Control system and positioning method for crane
The integration of satellite positioning and inclination angle calibration in crane control systems addresses the accuracy limitations of angle meters, enabling precise positioning and reducing swinging of suspended loads.
Patent Information
- Application Number
- JP2023054873
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-30
- Publication Date
- 2024-10-11
AI Technical Summary
Existing automatic crane control systems face limitations in accurately positioning the tip of the jib due to the accuracy constraints of angle meters, and methods like Patent Document 1 do not address precise alignment of the suspension fulcrum and hanging tool, leading to potential swinging of suspended loads.
A control system incorporating a satellite positioning system with GPS devices at the tip and load, combined with an inclination angle detection and calibration unit to adjust the position of the crane's support parts, allowing for precise control of the jib tip by determining the turning center and deriving correction values for angle detection.
Enhances the accuracy of positioning the crane's support parts, reducing swinging and improving safety by ensuring precise alignment and control, even in conditions where GPS positioning may be insufficient.
Smart Images

Figure 2024142641000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a control system for a crane having a rotating bed and a support extending therefrom, and to a position adjustment method for such a crane. [Background technology]
[0002] Patent Document 1 discloses a crane alignment method for aligning a crane's hoisting tool and a fulcrum supported by a hoisting member of the hoisting tool. This method includes a connection step of connecting the hoisting tool to a suspended load with a first positioning unit that measures the position provided on the fulcrum side and a second positioning unit that measures the position provided on the hoisting tool side, an alignment step of aligning the position between the fulcrum and the hoisting tool by comparing the position based on the first positioning unit with the position based on the second positioning unit, and a lifting step of hoisting the load with the hoisting tool after the alignment step is completed. According to the description in Patent Document 1, in the alignment process of this method, the position based on the first positioning unit is compared with the position based on the second positioning unit to align the suspension point and the suspension device, thereby making it possible to accurately reduce the amount of misalignment between the suspension point and the suspension device. Since the load is lifted by the suspension device in the lifting process with the amount of misalignment between the suspension point and the suspension device thus reduced, the occurrence of swaying of the load can be suppressed. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2020-169087 A Summary of the Invention [Problem to be solved by the invention]
[0004] In recent years, the practical application of automatic crane control has become more widespread in order to improve workability. In automatic crane control, for example, the position of the tip of the jib from which the hoisting equipment hangs can be adjusted using the inclination angle of the jib detected by a goniometer. However, there is a limit to the accuracy of the goniometer, and further improvement in the accuracy of the positioning of the tip of the jib, i.e., the hoisting equipment, in automatic crane control is desired.
[0005] Meanwhile, position control of various devices using satellite positioning systems such as GPS, i.e. Global Navigation Satellite System (GNSS), has been widely used in recent years, and its accuracy has improved. Therefore, by utilizing a satellite positioning system for position control of a crane, it is expected that the tip of the jib can be positioned more accurately.
[0006] The method of Patent Document 1 is merely aimed at aligning the suspension support point and the suspension tool by comparing the position based on the first positioning unit with the position based on the second positioning unit, thereby reducing the amount of deviation between the suspension support point and the suspension tool. In other words, the method of Patent Document 1 is not aimed at accurate position control of the suspension tool, and has problems.
[0007] An object of the present invention is to provide a configuration that enables more accurate position control of the tip of a support part, such as a jib, extending from a rotating body, for example, a rotating base, of a crane using a satellite positioning system. [Means for solving the problem]
[0008] In order to achieve the above object, the first aspect of the present invention is A control system for a crane, comprising: a positioning unit of a satellite positioning system provided at a tip of a support part extending from a rotating body on a base part, the tip being connected to a sling device by a rope hanging down from the tip; a tilt angle detection unit that detects a tilt angle of the support portion; a calibration unit that adjusts the position control of the tip of the support unit; Equipped with The calibration unit includes: determining a rotation center of the rotating body based on position information of the tip end based on an output of the positioning unit when the rotating body rotates within a predetermined rotation range in which the support unit is held at a predetermined inclination angle; and deriving an output correction value of the tilt angle detection unit based on an output of the tilt angle detection unit when the tip end is positioned at a position that is a predetermined distance away from the turning center based on an output of the positioning unit. to provide.
[0009] Preferably, deriving the output correction value of the inclination angle detection unit includes deriving the output correction value of the inclination angle detection unit based on the output of the inclination angle detection unit when the tip end is positioned at a position a first predetermined distance away from the center of rotation based on the output of the positioning unit, and the output of the inclination angle detection unit when the tip end is positioned at a position a second predetermined distance away from the center of rotation based on the output of the positioning unit.
[0010] Preferably, the control system further includes an automatic control unit configured to automatically control the rotating body and the support unit.
[0011] A second aspect of the present invention is A position adjustment method for a crane having a rotating body on a base and a support part having a hoist connected to a rope extending from the rotating body and hanging down from a tip part, comprising the steps of: determining a rotation center of the rotating body based on position information of the tip portion based on an output of a positioning unit of a satellite positioning system provided at the tip portion when the rotating body rotates within a predetermined rotation range with the support portion held at a predetermined tilt angle; deriving an output correction value of the tilt angle detection unit based on an output of the tilt angle detection unit that detects the tilt angle of the support unit when the tip end is positioned at a position that is a predetermined distance away from the center of rotation based on an output of the positioning unit; The present invention provides a method comprising: Effect of the Invention
[0012] According to the first or second aspect of the present invention, each of the above-mentioned configurations is provided, making it possible to use a satellite positioning system to more accurately control the position of the tip of a support in a crane that has a rotating body and a support extending therefrom. [Brief description of the drawings]
[0013] [Figure 1] 1 is a schematic configuration diagram of a crane according to an embodiment of the present invention. FIG. [Diagram 2] FIG. 2 is a block diagram showing a control system for the crane of FIG. 1. [Diagram 3] FIG. 2 is a schematic plan view of the crane of FIG. 1 as seen from above. [Figure 4] 2 is a flowchart relating to the control of the crane in FIG. 1. [Diagram 5] FIG. 2 is a schematic diagram for explaining a non-operator detection system in the crane of FIG. 1. [Figure 6] 2 is a flowchart relating to the control of the crane in FIG. 1. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0014] Hereinafter, an embodiment of the present invention will be described with reference to the accompanying drawings. The same components (or configurations) are denoted by the same reference characters, and also have the same names and functions. Therefore, detailed description thereof will not be repeated.
[0015] 1 shows a schematic diagram of a crane 10 according to one embodiment. The crane 10 has a post 14, a rotating base 16, a jib 18, a gantry 20, and a hoisting device (hook) 22. The crane 10 can lift a load W placed on a work surface, for example, the ground G, and move it to another location. The jib 18 is a support part.
[0016] The post 14 is a base, and here it is erected on the ground G, but it may be erected at another location, for example, on the top of a building. The post 14 is a columnar structure, and may be called a mast or a leg. The post 14 may be configured to have various heights, and may be, for example, a running body.
[0017] The swivel base 16 is an example of a rotating body, and is provided at the upper end of the post 14. Here, the swivel base 16 is rotatable about an axis C that is determined to extend vertically at the post 14. The axis C is not limited to being the axis of the post 14, and may be parallel to the axis of the post 14. A cab 23 is provided at the upper portion of the swivel base 16. The jib 18 is connected to the swivel base 16. The jib 18 is provided on the swivel base 16 so as to extend from a base end 18a on the swivel base 16 side.
[0018] The gantry 20 is erected on the rotating base 16. The gantry 20 extends straight vertically above the rotating base 16. The rotating base 16, a gantry top 20a which is the upper end of the gantry 20, and a tip end 18b of the jib 18 are supported by a wire rope WR1. The wire rope WR1 is wound and unwound by a winch 24, so that the jib 18 performs a raising and lowering operation with its base end 18a as a fulcrum. Note that although the gantry 20 is composed of one member here, it may be composed of a combination of multiple members, may have a mechanism in which multiple members move relatively to each other, or may be composed of a link mechanism.
[0019] In addition, the wire rope WR2 extends vertically downward from the tip 18b of the jib 18 with the tip 18b as a fulcrum, and a hoisting tool 22 is connected to the hanging tip of the wire rope WR2. The wire rope WR2 is wound up and unwound by the winch 26, so that the hoisting tool 22 moves up and down.
[0020] The hoisting tool 22 is a device that is connected to a load W to enable the load W to be hoisted by the crane 10. The hoisting tool 22 is a hook in this embodiment, and can be connected to a wire rope of the load W, for example.
[0021] FIG. 2 shows a block diagram of the control system 28 of the crane 10. The control system 28 includes a control device 30 provided in the cab 23. The control device 30 is a device that controls the entire crane 10. The control device 30 includes a processor (e.g., a CPU), a memory (e.g., a ROM, a RAM), a communication interface, and the like. In other words, the control device 30 is configured as a computer. The control device 30 realizes various functions, for example, by executing a program stored in the memory in the processor. The control device 30 may be configured from multiple computers. Furthermore, the control device 30 may be provided in a location other than the cab 23.
[0022] The control device 30 is connected to various sensors and receivers and is capable of communicating with them. For example, outputs from GPS positioning devices 32 and 34 are input to the control device 30. The GPS positioning device 32 is a positioning unit of the satellite positioning system, i.e., a first positioning unit, and is provided at the tip 18b of the jib 18. More specifically, the GPS positioning device 32 has a configuration for outputting a signal corresponding to the horizontal position, and is provided to acquire the position of the tip 18b, i.e., position information. The GPS positioning device 34 is a positioning unit of the satellite positioning system, i.e., a second positioning unit, and has a configuration for outputting a signal corresponding to the horizontal position, and is provided on the load W in this example. The GPS positioning device 34 is integrated into the mounting unit 33 together with a barometer 36, which is an example of a vertical position measuring unit, and is detachably attached to the load W. For example, the load W is a steel material, and the mounting unit 33 is detachably attached to the load W by the magnet of the mounting unit 33. The GPS positioning device 34 may be a component independent of the barometer 36 .
[0023] The GPS positioning devices 32 and 34 have the same configuration here, but may have different configurations. Each of the GPS positioning devices 32 and 34 is a device that measures its own position. The GPS positioning devices 32 and 34 are configured with a receiver for the Global Positioning System (GPS), which measures its position in the coordinate system on the earth by receiving signals from satellites, that is, a satellite signal receiver, and also include a communication unit that can communicate with the control device 30.
[0024] The GPS positioning devices 32 and 34 as satellite signal receivers receive signals from GPS satellites, which are multiple artificial satellites orbiting the Earth. The control device 30 acquires the respective positions, i.e., position information, based on the signals received by the GPS positioning devices 32 and 34. Note that the satellite positioning system, i.e., Global Navigation Satellite System (GNSS), is not limited to GPS. Position information may be detected based on signals from various satellite positioning systems. The GNSS is not limited to GPS and may include a Quasi-Zenith Satellite System, for example, the European "Galileo" and the Japanese "Michibiki" which is operated in conjunction with GPS.
[0025] The barometer 36 outputs a signal corresponding to the air pressure, in other words, a signal corresponding to the vertical position. Since the barometer 36 is provided on the suspended load W as described above, it outputs a signal corresponding to the vertical position of the suspended load W. Like the GPS positioning device 34, the barometer 36 also includes a communication unit capable of communicating with the control device 30. Note that the communication unit of the barometer 36 may be integrated into the communication unit of the GPS positioning device 34.
[0026] Furthermore, the jib 18 of the crane 10 is provided with a goniometer 37 for detecting the inclination angle θ thereof. Here, the goniometer 37 is provided at the base end portion 18a of the jib 18. Specifically, the goniometer 37 includes a collimator. The goniometer 37 also includes a communication unit capable of communicating with the control device 30. The output of the goniometer 37 is also input to the control device 30. The goniometer 37 corresponds to the inclination angle detection unit.
[0027] In addition to the GPS positioning devices 32, 34, the barometer 36, and the angle meter 37, an operation unit 38 and a display unit 40 are connected to the control device 30. The operation unit 38 is an operating lever, a switch, a touch panel, etc., and is provided in the driver's cab 23 together with the display unit 40.
[0028] Furthermore, a terminal device 42 is connected to the control device 30. The terminal device 42 is equipped with a processor (e.g., a CPU), a memory (e.g., a ROM, a RAM), a communication interface, etc., and is configured as a computer, and can be connected to the control device 30 via a network. Control information for the crane 10 can be input from this terminal device 42, and the control information is input to and acquired by the control device 30 via the terminal device 42. This allows the control device 30 to remotely control and automatically operate the crane 10.
[0029] The control device 30 controls the crane 10 based on information input from the GPS positioning devices 32, 34, the barometer 36, the angle meter 37, the operation unit 38, and the terminal device 42. The control device 30 realizes various functions by executing programs stored in the memory on a processor, and has the following functional modules. The control device 30 has, as its functional modules, an information acquisition unit 301, a hoisting device control unit 303 having an automatic control unit 3031 and a calibration unit 3033, a safety support unit 305, and a non-operator detection unit 307. The safety support system S is configured with this safety support unit 305.
[0030] The information acquisition unit 301 acquires horizontal position information based on the output of the GPS positioning devices 32, 34, atmospheric pressure information as vertical position information based on the output of the barometer 36, the tilt angle θ of the jib 18 based on the output of the goniometer 37, information input from the operation unit 38, and information input from the terminal device 42. Then, the information acquisition unit 301 stores the acquired information in a memory or transmits it to another functional module.
[0031] The hoisting tool control unit 303 transmits a command signal to the drive unit 44 of the crane 10 based on information input from, for example, the operation unit 38 and the terminal device 42. The drive unit 44 drives each drive mechanism of the crane 10 by receiving a command signal from the control device 30. The drive unit 44 includes a motor for rotating the rotating base 16, a winch 24 for raising and lowering the jib 18, and a winch 26 for moving the hoisting tool 22 up and down. The winch 24 for raising and lowering the jib 18 includes a motor for winding and unwinding the wire rope WR1, and the winch 26 for moving the hoisting tool 22 up and down includes a motor for winding and unwinding the wire rope WR2.
[0032] As described above, the hoisting device control unit 303 includes the automatic control unit 3031. The automatic control unit 3031 is configured to automatically control the swivel base 16 and the jib 18 in response to an automatic control command from the operation unit 38 or the terminal device 42. The automatic control unit 3031 can also automatically control the hoisting device 22 so as to position the load W at a predetermined position based on inputs from the GPS positioning device 34 and the barometer 36 provided on the load W. The automatic control unit 3031 transmits a command signal to the drive unit 44 so as to automatically control the position of the tip 18b of the jib 18 based on the value of the pulse counter of the swivel motor of the swivel base 16 and the output of the angle meter 37.
[0033] In this automatic control, when the tip 18b of the jib 18 is positioned at a target position, the swivel base 16 is rotated so as to direct the jib 18 to the target position, and a command signal is output to the drive unit 44 so as to set the inclination angle θ of the jib 18, which is correlated with the position of the tip 18b of the jib 18, to a target angle corresponding to the target position. As described above, the angle meter 37 is provided at the base end 18a of the jib 18 for measuring the inclination angle θ of the jib 18. Therefore, in order to more accurately control the position of the tip 18b in the automatic control, it is necessary to set the center of rotation of the swivel base 16 and adjust the detection value based on the output of the angle meter 37, that is, to perform calibration. For this calibration, the hoisting device control unit 303 is provided with the calibration unit 3033, as described above.
[0034] Here, the calibration by the calibration unit 3033 will be described with reference to FIG. 1 to FIG.
[0035] The calibration unit 3033 of the control device 30 may operate at a predetermined timing before the start of automatic control of the crane. For example, when an automatic control command is received, the calibration unit 3033 operates first, and then the automatic control unit 3031 operates. The calibration unit 3033 first determines the position of the axis C. Specifically, the calibration unit 3033 determines the position of the rotation center of the rotating base 16, that is, the axis C, based on the position information of the tip 18b based on the output of the GPS positioning device 32 when the rotating base 16, in which the jib 18 is held at a predetermined tilt angle, rotates within a predetermined rotation range. The tilt angle θ of the jib 18 is set to a predetermined tilt angle, for example, 30°, 45°, etc. (see FIG. 1). Note that this predetermined tilt angle is arbitrary and may be the same or different each time. At this time, the jib 18 is held at a predetermined rotation position. The predetermined rotation position can be, for example, as shown in FIG. 3, a position at 90° clockwise when the upper side is set as 0° around the axis C, but is not limited thereto. When the inclination angle θ of the jib 18 becomes the predetermined inclination angle and the jib 18 is held so that the tip end 18b of the jib 18 faces the predetermined rotation position, the output of the GPS positioning device 32 of the tip end 18b of the jib 18 is acquired. Then, while the inclination angle θ of the jib 18 is fixed at the predetermined inclination angle, the swivel base 16 is rotated in a predetermined rotation range δ (see arrow A1 in FIG. 3). For example, the predetermined rotation range δ can be a range of 180° from 0° to 180° around the axis C in FIG. 2, and may be a range of 90°, a range of 270°, a range of 360°, or any other range. The output of the GPS positioning device 32 during the rotation of the swivel base 16 within the predetermined rotation range δ is acquired by the calibration unit 3033 via the information acquisition unit 301. As a result, trajectory information of the tip end 18b of the jib 18 within the predetermined rotation range δ is acquired, and a predetermined calculation is performed to calculate the center of the trajectory of the tip end 18b as an arc. As a result, the calculated center is determined as the rotation center of the swivel base 16, that is, the position of the axis C.
[0036] Then, the calibration unit 3033 calculates position information of a position at a predetermined distance from the rotation center of the swivel base 16, that is, the position of the axis C, and moves the jib 18 so that the position based on the output of the GPS positioning device 32 of the tip end 18b coincides with the position of the position information. At this time, the swivel base 16 may also be moved. Then, the output of the angle meter 37 is obtained when the position based on the output of the GPS positioning device 32 of the tip end 18b coincides with a position at a predetermined distance from the position of the axis C. The control device 30 has in advance information such as the relationship between the tilt angle θ based on the output of the angle meter 37 and the length from the axis C to the GPS positioning device 32. Therefore, the tilt angle based on the output of the angle meter 37 when the position based on the output of the GPS positioning device 32 of the tip end 18b coincides with a position at a predetermined distance from the position of the axis C is combined with the relationship between the tilt angle θ based on the output of the angle meter 37 and the length from the axis C to the GPS positioning device 32 to perform a predetermined calculation, thereby deriving the output correction value of the angle meter 37. For example, when the specified distance corresponds to an inclination angle of 30° and an inclination angle of 31° is detected based on the output of the goniometer 37, there is a difference between them of 1° inclination angle, and therefore a correction value for correcting that 1° inclination angle is derived.
[0037] After the position of the center of rotation of the swivel base 16, i.e., the axis C, is determined, the output correction value based on the output of the angle meter 37 may be derived based on the output of the angle meter 37 for a plurality of predetermined distances. For example, the output correction value of the angle meter 37 may be derived based on the output of the angle meter 37 when the tip portion 18b is positioned at a position that is a first predetermined distance away from the center of rotation, i.e., the axis C, based on the output of the GPS positioning device 32, and the output of the angle meter 37 when the tip portion 18b is positioned at a position that is a second predetermined distance away from the axis C, based on the output of the GPS positioning device 32. The first predetermined distance is a value different from the second predetermined distance. For example, the first predetermined distance may correspond to the distance when the inclination angle is 30°, and the second predetermined distance may correspond to the distance when the inclination angle is 45°.
[0038] In this way, the center of rotation is determined based on the output of the GPS positioning device 32, and the output correction value of the goniometer 37 can be derived based on the output of the goniometer 37 when the tip 18b of the jib 18 is positioned at a position a predetermined distance away from the center of rotation based on the output of the GPS positioning device 32. Therefore, even when GPS positioning is insufficient during automatic control, it is possible to more accurately control the position of the tip 18b of the jib 18 based on the pulse counter of the motor (swivel motor) for rotating the swivel base 16 and the output of the goniometer 37.
[0039] Here, the automatic control unit 3031 of the hoisting device control unit 303 is configured to automatically control the up-down position, i.e., the vertical position, of the hoisting device 22 in addition to the swivel base 16 and the jib 18, in response to an automatic control command from the operation unit 38 or the terminal device 42. When a load W is connected to the hoisting device 22, the automatic control unit 3031 can control the winch 26, which winds up and rewinds the wire rope WR2, so as to position the load W at a predetermined vertical position that is determined relative to the vertical position of the load W based on the output of the barometer 36.
[0040] The above-described adjustment of the position control of the tip portion 18b of the jib 18, that is, the calibration method by the calibration unit 3033, will be described with reference to the flowchart of FIG.
[0041] When the hoisting device control unit 303 acquires a command for automatic control (positive determination in step S401), the calibration unit 3033 executes setting of the center of rotation of the swivel base 16 as described above (step S403). Then, when the position of the center of rotation, i.e., the axis C, is determined, the calibration unit 3033 derives an output correction value of the goniometer 37 (step S405). In this way, the position control of the tip 18b of the jib 18 is adjusted, that is, after the calibration unit 3033 performs calibration, the automatic control unit 3031 executes automatic control (step S407). Note that the operation of the calibration unit (steps S403 and S405) is not limited to being performed before the execution of automatic control upon receiving a command for automatic control, as described above, but may be executed at various predetermined timings.
[0042] Further functional modules of the controller 30 will now be further described.
[0043] The safety support unit 305 of the control device 30 is operated according to the position of the load W based on the output of the GPS positioning device 34 and the output of the barometer 36, which is a vertical position measurement unit. The position of the load W is determined using the horizontal position based on the output of the GPS positioning device 34 and the vertical position based on the output of the barometer 36.
[0044] Here, the safety support unit 305 operates when a load W is suspended from the hoisting tool 22 of the crane 10, particularly when the load W is located at a position vertically upward and a predetermined distance from the work surface. The predetermined distance can be set arbitrarily, for example, 1 m. Note that the work surface here is the ground G, but it may also be a location where the load W is not suspended in the air due to a force applied through the hoisting tool 22 of the crane 10, and may be a location at the top of a structure. Here, the safety support unit 305 is configured to determine a danger zone DZ in the work area of the crane 10 according to the position of the load W, and to emit a sound toward the danger zone DZ.
[0045] Specifically, as shown in Fig. 5, the safety support unit 305 determines a center based on the output from the GPS positioning device 34, and determines a cylindrical area within a predetermined radius from the center, particularly an area near the ground G, as a danger area DZ. The safety support unit 305 then transmits an activation signal to a speaker 46 that emits sound toward the danger area DZ. Here, the speaker 46 is a directional speaker that is activated to emit sound toward the danger area DZ, and is provided on the rotating base 16 and configured so that its orientation is controlled based on the output from the GPS positioning device 34 provided on the suspended load W in accordance with an instruction from the safety support unit 305.
[0046] The non-worker detection unit 307 and the camera 48 constitute a non-worker detection system DS. At the work site of the crane 10, a unique signal transmitter HD that emits a unique signal is provided on the helmet H worn by each worker. Here, the unique signal transmitter HD blinks a light at a predetermined cycle. The predetermined cycle for a worker who is expected to perform work in the danger zone DZ, such as slinging work, is different from the predetermined cycle for other people, that is, predetermined non-workers. The swivel base 16 of the crane 10 is provided with a camera 48 whose operation is controlled by the non-worker detection unit 307, and the camera 48 is controlled to face the danger zone DZ based on the output from the GPS positioning device 34. Therefore, the non-worker detection unit 307 can determine whether a predetermined non-worker is present in the danger zone DZ by analyzing an image from the camera 48 directed toward the danger zone DZ. 5, when the non-worker detection unit 307 of the non-worker detection system DS detects the presence of a predetermined non-worker P in the danger area DZ by analyzing an image from a camera 48 directed toward the danger area DZ, the safety support unit 305 can transmit an activation signal to the speaker 46 to emit an alarm sound toward the detected predetermined non-worker P. Note that here, for example, the sound emitted from the speaker 46 when there is no predetermined non-worker in the danger area DZ (hereinafter, the work sound) is separate from the alarm sound when the presence of a predetermined non-worker in the danger area DZ is detected, but they may be the same.
[0047] The safety support method by the above-described safety support system S will be described with reference to the flowchart of FIG.
[0048] When the crane 10 is in operation, the control device 30 acquires position information such as the position of the load W (step S601). In particular, this is preferably performed when the above-mentioned automatic control is being performed. However, it is also preferable to acquire position information when the automatic control is not being performed. The acquisition of position information (step S601) includes acquiring the output of the GPS positioning device 34, which is the second positioning unit, and acquiring the output of the barometer 36, which is the vertical position measuring unit. Then, in conjunction with the acquisition of the position information, the control device 30 detects the position of the load W (step S603). The position of the load W is detected based on the horizontal position of the load W based on the output of the GPS positioning device 34 and the vertical position of the load W based on the output of the barometer 36.
[0049] Then, it is determined whether or not the operating condition of the safety support unit 305 is satisfied (step S605). The operating condition of the safety support unit 305 here is that the load W is being suspended, but may be other conditions or may include other conditions in addition to this. For example, the operating condition of the safety support unit 305 may include that the above-mentioned automatic operation is being performed in addition to the load W being suspended. Note that the load W being suspended refers to, for example, that the load W is located at a position that is a predetermined distance above the work surface in the vertical direction.
[0050] When the load W is located on the work surface, that is, when the load W is not suspended in the air (negative determination in step S605), the safety support unit 305 is not activated, that is, the speaker 46 is not activated (step S607).
[0051] When the load W is being suspended, that is, when the load W is suspended in the air (positive determination in step S605), it is determined whether or not a predetermined non-worker is present in the danger zone DZ (step S609). When the presence of a predetermined non-worker P in the danger zone DZ cannot be detected by analysis of an image from the camera 48 directed toward the danger zone DZ (negative determination in step S609), the safety support unit 305 is operated to emit the above-mentioned work sound from the speaker 46 toward the danger zone DZ (step S611).
[0052] When analysis of the image from the camera 48 directed toward the danger zone DZ detects the presence of a specified non-worker P in the danger zone DZ (positive judgment in step S609), the safety support unit 305 is activated to emit an alarm sound from the speaker 46 toward the specified non-worker P in the danger zone DZ (step S613).
[0053] As described above, the control system 28 in the crane 10 includes the GPS positioning device 32, the angle meter 37, and the calibration unit 3033. The calibration unit 3033 executes the following: determining the center of rotation of the rotating bed 16 based on the position information of the tip 18b based on the output of the GPS positioning device 32 when the rotating bed 16 rotates within a predetermined rotation range with the jib 18 held at a predetermined inclination angle; and deriving an output correction value of the angle meter 37 based on the output of the angle meter 37 when the tip 18b is positioned at a position a predetermined distance away from the center of rotation based on the output of the GPS positioning device 32. Therefore, during automatic control using the angle meter 37, it is possible to more accurately control the position of the tip 18b of the jib 18.
[0054] Then, by deriving the output correction value of the goniometer 37 based on the output of the goniometer 37 when the tip 18b of the jib 18 is positioned at a position away from the goniometer 37 by a plurality of predetermined distances (for example, the above-mentioned first predetermined distance and second predetermined distance), it is possible to further improve the accuracy of the output correction of the goniometer 37. Therefore, at this time, during automatic control using the goniometer 37 or the like, it is possible to perform more accurate position control of the tip 18b of the jib 18.
[0055] Furthermore, the crane 10 is equipped with a safety support system S. In this safety support system S, the position of the load W is detected by a load position detection unit 305 based on the horizontal position of the load W based on the output of a GPS positioning device 34 and the vertical position of the load W based on the output of a barometer 36. Then, the safety support unit 305 is operated according to the detected position of the load W. This makes it possible to urge workers, etc. to be safe during work using the crane 10, thereby making it possible to support the assurance of the safety of workers, etc.
[0056] The safety support unit 305 then transmits an activation signal to the speaker 46 to emit sound toward the danger zone WZ that is determined according to the position of the suspended load W. This makes it possible to more reliably urge workers and others in the danger zone DZ to ensure safety. Since the speaker 46 is a directional speaker that is activated to emit sound toward the danger zone DZ, it is possible to more reliably urge workers and others in the danger zone DZ to ensure safety.
[0057] The device further includes a non-worker detection system DS that detects the presence of a predetermined non-worker P in the danger zone DZ, and the safety support unit 305 transmits an activation signal to the speaker 46 to emit an alarm sound to the detected predetermined non-worker P. This makes it possible to further support ensuring the safety of the predetermined non-worker in the danger zone DZ.
[0058] Furthermore, the control device 30 of the crane 10 includes an automatic control unit 3031 configured to automatically control the rotating base 16 and the jib 18 serving as a support unit. Therefore, the safety of the workers and the like can be further supported by the operation of the safety support unit 305 while the automatic control is being performed.
[0059] Furthermore, a barometer 36 is used as the vertical position measuring unit. When there is radio interference, the operation of the GPS positioning devices 32, 34 is limited, but the barometer 36 is not easily affected by radio waves. Furthermore, since the safety support unit 305 is operated while the load W is suspended based on the output of the barometer 36, the degree of safety support of the safety support system S can be further improved. Note that the vertical position measuring unit is not limited to the barometer 36, and various sensors that output signals corresponding to the vertical position of the load W from the work surface, such as a laser measuring device, can be used.
[0060] Although the embodiment and its modified examples according to the present invention have been described above, the present invention is not limited thereto. Various substitutions and modifications are possible without departing from the spirit and scope of the present invention as defined by the claims of this application. [Explanation of symbols]
[0061] 10. Crane 14 Posts 16 Swivel table (swivel body) 18 Jib (support part) 18b Tip 20 Gantry 22 Hanging device (hook) 28 Control System 30 Control device 32, 34 GPS positioning device (positioning unit) 36 Barometer 48 Camera 46 Speaker S Safety Support System DS Non-worker Detection System DZ Danger Zone W Hanging load
Claims
1. A control system for a crane, comprising: a positioning unit of the satellite positioning system provided at a tip of a support part extending from a swivel base on a base, the tip being connected to a sling attached to a rope hanging down from the tip; a tilt angle detection unit that detects a tilt angle of the support unit; a calibration unit that adjusts the position control of the tip of the support unit; Equipped with The calibration unit includes: determining a rotation center of the swivel base based on position information of the tip end based on an output of the positioning unit when the support unit is held at a predetermined tilt angle and the swivel body is rotating within a predetermined rotation range; deriving an output correction value of the tilt angle detection unit based on an output of the tilt angle detection unit when the tip end is positioned at a position that is a predetermined distance away from the turning center based on an output of the positioning unit; and execute Control system.
2. Deriving the output correction value of the tilt angle detection unit an output of the tilt angle detection unit when the tip end portion is positioned at a position that is a first predetermined distance away from the turning center based on an output of the positioning unit; and an output of the tilt angle detection unit when the tip end is positioned at a position that is a second predetermined distance away from the turning center based on the output of the positioning unit; and and deriving an output correction value of the tilt angle detection unit based on the Includes The control system of claim 1 .
3. Further comprising an automatic control unit configured to automatically control the rotating body and the support unit. The control system of claim 1 .
4. A method for adjusting a position of a crane having a rotating base on a base and a support part having a rope extending from the rotating body and hanging down from a tip part of the support part to which a sling is connected, comprising the steps of: determining a rotation center of the swivel base based on position information of the tip portion based on an output of a positioning unit of a satellite positioning system provided at the tip portion when the swivel base rotates within a predetermined rotation range with the support portion held at a predetermined inclination angle; deriving an output correction value of the tilt angle detection unit based on an output of the tilt angle detection unit that detects the tilt angle of the support unit when the tip end is positioned at a position that is a predetermined distance away from the center of rotation based on an output of the positioning unit; A method comprising:
Citation Information
Patent Citations
Tower crane device
JP2001080881A
Tool position measuring device of construction machine, yaw angle detecting device, work machine automatic control device and calibration device
JP2001159518A
Crane attitude arithmetic unit, overload preventive device and work range limiting device
JP2006044932A
Positioning method of crane hoisting accessory and crane system
JP2020169087A