Construction method of rotary pile, and rotary pile foundation structure
The rotating pile system addresses the construction burden of using casing pipes by penetrating and consolidating the impermeable layer with a spiral blade and enlarged diameter portion, effectively preventing pollutant spread and simplifying the process.
Patent Information
- Application Number
- JP2023051843
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-28
- Publication Date
- 2024-10-10
AI Technical Summary
The use of casing pipes in constructing steel piles on contaminated ground requires a separate construction step for pulling out the casing pipe, increasing construction burden and necessitating additional processes and equipment for introducing fluidized solidified material.
A rotating pile system that eliminates the need for casing pipes by using a pile body with a spiral blade and an enlarged diameter portion to penetrate and consolidate the impermeable layer, preventing pollutant spread by consolidating the impermeable layer near the outer circumferential surface of the pile.
Effectively prevents pollutants from spreading to lower layers by reducing voids in the impermeable layer, simplifying the construction process and eliminating the need for casing pipes and additional equipment.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a rotary pile construction method and a rotary pile foundation structure. [Background technology]
[0002] When constructing steel pipe piles or the like in ground contaminated with specific hazardous substances, a special construction method using a casing pipe is used to prevent the contaminants present in the aquifer near the ground surface from diffusing to the lower layers. For example, Patent Document 1 describes a pile construction method in which a casing pipe with a blocking cap attached to the tip is rotated and pressed into the impermeable layer below the contaminated layer, the blocking cap is removed and a fluidized solidified material is poured into the casing pipe, a prefabricated pile is constructed into the casing pipe with the fluidized solidified material poured in, the pile is driven into the supporting layer, and the casing pipe is then pulled out. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2022-66634 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, when using a casing pipe, the casing pipe must be installed separately from the pile and the process of removing the casing pipe is required, which increases the burden on construction. Also, the method described in Patent Document 1 requires a process and equipment for introducing the fluidized solidified material.
[0005] Therefore, the present invention aims to provide a rotary pile construction method and a rotary pile foundation structure that enable the process of constructing piles in ground containing a contaminated layer to be simplified by not using a casing pipe, while more effectively preventing the diffusion of contaminants. [Means for solving the problem]
[0006] [1] A construction method for inserting a rotary pile, which comprises a pile body, a spiral blade portion provided at the tip of the pile body, and an enlarged portion arranged coaxially with the pile body and having an outer diameter larger than the outer diameter of the pile body, into ground in which a contaminated aquifer, an impermeable layer, and a supporting layer are layered in that order from the surface side, the construction method for a rotary pile including the steps of: inserting the pile body and the blade portion into the ground; inserting the enlarged portion into the ground and consolidating the impermeable layer near the outer peripheral surface of the pile body with a pressing surface formed at the lower end of the enlarged portion; and reaching the blade portion to the supporting layer. [2] A construction method for a rotary pile as described in [1], wherein the outer diameter of the expansion portion is 0.9 to 1.1 times the outer diameter of the blade portion. [3] A construction method for a rotary pile described in [1], wherein the outer diameter of the expansion portion is 0.7 times or more and less than 0.9 times the outer diameter of the blade portion. [4] A construction method for a rotary pile described in any one of [1] to [3], in which the process of penetrating the pile body into the ground and the process of penetrating the expansion portion into the ground are performed in parallel. [5] A construction method for a rotary pile described in [4], wherein the expansion portion is fixed to the upper part of the pile body. [6] A construction method for a rotary pile described in any one of [1] to [3], further comprising the step of penetrating the enlarged portion into the ground after completion of the step of making the blade portion reach the supporting layer. [7] A rotary pile foundation structure including a rotary pile inserted into ground consisting of a contaminated aquifer, an impermeable layer, and a supporting layer, in that order from the surface side, wherein the rotary pile comprises a pile body, a spiral blade portion provided at the tip of the pile body, and an expanded portion arranged coaxially with the pile body and having an outer diameter larger than the outer diameter of the pile body, the blade portion reaching the supporting layer, and a pressing surface formed at the lower end of the expanded portion reaching the impermeable layer. [8] The rotary pile foundation structure described in [7], wherein the expansion portion is fixed to the upper part of the pile body. Effect of the Invention
[0007] According to the above configuration, the impermeable layer near the outer peripheral surface of the pile body is compressed by the pressing surface formed at the lower end of the enlarged portion, so that the voids formed in the impermeable layer when the blade portion penetrates are blocked and no longer function as water paths, thereby more effectively preventing contaminants contained in the soil of the contaminated aquifer from diffusing to lower layers. [Brief description of the drawings]
[0008] [Figure 1] FIG. 2 is a diagram illustrating a construction method for a rotary pile according to the first embodiment of the present invention. [Diagram 2] FIG. 1 is a diagram showing a structure of a rotary pile according to a first embodiment of the present invention. [Diagram 3] FIG. 2 is a diagram showing a state in which a rotary pile according to a first modified example of the first embodiment of the present invention has been driven into the ground and reached a supporting layer. [Figure 4] FIG. 11 is a side view of a rotary pile according to a second modified example of the first embodiment of the present invention. [Diagram 5] FIG. 11 is a side view of a rotary pile according to a third modified example of the first embodiment of the present invention. [Figure 6] FIG. 11 is a diagram illustrating a construction method for a rotary pile according to a second embodiment of the present invention. [Figure 7] FIG. 11 is a diagram showing a structure of a rotary pile according to a second embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. In this specification and the drawings, components having substantially the same functional configurations are designated by the same reference numerals, and duplicated explanations will be omitted.
[0010] (First embodiment) 1 is a schematic diagram showing a method for constructing a rotary pile according to a first embodiment of the present invention. In this embodiment, a rotary pile 10 is driven into ground in which a contaminated aquifer 1, an impermeable layer 2, an uncontaminated aquifer 3, and a supporting layer 4 are layered in this order from the ground surface side. The rotary pile 10 includes a cylindrical pile body 20, a spiral blade portion 21 provided at the tip of the pile body 20, and an expanded diameter portion 30 arranged coaxially with the pile body 20. The expanded diameter portion 30 has an outer diameter larger than the outer diameter of the pile body 20, and is fixed to the upper portion of the pile body 20.
[0011] The rotary pile 10 is driven into the ground by rotary pressing using a construction machine (not shown). By matching the amount of penetration per rotation during rotary penetration to the helical pitch of the blade portion 21, the rotary pile 10 can be driven into the ground while taking in soil from the opening at the tip of the rotary pile 10 without disturbing the ground.
[0012] Here, the contaminated aquifer 1 is an aquifer containing contaminants such as specific hazardous substances. The impermeable layer 2 is located below the contaminated aquifer 1 and substantially blocks the flow of groundwater between the contaminated aquifer 1 and the non-contaminated aquifer 3. The impermeable layer 2 does not necessarily have to be a completely impermeable layer, and may be, for example, a semi-impermeable layer defined as "a layer having a thickness of 1 meter or more and a hydraulic conductivity of 1 micrometer per second or less, or a layer having an equivalent or greater water-shielding effect." The non-contaminated aquifer 3 is an aquifer that does not contain contaminants because it is separated from the contaminated aquifer 1 by the impermeable layer 2. The ground may include additional layers on the surface side of the contaminated aquifer 1, or between the contaminated aquifer 1, the impermeable layer 2, the non-contaminated aquifer 3, and the supporting layer 4.
[0013] In the above-mentioned ground, when the rotary pile 10 is penetrated into the supporting layer 4 such as bedrock below the uncontaminated aquifer 3, it is necessary to prevent the rotary pile 10 from penetrating the impermeable layer 2, thereby preventing the contaminants contained in the contaminated aquifer 1 from mixing and diffusing into the uncontaminated aquifer 3. In this embodiment, by taking in the soil of the impermeable layer 2 in addition to the soil of the contaminated aquifer 1 inside the rotary pile 10, which is an open-ended rotary pile, the soil of the contaminated aquifer 1 is prevented from mixing into the uncontaminated aquifer 3.
[0014] Specifically, first, the soil of the contaminated aquifer 1 is stirred using an auger screw 40 as shown in FIG. 1(a), and then the pile body 20 and the blade portion 21 of the rotary pile 10 are inserted into the ground from the ground surface as shown in FIG. 1(b). At this time, the soil S1 of the contaminated aquifer 1 and the soil S2 of the impermeable layer 2 are taken into the rotary pile 10 through the opening at the tip of the rotary pile 10. In this way, if the soil S2 of the impermeable layer 2 in addition to the soil S1 of the contaminated aquifer 1 is taken into the rotary pile 10, even if the tip of the rotary pile 10 reaches the non-contaminated aquifer 3 as shown in FIG. 1(c), the soil S2 of the impermeable layer 2 separates the soil S1 of the contaminated aquifer 1 from the non-contaminated aquifer 3 inside the rotary pile 10, so that the diffusion of contaminants into the non-contaminated aquifer 3 can be prevented.
[0015] Next, as shown in Fig. 1(c), the enlarged diameter portion 30 is penetrated into the ground from the ground surface. Since the enlarged diameter portion 30 in this embodiment is fixed to the upper part of the pile main body 20, the process of penetrating the pile main body 20 into the ground and the process of penetrating the enlarged diameter portion 30 into the ground are carried out in parallel. By penetrating the enlarged portion 30 into the ground, the ground near the outer circumferential surface of the pile body 20 is consolidated by the pressing surface 33 formed at the lower end of the enlarged portion 30. A spiral void P may be formed near the outer circumferential surface of the pile body 20 as a trace of the blade portion 21 passing through the ground, but this void P is closed by the consolidation caused by the pressing surface 33.
[0016] 1(d), the tip of the rotary pile 10 is caused to reach the bearing layer 4, and construction is completed. When the tip of the rotary pile 10 reaches the bearing layer 4, the lower end (pressing surface 33) of the enlarged portion 30 reaches the impermeable layer 2, and at least a portion of the impermeable layer 2 is consolidated by the pressing surface 33, thereby closing the void P. As a result, the rotary pile foundation structure 100 using the rotary pile 10 of this embodiment has a structure in which the blade portion 21 reaches the supporting layer 4, and the pressing surface 33 formed at the lower end of the enlarged diameter portion 30 reaches the impermeable layer 2. The depth of the impermeable layer 2 varies depending on the ground, but is often 10 m or more. Therefore, the pressing surface 33 is also located at a depth of 10 m or more from the ground surface.
[0017] Here, whether the tip of the rotary pile 10 has reached the impermeable layer 2 can be determined from the magnitude of the rotation torque (hereinafter, also referred to as construction torque) required to penetrate the rotary pile 10 into the ground. Since the construction torque is highly correlated with the N value of the ground, if the N value measured in advance is different between the contaminated aquifer 1 and the impermeable layer 2, it can be determined that the tip of the rotary pile 10 has reached the impermeable layer 2 by the change in the construction torque accompanying the change in the N value. In addition, the construction torque also changes depending on the soil quality of the ground. In many cases, the contaminated aquifer 1 is sandy soil with a large hydraulic conductivity, whereas the impermeable layer 2 is clayey soil with a small hydraulic conductivity. Therefore, for example, even if the N values of the ground in each layer are approximately the same, it can be determined that the tip of the rotary pile 10 has reached the impermeable layer 2 by the change in the construction torque reflecting the change in soil quality.
[0018] If it is confirmed in advance, for example, by boring data or the like, that the ground of the contaminated aquifer 1 is not hard (for example, the N value is less than 10), the stirring step using the auger screw 40 in Fig. 1(a) may be omitted. In this case, even if the rotary pile 10 is penetrated as is, the tip of the rotary pile 10 will not be blocked by the soil S1 of the contaminated aquifer 1, and the soil S2 of the impermeable layer 2 can be taken into the rotary pile 10.
[0019] Furthermore, after a sufficient amount of soil from the impermeable layer 2 has been taken into the rotary pile 10, there is no problem from the perspective of preventing contamination even if blockage occurs at the tip. Therefore, it is not necessary for the soil S3 of the uncontaminated aquifer 3 and the soil S4 of the supporting layer 4 to be taken into the rotary pile 10 as in the example shown in Fig. 1, and in other examples, the tip of the rotary pile 10 may reach the supporting layer 4 in a state where the tip of the rotary pile 10 is blocked by the soil S2 of the impermeable layer 2 and the soil S3 of the uncontaminated aquifer 3.
[0020] 2 is a diagram showing the structure of the rotary pile used in the example shown in FIG. 1. As shown in the figure, the pile body 20 and the tubular portion 31 of the enlarged diameter portion 30 are both formed of circular steel pipes, and a pressing surface 33 is formed by a disk-shaped steel plate 32 welded to the end of the tubular portion 31 and the end of the pile body 20 at the lower end of the enlarged diameter portion 30. In the example shown in the figure, the outer diameter D2 of the enlarged diameter portion 30 is approximately the same as the outer diameter D1 of the blade portion 21. This example is not limited to this example, and the outer diameter D2 of the enlarged diameter portion 30 can be appropriately set within a range of, for example, 0.9 to 1.1 times the outer diameter D1 of the blade portion 21.
[0021] On the other hand, in the rotary pile 10, the distance A between the pressing surface 33 of the enlarged portion 30 and the tip of the rotary pile 10 in the ground depth direction (penetration direction of the rotary pile) is set according to the depth of the bearing layer 4 and the impermeable layer 2 in the ground on which the rotary pile 10 is constructed. Specifically, the distance A is set so that the pressing surface 33 reaches the impermeable layer 2 when the tip of the rotary pile 10 reaches the bearing layer 4. As shown in Fig. 1, if the depth of the bearing layer 4 is L1 and the depth of the impermeable layer 2 is L2, the distance A is calculated so that A≦L1-L2.
[0022] According to the first embodiment as described above, the soil S2 of the impermeable layer 2 taken in from the opening at the tip of the rotary pile 10, which is an open-end rotary pile, separates the soil S1 of the contaminated aquifer 1 taken in the inside of the rotary pile 10 from the uncontaminated aquifer 3, thereby preventing contaminants contained in the soil S1 of the contaminated aquifer 1 from mixing with the uncontaminated aquifer 3. In this case, the void P formed in the impermeable layer 2 when the blade portion 21 penetrates may become a water path through which the contaminants contained in the contaminated aquifer 1 flow, but the void P can be blocked by consolidating the impermeable layer 2 near the outer circumferential surface of the pile body 20 with the pressing surface 33 of the enlarged diameter portion 30. This makes it possible to more effectively prevent contaminants contained in the soil S1 of the contaminated aquifer 1 from mixing with the uncontaminated aquifer 3.
[0023] Note that voids P may be formed regardless of whether the rotary pile is open-ended or closed-ended, so even when a closed-ended rotary pile that does not have an opening at the tip of the rotary pile is used, unlike the above example, it may be useful to consolidate the impermeable layer by penetrating the enlarged diameter section to close the voids P. On the other hand, the size of the voids P remaining after the passage of the blades 21 varies depending on the ground and construction conditions, and there may be cases where the voids P are small and do not need to be closed. Therefore, for example, even when an open-ended rotary pile is used as described above, there may be cases where it is not necessary to perform consolidation by the enlarged diameter section.
[0024] (Modification of the first embodiment) Next, a description will be given of a modified example of the first embodiment. Fig. 3 is a diagram showing a state in which a rotary pile 10A according to a first modified example of the first embodiment has been driven into the ground and reached a supporting layer 4. 3, the outer diameter D2 of expanded diameter portion 30A in the modification of the first embodiment is smaller than the outer diameter D1 of blade portion 21. Specifically, the outer diameter D2 of expanded diameter portion 30A is, for example, 0.7 to less than 0.9 times the outer diameter D1 of blade portion 21.
[0025] As already mentioned, the size of the void P remaining after the passage of the blades 21 varies depending on the ground and construction conditions, so it may be possible to sufficiently prevent contaminants from mixing into the uncontaminated aquifer 3 by making the outer diameter D2 of the enlarged portion 30A smaller than the outer diameter D1 of the blades 21 and sealing only the inside of the void P (the side closer to the pile main body 20) by consolidation. By making the outer diameter D2 of the enlarged portion 30A smaller, the resistance when penetrating the rotary pile 10A into the ground is reduced, and the rotary pile 10A can be easily penetrated into the ground.
[0026] Fig. 4 is a side view of a rotary pile according to a second modified example of the first embodiment of the present invention. As shown in Fig. 4, the pressing surface 33B does not need to be perpendicular to the extending direction of the rotary pile 10B, and may be tapered so that the diameter gradually increases toward the upper side. By forming the pressing surface 33B in this way, it is possible to reduce the resistance when inserting the expanding portion 30B into the ground.
[0027] Fig. 5 is a side view of a rotary pile according to a third modified example of the first embodiment of the present invention. As shown in Fig. 5, the enlarged diameter portion 30C has only a disk-shaped steel plate 32 welded to the end of the pile body 20, and no tubular portion is provided. After the rotary pile is installed, the ground above the enlarged diameter portion 30C can be reinforced with, for example, cement, to reduce the influence of gaps and disturbed parts of the ground caused by the passage of the enlarged diameter portion 30C.
[0028] Second Embodiment 6 is a diagram illustrating a construction method of a rotary pile according to a second embodiment of the present invention. The rotary pile 10D of this embodiment includes a pile body 20, a blade portion 21, and an enlarged diameter portion 30D arranged coaxially with the pile body 20. The enlarged diameter portion 30D is not fixed to the pile body 20 and is movable in the extension direction of the pile body 20. The enlarged diameter portion 30D can be penetrated into the ground independently of the pile body 20 by using a construction machine.
[0029] In this embodiment, as in the first embodiment, the soil of the contaminated aquifer 1 is stirred using an auger screw, and then the tip of the pile body 20 is caused to reach the supporting layer 4 as shown in FIG. 6(a). Next, as shown in FIG. 6(b), the enlarged diameter portion 30D is caused to penetrate into the ground along the pile body 20. By penetrating the enlarged diameter portion 30D into the ground, the ground near the outer circumferential surface of the pile body 20 is consolidated by the pressing surface 33D, and the voids P are blocked. Thereafter, the tip of the enlarged diameter portion 30D is caused to reach the impermeable layer 2, and the construction is completed. When the tip of the enlarged diameter portion 30D reaches the impermeable layer 2, at least a part of the impermeable layer 2 is consolidated by the pressing surface 33D, and the voids P are blocked.
[0030] FIG. 7 is a diagram showing the structure of a rotary pile 10D according to a second embodiment of the present invention. As shown in the figure, the expanded diameter portion 30D is composed of a first tubular portion 31D forming the outer peripheral surface of the expanded diameter portion 30D, a second tubular portion 34 forming the inner peripheral surface of the expanded diameter portion 30D, and a holed disk-shaped steel plate 32 welded to the end of the first tubular portion 31D and the end of the second tubular portion 34 at the lower end of the expanded diameter portion 30D. The first tubular portion 31D and the second tubular portion 34 are formed of a circular steel pipe. The outer diameter of the expanded diameter portion 30D may be approximately the same as the outer diameter of the blade portion 21, as in the first embodiment, or may be smaller than the outer diameter of the blade portion 21. The inner diameter of the expanded diameter portion 30D is formed to be slightly larger than the outer diameter of the pile body 20.
[0031] As in the second embodiment described above, by using an expansion portion 30D that can move independently of the pile main body 20, and performing a process of making the expansion portion 30D reach the impermeable layer 2 after completing the process of making the tip of the pile main body 20 reach the supporting layer 4, it is possible to seal the void P and more effectively prevent contaminants contained in the soil S1 of the contaminated aquifer 1 from mixing with the uncontaminated aquifer 3. [Explanation of symbols]
[0032] 1...contaminated aquifer, 2...impermeable layer, 3...uncontaminated aquifer, 4...supporting layer, 10...rotary pile, 20...pile body, 21...wing portion, 30...expansion portion, 31...tubular portion, 32...steel plate, 33...pressure surface, 40...auger screw, 100...rotary pile foundation structure, P...void, S1, S2, S3, S4...soil.
Claims
1. A construction method for penetrating a rotary pile having a pile body, a spiral blade portion provided at the tip of the pile body, and an enlarged portion arranged coaxially with the pile body and having an outer diameter larger than the outer diameter of the pile body, into a ground in which a contaminated aquifer, an impermeable layer, and a supporting layer are layered in this order from the ground surface side, A step of penetrating the pile body and the wing portion into the ground; A step of penetrating the enlarged diameter portion into the ground and consolidating the impermeable layer near the outer circumferential surface of the pile body with a pressing surface formed at the lower end of the enlarged diameter portion; a step of causing the blade portion to reach the support layer; A method for installing a rotary pile, including:
2. The method for constructing a rotary pile according to claim 1 , wherein an outer diameter of the enlarged portion is 0.9 to 1.1 times an outer diameter of the blade portion.
3. The method for constructing a rotary pile according to claim 1 , wherein the outer diameter of the enlarged portion is 0.7 times or more and less than 0.9 times the outer diameter of the blade portion.
4. The method for constructing a rotary pile according to any one of claims 1 to 3, wherein the step of penetrating the pile body into the ground and the step of penetrating the enlarged portion into the ground are carried out in parallel.
5. The method for constructing a rotary pile according to claim 4 , wherein the enlarged diameter portion is fixed to an upper portion of the pile body.
6. The method for constructing a rotary pile according to claim 1 , further comprising the step of penetrating the enlarged portion into the ground after the step of causing the blade portion to reach the supporting layer is completed.
7. A rotary pile foundation structure including a rotary pile penetrating into ground in which a contaminated aquifer, an impermeable layer, and a supporting layer are layered in this order from the ground surface side, The rotary pile includes a pile body, a spiral blade portion provided at the tip of the pile body, and an expanded diameter portion arranged coaxially with the pile body and having an outer diameter larger than the outer diameter of the pile body, A rotary pile foundation structure, wherein the blade portion reaches the supporting layer, and the pressing surface formed at the lower end of the enlarged portion reaches the impermeable layer.
8. The rotary pile foundation structure according to claim 7 , wherein the enlarged diameter portion is fixed to an upper portion of the pile body.