Operation control system of conveyance device, conveyance device, operation control method of conveyance device, and program for operation control system of conveyance device

The operation control system for sub-belt conveyors in nickel oxide ore smelting facilities automatically adjusts conveyor operations based on main belt overload detection, addressing inefficiencies in manual adjustments and ensuring stable, efficient operation.

JP2024142675AInactive Publication Date: 2024-10-11SUMITOMO METAL MINING CO LTD

Patent Information

Application Number
JP2023054916
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-30
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In industrial facilities for smelting nickel oxide ore, the load on main belt conveyors fluctuates irregularly due to variations in ore input, requiring frequent manual adjustments of sub-belt conveyors to prevent overloading, which is inefficient and labor-intensive.

Method used

An operation control system that automatically controls the sub-belt conveyors by detecting main belt conveyor overload, storing operation data before shutdown, and restarting the sub-belt conveyors when the load normalizes, using load and current measurements to optimize conveyor operation.

Benefits of technology

This system enables automated, efficient, and stable operation of the entire conveyor system with minimal operator intervention, reducing manual adjustments and enhancing productivity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024142675000001_ABST
    Figure 2024142675000001_ABST
Patent Text Reader

Abstract

To provide operation control means capable of automatically performing operation control of the entire conveyance device, in a conveyance device in which a plurality of sub belt conveyors arranged in parallel with each other are connected to one main belt conveyor arranged on the downstream side of them.SOLUTION: An operation control system 100 of conveyance device includes an operation detection part 110, an operation state storage part 122, and an operation control part 121. The operation control part 121 stops an operation of a sub belt conveyor 11 when the operation detection part 110 detects that an operation state of a main belt conveyor 31 is in an overload state, and restores the operation of the sub belt conveyor 11 to a state before the stop based on stop just-before operation state data stored in the operation state storage part 122, in the case where the operation state of the main belt conveyor 31 detected by the operation detection part 110 is no longer in the overload state when a stop time of the sub belt conveyor 11 reaches a predetermined time.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an operation control system for a conveying device, a conveying device, an operation control method for a conveying device, and a program for the operation control system for the conveying device. More specifically, the present invention relates to an operation control system for automatically controlling the operation of belt conveyors operating in conjunction with a conveying device in which multiple sub-belt conveyors arranged in parallel are connected to one main belt conveyor arranged downstream of the sub-belt conveyors, a conveying device equipped with such an operation control system, an operation control method for a conveying device that performs such control, and a program for the operation control system that performs such control. [Background technology]

[0002] For example, in many smelting plants, such as industrial facilities for smelting nickel oxide ore by the high-temperature pressurized acid leaching (HPAL) process, a conveying device configured by combining multiple belt conveyors as shown in Fig. 1 is widely used as a conveying device for transporting ore within the plant. The conveying device 1 shown in Fig. 1 is configured such that multiple sub-belt conveyors 11, 21 are arranged in parallel on the upstream side where the ore is input, and are connected to a main belt conveyor 31 that is arranged downstream of the multiple sub-belt conveyors and inputs the ore into equipment for the next process (here, as an example, a sieving device 4). In the conveying device 1 configured as shown in the figure, the conveying work can be performed with any one of the multiple sub-belt conveyors in operation, or multiple sub-belt conveyors can be operated simultaneously in order to ensure a larger supply of ore.

[0003] In the above-mentioned conveying device 1, the load on the main belt conveyor 31 varies according to the variation in the amount of ore fed from the hoppers 12 and 22 to the sub-belt conveyors 11 and 21. For this reason, an operator had to monitor the operation status (e.g., current value) of the belt conveyor and manually adjust the operation status of the sub-belt conveyors 11 and 21 from time to time so that the load on the main belt conveyor 31 would not become overloaded. In particular, when multiple sub-belt conveyors 11 and 21 are operated simultaneously, the load on the main belt conveyor 31 varies more irregularly and more frequently, so that an operator had to frequently adjust the operation of multiple sub-belt conveyors 11 and 21 while constantly checking the load on the main belt conveyor 31 during the operation of the conveying device.

[0004] For example, as a control system for a conveying device consisting of belt conveyors arranged in series in multiple stages, a system has been developed in which a sensor is provided at the most downstream part of each belt conveyor to determine the presence or absence of a conveyed object, and a front-loading operation is controlled at the start of the conveyor based on information obtained by the sensor (see Patent Document 1). However, in a conveying device configured such that one main belt conveyor 31 is connected to the downstream side of multiple sub belt conveyors 11 and 21 arranged in parallel on the upstream side, as in the above-mentioned conveying device 1, an operator is still forced to manually adjust the output of multiple sub belt conveyors in order to respond to irregular fluctuations in the load on the main belt conveyor 31. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2004-315194 A Summary of the Invention [Problem to be solved by the invention]

[0006] The present invention aims to provide an operation control means for a conveying device that is widely used in industrial facilities for smelting nickel oxide ore, and that is configured by connecting multiple auxiliary belt conveyors arranged in parallel to one main belt conveyor arranged downstream of the multiple auxiliary belt conveyors, and that can automatically control the operation of the entire conveying device. [Means for solving the problem]

[0007] The inventor of the present invention has come up with the idea that the above-mentioned problems can be solved by controlling a conveying device in which multiple auxiliary belt conveyors arranged in parallel are connected to one main belt conveyor arranged downstream of the multiple auxiliary belt conveyors, in which the fact that the operating state of the main belt conveyor has become overloaded is fed back to the operation of the auxiliary belt conveyor, and further, when the auxiliary belt conveyor is stopped by this control, storing the operating state data of the auxiliary belt conveyor just before it is stopped, and returning the auxiliary belt conveyor to the state before it was stopped at an appropriate timing based on the stored operating state data, and has completed the present invention. Specifically, the present invention provides the following.

[0008] (1) An operation control system for a conveying device in which multiple auxiliary belt conveyors arranged in parallel are connected to one main belt conveyor arranged downstream of the multiple auxiliary belt conveyors, the operation control system comprising: an operation detection unit that detects the operation states of the main belt conveyor and the auxiliary belt conveyor; an operation state memory unit that stores operation state data of the auxiliary belt conveyor; and an operation control unit that controls the operation of the auxiliary belt conveyor, wherein when it is detected that the operation state of the main belt conveyor has become overloaded, the operation control unit stops the operation of the auxiliary belt conveyor after inputting operation state data of the auxiliary belt conveyor immediately before it is stopped into the operation state memory unit, and when the operation state of the main belt conveyor detected by the operation detection unit is no longer overloaded when a predetermined time has elapsed, the operation control system for a conveying device returns the operation of the auxiliary belt conveyor to the state before it was stopped based on the operation state data immediately before it is stopped stored in the operation state memory unit.

[0009] According to the operation control system for a conveying device of (1), in a conveying device in which multiple sub-belt conveyors arranged in parallel are connected to one main belt conveyor arranged downstream of them, operation control of the entire conveying device can be performed automatically.

[0010] (2) An operation control system for a conveying device as described in (1), wherein the motion detection unit is a load measurement unit that measures the weight of an object loaded on the belt conveyor and / or a current measurement unit that measures the current flowing through a drive motor of the belt conveyor.

[0011] According to the operation control system for a conveyor of (2), the operation state of each belt conveyor in the operation control system for a conveyor of (1) can be detected by either one of the above detection means or both of them as the most suitable detection means according to the type and nature of the conveyed object or the driving method of the belt conveyor. By appropriately combining both means, the operation state of the belt conveyor can be accurately detected regardless of the type and nature of the conveyed object or the driving method of the belt conveyor, so that the versatility of the operation control system for a conveyor of (1) can be improved and the reliability of the control operation can be further improved.

[0012] (3) A conveying device in which a plurality of the auxiliary belt conveyors arranged in parallel are connected to one of the main belt conveyors arranged downstream of the auxiliary belt conveyors, the conveying device being equipped with an operation control system described in (1) or (2).

[0013] According to the conveying device of (3), in a conveying device that combines a plurality of belt conveyors that are widely used as a device for conveying ores, etc. in industrial facilities that smelt nickel oxide ores, etc., it is possible to enjoy the above-mentioned effects of the operation control system of the conveying device of (1) or (2), reduce the costs associated with controlling the conveying device, and contribute to improving the productivity of industrial products.

[0014] (4) An operation control method for a conveying device in which a plurality of auxiliary belt conveyors arranged in parallel are connected to one main belt conveyor arranged downstream of the auxiliary belt conveyors, the method comprising: an operation detection step in which an operation detection unit detects an operation state of the main belt conveyor; a auxiliary belt conveyor operation state input step in which, when the operation detection unit detects that the operation state of the main belt conveyor has become overloaded, an operation control unit inputs operation state data immediately before the stop of the auxiliary belt conveyor to an operation state storage unit; a auxiliary belt conveyor operation stop step in which the operation control unit stops the operation of the auxiliary belt conveyor; a stop time calculation step in which the operation control unit calculates the elapsed time after the operation of the auxiliary belt conveyor has stopped and detects that the elapsed time has reached a predetermined time; and, when the elapsed time has passed the predetermined time, if the operation state of the main belt conveyor detected by the operation detection unit is no longer overloaded, the operation control unit outputs the operation state data immediately before the stop stored in the operation state storage unit to restore the operation of the auxiliary belt conveyor to the state before it was stopped.

[0015] According to the operation control method for a conveying device of (4), in a conveying device in which multiple sub-belt conveyors arranged in parallel are connected to one main belt conveyor arranged downstream of them, the operation of the entire conveying device can be automatically controlled.

[0016] (5) In the method for controlling the operation of a conveying device described in (4), a program for an operation control system of a conveying device is provided, which executes the sub-belt conveyor operation status input step, the sub-belt conveyor operation stopping step, the stop time calculation step, and the sub-belt conveyor operation resuming step.

[0017] (5) According to the program for the operation control system of a conveying device, in a conveying device in which multiple sub-belt conveyors arranged in parallel are connected to one main belt conveyor arranged downstream of them, the operation of the entire conveying device can be automatically controlled. Effect of the Invention

[0018] According to the present invention, in a conveying device in which multiple sub-belt conveyors arranged in parallel are connected to one main belt conveyor arranged downstream of them, the operation of the entire conveying device can be automatically controlled. [Brief description of the drawings]

[0019] [Figure 1] 1 is a diagram illustrating an example of a configuration of a conveying device according to the present invention. [Diagram 2] 1 is a block diagram showing a basic configuration of an operation control system for a conveying device according to the present invention; [Diagram 3] FIG. 4 is a flow chart showing the flow of a method for controlling the operation of a transport device according to the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0020] Hereinafter, an embodiment of the present invention will be described. However, the present invention is not limited to the embodiment described below.

[0021] <Summary of the Invention> The "operation control system for a conveying device" and the "operation control method for a conveying device" of the present invention are operation control means for automatically controlling the operation of belt conveyors operating in conjunction with each other in a conveying device 1 having a main belt conveyor 31 connected downstream of multiple sub belt conveyors 11, 21 arranged in parallel, such as the conveying device 1 shown in Fig. 1. The "conveying device" of the present invention is, as an example, a conveying device having a configuration as shown in Fig. 1, and is a conveying device equipped with the "operation control system for a conveying device" of the present invention.

[0022] <Transportation equipment> The conveying device to which the "operation control system for a conveying device" and the "operation control method for a conveying device" of the present invention are applied is, for example, the conveying device 1 shown in FIG. 1. This conveying device 1 is configured such that two auxiliary belt conveyors 11, 21 are connected to one main belt conveyor 31 arranged downstream of the auxiliary belt conveyors. However, the configuration of the conveying device to be controlled by the "operation control system for a conveying device" and the "operation control method for a conveying device" of the present invention is not limited to this. For example, the conveying device to be controlled by the "operation control system for a conveying device" and the "operation control method for a conveying device" of the present invention may have any number of auxiliary belt conveyors arranged in parallel, which may be two or more, as long as they can be connected in parallel to the main belt conveyor 31. Furthermore, when the number of auxiliary belt conveyors is three or more, only two belt conveyors (or any number less than the total number of auxiliary belt conveyors) arbitrarily selected from those belt conveyors can be selected in advance as the control objects, and the conveying device of the present invention can be configured by regarding these selected two belt conveyors (or any number less than the total number of auxiliary belt conveyors) as the controlled auxiliary belt conveyors that constitute the conveying device of the present invention.

[0023] In addition, the conveying device controlled by the "operation control system for conveying device" and the "operation control method for conveying device" of the present invention may be a main belt conveyor 31 configured by connecting multiple belt conveyors in series (two in FIG. 1). In this specification, when the "main belt conveyor" connected to the downstream side of multiple sub-belt conveyors is configured by connecting multiple belt conveyors in series, all of the belt conveyors connected in series are considered as "one main belt conveyor" as a whole. However, in this case, it is not necessary to detect the operation of all belt conveyors that are the object of the operation detection by the conveying device operation control system 100, and it is sufficient to detect the operation of the most downstream belt conveyor (the belt conveyor that feeds ore into the sieving device 4 in FIG. 1) among the multiple connected belt conveyors.

[0024] As a specific embodiment of the conveying device of the present invention in an industrial facility or the like for smelting nickel oxide ore, as shown in FIG. 1, hoppers 12, 22 for feeding nickel oxide ore to each conveyor are installed at upper positions on the upstream side of each of the sub-belt conveyors 11, 21, while equipment for performing the next process (here, as an example, a screening device 4) is located downstream of the main belt conveyor 31. This overall configuration can be cited as an example of a preferred embodiment of the conveying device of the present invention.

[0025] <Transportation device operation control system> [Overall configuration] 2, the operation control system (operation control system 100) of the transport device of the present invention includes a motion detection unit 110 and a calculation processing unit 120. The motion detection unit 110 preferably includes either a load measurement unit 111 or a current measurement unit 112, or both. The calculation processing unit 120 includes at least a motion control unit 121 and a motion state storage unit 122.

[0026] Here, in the operation control system 100, the arithmetic processing unit 120 receives data related to the operation state of the main belt conveyor 31 from the operation detection unit 110, and is configured as an information processing system in which these units are connected to each other so that they can communicate with each other, so that the arithmetic processing unit 120 can receive data related to the operation state of the main belt conveyor 31 from the operation detection unit 110 and transmit appropriate control signals to the sub belt conveyors 11 and 21 to be controlled. The connections between the above units can be wired connections using dedicated communication cables or wired LAN connections. Also, they are not limited to wired connections, and can be connections using various wireless communications such as wireless LAN and short-distance wireless communications.

[0027] Among the above-mentioned components constituting the operation control system 100, the operation detection unit 110 is distributed and disposed at positions where it is possible to actually detect the operation of the main belt conveyor 31 and the sub belt conveyors 11 and 21 (within a range where it can be directly or indirectly installed on the main belt conveyor 31 and the sub belt conveyors 11 and 21 to be controlled). The location of the calculation processing unit 120 is not particularly limited, and it can be installed near the installation location of the transport device to be controlled, or it can be installed in another facility located at an arbitrary location physically separated from the installation location of the transport device, or on the Internet (so-called cloud). Such an embodiment as a distributed information system is naturally included in the technical scope of the "transport device operation control system" of the present invention.

[0028] [Motion detection section] The motion detection unit 110 is composed of various technical means capable of detecting that the main belt conveyor 31 is overloaded, and the motion states of the sub belt conveyors 11, 21 at any time. Such technical means include, for example, a load measurement unit 111 that measures the weight of the load on the main belt conveyor 31 and the sub belt conveyors 11, 21, or a current measurement unit 112 that measures the current flowing through the drive motors of each of these belt conveyors. The motion detection unit 110 can be composed of any one of these, but is preferably composed of both of these.

[0029] (Load measurement section) The load measuring unit 111 is a weight measuring means for detecting the weight of the load on each belt conveyor constituting the conveying device 1 to be controlled. The load measuring unit 111 can be configured by a weighing machine capable of detecting the weight (load) of the transported object of the entire belt conveyor or per unit length. Specifically, as an example, the load measuring unit 111 can be configured by a "conveyor scale" disclosed in Japanese Patent Laid-Open Publication No. 58-95220, or any of various other known load detectors called conveyor scales or belt scales.

[0030] (Current measurement part) The current measuring unit 112 is a current measuring means for measuring the current flowing through the drive motor of each belt conveyor constituting the conveying device 1 to be controlled. The current measuring unit 112 can be configured by various measuring devices capable of sensing and measuring the fluctuation of the current flowing through the drive motor of the belt conveyor. Specifically, as one example, the current measuring unit 112 can be configured by connecting a ampere transformer to the current circuit of the drive motor.

[0031] [Calculation processing unit] The arithmetic processing unit 120 performs arithmetic processing required for automatically executing appropriate control of the operation of the conveying device 1 using data related to the operation state of the main belt conveyor 31 and the sub belt conveyors 11 and 21 transmitted from the operation detection unit 110 as input values, and outputs data for controlling the operation of the sub belt conveyors 11 and 21 as output values ​​at appropriate timing. For this purpose, as described above, the arithmetic processing unit 120 is communicatively connected to the operation detection unit 110 installed on each belt conveyor and the sub belt conveyors 11 and 21 to be controlled, so that the arithmetic processing unit 120 can receive data related to the operation state of the main belt conveyor 31 from the operation detection unit 110 and transmit appropriate control signals to the sub belt conveyors 11 and 21 to be controlled.

[0032] The arithmetic processing unit 120 may be configured as a dedicated information processing device specialized for arithmetic processing purposes for executing the operation of the operation control system 100, or an information processing means having the necessary functions may be configured as a server on the cloud and shared by multiple clients. The arithmetic processing unit 120 may also be configured by appropriately distributing and incorporating the core components of the present invention into an information processing device constituting a distributed control system (DCS) or the like installed to control the entire process in a factory or the like where the transport device of the present invention is installed.

[0033] In any of the above configurations, the arithmetic processing unit 120 includes hardware such as a CPU, a memory, a communication unit, etc. The arithmetic processing unit 120 having such a configuration can specifically execute various operations and a method for controlling the operation of a transport device, which will be described below, by causing the hardware to execute a "program for a transport device operation control system," which is a computer program according to the present invention.

[0034] (Motion control unit) The operation control unit 121 is a sequence control device that temporarily stops the operation of the sub belt conveyor when the load measurement unit 111, the current measurement unit 112, or both of them that configure the operation detection unit 110 detect that the operation state of the main belt conveyor 31 has become overloaded, and further controls the operation to be resumed at an appropriate timing and restored to the state before the stop. Specific details of the operation of the operation control unit 121 will be described later together with the explanation of "Method for controlling operation of a conveying device (operation of the operation control system for a conveying device)".

[0035] (Operation status storage unit) When the operation state of the main belt conveyor 31 measured by the operation detection unit 110 is detected to be overloaded, the operation state storage unit 122 stores operation state data (operation state data immediately before stopping) of the sub belt conveyor 11 at the time of detection. Specifically, the operation state data immediately before stopping may be any numerical data capable of specifying the operating speed (the number of rotations per unit time of the drive motor) of the sub belt conveyor 11 to be controlled at the above-mentioned detection time (time immediately before stopping), and may be the current value of the belt conveyor at the same time, or more preferably, a combination of the current value of the belt conveyor and the live load at the same time. The operation state storage unit 122 may be configured by various storage devices capable of inputting and storing such numerical data and outputting it as necessary.

[0036] <Method for controlling operation of a transport device (operation of the operation control system for a transport device)> 3 is a flow diagram showing the flow of the "operation control method for a conveying device" of the present invention that can be executed using the operation control system 100. The "operation control method for a conveying device" of the present invention is a control process that can automatically control the operation of the entire conveying device 1 in a conveying device 1 that is configured by connecting one main belt conveyor 31 to the downstream side of multiple sub belt conveyors 11 and 21 that are arranged in parallel.

[0037] This "operation control method for a conveying device" is a process in which an operation detection step S10, a sub-belt conveyor operation state input step S20, a sub-belt conveyor operation stop step S30, a stop time calculation step S40, and a sub-belt conveyor operation restart step S50 are performed in sequence, as shown in Fig. 3. This process can be implemented by applying the operation control system 100 described in detail above to the conveying device 1.

[0038] As an initial state of the conveying device when implementing the "method for controlling operation of a conveying device" of the present invention, it is assumed that the main belt conveyor continues to operate. In addition, it is assumed that at least two or more sub-belt conveyors continue to operate. In the following, as an example of an embodiment of the "method for controlling operation of a conveying device" of the present invention, a detailed embodiment will be described in which, in a conveying device 1 in which two sub-belt conveyors 11 and 21 continue to operate as shown in FIG. 1, these two sub-belt conveyors are the control targets, and the operation of the entire conveying device is controlled by the "method for controlling operation of a conveying device" of the present invention.

[0039] [Motion detection step] In the operation detection step S10, the operation detection unit 110 constituting the operation control system 100 continuously measures the operation state to detect the operation state of the main belt conveyor 31 of the transport device 1. The measurement of the operation state is performed by a detection device constituting the operation detection unit 110, specifically, the load measurement unit 111 and / or the current measurement unit 112.

[0040] Data relating to the operation state measured by the operation detection unit 110 is continuously transmitted to the calculation processing unit 120. If it is detected based on the data that the operation state of the main belt conveyor 31 is in a preset "overload" state (main conveyor operation state, NO), the process proceeds to sub-belt conveyor operation state input step S20, and if it is not detected that the main conveyor is in an "overload" state (main conveyor operation state, YES), the process returns to operation detection step S10 and the detection operation continues.

[0041] The operation state of the main belt conveyor 31 being in an "overload" state means that the load or current value, or a combination of these values, detected by a detection device constituting the operation detection unit 110, exceeds a predefined threshold value. The determination of whether the operation state of the main belt conveyor 31 is "overloaded" or not is performed by the calculation processing unit 120, and a device (such as a limiter) that performs the determination and outputs the determination result may be incorporated at any position in the overall configuration as one of the constituent elements of the calculation processing unit 120 constituting the operation control system 100, and may be, for example, distributed on the main belt conveyor 31 side in a state of being communicably connected to the main information processing device constituting the calculation processing unit 120.

[0042] [Step to input secondary belt conveyor operation status] In the sub-belt conveyor operation state input step S20, the operation control unit 121 inputs the "operation state data immediately before stopping", that is, the "operation state data" of the sub-belt conveyors 11, 21 at the time when the operation state of the main belt conveyor 31 is detected to be in the "overload" state in the operation detection step S10, to the operation state storage unit 122, and the operation state data is stored as the "operation state data immediately before stopping" in the operation state storage unit 122. As described above, the operation state data of the sub-belt conveyor may be any numerical data capable of specifying the operating speed (the number of rotations per unit time of the drive motor) of the sub-belt conveyor 11 to be controlled at the time of the detection.

[0043] [Secondary belt conveyor stop step] In the sub-belt conveyor operation stop step S30, after inputting the "operation state data immediately before stop" to the operation state storage unit 122, the operation control unit 121 stops the operation of the sub-belt conveyors 11 and 21. As a specific operation, a signal to stop the operation of the sub-belt conveyors 11 and 21 is output to the operation control means of each conveyor.

[0044] [Stop time calculation step] In the stop time calculation step S40, the operation control unit 121 calculates the elapsed time after the operation of the sub belt conveyors 11, 21 has stopped, and detects that the elapsed time has reached a predetermined time. The above-mentioned predetermined elapsed time is not particularly limited, but is preferably 15 seconds or more and 120 seconds or less, and a particularly preferred example is 60 seconds.

[0045] The stop time of the operation of the sub-belt conveyors 11, 21, i.e., the time elapsed after operation was stopped in the sub-belt conveyor operation stop step S30, is calculated, and when the stop time reaches a predetermined time (for example, 60 seconds), if the operation state of the main belt conveyor 31 measured by the operation detection unit 110 is not in an "overload" state (main conveyor operation state, YES), proceed to the sub-belt conveyor operation restart step S50.If the operation state of the main belt conveyor 31 measured by the operation detection unit 110 at this point is in an "overload" state (main conveyor operation state, NO), the stop time calculation step S40 is repeated.

[0046] [Secondary belt conveyor operation restart step] In the sub-belt conveyor operation restart step S50, the operation control unit 121 outputs the above-mentioned "operation state data immediately before stopping" stored in the operation state storage unit 122, and restores the operation of the sub-belt conveyors 11, 21 to the state before stopping, that is, the operating speed (the number of rotations per unit time of the drive motor) at the time when the operating state of the main belt conveyor 31 was detected to be in the "overload" state. Note that, as a specific control means for the operating speed of the sub-belt conveyors 11, 21, various known control methods such as PID control (Proportional-Integral-Differential Controller, PID Controller) can be used.

[0047] After completion of the sub-belt conveyor operation restart step S50, if a command to end the control operation is input (control end, Yes), the control operation is ended; otherwise, that is, if the implementation of the "conveying device operation control method" is to be continued (control end, No), the process returns to the operation detection step S10 and the above-mentioned control operation is continued. EXAMPLES

[0048] In an industrial facility for smelting nickel oxide ore, the "operation control system for a conveying device" of the present invention was applied to a conveying device having the configuration shown in FIG. 1, and a test operation was carried out while controlling the operation by the above-mentioned "operation control method for a conveying device". The operation was carried out for a total of 39.5 hours in three separate sessions. During this time, the number of times that the operation state of the main belt conveyor 31 was detected to be overloaded in the operation detection step S10 was 67 in total (an average of 1.48 times per hour), and at each detection point, the sub-belt conveyor operation state input step S20, the sub-belt conveyor operation stop step S30, the stop time calculation step S40, and the sub-belt conveyor operation restart step S50 were executed. During the entire test operation period, an operator was made to monitor the operation of the conveying device, but no intervention by the operator was required.

[0049] As a result of the above test operation, it was confirmed that the "transportation device operation control system" and "transportation device operation control method" of the present invention enable operation control with minimal operator intervention, thereby enabling more efficient and stable operation. [Explanation of symbols]

[0050] 1. Transport device 11, 21 Secondary conveyor belt 12, 22 Hopper 31 Main belt conveyor 4 Sieving device 100 Driving control system 110 Motion detection unit 111 Load measurement section 112 Current measurement section 120 Processing section 121 Motion control section 122 Operation status memory unit S10 Motion detection step S20 Sub-belt conveyor operation status input step S30 Secondary belt conveyor operation stop step S40 Stop time calculation step S50 Secondary belt conveyor operation restart step

Claims

1. An operation control system for a conveying device in which a plurality of sub-belt conveyors arranged in parallel are connected to a single main belt conveyor arranged downstream of the sub-belt conveyors, An operation detection unit that detects an operation state of the main belt conveyor and the sub belt conveyor; an operation status storage unit in which operation status data of the sub belt conveyor is stored; An operation control unit that controls the operation of the sub belt conveyor; Equipped with When it is detected that the operation state of the main belt conveyor has become overloaded, the operation control unit inputs operation state data immediately before the stop of the sub belt conveyor into the operation state storage unit and then stops the operation of the sub belt conveyor, and when a predetermined time has elapsed since the sub belt conveyor was stopped and the operation state of the main belt conveyor detected by the operation detection unit is no longer overloaded, the operation control unit restores the operation of the sub belt conveyor to the state before it was stopped based on the operation state data immediately before the stop stored in the operation state storage unit. Operation control system for conveying equipment.

2. The motion detection unit, A load measuring unit that measures the weight of an object loaded on the belt conveyor, and / or a current measuring unit that measures a current flowing through a drive motor of the belt conveyor.

2. An operation control system for a transport device according to claim 1.

3. A conveying device in which a plurality of the sub-belt conveyors arranged in parallel are connected to one of the main belt conveyors arranged downstream of the sub-belt conveyors, The operation control system according to claim 1 or 2 is provided. Conveying device.

4. A method for controlling the operation of a conveying device in which a plurality of sub-belt conveyors arranged in parallel are connected to a single main belt conveyor arranged downstream of the sub-belt conveyors, comprising the steps of: a motion detection step in which a motion detection unit detects a motion state of the main belt conveyor; a sub-belt conveyor operation state input step in which, when the operation detection unit detects that the operation state of the main belt conveyor has become overloaded, an operation control unit inputs operation state data immediately before the stop of the sub-belt conveyor into an operation state storage unit; a sub-belt conveyor operation stopping step in which the operation control unit stops the operation of the sub-belt conveyor; a stop time calculation step in which the operation control unit calculates an elapsed time after the operation of the sub belt conveyor has been stopped and detects that the elapsed time has reached a predetermined time; a sub-belt conveyor operation restart step in which, when the elapsed time has passed the predetermined time, if the operation state of the main belt conveyor detected by the operation detection unit is no longer overloaded, the operation control unit outputs the operation state data immediately before stop stored in the operation state storage unit, and restores the operation of the sub-belt conveyor to the state before it was stopped; Consisting of A method for controlling operation of a transport device.

5. 5. The method for controlling an operation of a conveying device according to claim 4, Executing the sub-belt conveyor operation state input step, the sub-belt conveyor operation stop step, the stop time calculation step, and the sub-belt conveyor operation restart step. A program for the operation control system of a conveying device.

Citation Information

Patent Citations

  • Conveyor facility

    JP2004315194A

Cited By

  • A belt tear prevention control method and system

    WO2026083384A1