Tuyere breaking / inspection machine and copper converter therewith as well as copper smelting method
The tuyere breaking and inspection machine with a mechanical punching machine and infrared thermometer addresses tuyere clogging and refractory wear by removing solidified material and managing air cooling, ensuring efficient operation and extended converter life.
Patent Information
- Application Number
- JP2023054571
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-30
- Publication Date
- 2024-10-11
AI Technical Summary
The existing technologies face challenges in efficiently removing solidified material from tuyeres in copper converters, leading to clogging and significant wear of tuyere refractories, which can cause operational interruptions and reduce the life of the converter.
A tuyere breaking and inspection machine equipped with a mechanical punching machine and an infrared thermometer to detect and remove solidified material, coupled with a control system to manage air cooling based on temperature data, preventing tuyere clogging and refractory wear.
The system effectively prevents tuyere clogging and refractory wear, allowing for scheduled maintenance and extending the life of the copper converter by detecting wear before critical temperature thresholds are reached.
Smart Images

Figure 2024142434000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a tuyere opening and inspection machine, a copper converter facility equipped with the tuyere opening and inspection machine, and a copper smelting method. [Background technology]
[0002] In non-ferrous metal smelting, raw materials containing the target metal are first smelted in a dry smelting process to concentrate the target metal, and then electrolytically treated in a hydrometallurgical process to produce a high-purity target metal. For example, in copper smelting, first, in a dry copper smelting process, the main raw material, copper concentrate with a copper content of about 20 to 30%, is processed in a smelting furnace, a converter, and a refining furnace in sequence to produce refined crude copper with a copper content of about 99%, and then, in a hydrometallurgical process, an anode obtained by casting the refined crude copper and a separately prepared cathode are charged into an electrolytic cell to perform electrolytic refining, producing electrolytic copper with a copper content of 99.99% as the final product.
[0003] More specifically, in the dry copper smelting process, copper concentrate and flux are charged into a smelting furnace, such as a flash furnace, and melted and oxidized to separate and remove impurities mainly composed of Fe as slag (also called slag), producing matte (also called kawa) with a copper content of about 60 to 70%. This matte is charged into a converter, which is a substantially cylindrical container that is supported horizontally and rotatably, via a ladle and further oxidized to produce crude copper with a copper content of about 98%. This crude copper is charged into a refining furnace to remove impurities such as oxygen, producing refined crude copper with a copper content of about 99%. The slag separated and removed in the flash furnace contains a small amount of matte, and is transferred to a refining furnace via a ladle to recover copper.
[0004] Among the above series of processes, the converter process is a two-stage batch operation: a can-making stage (also called a can-making process) in which converter slag (also called converter slag) generated by oxidizing iron sulfide contained in matte is extracted and white copper sulfide is left in the furnace, and a copper-making stage (also called a copper-making process) in which the white copper is oxidized to produce metallic copper. That is, in the can-making stage, air or oxygen-enriched air is blown into matte with a copper content of about 60 to 70% received from the flash smelting furnace to oxidize the iron sulfide contained in the matte, and Fe-SiO2-based converter slag is produced together with a flux mainly composed of SiO2 added separately. This converter slag is separated to the upper layer of the converter by gravity, and the converter slag is extracted from the throat by tilting the converter, leaving white copper with a copper content of about 70 to 80% containing almost no iron in the converter. In the copper-making stage that follows the converter slag-making stage, air or oxygen-enriched air is blown into the slag remaining after the converter slag is removed to oxidize the copper sulfide contained in the slag, producing blister copper.
[0005] In the above-mentioned can-making and copper-making stages, air or oxygen-enriched air is blown through a plurality of tuyere holes made of metal pipes arranged in a row along the rotation axis of the straight body of the substantially cylindrical furnace body, in order to disperse the air or oxygen-enriched air and make it contact efficiently with the fluid matte or white ash, also called molten metal. These tuyere holes are arranged below the liquid level of the molten metal in the converter furnace body, penetrating the shell and refractories of the furnace body. For this reason, during the batch operation in the can-making and copper-making stages, the molten metal present at the tips of the tuyere holes may be cooled and solidified by the air or oxygen-enriched air, and may adhere to the tips of the tuyere holes as solidified matter. If this state is left as it is, the solidified matter will gradually grow and eventually clog the tips of the tuyere holes, making it difficult to blow the air or oxygen-enriched air through the tuyere holes.
[0006] In order to prevent the above-mentioned clogging of the multiple tuyere, Patent Document 1 discloses a technique of providing a device called a tuyere opening machine or mechanical punching machine adjacent to the converter, which is equipped with a mechanism for reciprocating a metal round bar called a punching rod, which has a diameter smaller than the inside diameter of each tuyere, using, for example, a cylinder that uses compressed air. This makes it possible to insert the punching rod into the tuyere so that its tip protrudes slightly from the tip opening of each tuyere, making it possible to remove the solidified material adhering to the tip of the tuyere (hereinafter also referred to as opening). [Prior art documents] [Patent documents]
[0007] [Patent Document 1] JP 2015-067840 A Summary of the Invention [Problem to be solved by the invention]
[0008] As described above, since air or oxygen-enriched air is blown in from the tuyere, the molten material present in the vicinity of the tip of the tuyere is likely to undergo a concentrated oxidation reaction with the air or oxygen-enriched air, and as a result, the refractory material in the part of the converter through which the tuyere penetrates (hereinafter also referred to as tuyere refractory material) tends to be significantly worn out by the oxidation reaction accompanied by heat. Therefore, as the number of batch operations of the converter is increased, the shell part of the converter in the region lined with the tuyere refractory material may become red hot.
[0009] When the shell of the converter becomes red-hot as described above, there is a risk of the shell being damaged, so the converter operation must be immediately stopped and the converter refractory must be repaired. This can result in problems such as a decrease in copper smelting production and a shortened converter life. Therefore, there has been a demand for a technology that can grasp the extent of wear in the tuyere refractory before the shell becomes red-hot, so that operation can be stopped and repairs can be carried out as planned as possible.
[0010] The present invention has been made in consideration of the above circumstances, and has an object to provide a tuyere opening and inspection machine which prevents the clogging of multiple tuyere of an operating copper converter by operating a mechanical punching machine during batch operation in order to remove solidified material adhering to the tips of the tuyere, and which makes it possible to reliably and efficiently grasp the degree of wear of the tuyere refractory lining the shell parts at the points where the multiple tuyere pass through before the shell parts become red-hot, as well as a copper converter equipment equipped with the same, and a copper smelting method using the copper converter equipment. [Means for solving the problem]
[0011] In order to achieve the above-mentioned object, the tuyere opening and inspection machine of the present invention is a tuyere opening and inspection machine that breaks open solidified materials adhering to the tips of a plurality of tuyere arranged in a row along the direction of the rotation axis of a copper converter consisting of a rotatably supported horizontal cylindrical container, and inspects the wear state of tuyere refractory material, and is characterized by having: a carriage that can travel back and forth in the direction of the rotation axis at the side of the copper converter; a mechanical punching machine placed on the carriage and consisting of a punching rod to be inserted into the plurality of tuyere and a cylinder for reciprocating said punching rod; an infrared thermometer mounted on the carriage and measuring the temperature of the points on the shell of the copper converter where the plurality of tuyere pass; a transmitter that wirelessly transmits the measured temperature data; and a receiver that receives the temperature data transmitted from the transmitter.
[0012] A copper converter facility according to the present invention is characterized by comprising the above-mentioned tuyere opening and inspection machine and a copper converter.
[0013] Furthermore, the copper smelting method according to the present invention is a copper smelting method which involves breaking open and inspecting a plurality of tuyere arranged in a row along the direction of the rotation axis of a copper converter consisting of a rotatably supported horizontal cylindrical vessel, characterized in that a cart is moved from one end to the other in the direction of the rotation axis by repeatedly running and stopping at the side of the copper converter, and a mechanical punching machine is used to break open the solidified material in one or more of the plurality of tuyere, and an infrared thermometer is used to measure the temperature of the tuyere penetration point in the shell of the copper converter for one or more of the tuyere in accordance with the timing of the breaking open, and a degree of wear of the tuyere refractory is determined based on the measured temperature data. Effect of the Invention
[0014] According to the present invention, it is possible to prevent the clogging of a plurality of tuyere in an operating copper converter, and it is also possible to reliably and efficiently grasp the degree of wear of the tuyere refractory lining the penetration points of the plurality of tuyere and the surrounding areas before the shell portion becomes red hot. [Brief description of the drawings]
[0015] [Figure 1] FIG. 1 is a perspective view of a copper converter facility according to an embodiment of the present invention. [Diagram 2] 2 is a side view of a tuyere opening and inspection machine constituting the copper converter facility of FIG. 1 and a cross-sectional view of the tuyere portion of the copper converter. FIG. [Diagram 3] FIG. 2 is a cross-sectional view showing a state in which a tuyere refractory of a copper converter constituting the copper converter facility of FIG. 1 has been worn out. [Figure 4] FIG. 2 is a configuration diagram of a control system controlled by a control means of the copper converter facility according to the embodiment of the present invention. [Diagram 5] 5 is a flowchart showing a control algorithm of the control system in FIG. 4. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0016] Hereinafter, an embodiment of the tuyere opening and inspection machine according to the present invention will be described. First, a copper converter facility equipped with the tuyere opening and inspection machine according to the embodiment of the present invention will be described with reference to FIG. 1. The copper converter facility shown in FIG. 1 comprises a copper converter 1 and a tuyere opening and inspection machine 2 having a mechanical punching machine, and the operation of the copper converter 1 is controlled in a control room 3. The copper converter 1 comprises a furnace body 11 composed of a horizontally placed cylindrical shell part and a refractory material lining the shell part, a pair of converter tires 12 concentrically provided on the outside of the furnace body 11, and a receiving roller 13 that rotatably supports the furnace body 11 via the converter tires 12. A furnace mouth 14 serving as an inlet and outlet for the molten material is provided at the center of the rotation axis direction of the furnace body 11, and a plurality of tuyere ports 15 are provided in a row along the rotation axis direction in the straight body part of the furnace body 11. As a result, the copper converter 1 can be freely rotated around the rotation axis O as shown by the white arrow, and by tilting the copper converter 1, the converter slag and blister copper generated in the furnace can be discharged from the furnace throat 14.
[0017] On the other hand, as shown in FIG. 2, the tuyere opening / inspection machine 2 comprises a carriage 22 capable of reciprocating on a track 21 laid parallel to the rotation axis O at the side of the copper converter 1, a mechanical punching machine 23 mounted on the carriage 22, an operator's cab 24 in which an operating means for operating the mechanical punching machine 23 is provided, an infrared thermometer 25 for measuring the temperature of the points in the shell of the copper converter 1 where the multiple tuyere 15 penetrate, a transmitter 26 for wirelessly transmitting the measured temperature data, a receiver 27 for receiving and outputting the temperature data transmitted from the transmitter 26, and an air release piping 31 such as a steel pipe equipped with a valve 30 that is used depending on the degree of wear of the tuyere refractory determined on the basis of the temperature data input from the receiver 27.
[0018] With the above-mentioned configuration, it is possible to prevent the multiple tuyere 15 of the copper converter 1 from being blocked by solidified material, and when the temperature of the multiple tuyere 15 in the shell part of the copper converter 1 exceeds a predetermined threshold, for example, an alarm can be issued in the control room 3 as necessary, and an open signal can be output to the valve 30 to release air from the air release pipe 31 toward the tuyere 15 having a temperature exceeding the threshold to cool it. As a result, it is possible to reliably and efficiently detect wear of the tuyere refractory lining the penetration point of the tuyere 15 and its surrounding area in the shell part of the furnace body 11 of the copper converter 1 before the shell part becomes red hot, and as a result, the life of the copper converter 1 can be extended.
[0019] That is, in the past, it was not possible to grasp the progress of wear of the tuyere refractory C unless the penetration point P of the tuyere 15 in the shell part S of the furnace body 11 became red-hot. Therefore, when the penetration point of the tuyere 15 becomes red-hot, the tuyere refractory C is often already significantly worn as shown in FIG. 3, and if left unattended, the shell part S may be damaged. Therefore, it is necessary to immediately stop the operation of the copper converter and repair it, and the progress of wear of the tuyere refractory until it becomes red-hot adversely affects the life of the copper converter. In contrast, by adopting the tuyere opening and inspection machine 2 according to the embodiment of the present invention described above, the progress of wear of the tuyere refractory can be detected at an early stage and repaired, so that the operation can be stopped in a planned manner so as to minimize the adverse effect on productivity, and the life of the copper converter can be prevented from being shortened.
[0020] The mechanical punching machine 23 may be one that reciprocates one punching rod with one cylinder, but it is preferable to simultaneously reciprocate multiple punching rods arranged in parallel with one cylinder, since this increases the work efficiency. Note that, although an example in which four punching rods are reciprocated with one cylinder is shown in Fig. 1, the number of punching rods is not limited to four.
[0021] As described above, when there is one punching rod, the carriage 22 is moved intermittently so that the tip of the punching rod faces the multiple tuyere 15 one by one in sequence, and the punching rod is reciprocated at each stop position to remove the adhering coagulated material. On the other hand, when there are, for example, four punching rods, the carriage 22 is moved intermittently so that the tip of a set of four punching rods faces the multiple tuyere 15 one by one in sequence, and the four punching rods are reciprocated at each stop position to remove the coagulated material from all four tuyere at once. In this way, if there are multiple punching rods, it is possible to perform the breaking-through work on multiple tuyere at once, which significantly improves the work efficiency.
[0022] In the case where there are multiple punching rods, the carriage 22 may be moved by the number of punching rods so as to face the multiple tuyere 15 in sequence in the number of punching rods as described above, or may be moved by a number less than the number of punching rods in order to perform the breaking-through work multiple times with the multiple punching rods for each of the multiple tuyere 15 as necessary. For example, when the mechanical punching machine 23 has four punching rods as shown in FIG. 1, the carriage 22 may be moved by the number of two punching rods at a time, so that the breaking-through work can be performed twice for each tuyere with different punching rods. In this case, the work efficiency is lower than that of the above method, but the attached solidified matter can be removed more reliably.
[0023] While the above-mentioned breaking-through work is being performed, the infrared thermometer 25 measures the temperature of the penetration points of the tuyere 15 in the shell part where the breaking-through work is being performed. In this case, it is preferable that the number of penetration points of the tuyere 15 measured at one time by the infrared thermometer 25 is within a range of 4 to 8. By limiting the number of points at which the temperature is measured at one time to 8 or less, it is possible to obtain highly accurate temperature data. Furthermore, by limiting the number of points at which the temperature is measured at one time to 4 or more, it is possible to avoid the problem that some of the penetration points of the multiple tuyere 15 are not subjected to temperature measurement, even when the carriage 22 is moved by the number of punching rods of the mechanical punching machine 23 as described above.
[0024] The infrared thermometer 25 is preferably provided in the operator's cab 24. The reason for this is that the atmosphere in which the tuyere opening and inspection machine 2 is provided is filled with dust particles originating from various raw materials charged into the copper converter 1 through the throat 14 of the copper converter 1 and dust particles accompanying the exhaust gas discharged from the throat 14 of the copper converter 1 during operation, and this is to avoid adverse effects such as breakdowns caused by such dust particles.
[0025] In addition, the infrared thermometer constituting the infrared temperature measuring device 25 is preferably provided with a cover on the lens to prevent the above-mentioned dust, and further, it is preferable that air is constantly or periodically blown onto the surface of the cover. This makes it possible to make the infrared thermometer less susceptible to the adverse effects of radiant heat, and also to prevent dust from adhering to the surface of the cover.
[0026] Next, a copper smelting method using the tuyere breaking and inspection machine according to the embodiment of the present invention will be described. In the copper smelting method according to the embodiment of the present invention, the cart 22 is moved from one end of the copper converter 1 to the other end by repeatedly running and stopping a certain distance along a track 21 laid parallel to the rotation axis O at the side of the copper converter 1. Then, at each stopping position, one or more punching rods of the mechanical punching machine 23 are used to break open one or more tuyere 15 arranged in a row along the rotation axis O direction in the straight body part of the furnace body 11 of the copper converter 1. This makes it possible to sequentially remove solidified materials adhering to the tips of the multiple tuyere 15.
[0027] In the copper smelting method according to the embodiment of the present invention, the temperature of the tuyere 15 of the shell of the copper converter 1 is measured by an infrared thermometer 25 at the point where the tuyere 15 penetrates the shell of the copper converter 1 in accordance with the timing of the opening of one or more tuyere 15 of the copper converter 1. Then, the temperature data measured by the infrared thermometer 25 is wirelessly transmitted to a receiver 27 provided in the control room 3 by a transmitter 26. The receiver 27 outputs the received temperature data to a control means 28. The control means 28 controls the control system shown in FIG. 4 based on the temperature data input from the receiver 27. The control system shown in FIG. 4 is controlled by a control algorithm shown in FIG. 5. That is, when the temperature data measured by the infrared thermometer 25 exceeds a predetermined upper limit value, an open signal is output to a valve 30 of the air discharge pipe, and air is blown to the tuyere 15 penetrating point of the shell of the copper converter 1 to cool it. Furthermore, in the absence of the control system, the temperature data may be displayed in a graph or table, and after an operator determines that the upper limit has been exceeded, the valve of the air release pipe may be opened to blow air against the point in the shell of the copper converter 1 where the tuyere 15 penetrates, thereby cooling the temperature.
[0028] When blowing air onto the tuyere penetration point in the shell part of the copper converter 1 as described above, it is preferable to provide a metal air discharge pipe 31 such as a steel pipe parallel to the rotation axis O of the copper converter 1 above the part of the tuyere that protrudes outward from the shell part as shown in Fig. 2, and to discharge air towards the tuyere penetration point from a through hole previously drilled in the pipe 31. The reason for using a metal pipe as described above is that the temperature of the shell part may exceed 400°C.
[0029] 1 shows an example in which only one air discharge pipe 31 is provided for all of the multiple tuyere 15, but the present invention is not limited to this. For example, the air discharge pipe 31 and the valve 30 may be provided for one or more tuyere that are collectively breached by the mechanical punching machine 23. The air discharge pipe 31 may be placed above the portions of the multiple tuyere that protrude outward from the shell portion as described above, or may be suspended below the protruding portions of the multiple tuyere. Either case is preferable because it can be easily installed and the multiple tuyere portions can be efficiently cooled.
[0030] During the can-making period, the operation using the above-mentioned tuyere opening and inspection machine 2 is preferably carried out between 5 minutes after the start of batch operation and the end of the can-making period. On the other hand, during the copper-making period, in order to melt the waste copper raw materials charged before the batch operation in the copper-making period, it is preferable to carry out the operation between 15 minutes after the start of batch operation and the time when the waste copper raw materials are recharged through the furnace throat, or between 20 minutes before the end of batch operation when the furnace temperature rises toward the end of the batch operation. EXAMPLES
[0031] Copper smelting operations were carried out using a copper converter facility consisting of a copper converter 1 having a horizontal cylindrical furnace body as shown in Figure 1, and a tuyere opening and inspection machine 2 having a structure in which a mechanical punching machine 23 is mounted on a cart 22 that travels in the direction of the rotation axis O of the copper converter 1. The tuyere opening and inspection machine 2 is equipped with an infrared thermometer 25 that measures the temperature of the penetration points of the shell part of four tuyere 15, which are collectively opened by the mechanical punching machine, out of the multiple tuyere 15 arranged in a horizontal row in the shell part of the copper converter 1, and a transmitter 26 that wirelessly transmits the temperature data measured by the infrared thermometer 25 to a receiver 27 installed in the control room 3. In the control room 3, when the temperature data input from the receiver 27 exceeds 400°C, air is blown onto the penetration points of the corresponding tuyere in the shell part to cool it.
[0032] For the cooling by air, an iron air discharge pipe 31 was installed above all the tuyere arranged in a row on the shell part. An air discharge hole was drilled in advance in each air discharge pipe 31 at a position facing the shell part. Compressed air was introduced from an air supply source through a valve 30 installed on the air discharge pipe 31. The copper converter 1 was operated in batches consisting of two can-making periods for producing converter slag and a copper-making period for producing blister copper. In the first can-making period, 140 to 170 tons of copper was accepted, and in the next can-making period, 60 to 90 tons of copper was accepted. The above batch operation was carried out in two campaigns. Here, the campaign refers to the entire operation from starting the operation of a converter after the furnace repair was completed, performing multiple batch operations, and ending the operation due to the wear of the tuyere refractory, until the furnace repair was started.
[0033] As a comparative example, ten campaigns of batch copper smelting operations were carried out in the same manner as in the example, except that the carriage on which the mechanical punching machine was mounted was not equipped with an infrared thermometer for measuring the temperature at the point where the tuyere penetrated in the shell of the copper converter 1, nor with a transmitter for transmitting the temperature data measured by the infrared thermometer, and no receiver for receiving the temperature data was provided in the control room.
[0034] As a result, in the working example, when batch operation had been performed for an average of 71% of the entire campaign, it was detected that the temperature of the shell part of the copper converter to which the tuyere was attached exceeded 400°C, so cooling of that part with air was started, and thereafter, while continuing this cooling, the remaining 29% of the batch operation was performed, and then, furnace repair of the converter was started. On the other hand, in the comparative example, when batch operation had been performed for an average of 91% of the entire campaign, red heat was detected in the shell part of the copper converter to which the tuyere was attached, so cooling of that part with air was started, and thereafter, while continuing this cooling, the remaining 9% of the batch operation was performed, and then, furnace repair of the converter was started.
[0035] As described above, in the embodiment, the temperatures of all the penetration points of the multiple tuyere during operation of the mechanical punching machine of the copper converter could be efficiently measured. As a result, in the embodiment, it was possible to accurately detect when the temperature of the penetration point of the tuyere exceeded the predetermined threshold value of 400°C, so that it became possible to cool the penetration point of the tuyere at an early timing, and the campaign life of the converter could be extended by an average of 6% compared to the comparative example. [Explanation of symbols]
[0036] 1 Copper converter 2 Tuyere opening and inspection machine 3. Control Room 11 Furnace body 12 Converter tires 13 Support roller 14 Hearth 15 Tuyere 21 orbit 22 Trolley 23 Mechanical Punching Machine 24 Cab 25 Infrared thermometer 26 Transmitter 27 Receiver 28 Control Means 30 Valve 31 Air release pipe C Tuyere refractory P Penetration point S Shell part
Claims
1. 1. A tuyere breaking-opening and inspection machine for breaking open solidified materials adhering to the tips of a plurality of tuyere arranged in a row along the direction of the rotation axis of a copper converter consisting of a rotatably supported horizontal cylindrical container, and for inspecting the wear state of tuyere refractory material, the machine comprising: a carriage capable of reciprocating in the direction of the rotation axis at the side of the copper converter; a mechanical punching machine placed on the carriage and comprising a punching rod to be inserted into the plurality of tuyere and a cylinder for reciprocating said punching rod; an infrared thermometer mounted on the carriage for measuring the temperature of the shell portion of the copper converter at the points where the plurality of tuyere pass; a transmitter for wirelessly transmitting the measured temperature data; and a receiver for receiving the temperature data transmitted from the transmitter.
2. 2. The tuyere breaking and inspection machine according to claim 1, wherein the infrared thermometer is provided in a cab mounted on the bogie.
3. The tuyere breaking and inspection machine of claim 2 further comprises a metal pipe provided above the portion of the plurality of tuyere that protrudes outward from the shell portion and having a through hole that opens toward the penetration points of the plurality of tuyere, and when the degree of wear exceeds a predetermined limit, air is blown toward the penetration points of the tuyere through the metal pipe.
4. A copper converter facility comprising a copper converter and the tuyere opening and inspection machine according to any one of claims 1 to 3.
5. 1. A copper smelting method involving breaking open and inspecting a plurality of tuyere holes arranged in a row along the direction of a rotation axis of a copper converter consisting of a rotatably supported horizontal cylindrical vessel, the method comprising: moving a cart from one end to the other end by repeatedly running and stopping it in the direction of the rotation axis beside the copper converter; breaking open solidified material for one or more of the plurality of tuyere holes using a mechanical punching machine; measuring the temperature of the tuyere penetrating point on the shell part of the copper converter for one or more of the tuyere holes with an infrared thermometer in accordance with the timing of the breaking open; and determining the degree of wear of the tuyere refractory material based on the measured temperature data.
6. 6. The copper smelting method according to claim 5, characterized in that, when the degree of wear determined based on the temperature data measured by the infrared thermometer exceeds a predetermined limit, air is blown onto a portion of the shell part of the copper converter through which the one or more tuyere(s) pass.