal to or lower than the lower limit of the specified concentration range of 9.5% (YES), step S6 is executed. On the other hand, if the helium concentration in the detection gas is not equal to or lower than the lower limit of the specified concentration range of 9.5% (NO), the second supply valve 27 is opened and the detection gas is replenished (pressurized) to the second accumulator tank 28. After replenishment, the second supply valve 27 is closed. As a result, the amount of detection gas in the first accumulator tank 26 becomes 200 NL, and the amount of detection gas in the second accumulator tank 28 becomes 100 NL.

[0099] In step S6, the refining valve 31 is opened, and the probe gas in the first accumulator tank 26 is introduced into the refining column 35.

[0100] In step S7, the measurement signals of the first flow meter 34, the second flow meter 36, and the third flow meter 39 are acquired.

[0101] In step S8, the first variable flow valve 33 is driven to adjust the flow rate of the probe gas introduced into the purification column 35. The target value of the introduction flow rate is determined from the introduction amount v1 (see FIG. 2(B) above) into the purification column 35 and the treatment time, and the introduction amount v1 is determined by the extraction rate a, that is, the set helium concentration d1, the lower limit d0 of the specified concentration range, and the waste rate b (see FIG. 2(B) above).

[0102] In step S9, it is determined whether the flow rate of the probe gas introduced into the purification column 35 is within a specified range. If the flow rate of the probe gas introduced into the purification column 35 is within the specified range (YES), step S10 is executed. On the other hand, if the flow rate of the probe gas introduced into the purification column 35 is not within the specified range (NO), step S8 is executed again.

[0103] In step S10, the second variable flow valve 38 is driven to adjust the exhaust flow rate of the waste gas. Note that the "waste gas" refers to gas that is separated and exhausted from the low-concentration helium probe gas in the purification column 35, and is not reused, and is entirely or mostly made up of air.

[0104] In step S11, it is determined whether the exhaust flow rate of the waste gas is within a specified range. If the exhaust flow rate of the waste gas is within the specified range (YES), step S12 is executed. On the other hand, if the exhaust flow rate of the waste gas is not within the specified range (NO), step S10 is executed again.

[0105] In step S12, a measurement signal is acquired from the first gas concentration meter 37. The first gas concentration meter 37 measures the helium concentration ("c" in FIG. 2(C) above) in the amount of high-concentration helium exploration gas refined in the refiner tube 35 ("regenerated gas amount v2" in FIG. 2(C) above).

[0106] In step S13, it is determined whether the helium concentration in the regenerated exploration gas is within a predetermined range. The "predetermined range" here refers to the helium concentration c in the regenerated gas volume v2 when the amount of helium ("regenerated helium amount" in FIG. 2(C) above) in the high-concentration helium exploration gas volume (regenerated gas volume v2) is at its maximum value (= a × d0V0 [NL]) and the amount of air ("regenerated air amount" in FIG. 2(C) above) in the regenerated gas is zero. In this case, the helium concentration c in the regenerated gas volume v2 is equal to 100% or an approximation of 100%.

[0107] If the helium concentration in the purification probe gas is within the predetermined range (YES), step S14 is executed. On the other hand, if the helium concentration in the purification probe gas is not within the predetermined range (NO), step S10 is executed again.

[0108] In step S14, the measurement signal of the second gas concentration meter 42 is acquired.

[0109] In step S15, it is determined whether the helium concentration in the recurrent mixed gas is the set concentration (10%). If the helium concentration in the recurrent mixed gas is the set concentration (10%) (YES), step S16 is executed. On the other hand, if the helium concentration in the recurrent mixed gas is not the set concentration (10%) (NO), step S10 is executed again. Note that the "recurrent mixed gas" refers to a mixed gas generated by recurrently mixing a high-concentration helium probe gas that has been partially extracted and purified from a low-concentration helium probe gas with the original low-concentration helium probe gas.

[0110] In step S16, the first mass flow controller 44 or the second mass flow controller 46 is driven to replenish the recurrent mixed gas with air or helium gas from the air line 45 or the helium gas cylinder 47. The amount of air or helium to be replenished to the recurrent mixed gas is calculated by the control device 43 based on the waste gas amount v3 (FIG. 2(D) above) and the set helium concentration d1 (10%). For example, from FIG. 2(D) above, the waste gas amount v3=a(1-d0)V0[NL], so the amount of helium to be replenished is d1a(1-d0)V0[NL], and the amount of air to be replenished is (1-d1)a(1-d0)V0[NL].

[0111] In step S17, purification valve 31 is closed, second supply valve 27 is opened, and the probe gas with the specified helium concentration in first accumulator tank 26 is replenished (pressurized) to second accumulator tank 28. After replenishment, second supply valve 27 is closed.

[0112] As described above, the control device 43 opens the recovery valve 21 in step S2 and drives the recovery pump 23 and the gas compressor 25, so that the probe gas in the test piece 11 is automatically recovered in the first accumulator tank 26. Then, in step S3, the control device 43 opens the stirring valve 41, so that stirring of the probe gas in the first accumulator tank 26 is automatically started. Then, in step S5, if the helium concentration in the probe gas in the first accumulator tank 26 measured by the second gas concentration meter 42 is below the lower limit of the specified concentration range, the control device 43 opens the purification valve 31 in step S6, so that partial purification of the probe gas in the first accumulator tank 26 is automatically started. Then, in step S8, the first variable flow valve 33 is driven, so that the introduction flow rate of the probe gas into the purification tube 35 is automatically adjusted. Similarly, in step S10, the exhaust flow rate of the waste gas is automatically adjusted.

[0113] As a result, the high-concentration helium probe gas refined in the refiner 35 is mixed and stirred with the low-concentration helium probe gas in the intermediate tank 24. Then, in step S16, the specified-concentration helium probe gas, "whose helium concentration has been adjusted to the set concentration (10%)" corresponding to the amount of waste gas separated and discarded in the refiner 35, is replenished to the recurrent mixed gas, "whose helium concentration has been adjusted to the set concentration (10%)". Then, in step S17, the specified-concentration helium probe gas, corresponding to the amount required for leak testing (20NL in this embodiment), is pumped from the first accumulator tank 26 to the second accumulator tank 28 and replenished. This makes it possible to significantly reduce the consumption of helium gas used in leak testing, and to repeatedly perform highly reliable leak testing in which the helium concentration in the probe gas supplied to the test object 11 is always maintained within the specified concentration range.

[0114] Second embodiment FIG. 8 is an explanatory diagram showing the configuration of the main parts of a leak test device 200 according to the second embodiment of the present invention. This leak testing apparatus 200 is a leak testing apparatus for a test subject 11' in which it is not possible to perform internal vacuum evacuation (a so-called "low-rigidity test subject"), and like the leak testing apparatus 100 described above, it is configured to recover, stir, and partially purify the probe gas inside the test subject 11', significantly reduce the consumption of helium gas used for leak testing, and repeatedly perform highly reliable leak tests in which the helium concentration of the probe gas is always maintained within a specified concentration range.

[0115] Therefore, the exploration gas recovery and supply cycle 20, the helium gas purification cycle 30, and the gas mixing cycle 40 are common to the above-mentioned leak inspection device 100. The only difference from the above-mentioned leak inspection device 100 is the leak inspection section 10'. Specifically, the second vacuum valve 15 and the second vacuum pump 16 of the leak inspection device 100 have been removed, and a purification column introduction valve 17 and a second purification column 18 have been newly added to the downstream side of the test object 11', and an air introduction valve 19 has been added to the upstream side.

[0116] That is, in this leak inspection device 200, the detection gas introduced into the test object 11' is pushed out by air and is collected by the detection gas collection / supply cycle 20. Therefore, in order to remove the air contained in the detection gas to be collected, a second purification column 18 is provided upstream of the collection tank 22. In addition, a purification column introduction valve 17 for cutting / allowing communication is provided between the test object 11' and the second purification column 18. In addition, an air introduction valve 19 for introducing air is provided between the test object 11' and the second supply valve 29 in parallel with the second supply valve 29.

[0117] FIG. 9 is a process diagram showing a leak inspection process using the leak inspection device 200 according to the second embodiment of the present invention.

[0118] First, in process P1', the test object 11' is set in the vacuum vessel 12. The internal volume of the test object 11' is 4L, as in the leak inspection device 100, and a mixed gas consisting of helium with a concentration of 10% and air with a concentration of 90% is used as the detection gas. The detection gas pressure inside the test object 11' during the leak inspection is 0.5MPa, and the amount of detection gas used for one leak inspection is 20NL. Here, in order to stabilize the helium concentration of the detection gas, the volumes of the first accumulator tank 26 and the second accumulator tank 28 are each four times that of the leak inspection device 100. That is, the first accumulator tank 26 has a volume of 100L, a pressure of 0.8MPa, and a detection gas capacity of 800NL, while the second accumulator tank 28 immediately before the leak inspection unit 10' has a volume of 50L, a pressure of 0.8MPa, and a detection gas capacity of 400NL.

[0119] Next, in process P2', the first vacuum valve 13a is opened and the inside of the vacuum vessel 12 is evacuated by the first vacuum pump 13. When the inside of the vacuum vessel 12 reaches a predetermined vacuum level (e.g., 2000 Pa), the first vacuum valve 13a is closed and the operation of the first vacuum pump 13 is stopped.

[0120] Next, in process P3', a probe gas is supplied into the test object 11'. The method of supplying the probe gas to the test object 11' can be a replacement method using the probe gas. Since the volume of the test object 11' is 4 L, the amount of the probe gas introduced into the second purification column 18 is 6 L. The probe gas introduction flow rate is 30 L / min in order to reduce the amount of waste helium in the second purification column 18 (replacement time 12 seconds (= 6 L / 30 L / min x 60 seconds / min)). Here, the probe gas introduction flow rate is set by a flow control valve (not shown) on the exhaust side of the second purification column 18.

[0121] In addition, since the detection gas and air pass through the second purification column 18 and are introduced into the detection gas recovery and supply cycle 20, the helium concentration of the detection gas in the first accumulator tank 26 increases in this leak inspection device 200. For example, an experiment was performed 10 times in which the helium concentration of the detection gas went from the set concentration of 10% to the upper limit of the specified concentration range of 10.5%, and then purified in the helium gas purification cycle 30 to return the helium concentration to the set concentration of 10%, and the time for the helium concentration of the detection gas to reach the upper limit of the specified concentration range of 10.5%, and the amount of helium gas and air to be discarded were estimated. As a result, the time for the helium concentration of the detection gas to reach the upper limit of the specified concentration range of 10.5% from the set concentration of 10% was 28 minutes, the amount of helium discarded per inspection was 39 NmL, the amount of air discarded per inspection was 1.7 NL, the amount of helium discarded by purification in the purification column 35 of the helium gas purification cycle 30 was 37 NmL, and the amount of air discarded was 57.6 NL.

[0122] Therefore, in the case of continuous purification by the helium gas purification cycle 30, the refill helium flow rate was estimated to be 40 NmL / min and the air flow rate was estimated to be 3.7 NL / min. In fact, when continuous purification was performed by the helium gas purification cycle 30 and helium gas and air gas at these flow rates were introduced into the intermediate tank 24, the helium concentration of the exploration gas in the accumulator tank 26 stabilized. The introduction of the helium gas and air is performed by the second mass flow controller 46 and the first mass flow controller 44, and the second mass flow controller 46 and the first mass flow controller 44 are controlled by the control device 43.

[0123] Next, in process P4', the detection gas detector 14 detects a leak.

[0124] Next, in process P5', the probe gas is collected, mixed, and partially purified while the inside of the test object 11' is filled with air. The collection of the probe gas by the probe gas collection and supply cycle 20, the partial purification of the probe gas by the helium gas purification cycle 30, and the mixing of the probe gas by the gas mixing cycle 40 are almost the same as those in the above-mentioned leak test device 100, so the explanation of these will be omitted.

[0125] Next, in process P6', after the detection gas is collected, the vacuum vessel 12 is exposed to the atmosphere and the test specimen 11 is removed. After that, processes P1' to P5' are repeatedly performed for all the test specimens 11.

[0126] (Verification example: Amount of refill helium and amount of refill air considering the performance of the purification tube 35) Incidentally, in the partial purification, recurrent mixing and stirring process according to the present invention in the above-mentioned Figures 2 and 3, for convenience of explanation, the "amount of probe gas introduced into the purification column 35 v1" and the "waste ratio b in the purification column 35 (=amount of waste gas v3 / amount of probe gas introduced into the purification column 35 v1)" are determined so that the amount of waste helium in the waste gas amount v3 in the purification column 35 is zero, and the amount of regenerated air in the regenerated gas amount v2 is both zero (helium concentration c in the regenerated gas amount is 100%). However, in an actual leak inspection device, it is considered that the amount of waste helium in the waste gas amount v3 and the amount of regenerated air in the regenerated gas amount v2 will not both be zero. This is considered to be largely dependent on the characteristics (performance) of the separation membrane of the purification column 35 and the processing time.

[0127] For example, as shown in Figure 10(a), when the flow rate q (=v1 / T, T: treatment time) of the exploration gas introduced into the purification column 35 is increased, the helium concentration in the waste gas volume v3 gradually increases from 0.02% to 7.58%, and the waste helium volume never becomes zero. On the other hand, as shown in Figure 10(b), when the flow rate q of the exploration gas introduced into the purification column 35 is increased, the air concentration in the regeneration gas volume v2 changes from 85.3% (=100%-14.7%) to 70% (=100%-30.0%), and the helium concentration c in the regeneration gas volume v2 never becomes 100%.

[0128] Therefore, in an actual leak inspection device, it is more efficient to introduce a new parameter, helium regeneration rate η = (amount of helium in regenerated gas volume v2) / (amount of helium in amount v1 of detection gas introduced into purification column 35), and determine the amount v1 of detection gas introduced into purification column 35 and the waste rate b by taking this helium regeneration rate η into consideration. As shown in Figure 11, the helium regeneration rate η varies in the range of 0<η<1.

[0129] Furthermore, in the process of recovering the detection gas from the test specimen 11 in the actual leak test device (step S2 in FIG. 6), an unrecoverable detection gas amount of 0.08 NL (= helium amount 0.008 NL + air amount 0.072 NL) remains inside the test specimen 11. This means that 0.08 NL of detection gas is unconditionally discarded from the first accumulator tank 26 for each leak test. Therefore, when refilling air or helium gas in step S16 in FIG. 7, the amount of detection gas that cannot be recovered from the test specimen 11 needs to be refilled for the number of tests, similarly to the amount of discarded gas v3.

[0130] As described above, the number of tests required for the helium concentration in the detection gas in the first accumulator tank 26 to reach the lower limit of the specified concentration range, 9.5%, from the set value of 10% is 125. Therefore, the amount of detection gas discarded in 125 leak tests is 0.08NL x 125 = 10NL (=1.0NL helium amount + 9.0NL air amount, helium concentration d1 = 0.1), so when refilling air or helium gas in step S16 in Fig. 7, it is necessary to refill 1.0NL helium amount and 9.0NL air amount, respectively.

[0131] Figures 12 and 13 are conceptual diagrams showing the partial purification, recurrent mixing, stirring and replenishment process using the leak testing device of the present invention, taking into account the helium regeneration rate η and "replenishment of the amount of detection gas for the number of tests that cannot be recovered from the test subject 11."

[0132] In particular, in Fig. 12(D), the helium regeneration rate η is introduced, and the waste rate b is determined by the helium regeneration rate η and the "helium concentration c in the regenerated gas volume v2". The helium regeneration rate η is expressed as the following formula 1 using the helium concentration c in the regenerated gas volume v2, the waste rate b, and the helium concentration d0, which is the lower limit of the specified concentration range. (Equation 1): Helium regeneration rate η = amount of regenerated helium in regenerated gas volume v2 / amount of introduced helium = c(1-b)aV0 / d0aV0=c(1-b / d0) Therefore, the discard rate b is expressed as the following equation 2 by solving equation 1 for b. (Equation 2): Waste rate b = 1-ηd0 / c Therefore, the amount of regenerated gas v2 is expressed as the following formula 3 using the helium regeneration rate η. (Equation 3): Regeneration gas volume v2 = (1-b)aV0 = (ηd0 / c)aV0 [NL] In addition, the amount of waste gas v3 is expressed as the following equation 4 using the helium regeneration rate η. (Equation 4): Waste gas volume v3 = baV0 = (1-ηd0 / c)aV0 [NL]

[0133] In FIG. 12(D), the amount of regenerated helium in the amount of regenerated gas v2 and the amount of regenerated air that are recurrently mixed with the remaining portion of the search gas in the intermediate tank 24 are expressed by the following Equation 5 and Equation 6, respectively, using the helium regeneration rate η. (Equation 5): Amount of regenerated helium = amount of regenerated gas v2 × helium concentration c = ηd0aV0 [NL] (Equation 6): Regenerated air volume = Regenerated gas volume v2 - Regenerated helium volume = (ηd0 / c)aV0-ηd0aV0=(1 / c-1)ηd0aV0[NL]

[0134] In FIG. 12(E), the total amount V1 of the probe gas in the first accumulator tank 26 immediately after the pumping of the recurrent mixed gas from the intermediate tank 24 is expressed by the following formula 7 using the helium regeneration rate η. (Equation 7): Total amount of exploration gas V1 = Regenerated gas amount v2 + Remaining amount of exploration gas = (1-b)aV0 + (1-a)V0 = (1-ab)V0 = {1-a(1-ηd0 / c)}V0 [NL] The amount of helium in the first accumulator tank 26 is expressed by the following formula 8 using the helium regeneration rate η. (Equation 8): Amount of helium = amount of regenerated helium + amount of helium in the remaining exploration gas = ηd0aV0 + d0(1-a)V0 = {1-(1-η)a}d0V0 [NL] Therefore, the helium concentration d1 of the probe gas in the first accumulator tank 26 immediately after the pumping of the recurrent mixed gas from the intermediate tank 24 is expressed by the following equation 9 using the helium regeneration rate η. (Equation 9): Helium concentration d1 = helium volume / total volume of exploration gas V1 = {1-(1-η)a}d0 / {1-a(1-ηd0 / c)}

[0135] In FIG. 13, a quantity of detection gas with helium concentration d1 equivalent to a quantity of waste gas v3 and a quantity of detection gas with helium concentration d1 v4 (=10 NL) for the number of tests (125 tests) that cannot be recovered from the test subject 11 are replenished. Therefore, the amount of helium to be replenished to the first accumulator tank 26 is expressed as the following formula 10 using the helium regeneration rate η. (Formula 10): Replenishment helium amount = d1×(v3+v4)=d1×{(1-ηd0 / c)aV0+v4}[NL]

[0136] Therefore, the amount of replenishment air to be replenished to the first accumulator tank 26 is expressed as in the following formula 11 using the helium regeneration rate η. (Formula 11): Replenishment air amount = (1-d1)×(v3+v4)=(1-d1)×{(1-ηd0 / c)aV0+v4}[NL]

[0137] An embodiment of the present invention has been described above with reference to the drawings. The embodiment of the present invention is not limited to the above, and various modifications and changes can be made within the scope of the technical features of the present invention. For example, it is possible to use other gases (e.g., hydrogen, argon) instead of helium as the detection target gas in the detection gas. Also, it is possible to use other inert gases (e.g., nitrogen, carbon dioxide) instead of air for the remaining gas. Explanation of symbols

[0138] 10 Leak inspection unit (leak inspection means) 10' Leak inspection unit (leak inspection means) 11 Test subject 11' Test subject 12 Vacuum container 13 First vacuum pump 13a First vacuum valve 14. Gas detector (helium leak detector) 15 Second vacuum valve 16 Second Vacuum Pump 17 Purification column inlet valve 18 Second Refinery (another refinery) 19 Air introduction valve (residual gas introduction mechanism) 20 Exploration gas recovery and supply cycle (Exploration gas recovery and supply means) 21 Recovery valve 22 Recovery tank (No. 1 tank) 23 Recovery pump 24 Intermediate tank (third tank) 25 Gas Compressor 26 First Accumulator Tank (Second Tank) 27 First supply valve 28 Second Accumulator Tank 29 Second supply valve 30 Helium gas purification cycle (exploration gas purification means) 31 Purification valve 32 Pressure reducing valve 33 First variable flow valve (first flow control valve) 34 1st flow meter 35 Refining tube (refining section) 36 2nd flow meter 37 First gas concentration meter 38 Second variable flow valve (second flow control valve) 39 3rd flow meter 40 Gas mixing cycle (probing gas mixing means) 41 Agitation valve 41a Return Route 42 Second gas concentration meter 43 Control device (PLC) 44 First mass flow controller (residual gas supply means) 45 Air line (residual gas supply means) 46 Second mass flow controller (detection target gas supply means) 47 Helium gas cylinder (means for supplying gas to be detected) 48 Release Valve 100 Leak inspection device 200 Leak inspection device

Claims

1. A leak inspection method for filling a detection gas into a test object (11, 11') placed in a predetermined vacuum environment and detecting the detection gas leaking from the test object (11, 11'), comprising: The detection gas is repeatedly used in the form of a mixed gas "consisting of a part of the detection target gas (He) and most of the remaining gas (Air)"; The detection gas filled in the test object (11, 11') is collected in a first tank (22) after the leak test is completed, and then transferred from the first tank (22) to a second tank (26) to measure the concentration of the detection target gas (He) in the detection gas; If the concentration of the target gas (He) in the detection gas is equal to or lower than the lower limit of a specified concentration range, a portion of the low-concentration detection gas in the second tank (26) "whose concentration of the target gas (He) is equal to or lower than the lower limit of a specified concentration range" is extracted and transferred to a purification section (35) that "concentrates the concentration of the target gas (He)," and the remainder of the low-concentration detection gas is transferred to a third tank (24); In the third tank (24), the high-concentration probe gas "in which the concentration of the target gas (He) transferred from the purification section (35) is concentrated" is recurrently mixed with the low-concentration probe gas transferred from the second tank (26), and the gas is then pumped into the second tank (26) and expanded. This process of partial purification, recurrent mixing, and stirring is then repeated to adjust the concentration of the target gas (He) in the low-concentration probe gas to a specified concentration, and the gas is reused for leak testing of the next test specimens (11, 11'). A leak inspection method using a mixed gas.

2. 2. The leak inspection method according to claim 1, While measuring the concentration of the detection target gas (He) in the detection gas in the second tank (26) and the concentration of the detection target gas (He) in the high concentration detection gas transferred from the purification section (35) to the third tank (24), The flow rate (v1) of the low-concentration detection gas partially extracted from the second tank (26) and the flow rate (v3) of the waste gas separated and exhausted from the purification section (35) are respectively adjusted to adjust the concentration of the detection target gas (He) in the low-concentration detection gas to a specified concentration. A leak inspection method using a mixed gas.

3. 2. The leak inspection method according to claim 1, The concentration of the detection target gas (He) in the low concentration detection gas is adjusted to a specified concentration by separately adding a residual gas (Air) or a detection target gas (He) to the high concentration detection gas and the low concentration detection gas that are recurrently mixed in the third tank (24). A leak inspection method using a mixed gas.

4. 2. The leak inspection method according to claim 1, If the test object (11') cannot be evacuated, a probe gas is supplied to the inside of the test object (11'), and the probe gas flowing out from the inside of the test object (11') is recovered in the first tank (22) after removing air in a separate purification section (18). If necessary, the partial purification, recurrent mixing, and stirring process is repeated while filling the inside of the test object (11') with the probe gas. A leak inspection method using a mixed gas.

5. 5. The leak inspection method according to claim 4, Air is supplied to the inside of the test specimen (11'), and the air is removed from the detection gas flowing out from the inside of the test specimen (11') in the purification section (18), and the detection gas is then collected in the first tank (22). If necessary, the partial purification, recurrent mixing, and stirring process is repeated while the detection gas is collected from the inside of the test specimen (11'). A leak inspection method using a mixed gas.

6. 2. The leak inspection method according to claim 1, The specified concentration of the detection target gas (He) in the detection gas supplied to the inside of the test object (11, 11') is 10% or less. A leak inspection method using a mixed gas.

7. A leak inspection means (10, 10') having a vacuum container (12) capable of accommodating a test object (11, 11') under a predetermined vacuum environment, and a detection gas detector (14) for detecting the detection target gas (He) in a detection gas "consisting of a part of the detection target gas (He) and a majority of the remaining gas (Air)" leaking from the test object (11, 11'); A detection gas recovery and supply means (20) having a first tank (22) for storing detection gas recovered from the test object (11, 11'), a third tank (24) for adjusting the concentration of the detection target gas (He) in the detection gas, a second tank (26) for storing detection gas to be supplied to the test object (11, 11'), and a gas compressor (25) for compressing the detection gas in the third tank (24) to the second tank (26); a detection gas purification means (30) including a purification column (35) for concentrating the concentration of the detection target gas (He) in the second tank (26), a first flow rate control valve (33) for controlling the flow rate (v1) of the detection gas introduced from the second tank (26) to the purification column (35), and a second flow rate control valve (38) for controlling the flow rate (v3) of the waste gas separated and exhausted from the purification column (35); a return path (41a) for transferring the detection gas in the second tank (26) to the third tank (24), and a detection gas stirring means (40) having a second gas concentration meter (42) for measuring the concentration of the detection target gas (He) in the second tank (26). A leak inspection device using a mixed gas.

8. 8. The leak test device according to claim 7, The detection gas purification means (30) includes a first gas concentration meter (37) for measuring the concentration of the detection target gas (He) in the high concentration detection gas transferred from the purification tube (35) to the third tank (24), a first flow meter (33) for measuring the flow rate (v1) of the low concentration detection gas introduced from the second tank (26) to the purification tube (35), a second flow meter (36) for measuring the flow rate (v2) of the high concentration detection gas transferred from the purification tube (35) to the third tank (24), and a third flow meter (39) for measuring the flow rate (v3) of the waste gas exhausted from the purification tube (35). a control device (43) that individually controls the first flow rate adjustment valve (33) and the second flow rate adjustment valve (38) based on the measurement value of the first gas concentration meter (37) and each of the measurement values ​​of the flow meters (33, 36, 39). A leak inspection device using a mixed gas.

9. 8. The leak test device according to claim 7, The detection gas agitation means (40) has a residual gas supply means (44, 45) or a detection target gas supply means (46, 47) for supplying a residual gas (Air) or a detection target gas (He) to the third tank (24). A leak inspection device using a mixed gas.

10. 8. The leak test device according to claim 7, The leak inspection means (10') includes another purification column (18) in series between the test object (11') and the first tank (22) for concentrating the concentration of the target gas (He) in the detection gas collected from inside the test object (11'). A leak inspection device using a mixed gas.

11. 8. The leak test device according to claim 7, The leak inspection means (10') includes a residual gas introduction mechanism (19) for introducing residual gas (Air) into the inside of the test object (11') and disposed in parallel between the test object (11') and the supply tank (28). A leak inspection device using a mixed gas.

12. 8. The leak test device according to claim 7, The specified concentration of the detection target gas (He) in the detection gas supplied to the inside of the test object (11, 11') is 10% or less. A leak inspection device using a mixed gas.

Citation Information

Patent Citations

  • Compression by helium and its recovery

    JP1994321514A

  • Leak inspection device and control method of leak inspection device

    JP2004340844A

  • Apparatus and method for recovery and recycle of tracer gas from leak testing process with randomly varying demand

    US20040144161A1

  • Apparatus and method for reducing oxygen and increasing nitrogen in secure enclosure

    US20170216764A1

  • Coolant recovery system

    US5452583A