Starting method of power generation system and power generation system
The described power generation system stabilizes the induction generator's transition from motoring to power generation, reducing costs by eliminating the inverter and minimizing voltage drops and inrush currents through a controlled method involving a condenser, evaporator, and turbine configuration.
Patent Information
- Application Number
- JP2023054454
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-30
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2043-03-30
AI Technical Summary
Existing power generation systems using organic Rankine cycles incur high costs due to the inclusion of an inverter device, and there is a lack of a stable method for transitioning the generator from motoring to power generation mode during startup.
A power generation system with a condenser, evaporator, and turbine, utilizing a circulation line, bypass line, flow control valve, induction generator, and switching device, where the induction generator is parallel to a main generator, and controlled through a method involving turbine starting, generator motoring, and turbine speed increasing steps to stabilize the induction generator's transition.
The system allows for stable startup of the induction generator, reduces costs by eliminating the need for an inverter, and minimizes voltage drops and inrush currents, while ensuring continuous power supply.
Smart Images

Figure 2024142347000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a start-up method for a power generation system using an organic Rankine cycle, and the power generation system. [Background technology]
[0002] In the power generation system disclosed in Patent Document 1, an organic fluid evaporated in an evaporator drives a power turbine, which generates electricity in a generator. The generated electricity is then fed to an onboard system after being frequency-adjusted by an inverter device. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2011-231636 A Summary of the Invention [Problem to be solved by the invention]
[0004] In the above power generation system, the generator is equipped with an inverter device, which may lead to an increase in costs. In addition, when the generator performs motoring in response to the start-up of the power generation system, it is preferable that the generator stably switches from the motoring mode to the power generation mode. However, the above patent document does not disclose a specific configuration.
[0005] An object of the present disclosure is to provide a power generation system startup method and a power generation system that can stably start an induction generator and achieve low costs. [Means for solving the problem]
[0006] A method for starting up a power generation system according to at least one embodiment of the present disclosure includes: A method for starting up a power generation system including a condenser, an evaporator, and a turbine, comprising the steps of: The power generation system includes: a circulation line for allowing an organic medium as a heat transfer medium to flow through the condenser, the evaporator, and the turbine in this order; a bypass line for directing the organic medium discharged from the evaporator to the condenser while bypassing the turbine; a flow control valve for adjusting a ratio between a bypass flow rate of the organic medium flowing through the bypass line and a main flow rate which is a flow rate of the organic medium flowing into the turbine; an induction generator coupled to the turbine; a switching device configured to switch between an enabling state that enables conduction between the induction generator and a power grid and a prohibiting state that prohibits the conduction; Equipped with The induction generator is provided in parallel with a main generator that constitutes the power system and has a larger capacity than the induction generator, The method for starting the power generation system includes the steps of: a turbine start-up step of increasing the main flow rate by adjusting an opening degree of the flow regulating valve; The rotational speed of the induction generator, which is increased by the execution of the turbine starting step, is a target rotational speed. a generator motoring step of switching the switching device from the prohibited state to the permitted state to start supplying power from the power grid to the induction generator when the motoring state reaches the predetermined value; a turbine speed-up step of adjusting an opening degree of the flow regulation valve to further increase the main flow rate after the generator motoring step is executed; a power generation start step of causing the induction generator, which has switched from a motor to a generator, to start supplying power to the power grid when the rotation speed of the induction generator exceeds a synchronous rotation speed that is greater than the target rotation speed; Equipped with.
[0007] A power generation system according to an embodiment of the present disclosure includes: 1. A power generation system comprising a condenser, an evaporator, and a turbine, a circulation line for allowing an organic medium as a heat transfer medium to flow through the condenser, the evaporator, and the turbine in this order; a bypass line for directing the organic medium discharged from the evaporator to the condenser while bypassing the turbine; a flow control valve for adjusting a ratio between a bypass flow rate of the organic medium flowing through the bypass line and a main flow rate which is a flow rate of the organic medium flowing into the turbine; an induction generator coupled to the turbine; a switching device configured to switch between an enabling state that enables conduction between the induction generator and a power grid and a prohibiting state that prohibits the conduction; Controller and Equipped with The induction generator is provided in parallel with a main generator that constitutes the power system and has a larger capacity than the induction generator, The controller: a turbine start-up control unit for increasing the main flow rate by controlling an opening degree of the flow regulating valve; a generator motoring control unit for switching the switching device from the prohibited state to the permitted state when a rotation speed of the induction generator, which is increased by the aperture control of the turbine start-up control unit, reaches a target rotation speed; and and a turbine speed increase control unit for adjusting the opening of the flow regulating valve to further increase the main flow rate so that the rotational speed of the induction generator exceeds a synchronous rotational speed that is higher than the target rotational speed after the switching device switches to the permitted state. Effect of the Invention
[0008] According to the present disclosure, it is possible to provide a power generation system startup method and a power generation system that can stably start up an induction generator and achieve low costs. [Brief description of the drawings]
[0009] [Figure 1] 1 is a schematic diagram of a power generation system according to an embodiment; [Diagram 2] 5 is a graph showing a schematic change over time in the rotation speed of an induction generator performing a startup operation according to an embodiment. [Diagram 3]FIG. 2 is a schematic diagram showing a functional configuration of a controller according to an embodiment. [Figure 4] 4 is a flowchart showing a method for starting up a power generation system according to an embodiment. [Diagram 5] 4 is a flowchart showing a method for operating a power generation system when a trip occurs according to one embodiment. [Figure 6] 10 is a flowchart illustrating a method for operating a power generation system when an overload occurs according to an embodiment; DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] Hereinafter, some embodiments of the present disclosure will be described with reference to the accompanying drawings. However, the dimensions, materials, shapes, relative arrangements, etc. of components described as the embodiments or shown in the drawings are merely illustrative examples and are not intended to limit the scope of the present disclosure. For example, expressions expressing relative or absolute configuration, such as "in a certain direction," "along a certain direction," "parallel," "orthogonal," "center," "concentric," or "coaxial," not only strictly express such a configuration, but also express a state in which there is a relative displacement with a tolerance or an angle or distance to the extent that the same function is obtained. For example, expressions indicating that things are in an equal state, such as "identical," "equal," and "homogeneous," not only indicate a state of strict equality, but also indicate a state in which there is a tolerance or a difference to the extent that the same function is obtained. For example, expressions describing shapes such as a rectangular shape or a cylindrical shape do not only refer to rectangular shapes, cylindrical shapes, etc. in the strict geometric sense, but also refer to shapes that include uneven portions, chamfered portions, etc., to the extent that the same effect is obtained. On the other hand, the expressions "comprise", "include", or "have" a certain element are not exclusive expressions excluding the presence of other elements. In addition, the same components are denoted by the same reference numerals and the description thereof may be omitted.
[0011] <Overall configuration of power generation system 1> FIG. 1 is a schematic diagram of a power generation system 1 according to an embodiment of the present disclosure. The power generation system 1 of this example includes a power system 5, a main generator 2 connected to the power system 5, an emergency generator 3 provided in parallel with the main generator 2 via the power system 5, and a predetermined device 7 configured to receive power from the power system 5. The predetermined device 7 may be anything that operates by the supply of power, and an example of the predetermined device 7 is one or more driving devices such as a motor. The power generation system 1 may be provided on a ship or on land, but the following will exemplify the power generation system 1 provided on a ship. Note that the emergency generator 3 is not an essential component of the present disclosure.
[0012] The power system 5 includes a bus bar 8 and switching devices 9A to 9C. The switching device 9A is configured to switch the conduction state between the bus bar 8 and the main generator 2. Similarly, the switching device 9B is configured to switch the conduction state between the bus bar 8 and the emergency generator 3, and the switching device 9C is configured to switch the conduction state between the bus bar 8 and a predetermined device 7. As an example, the switching devices 9A to 9C are circuit breakers configured to switch between an enabling state that enables conduction and a prohibiting state that prohibits conduction.
[0013] The power generation system 1 further includes a power generation system 10 configured to utilize an organic medium, which may be, for example, R-245fa or R1233zd(E) (i.e., HFO-1233zd(E)), as a heat medium. The power generation system 10 includes an induction generator 15 configured to rotate integrally with the turbine 13. The induction generator 15 is provided in parallel with the main generator 2 and the emergency generator 3 via a bus 8 of the power system 5. Note that the capacity of the main generator 2 is larger than the capacity of the induction generator 15 and the capacity of the emergency generator 3. During normal operation of the power generation system 1, a predetermined device 7 receives power from each of the main generator 2 and the induction generator 15, but the frequency of the power supply depends on the frequency of the main generator 2, and therefore the induction generator 15 does not require a converter or an inverter.
[0014] <Configuration of power generation system 10> The power generation system 10 includes a condenser 11, an evaporator 12, and a turbine 13. The condenser 11 is configured to condense the organic medium by using cooling water such as natural water (more specifically, seawater). The evaporator 12 is configured to evaporate the organic medium by using heat contained in, for example, hot water. The turbine 13 is configured to rotate using the gaseous organic medium as a working medium.
[0015] The power generation system 10 further includes a circulation line 20 through which the organic medium flows in sequence through the condenser 11, the evaporator 12, and the turbine 13. The circulation line 20 includes a condenser-evaporator line 23 connected between the condenser 11 and the evaporator 12, an evaporator-turbine line 21 connected between the evaporator 12 and the turbine 13, and a turbine condenser line 22 connected between the turbine 13 and the condenser 11. The condenser-evaporator line 23 is provided with a pump device 16 for sending the organic medium discharged from the condenser 11 to the evaporator 12.
[0016] The power generation system 10 further includes a bypass line 25 for directing the organic medium discharged from the evaporator 12 to the condenser 11, bypassing the turbine 13. An inlet 25A of the bypass line 25 is connected to the evaporator turbine line 21 between the evaporator 12 and the turbine 13, and an outlet 25B of the bypass line 25 is connected to the turbine condenser line 22 between the turbine 13 and the condenser 11.
[0017] The power generation system 10 includes a flow regulation valve 30 for adjusting the ratio between a bypass flow rate, which is the flow rate of the organic medium flowing through the bypass line 25, and a main flow rate, which is the flow rate of the organic medium flowing into the turbine 13. The flow regulation valve 30 illustrated in FIG. 1 includes a first flow regulation valve 31 provided in the evaporator turbine line 21, and a bypass flow regulation valve 35 provided in the bypass line 25. The first flow regulation valve 31 is located between the inlet 25A of the bypass line 25 and the turbine 13. The opening degree of each of the first flow regulation valve 31 and the bypass flow regulation valve 35 is controlled to regulate the main flow rate and control the rotation speed of the turbine 13. The power generation system 10 of this example further includes an opening / closing valve 29 provided in the evaporator turbine line 21 between the inlet 25A and the first flow regulation valve 31.
[0018] The power generation system 10 further includes a switching device 14 for switching a conduction state between the induction generator 15 and the bus 8 of the power system 5. As an example, the switching device 14 is a circuit breaker configured to switch between an enabling state that allows conduction and a disabling state that disabling conduction.
[0019] The rotation speed of induction generator 15 changes by adjusting the main flow rate through the opening control of flow regulation valve 30. When switching device 14 switches from the prohibited state to the permitted state while the rotation speed of induction generator 15 is below the synchronous rotation speed, induction generator 15 receives power supply from power grid 5 and operates as an electric motor. That is, induction generator 15 motors. As a result, the rotation speed of induction generator 15 increases to the synchronous rotation speed. Here, the synchronous rotation speed is the rotation speed of induction generator 15 that corresponds to the frequency of power grid 5. The synchronous rotation speed may be the rated rotation speed of induction generator 15.
[0020] On the other hand, when the switching device 14 maintains the permitted state and the rotational speed of the induction generator 15 exceeds the synchronous rotational speed, the electromotive force generated in the stator coil of the induction generator 15 due to the rotation of the rotor of the induction generator 15 exceeds the potential of the bus bar 8 that has been supplying power to the induction generator 15, and the direction of power flow between the induction generator 15 and the power grid 5 is switched. At this time, the induction generator 15 supplies power to the power grid 5 as a generator. The power is supplied to a predetermined device 7.
[0021] Figure 2 is a graph showing the change over time of the rotational speed of the induction generator 15 in the startup operation of the power generation system 10. The horizontal axis of the graph indicates time, and the vertical axis indicates the rotational speed of the induction generator 15. The outline of the startup operation of the power generation system 10 in this example is as follows. At the start of startup, the switching device 14 is in the prohibited state. First, as the organic medium flows into the turbine 13, the induction generator 15 starts to rotate (0 ≦ t < t1). Triggered by the rotational speed of the induction generator 15 reaching a target rotational speed lower than the synchronous rotational speed (t = t1), the switching device 14 switches to the permitted state. In this case, the induction generator 15 starts motoring due to the power supply from the power grid 5. When the rotational speed of the induction generator 15 further increases and exceeds the synchronous rotational speed (t > t2) by controlling the opening degree of the flow control valve 30, the induction generator 15 supplies power to the power grid 5 as a generator. In this way, by increasing the rotational speed of the turbine 13 with the organic medium before the start of motoring, it is possible to suppress the voltage drop of the power grid 5 and reduce the inrush current of the induction generator 15 at the start of motoring.
[0022] Note that, as an example, the target rotational speed is a rotational speed of 95% or more and less than 100% with respect to the synchronous rotational speed. In this case, together with suppressing the voltage drop of the power grid 5 and reducing the inrush current of the induction generator 15 described above, it is also possible to reduce the starting torque of the turbine 13.
[0023] <Heat source system of the evaporator 12> Returning to FIG. 1, the power generation system 10 includes a hot water supply line 121 for supplying hot water to the evaporator 12 as a heat source for evaporating the organic medium, a hot water discharge line 122 for flowing hot water discharged from the evaporator 12, a hot water bypass line 125 connected to the hot water supply line 121 and the hot water discharge line 122 so as to bypass the evaporator 12, and a hot water flow control valve 127. The hot water flow control valve 127 is configured to change the ratio between a main hot water flow rate, which is the flow rate of hot water flowing into the evaporator 12, and a hot water bypass flow rate, which is the flow rate of hot water flowing through the hot water bypass line 125. The hot water flow control valve 127 of this example is a three-way valve provided at the connection position of the hot water bypass line 125 and the hot water supply line 121. The hot water flow control valve 127 according to another example may be a flow control valve provided in each of the hot water supply line 121 and the hot water flow control valve 127.
[0024] The hot water flowing through the hot water supply line 121 is water heated by the heating device 70. The heating device 70 in this example is a heat exchanger configured to heat water through heat exchange between the exhaust gas discharged from the marine main engine 79 and the water. That is, the hot water supply line 121 in this example is configured to supply the hot water heated by the exhaust gas discharged from the marine main engine 79 to the evaporator 12. However, as described above, the power generation system 10 may be installed on land, and in that case, the heating device 70 may be, for example, a boiler, and the marine main engine 79 is not an essential component of the present disclosure. In addition, the boiler may be provided on the ship, and jacket water, which is cooling water for the engine, may be adopted as the heat source.
[0025] If the aperture of the flow adjustment valve 30 is constant, the greater the heat capacity of the hot water flowing into the evaporator 12, the greater the main flow rate of the organic medium flowing from the evaporator 12 to the turbine 13, and the greater the output power of the induction generator 15 (i.e., the load on the induction generator 15). When the controller 90, which is a component of the power generation system 10, determines that the power measured by the power meter 91 has exceeded a specified power, it is configured to control the aperture of the hot water flow adjustment valve 127 to increase the hot water bypass flow rate and reduce the main hot water flow rate (details will be described later).
[0026] <Controller 90> The mechanical configuration of the controller 90 is as follows. The controller 90 is configured by a computer, and includes a processor, a memory (storage medium), and an external communication interface. The processor is a CPU, a GPU, an MPU, a DSP, or a combination thereof. The processor according to other embodiments may be realized by an integrated circuit such as a PLD, an ASIC, an FPGA, or an MCU. The memory is configured to store various data temporarily or non-temporarily, and is realized by at least one of a RAM, a ROM, and a flash memory, for example. The processor executes various control processes according to instructions of a program loaded into the memory. The control processes include a process in which the processor sends control signals to the switching devices 9A to 9C, 14, the flow regulation valve 30, the hot water flow regulation valve 127, and the opening / closing valve 29, and a process in which the processor acquires measurement results from the power meter 91 and the rotation speed meter 98.
[0027] 3 is a schematic diagram showing a functional configuration of a controller 90 according to an embodiment of the present disclosure. The controller 90 includes a turbine startup control unit 81, a generator motoring control unit 82, and a turbine speed increase control unit 83.
[0028] The turbine startup control unit 81 is configured to increase the main flow rate of the organic medium flowing into the turbine 13 by controlling the opening of the flow regulation valve 30 at the start of startup of the power generation system 10. More specifically, the turbine startup control unit 81 is configured to send a control signal to the first flow regulation valve 31 to increase the opening, and to the bypass flow regulation valve 35 to decrease the opening. When these control signals are sent, the induction generator 15 starts up together with the turbine 13, and the rotation speed of the induction generator 15 increases. Note that the turbine startup control unit 81 in this example also executes a process of sending an open signal to the on-off valve 29. The on-off valve 29 to which the open signal is input switches from a closed state to an open state.
[0029] The generator motoring control unit 82 is configured to switch the switching device 14 from a prohibited state to a permitted state when the rotation speed of the induction generator 15, which is increased by the opening control of the turbine start-up control unit 81, reaches the target rotation speed. More specifically, the generator motoring control unit 82 is configured to determine whether the measurement result of the rotation speed measuring device 98 has reached the target rotation speed. Then, when the generator motoring control unit 82 determines that the measurement result has reached the target rotation speed, a control signal for switching from the prohibited state to the permitted state is transmitted from the generator motoring control unit 82 to the switching device 14. When the control signal is transmitted, the rotation speed of the induction generator 15 is equal to or lower than the synchronous rotation speed, so that the induction generator 15 performs motoring by the power supplied from the power system 5 (more specifically, by the power supplied from the main generator 2). Thereafter, the rotation speed of the induction generator 15 increases to the synchronous rotation speed.
[0030] The turbine speed-up control unit 83 is configured to adjust the opening of the flow regulation valve 30 to further increase the main flow rate of the organic medium flowing into the turbine 13 so that the rotation speed of the induction generator 15 exceeds the synchronous rotation speed after the switching device 14 switches from the prohibited state to the permitted state. More specifically, the turbine speed-up control unit 83 is configured to send a control signal to the first flow regulation valve 31 to further increase the opening, and to the bypass flow regulation valve 35 to further decrease the opening. As a further detailed example, the first flow regulation valve 31 is fully opened. As a result of the further increase in the main flow rate of the organic medium flowing into the turbine 13, the rotation speed of the induction generator 15 exceeds the synchronous rotation speed. The induction generator 15 switches from an electric motor to a generator, and power is supplied from the induction generator 15 to the power grid 5.
[0031] According to the above configuration, the timing when the electric power for motoring is supplied from the power system 5 to the induction generator 15 is after the rotation speed of the induction generator 15 reaches the target rotation speed, so that the inrush current of the induction generator 15 at the start of motoring can be reduced, and the induction generator 15 can be stably started. In addition, the effect of reducing the voltage drop of the power system 5 and the effect of reducing the starting torque of the turbine 13 can also be obtained. In addition, the rotation speed of the induction generator 15 exceeds the synchronous rotation speed due to the increase in the mainstream amount of the organic refrigerant by the turbine speed increase control unit 83, and the induction generator 15 switches from the electric motor to the generator. At this time, the organic medium continuously flows into the turbine 13, so that the increase and decrease of the rotation speed of the generator at the synchronous rotation speed is suppressed. Furthermore, at the start of power generation by the induction generator 15, the induction generator 15 can supply electric power to the predetermined device 7 together with the main generator 2. At this time, the induction generator 15 does not supply electric power to the predetermined device 7 by itself, so that the inverter and converter for the induction generator 15 are not required, and the power generation system 10 can be made inexpensive. As a result, the power generation system 10 is realized which can stably start up the induction generator 15 and achieves low costs.
[0032] The inrush current of induction generator 15 is the peak current that flows through the stator coil of induction generator 15 at the moment motoring starts. After a certain amount of time has passed since motoring started, the current that flows through the stator coil becomes smaller than the peak current.
[0033] Continuing with the description of the configuration of the controller 90, the controller 90 may further include a trip determination unit 84, a shutoff control unit 85, and a turbine deceleration control unit 86, although these are not essential components of the present disclosure.
[0034] The trip determination unit 84 is configured to determine whether to trip the power generation system 10. More specifically, the trip determination unit 84 is configured to determine whether a trip condition for the power generation system 10 is satisfied. As an example, when at least one of the following events (A) to (C) occurs, it is determined that the trip condition is satisfied. (A) The power generation system 10 is subjected to vibration exceeding a specified level. (B) A trip command is input to the controller 90. (C) The switching device 14 has switched from a permitted state to a prohibited state.
[0035] The cutoff control unit 85 is configured to switch the switching device 14 from a permitted state to a prohibited state when the trip determination unit 84 determines that the power generation system 10 is to be tripped. More specifically, when a trip condition is satisfied, a control signal for switching from the permitted state to the prohibited state is sent from the cutoff control unit 85 to the switching device 14. When the switching device 14 switches to the prohibited state, the power supply by the induction generator 15 is stopped.
[0036] It should be noted that the cutoff control unit 85 of this example does not execute the control process when the event (C) above occurs (because the switching device 14 has already been switched to the prohibited state.) In other words, the cutoff control unit 85 of this example switches the switching device 14 to the prohibited state only when at least one of the events (A) and (B) among the events (A) to (C) above occurs.
[0037] Furthermore, when the switching device 14 switches from the permitted state to the prohibited state, the main generator 2 supplies power to the predetermined device 7 while supplementing the power supplied by the induction generator 15. Such power supply from the main generator 2 is performed without the controller 90 executing any particular control process.
[0038] The turbine deceleration control unit 86 is configured to decelerate the turbine 13 by controlling the opening degree of the flow regulation valve 30 when a trip condition of the power generation system 10 is satisfied. More specifically, the turbine deceleration control unit 86 is configured to send a control signal to the bypass flow regulation valve 35 to increase the opening degree, and to send a control signal to the first flow regulation valve 31 to decrease the opening degree. When these control signals are sent, the bypass flow rate of the organic medium increases and the mainstream flow rate of the organic medium decreases, so that the turbine 13 decelerates.
[0039] In this example, a control signal for setting the opening degree to 0% is sent from the turbine deceleration control unit 86 to the first flow regulation valve 31. That is, the turbine 13 is stopped by the control processing of the turbine deceleration control unit 86. Furthermore, the turbine deceleration control unit 86 in this example is configured to transmit a close signal to the on-off valve 29 when the trip condition is satisfied. With this configuration, the on-off valve 29 is closed when the trip condition is satisfied, and the inflow of the organic medium into the turbine 13 is reliably prevented. Furthermore, in this example, the on-off valve 29 and the first flow regulation valve 31 are provided between the inlet 25A of the bypass line 25 and the turbine 13 (see FIG. 1), so that the turbine 13 can quickly execute a stop operation following the control processing of the turbine deceleration control unit 86.
[0040] Furthermore, in this example, when the trip condition of the power generation system 10 is satisfied, the hot water flow adjustment valve 127 is opened. The hot water bypass flow rate increases, and the amount of heat input to the evaporator 12 is reduced.
[0041] According to the above configuration, the turbine deceleration control unit 86 controls the opening of the flow regulation valve 30 when the trip condition is satisfied. This makes it possible to immediately execute a process to decelerate the turbine 13 when the power generation system 10 trips. Even if the power generation system 10 stops generating power due to a trip of the power generation system 10, the main generator 2 continues to supply power while supplementing the power supplied by the induction generator 15, so that the specified equipment 7 can continue to operate.
[0042] The following is a further explanation of the configuration of the controller 90. The controller 90 may further include an overload determination unit 87 and a generator load reduction control unit 88, although these are not essential components of the present disclosure.
[0043] The overload determination unit 87 is configured to determine whether the output power of the induction generator 15 has exceeded a specified power based on the measurement result of the power meter 91. The specified power is a threshold value for determining whether the output power (i.e., the load) of the induction generator 15 is excessive. The generator load reduction control unit 88 is configured to control the aperture of the hot water flow adjustment valve 127 to reduce the main hot water flow rate flowing into the evaporator 12 and to increase the hot water bypass flow rate when it is determined that the output power of the induction generator 15 has exceeded the specified power. In this example, the main hot water flow rate and the hot water bypass flow rate are controlled by controlling the aperture of the hot water flow adjustment valve 127, which is a three-way valve.
[0044] When the heat capacity of the hot water flowing into the evaporator 12 increases due to an increase in the output of the marine main engine 79, the amount of heat input from the hot water to the evaporator 12 increases, which increases the main flow rate of the organic medium flowing into the turbine 13, and this may cause the output power of the induction generator 15 to become excessive. In this regard, according to the above-mentioned configuration, when it is determined that the output power of the induction generator 15 has exceeded the specified power, the main hot water flow rate is reduced, so that the load on the induction generator 15 can be prevented from becoming excessive.
[0045] In addition, when the power generation system 10 is an ORC system instead of the waste heat ORC system as shown in FIG. 1, a seawater supply line is provided instead of the hot water supply line 121, a seawater bypass line is provided instead of the hot water bypass line 125, a seawater control valve is provided instead of the hot water flow adjustment valve 127, and liquid LNG is supplied to the condenser 11 instead of cooling water. The temperature of the seawater flowing through the seawater supply line is kept almost constant. The vaporized LNG discharged from the condenser 11 is supplied to the demand destination. Since the amount of LNG required by the demand destination changes, the amount for condensing the organic medium in the condenser 11 varies. Therefore, when the ORC system is applied, the process by which the seawater control valve is controlled when an overload occurs is different from the process by which the hot water flow adjustment valve 127 is controlled in the waste heat ORC system.
[0046] Specifically, when the demand for LNG at the demand destination decreases, the amount of liquid LNG supplied to the condenser 11 also decreases. In this case, the amount of heat held in the circulation line 20 increases, and when this amount of heat exceeds a predetermined value, an overload occurs in the induction generator 15. At this time, the seawater control valve is controlled to release seawater into the seawater bypass line, thereby reducing the amount of heat input to the evaporator 12 (the amount of heat input to the circulation line 20).
[0047] <Method of starting the power generation system 10> A start-up method of the power generation system 10 will be described with reference to Figs. 3 and 4. Fig. 4 is a flowchart showing an operation method of the power generation system 10 according to an embodiment of the present disclosure. The operation method includes a start-up method of the power generation system 10. At least a part of the operation method is realized by control processing of a processor constituting the controller 90. In the following description, "step" may be abbreviated as "S", and the processor of the controller 90 may be abbreviated as "processor". Before the operation method of the power generation system 10 is started, the turbine 13 is stopped, and the switching device 14 is in a prohibited state.
[0048] First, a turbine startup step (S11) is executed in which the opening of the flow regulating valve 30 is adjusted to increase the main flow rate of the organic medium flowing into the turbine 13. S11 is executed by a processor, and the processor that executes S11 is an example of the turbine startup control unit 81. By executing S11, the rotation speed of the turbine 13 gradually increases.
[0049] Next, a generator motoring step (S13) is executed. In S13, when the rotation speed of the induction generator 15 reaches the target rotation speed, the switching device 14 switches from the prohibited state to the permitted state, and power supply from the power system 5 to the induction generator 15 is started. At this timing, the induction generator 15 starts as an electric motor. S13 is executed by a processor, and the processor that executes S13 is an example of the generator motoring control unit 82.
[0050] Next, a turbine speed-up step (S15) is executed in which the opening of the flow regulation valve 30 is adjusted to further increase the main flow rate flowing into the turbine 13. S15 is executed by a processor, and the processor that executes S15 is an example of the turbine speed-up control unit 83. Execution of S15 further increases the rotation speed of the induction generator 15. Note that the first flow regulation valve 31 is fully opened when the output of the induction generator 15 relative to the amount of heat input from the hot water supply line 121 to the evaporator 12 becomes maximum. The first flow regulation valve 31 is fully opened when t≧t2 in FIG. 2.
[0051] After execution of S15, a power generation start step (S17) is executed. In S17, induction generator 15, which has switched from a motor to a generator as a result of the rotation speed of induction generator 15 exceeding the synchronous rotation speed, starts supplying power to power grid 5. S17 is a step that is realized after execution of S15, and the processor does not need to perform any particular control process in S17. After execution of S17, the flowchart in FIG. 4 ends.
[0052] <Method of operating the power generation system 10 when a trip occurs> FIG. 5 is a flowchart showing a method of operating the power generation system 10 when a trip occurs.
[0053] When it is determined that the trip condition is satisfied, the switching device 14 is switched from the permitted state to the prohibited state (S21). S21 is executed by a processor, and the processor that executes S21 is an example of the cutoff control unit 85.
[0054] Next, a turbine deceleration step (S23) is executed in which the bypass flow rate of the organic medium is increased and the main flow rate of the organic medium flowing into the turbine 13 is reduced by controlling the opening degree of the flow regulating valve 30. In this example, in S23, the turbine 13 is stopped and the induction generator 15 is also stopped. S23 is executed by a processor, and the processor executing S23 is an example of the turbine deceleration control unit 86.
[0055] Next, the opening control of the hot water flow adjustment valve 127 is executed (S24), the hot water bypass flow rate increases, and the amount of heat input to the evaporator 12 decreases.
[0056] Next, a power supply continuation step (S25) is executed in which the main generator 2 continues to supply power to the predetermined device 7 while supplementing the power that was being supplied to the predetermined device 7 by the induction generator 15. S25 is executed automatically by execution of S21. No special control process by the processor is required for S25. Thereafter, the flowchart of FIG. 5 ends.
[0057] <Method of operating the power generation system 10 when an overload occurs> Fig. 6 is a flowchart showing a method of operating the power generation system 10 when an overload occurs. First, it is determined whether the load on the induction generator 15 is excessive based on the measurement result of the power meter 91 (S27). S27 is executed by a processor, and the processor executing S27 is an example of the overload determination unit 87. If it is determined that the load on the induction generator 15 is not excessive (S27: NO), the flowchart in Fig. 6 ends. After this, the operation of the power generation system 10 continues.
[0058] If it is determined that the load on the induction generator 15 is excessive (S27: YES), a generator load reduction step (S29) is executed. In S29, the opening degree of the hot water flow control valve 127 is controlled to reduce the main hot water flow rate flowing into the evaporator 12 and to increase the hot water bypass flow rate. S29 is executed by a processor, and the processor executing S29 is an example of the generator load reduction control unit 88. Thereafter, the flowchart in FIG. 6 ends.
[0059] As described above, the flow regulation valve 30 (see FIG. 1) includes the first flow regulation valve 31 provided in the evaporator turbine line 21 between the inlet 25A of the bypass line 25 and the turbine 13, and the bypass flow regulation valve 35 provided in the bypass flow regulation valve 35. Then, in the turbine startup step (S11) and the turbine speed increase step (S15), the opening degree of the bypass flow regulation valve 35 is decreased, and the opening degree of the first flow regulation valve 31 is increased. According to the above configuration, since the first flow regulation valve 31 is disposed immediately before the turbine 13, the mainstream flow rate of the organic medium flowing into the turbine 13 can be accurately controlled in each of S11 and S15.
[0060] <Summary> The contents described in the above-mentioned embodiments can be understood, for example, as follows.
[0061] 1) The power generation system (10) according to one embodiment of the present disclosure includes: A method for starting up a power generation system including a condenser (11), an evaporator (12), and a turbine (13), comprising the steps of: The power generation system includes: a circulation line (20) for allowing an organic medium as a heat transfer medium to flow through the condenser, the evaporator, and the turbine in this order; a bypass line (25) for directing the organic medium discharged from the evaporator to the condenser, bypassing the turbine; a flow control valve (30) for adjusting a ratio between a bypass flow rate of the organic medium flowing through the bypass line and a main flow rate which is a flow rate of the organic medium flowing into the turbine; an induction generator (15) coupled to the turbine; a switching device (14) configured to switch between an enabling state that enables conduction between the induction generator and the power grid (5) and a prohibiting state that prohibits the conduction; Equipped with The induction generator is provided in parallel with a main generator (2) that constitutes the power system and has a capacity larger than that of the induction generator, The method for starting the power generation system includes the steps of: A turbine start-up step (S11) of increasing the main flow rate by adjusting the opening degree of the flow regulating valve; a generator motoring step (S13) of switching the switching device from the prohibited state to the permitted state when the rotation speed of the induction generator, which is increased by the execution of the turbine starting step, reaches a target rotation speed, and starting the supply of power from the power grid to the induction generator; a turbine speed-up step (S15) of adjusting an opening degree of the flow control valve to further increase the main flow rate after the generator motoring step is executed; a power generation start step (S17) in which, when the rotation speed of the induction generator exceeds a synchronous rotation speed that is greater than the target rotation speed, the induction generator that has switched from a motor to a generator starts supplying power to the power grid; Equipped with.
[0062] According to the above configuration 1), the timing when the electric power for motoring is supplied from the power system to the induction generator is after the rotation speed of the induction generator reaches the target rotation speed, so that the inrush current of the induction generator at the start of motoring can be reduced, and the induction generator can be stably started. In addition, the effect of reducing the voltage drop of the power system and the effect of reducing the starting torque of the turbine can also be obtained. In addition, the increase in the mainstream amount of the organic refrigerant in the turbine speed-up step causes the rotation speed of the induction generator to exceed the synchronous rotation speed, and the induction generator switches from the electric motor to the generator. In the power generation start step, the induction generator can supply electric power to a predetermined device together with the main generator. At this time, the induction generator does not supply electric power to the predetermined device alone, so that an inverter and a converter for the induction generator are not required, and the power generation system can be made inexpensive. As described above, a power generation system start method that can stably start the induction generator and achieves low cost is realized.
[0063] 2) In some embodiments, a method for starting the power generation system according to 1) above, comprising the steps of: The method further includes a turbine deceleration step (S23) of increasing the bypass flow rate and reducing the main flow rate by controlling the opening degree of the flow regulating valve when a specified trip condition is satisfied after execution of the power generation start step.
[0064] According to the above configuration 2), the step of decelerating the turbine can be immediately executed when the power generation system trips.
[0065] 3) In some embodiments, a method for starting up the power generation system according to 1) or 2) above, comprising the steps of: In the power generation start step, the induction generator supplies power together with the main generator to a predetermined device (7) connected to the power grid; The method for starting the power generation system includes the steps of: The method further includes a power supply continuation step (S25) in which, when a specified trip condition is satisfied and the switching device is switched to the prohibited state, the main generator continues to supply power to the specified device while supplementing the power that was being supplied by the induction generator.
[0066] According to the above configuration 3), even if the power generation system stops generating power due to a trip of the power generation system, the specified equipment can continue to operate by the power supply from the main generator.
[0067] 4) In some embodiments, a method for starting up the power generation system according to 1) or 3) above, comprising the steps of: The power generation system includes: a hot water supply line (121) for supplying hot water heated by exhaust gas discharged from a marine main engine (79) to the evaporator as a heat source for evaporating the organic medium; a hot water discharge line (122) for carrying the hot water discharged from the evaporator; a hot water bypass line (25) connected to the hot water supply line and the hot water discharge line so as to bypass the evaporator; a hot water flow control valve (127) for changing a ratio between a main hot water flow rate, which is a flow rate of the hot water flowing into the evaporator, and a hot water bypass flow rate of the hot water flowing through the hot water bypass line; Equipped with The method for starting the power generation system includes the steps of: The method further includes a generator load reduction step (S29) of controlling the opening of the hot water flow regulating valve to reduce the main hot water flow rate and increase the hot water bypass flow rate when it is determined that the output power of the induction generator has exceeded a specified power.
[0068] When the heat content of the hot water flowing into the evaporator increases due to an increase in the output of the marine main engine, the amount of heat input from the hot water to the evaporator increases, which in turn increases the main flow rate of the organic medium flowing into the turbine, which may cause the output power of the induction generator to become excessive. In this regard, according to the configuration of 4) above, when it is determined that the output power of the induction generator has exceeded the specified power, the main hot water flow rate is reduced, thereby preventing the load on the induction generator from becoming excessive.
[0069] 5) In some embodiments, a method for starting up the power generation system according to any one of 1) to 4) above, comprising the steps of: the circulation line includes an evaporator turbine line (21) connected to the evaporator and the turbine, the evaporator turbine line (21) having an inlet (25A) of the bypass line connected between the evaporator and the turbine, The flow regulation valve is a first flow adjustment valve (31) provided in the evaporator turbine line between the inlet of the bypass line and the turbine; a bypass flow control valve (35) provided in the bypass line; Including, In each of the turbine startup step and the turbine speed increasing step, the opening degree of the bypass flow regulation valve is decreased and the opening degree of the first flow regulation valve is increased.
[0070] According to the above configuration 5), since the first flow regulation valve is disposed immediately before the turbine, the main flow rate can be controlled with high precision in each of the turbine startup step and the turbine speed increase step.
[0071] 6) At least one embodiment of the power generation system (10) according to the present disclosure includes: A power generation system including a condenser (11), an evaporator (12), and a turbine (13), a circulation line (20) for allowing an organic medium as a heat transfer medium to flow through the condenser, the evaporator, and the turbine in this order; a bypass line (25) for directing the organic medium discharged from the evaporator to the condenser, bypassing the turbine; a flow control valve (30) for adjusting a ratio between a bypass flow rate of the organic medium flowing through the bypass line and a main flow rate which is a flow rate of the organic medium flowing into the turbine; an induction generator (15) coupled to the turbine; a switching device (14) configured to switch between an enabling state that enables conduction between the induction generator and the power grid (5) and a prohibiting state that prohibits the conduction; Controller (90) and Equipped with The induction generator is provided in parallel with a main generator (2) that constitutes the power system and has a capacity larger than that of the induction generator, The controller: a turbine start-up control unit (81) for increasing the main flow rate by controlling an opening degree of the flow regulating valve; a generator motoring control unit (82) for switching the switching device from the prohibited state to the permitted state when the rotation speed of the induction generator, which is increased by the aperture control of the turbine start-up control unit, reaches a target rotation speed; and a turbine speed increase control section (83) for adjusting the opening of the flow control valve to further increase the main flow rate so that the rotational speed of the induction generator exceeds a synchronous rotational speed which is higher than the target rotational speed after the switching device switches to the permitted state.
[0072] According to the configuration 6) above, it is possible to obtain the same effect as that of 1) above. [Explanation of symbols]
[0073] 1: Power generation system 2: Main generator 3: Emergency generator 5: Power system 7:Equipment 8: Bus bar 9A~9C: Switching device 10: Power generation system 11: Condenser 12: Evaporator 13: Turbine 14: Switching device 15: Induction generator 16: Pump equipment 20:Circulation line 21: Evaporator turbine line 22: Turbine condenser line 23: Condenser-evaporator line 25: Bypass line 25A: Entrance 25B:Exit 29:Shut-off valve 30: Flow control valve 31: First flow control valve 35: Bypass flow control valve 70: Heating equipment 79: Marine main engine 81: Turbine start-up control unit 82: Generator motoring control unit 83: Turbine speed increase control section 84: Trip determination section 85:Shutdown control section 86: Turbine deceleration control section 87: Overload judgment section 88: Generator load reduction control unit 90: Controller 91: Power measuring instruments 98: Rotational speed measuring device 121: Hot water supply line 122: Hot water discharge line 125: Hot water bypass line 127:Hot water flow control valve
Claims
1. A method for starting up a power generation system including a condenser, an evaporator, and a turbine, comprising the steps of: The power generation system includes: a circulation line for allowing an organic medium as a heat transfer medium to flow through the condenser, the evaporator, and the turbine in this order; a bypass line for directing the organic medium discharged from the evaporator to the condenser while bypassing the turbine; a flow control valve for adjusting a ratio between a bypass flow rate of the organic medium flowing through the bypass line and a main flow rate which is a flow rate of the organic medium flowing into the turbine; an induction generator coupled to the turbine; a switching device configured to switch between an enabling state that enables conduction between the induction generator and a power grid and a prohibiting state that prohibits the conduction; Equipped with The induction generator is provided in parallel with a main generator that constitutes the power system and has a larger capacity than the induction generator, The method for starting the power generation system includes the steps of: a turbine start-up step of increasing the main flow rate by adjusting an opening degree of the flow regulating valve; a generator motoring step of switching the switching device from the prohibited state to the permitted state to start supplying power from the power grid to the induction generator when the rotation speed of the induction generator, which is increased by the execution of the turbine starting step, reaches a target rotation speed; a turbine speed-up step of adjusting an opening degree of the flow regulation valve to further increase the main flow rate after the generator motoring step is executed; a power generation start step of causing the induction generator, which has switched from a motor to a generator, to start supplying power to the power grid when the rotation speed of the induction generator exceeds a synchronous rotation speed that is greater than the target rotation speed; Equipped How to start up a power generation system.
2. The method further includes a turbine deceleration step of increasing the bypass flow rate and reducing the main flow rate by controlling an opening degree of the flow regulation valve when a prescribed trip condition is satisfied after the power generation start step is performed. The method for starting a power generation system according to claim 1 .
3. In the power generation starting step, the induction generator supplies power together with the main generator to a predetermined device connected to the power grid; The method for starting the power generation system includes the steps of: When a prescribed trip condition is satisfied and the switching device is switched to the prohibited state, the main generator continues to supply power to the predetermined device while supplementing the power supplied by the induction generator. A method for starting up a power generation system according to claim 1 or 2.
4. The power generation system includes: a hot water supply line for supplying hot water heated by exhaust gas discharged from a marine main engine to the evaporator as a heat source for evaporating the organic medium; a hot water discharge line through which the hot water discharged from the evaporator flows; a hot water bypass line connected to the hot water supply line and the hot water discharge line so as to bypass the evaporator; a hot water flow control valve for changing a ratio between a main hot water flow rate, which is a flow rate of the hot water flowing into the evaporator, and a hot water bypass flow rate of the hot water flowing through the hot water bypass line; Equipped with The method for starting the power generation system includes the steps of: The method further includes a generator load reduction step of controlling an opening degree of the hot water flow regulating valve to reduce the main hot water flow rate and increase the hot water bypass flow rate when it is determined that the output power of the induction generator exceeds a specified power. A method for starting up a power generation system according to claim 1 or 2.
5. the circulation line includes an evaporator-turbine line connected to the evaporator and the turbine, the evaporator-turbine line having an inlet of the bypass line connected between the evaporator and the turbine, The flow regulating valve is a first flow regulation valve provided in the evaporator turbine line between the inlet of the bypass line and the turbine; a bypass flow regulation valve provided in the bypass line; Including, In each of the turbine startup step and the turbine speed increase step, the opening degree of the bypass flow regulation valve is decreased and the opening degree of the first flow regulation valve is increased. A method for starting up a power generation system according to claim 1 or 2.
6. 1. A power generation system comprising a condenser, an evaporator, and a turbine, a circulation line for allowing an organic medium as a heat transfer medium to flow through the condenser, the evaporator, and the turbine in this order; a bypass line for directing the organic medium discharged from the evaporator to the condenser while bypassing the turbine; a flow control valve for adjusting a ratio between a bypass flow rate of the organic medium flowing through the bypass line and a main flow rate which is a flow rate of the organic medium flowing into the turbine; an induction generator coupled to the turbine; a switching device configured to switch between an enabling state that enables conduction between the induction generator and a power grid and a prohibiting state that prohibits the conduction; Controller and Equipped with The induction generator is provided in parallel with a main generator that constitutes the power system and has a larger capacity than the induction generator, The controller: a turbine start-up control unit for increasing the main flow rate by controlling an opening degree of the flow regulating valve; a generator motoring control unit for switching the switching device from the prohibited state to the permitted state when a rotation speed of the induction generator, which is increased by the aperture control of the turbine start-up control unit, reaches a target rotation speed; and a turbine speed increase control unit for adjusting an opening degree of the flow regulating valve to further increase the main flow rate so that the rotational speed of the induction generator exceeds a synchronous rotational speed that is higher than the target rotational speed after the switching device is switched to the permitted state; A power generation system comprising:
Citation Information
Patent Citations
Waste heat utilization method, waste heat utilization system and treatment method of boiler exhaust gas
JP2014009624A
Compressor system and waste heat recovery power generation method
JP2017129076A
Binary power generation device and binary power generation method
JP2020002892A
Exhaust heat recovery power generator and ship provided with exhaust heat recovery power generator
JP2011231636A