Operation arrangement support system, operation arrangement support device and operation arrangement support method
The system automates timetable rescheduling by using a central processing unit and prediction input unit to learn from past inputs, reducing manual input errors and enabling real-time, accurate rescheduling.
Patent Information
- Application Number
- JP2023057760
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-31
- Publication Date
- 2024-10-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing train rescheduling systems require manual input of timetable changes by dispatchers, which is time-consuming and prone to errors, preventing real-time adjustments and optimal rescheduling.
A system that automates the input of timetable rescheduling details using a central processing unit, a station processing device, and a timetable rescheduling prediction input unit, which learns from past inputs to predict and display accurate rescheduling options for dispatcher approval.
Reduces the workload and errors associated with manual input, enabling real-time and accurate timetable rescheduling by automating the process and improving the accuracy of rescheduling decisions.
Smart Images

Figure 2024145422000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a traffic replanning assistance system, a traffic replanning assistance device, and a traffic replanning assistance method. [Background technology]
[0002] Previously, when train operation conditions were disrupted from the planned schedule, dispatchers would manually input the changes to the schedule into the traffic rescheduling system to reschedule operations to restore normal operation. In such cases, all the information required for the traffic rescheduling system had to be manually entered, which took time to complete, making it impossible to reschedule operations in real time. In addition, when entering data into the traffic rescheduling system, it was sometimes difficult to always make optimal traffic rescheduling due to input errors caused by human error or the lack of experience of dispatchers.
[0003] In order to address these issues, for example, Patent Document 1 discloses a technology that includes "a headquarters computer 12 that collects actual station information and accepts and processes information necessary for traffic reorganization, a station processing device 13 that transmits the actual information to the station, and a traffic management command terminal 2 that accepts traffic reorganization inputs based on a planned timetable 8 and an actual timetable 9 and transmits them to the headquarters computer 12. The traffic management command terminal 2 includes a traffic reorganization input item database 3 that can store traffic reorganization input contents and the number of such items, an input history learning unit 6 that stores additional information in the database, a correctness judgment unit 5 that works in cooperation with the above to determine whether newly entered traffic reorganization input contents are correct based on the number of items entered in the past, a traffic reorganization correction unit 7 that searches for and proposes traffic reorganization correction proposals that are determined to be correct, and a traffic management command unit 4 that oversees the entire system."
[0004] In addition, Patent Document 2 discloses a technology that "creates a plan for traffic rescheduling, sets priorities for the order of traffic rescheduling based on operational disruption information and train position information, and executes traffic rescheduling for pending implementation based on these priorities."
[0005] Furthermore, for example, Patent Document 3 discloses a technology that "by incorporating the contents (control plan) input by the dispatcher to the traffic replanning device 2 when the timetable is disrupted into the predictive simulation function without waiting for the train operation status as a result of the control of the signal equipment 4 by the traffic management device 3 which has received the contents, it is possible to improve the accuracy of the predictive simulation and propose traffic replanning proposals 13 early. In addition, by automatically adjusting the presentation order of the traffic replanning proposals 15 and the selection of the main proposal from among multiple traffic replanning proposals based on the history of the dispatcher's approval 17 or rejection 22 of the traffic replanning proposals 15 presented by the traffic replanning device 2, it is possible to present traffic replanning proposals that are in line with actual operations."
[0006] Furthermore, Patent Document 4 discloses a technology in which "the train operation control device according to this embodiment is equipped with an operation monitoring unit that calculates the delay time of the train when the train is delayed from the operation plan. The memory unit stores delay recovery rules that determine a recovery running section among multiple running sections in which the running time in the operation plan is shortened in order to recover the delay time. The arrival and departure time correction unit corrects the running time in the recovery running section in accordance with the delay recovery rule when the train is delayed, and re-plans the target arrival and departure times in the operation plan. An operation curve is created in real time for this target arrival and departure time."
[0007] Furthermore, Patent Document 5 discloses a technology including "a crew operation command system 10 and a train schedule command system 20, the crew operation command system 10 including a crew operation information storage unit 3 that stores crew operation information, an alarm extraction unit 4 that extracts alarms that occur in the crew operation information due to a train schedule change proposal, a proposal evaluation unit 7 that creates multiple crew operation information for eliminating the alarms and evaluation information that evaluates the crew operation information as crew operation information change proposals / evaluation information, a crew support information display unit 6 that displays the crew operation information change proposals / evaluation information, etc., and a proposal execution unit 9 that replaces the content of the crew operation information change proposal when one crew operation information change proposal / evaluation information is selected, and the proposal evaluation unit 7 simultaneously displays multiple crew operation information change proposals / evaluation information in a list format on the crew support information display unit 6." [Prior art documents] [Patent documents]
[0008] [Patent Document 1] JP 2020-078989 A [Patent Document 2] JP 2011-173530 A [Patent Document 3] JP 2008-222004 A [Patent Document 4] JP 2018-007402 A [Patent Document 5] JP 2013-035502 A Summary of the Invention [Problem to be solved by the invention]
[0009] However, in the invention described in Patent Document 1, although the correctness of the traffic rescheduling details entered by the dispatcher is judged, the traffic rescheduling details themselves are assumed to be entered by the dispatcher. In addition, the inventions described in Patent Documents 2 to 5 also present traffic rescheduling proposals to recover from delays, but still assume that the details of traffic rescheduling will be entered by the dispatcher. For this reason, all of the prior art assumes that the details of traffic rescheduling will be entered by the dispatcher, and does not reduce the work of entering traffic rescheduling.
[0010] Therefore, an object of the present invention is to provide a technology that can automate the input of operation schedule rescheduling details and reduce the operation schedule rescheduling input work required by dispatchers. [Means for solving the problem]
[0011] In order to solve the above problems, one representative traffic replanning support system of the present invention is a traffic replanning support system that supports train operations and traffic replanning, and is equipped with a central processing unit that processes control requests to control the route of a train in accordance with the train operation status based on actual station information and traffic replanning information, which is information regarding traffic replanning input by a dispatcher, a station processing unit that transmits the traffic replanning information based on field equipment to the central processing unit and receives the control request based on the train operation status from the central processing unit, and a traffic replanning support device that displays the train operation plan and the train operation status in a comparable manner and transmits the input traffic replanning input content to the central processing unit, and the operation management command terminal has a display unit that displays a traffic replanning dialogue box for inputting the traffic replanning input content, a traffic replanning input database that stores the traffic replanning input content and the train operation status at the time the traffic replanning input content was input, an input history learning unit that stores additional information in the traffic replanning input database, and a traffic replanning prediction input unit that compares the train operation plan and the train operation status with the traffic replanning input database to predict the traffic replanning input content and automatically inputs it into the traffic replanning dialogue box. Effect of the Invention
[0012] According to the present invention, it is possible to provide a technology that can automate the input of traffic rescheduling details and reduce the input work of traffic rescheduling by dispatchers. Problems, configurations and effects other than those described above will become apparent from the following description of the preferred embodiment of the invention. [Brief description of the drawings]
[0013] [Figure 1] FIG. 1 is a diagram showing an example of the configuration of a timetable replanning support system in the first embodiment. [Diagram 2] FIG. 2 is a diagram showing examples of timetable adjustment items and automatically input results in the first embodiment. [Diagram 3] FIG. 3 is a flowchart showing the automatic input process performed by the timetable rescheduling prediction input unit. [Figure 4]FIG. 4 is a flowchart showing the learning process performed by the input history learning unit. [Diagram 5] FIG. 5 is a flowchart showing the automatic input process performed by the timetable replanning prediction input unit in the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0014] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. Note that the present invention is not limited to the embodiment. In addition, in the description of the drawings, the same parts are denoted by the same reference numerals. When there are multiple components having the same or similar functions, they may be described by using the same reference numerals with different subscripts, or when there is no need to distinguish between these multiple components, the subscripts may be omitted. In addition, although terms such as "first," "second," and "third" may be used in the present disclosure to describe various elements or components, it will be understood that these elements or components should not be limited by these terms. These terms are used only to distinguish one element or component from another element or component. Thus, a first element or component discussed below can also be referred to as a second element or component without departing from the teachings of the inventive concept. In order to facilitate understanding of the invention, the position, size, shape, range, etc. of each component shown in the drawings may not represent the actual position, size, shape, range, etc. Therefore, the present invention is not necessarily limited to the position, size, shape, range, etc. disclosed in the drawings.
[0015] In this disclosure, "traffic rescheduling information" refers to information regarding traffic rescheduling input by a dispatcher. In addition, a "planned train timetable" is a train operation plan / schedule that is planned in advance, while an "actual train timetable" is a train operation timetable that actually saw trains run. Furthermore, the train operation status refers to the train's location on the line and the delay status compared with the planned schedule. Furthermore, the term "route facilities" includes station processing devices and field facilities, and refers to facilities and devices that transmit field information and receive route requests.
[0016] [First embodiment] First, a timetable replanning support system 1 according to a first embodiment will be described with reference to FIG. FIG. 1 is a diagram showing an example of the configuration of a timetable replanning support system 1 in the first embodiment. The train rescheduling support system 1 is a support system for rescheduling trains so that trains are operated based on a planned train schedule 12 according to their location on the tracks. The traffic replanning support system 1 mainly includes a traffic replanning support device 2, a central processing unit 3, a station processing unit 4, and field equipment 6. The traffic replanning support device 2 is a terminal for operating the traffic replanning support system 1, and is equipped with a user interface 5.
[0017] <Central Processing Unit> The central processing unit 3 stores a planned train schedule 12 , and is capable of receiving on-site information from the station processing unit 4 to create train operation status 13 and an actual train schedule 11 . In addition, the central processing unit 3 can transmit a planned timetable 12 , a track record timetable 11 and train operation status 13 to the train replanning support device 2 . Furthermore, the central processing unit 3 changes the planned timetable 12 based on the details of the rescheduling received from the timetable rescheduling support device 2. Then, the central processing unit 3 can create a route request for controlling the route of the train based on the changed planned timetable 12 and transmit it to the station processing unit 4.
[0018] <Station processing device> The station processing device 4 receives on-site information from on-site equipment 6 such as track circuits, signals, and points, and transmits it to the central processing device 3. In addition, when a route request is received from the central processing device 3, the station processing device 4 transmits the route request to the on-site equipment 6.
[0019] <On-site equipment> The field equipment 6 transmits field information to the station processing device 4. When a route request is received from the station processing device 4, the field equipment 6 judges whether or not a route can be configured, and if it judges that a route can be configured, a route according to the route request is configured.
[0020] <Traffic rescheduling support device> The traffic replanning support device 2 is a terminal that operates the traffic replanning support system 1, and is connected to the central processing unit 3. The traffic replanning support device 2 mainly includes an operation command unit 14, an input history learning unit 18, a traffic replanning input database 16, a traffic replanning prediction input unit 17, and a user interface 5. In addition, the train replanning support device 2 can display the planned timetable 12 and train operation status 13 received from the central processing device 3 on the user interface 5 in a comparable format.
[0021] (Operation Control Department) When the operation control unit 14 receives a signal for rescheduling from the user interface 5 , it can display the planned timetable 12 , actual timetable 11 and train operation status 13 received from the central processing unit 3 on the user interface 5 . The signal for traffic replanning from the user interface 5 can be automatically transmitted when the traffic replanning dialog box 15 of the user interface 5 is opened. In other words, when the dispatcher opens the traffic replanning dialog box 15, the operation for creating a predicted value for traffic replanning and displaying the predicted value in the traffic replanning dialog box 15 described below may be started.
[0022] Then, a command (call) is sent to the timetable replanning prediction input unit 17 to create a predicted value for timetable replanning, and the predicted value for timetable replanning is received from the timetable replanning prediction input unit 17 as input data (primary data), which can be displayed on the user interface 5. If the primary data is approved in the user interface 5, the traffic rescheduling details are deemed to be confirmed, and the traffic control unit 14 can transmit the confirmed traffic rescheduling details (primary data) to the central processing unit 3.
[0023] Furthermore, if the user interface 5 does not approve the primary data and receives secondary data that changes the primary data, it stores the secondary data.The secondary data is then sent to the timetable replanning prediction input unit 17, which creates predicted values again for items in the secondary data that have not been changed from the primary data, and the results are received as tertiary data from the timetable replanning prediction input unit 17, and the tertiary data can be displayed on the user interface 5. When the tertiary data is approved in the user interface 5, the contents of the timetable rescheduling are deemed to have been confirmed, and the operation control unit 14 can transmit the confirmed contents of the timetable rescheduling to the central processing unit 3. If the tertiary data is not approved and quaternary data in which the tertiary data has been changed is returned from the user interface 5, as in the case of the secondary data described above, the traffic rescheduling prediction input unit 17 can create new predicted values for items other than those that have been changed, and the same process can be repeated until the traffic rescheduling contents are approved.
[0024] In addition, the creation of predicted values for timetable replanning and display of the predicted values on the user interface 5 may be performed via the operation control unit 14, or data may be sent and received directly between the timetable replanning prediction input unit 17 and the user interface 5. In addition, the timing of creating a predicted value in the timetable replanning prediction input unit 17 may be each time the parameters of the input item for the predicted value in the user interface 5 are changed, or it may be performed periodically at regular intervals, or it may be performed using a combination of these timings.
[0025] (Train rescheduling input database) The train timetable rescheduling input database 16 is a database that stores the contents of train timetable rescheduling that have been input in the past and the train operation status 13 at the time the contents of the train timetable rescheduling were input.
[0026] (Input history learning section) The input history learning unit 18 is a functional unit that compares and learns from the data stored in the train rescheduling input database 16, the train rescheduling input content, the train operation status 13 at the time of input, and the planned timetable 12, and stores the learning results in the train rescheduling input database 16. When new timetable replanning data is confirmed, the input history learning unit 18 can store it in the timetable replanning input database 16 as additional information. Here, the additional information refers to the timetable rescheduling details confirmed by the traffic control unit 14 and the learning results obtained by machine learning using the timetable rescheduling details confirmed by the traffic control unit 14 as learning data. In addition, when obtaining the learning results, the input history learning unit 18 may add the data stored in the train operation rescheduling input database 16, the train operation status 13, and the planned timetable 12 as learning data in addition to the train operation rescheduling content confirmed by the train operation control unit 14. Furthermore, the input history learning unit 18 may analyze the details of train operation rescheduling determined by the operation control unit 14 using a method other than machine learning, for example, statistical analysis.
[0027] (Train rescheduling prediction input section) The traffic replanning prediction input unit 17 compares the train operation status 13, the planned timetable 12, and the traffic replanning input database 16 to create a predicted value for the traffic replanning content. The created predicted value may be automatically displayed in the traffic replanning dialogue box 15 via the operation control unit 14, or may be directly sent from the traffic replanning prediction input unit 17 to the traffic replanning dialogue box 15 and automatically displayed in the traffic replanning dialogue box 15. The timetable rescheduling prediction input unit 17 may output the predicted value with an index indicating the accuracy or appropriateness of the predicted value. As an index indicating the accuracy or appropriateness, the similarity with past similar timetable rescheduling cases may be expressed as a probability.
[0028] In addition, the more data the input history learning unit 18 stores in the timetable rescheduling input database 16, the more accurate the timetable rescheduling prediction input unit 17 can create prediction values. For this reason, as described above, the input history learning unit 18 can increase the accuracy of the prediction value of the timetable replanning prediction input unit 17 by storing additional information in the timetable replanning input database 16.
[0029] In this embodiment, the traffic control unit 14 also functions as an approval unit for the dispatcher to approve the contents displayed in the traffic rescheduling dialogue box 15. In this embodiment, the traffic control unit 14 and the approval unit are described as being integrated, but the traffic control unit 14 and the approval unit may be separate entities.
[0030] (User Interface) The user interface 5 is a display unit that displays a timetable replanning dialogue box 15, and also serves as a manual input unit for inputting the contents of timetable replanning into the timetable replanning support device 2. In this embodiment, the user interface 5 may be a monitor and a keyboard and mouse, with a traffic replanning dialogue box 15 displayed on the monitor and information input to the traffic replanning support device 2 using the keyboard and mouse, or it may be another device such as a tablet terminal. The traffic rescheduling dialogue box 15 displays the traffic rescheduling details for each traffic rescheduling item, and allows the user to input the traffic rescheduling details.
[0031] The dispatcher checks the contents of the predicted value of the traffic reordering displayed in the traffic reordering dialogue box 15, and if there is no problem with the predicted value, approves the predicted value as the content of the traffic reordering. The approved predicted value is then sent to the traffic control unit 14, and is then sent from the traffic control unit 14 to the central processing unit 3. If there is a problem with the predicted value (primary data) automatically displayed, the dispatcher can manually correct the predicted value in the traffic reordering dialogue box 15, confirm the content, and send it to the central processing unit 3.
[0032] In this disclosure, "automatic" means that the traffic rescheduling prediction input unit 17 automatically displays data as parameters for each input item in the traffic rescheduling dialogue box 15 without the dispatcher having to input individual data, and "manual input" means that the dispatcher inputs parameter data for each individual input item.
[0033] FIG. 2 is a diagram showing an example of the display of the train schedule rescheduling dialogue box 15. As shown in FIG. The train rescheduling dialog box 15 mainly includes an input item column 151 and a parameter column 152.
[0034] (Input item string) The input item column 151 is an item for specifying the content of the operation rescheduling, such as starting station, starting track, starting time, departure track, departure time, destination station, destination track, arrival track, arrival time, train type, and number of cars, but other items may also be included.
[0035] (parameter column) The parameter column 152 contains values corresponding to the input item column 151, and is automatically displayed by the timetable rescheduling prediction input unit 17. In addition, the contents of the parameter column 152 can be changed manually by a commander via the user interface 5.
[0036] If the contents of the parameter column 152 are manually changed, the operation rescheduling prediction input unit 17 will store the contents of the parameter column 152 that have been manually changed, and then recalculate the contents of the parameter column 152 that have not been manually changed by the dispatcher, and automatically input them into the user interface 5.
[0037] <Creating predicted values for traffic rescheduling and automatic input processing> Next, the creation of predicted values for timetable replanning and automatic input processing performed by the timetable replanning prediction input unit 17 will be described with reference to FIG. The process shown in FIG. 3 is performed for each input item of the traffic schedule adjustment, but it is also possible to process all input items simultaneously. FIG. 3 is a flowchart showing the automatic input process performed by the timetable rescheduling prediction input unit 17.
[0038] (Step S101) First, the timetable replanning prediction input unit 17 receives a timetable replanning command from the user interface 5, and acquires the timetable replanning input database 16 when creating a timetable replanning prediction value.
[0039] (Step S102) Next, the timetable rescheduling prediction input unit 17 acquires the train operation status 13.
[0040] (Step S103) Next, the timetable rescheduling prediction input unit 17 searches for the most accurate and appropriate prediction value for each input item. Specifically, the timetable rescheduling prediction input unit 17 compares the acquired learning results with the train operation status 13, and searches for prediction values that are highly similar to past similar timetable rescheduling cases for each input item.
[0041] (Step S104) Next, the traffic control unit 14 automatically inputs the searched predicted value into the traffic rescheduling dialogue box 15 (input of primary data).
[0042] (Step S105) In the user interface 5, if the predicted values automatically input into the traffic rescheduling dialogue box 15 are approved as the contents of the traffic rescheduling, the process ends.
[0043] (Step S106) If the predicted value is not approved as the content of the operation schedule adjustment and the automatically entered predicted value is changed, the changed predicted value data (secondary data) will be received.
[0044] (Step 107) For the changed data, a search is made for the data with the highest probability of accuracy and appropriateness for each input item, similar to step 103. However, items that have been changed in the traffic rescheduling dialogue box 15 (items changed by the dispatcher) are excluded from the search, and items that have not been changed are the subject of the search.
[0045] (Steps 108 and 109) The contents of steps 108 and 109 are similar to the contents of steps 103 and 104 described above.
[0046] That is, in the traffic replanning dialogue box 15, the contents of the traffic replanning items for the changed items (items changed by the dispatcher) are fixed, and a search is performed again for the items that have not been changed, and the searched contents are automatically input again into the traffic replanning dialogue box 15. This is then repeated until the automatically input traffic replanning contents are approved.
[0047] <Learning process> Next, the learning process performed by the input history learning unit 18 will be described with reference to FIG. FIG. 4 is a flowchart showing the learning process performed by the input history learning unit 18. The process in FIG. 4 is based on the premise that all of the traffic rescheduling details displayed in the traffic rescheduling dialogue box 15 have been approved.
[0048] (Step S201) First, the input history learning unit 18 acquires the contents that are displayed in the traffic rescheduling dialogue box 15 and approved by the dispatcher (S201).
[0049] (Step S202) Next, the input history learning unit 18 collects data from the train timetable adjustment input database 16 (S202).
[0050] (Step S203) Next, the input history learning unit 18 acquires the train operation status 13.
[0051] (Step S204) Next, the input history learning unit 18 acquires the planned schedule 14 .
[0052] (Step S205) Next, the input history learning unit 18 analyzes the learning result data, the train operation status 13, and the planned timetable 14, and obtains the learning result.
[0053] (Step S206) The input history learning unit 18 transmits the updated learning results to the train timetable rescheduling input database.
[0054] The timetable replanning support system 1 according to the first embodiment has been described above. The traffic rescheduling support system 1 disclosed herein mainly comprises an operation control unit 14, a traffic rescheduling prediction input unit 17, an input history learning unit 18, and a traffic rescheduling input database 16. The traffic rescheduling prediction input unit 17 predicts the content of the traffic rescheduling input by the dispatcher into the traffic rescheduling dialogue box 15 based on the past input content, and automatically inputs it into the user interface 5 as a predicted value. This allows the dispatcher to check the automatically entered details of traffic rescheduling, and if any corrections are necessary, they can manually correct only those items. This significantly reduces the input work required for traffic rescheduling, and cuts down on the input burden and input errors. In addition, the timetable rescheduling prediction input unit 17 can provide highly accurate and appropriate predicted values for timetable rescheduling based on past input contents. Furthermore, if the dispatcher modifies the predicted value of traffic rescheduling indicated by the traffic rescheduling support device, a re-search (recalculation) is performed for items other than the modified items to determine the optimal traffic rescheduling content, which also makes it possible to improve the accuracy of traffic rescheduling.
[0055] [Second embodiment] The second embodiment shows a procedure for changing a predicted value when the traffic replanning prediction input unit 17 re-searches for a predicted value displayed in the traffic replanning dialog box at regular intervals. The train operation status 13 changes from moment to moment. For this reason, it is desirable for the traffic replanning prediction input unit 17 to re-search for a predicted value displayed in the traffic replanning dialog box at regular intervals, regardless of whether the predicted value of the traffic replanning has been approved or not, and to display a predicted value according to the latest situation. However, if the re-searched forecast value is updated even though the accuracy and appropriateness of the re-searched forecast value has not reached a certain level, it may lead to misleading the judgment of the control officer. For this reason, in the second embodiment, the predicted value displayed in the train rescheduling dialogue box 15 is updated only when the newly searched predicted value has a certain level of accuracy and appropriateness or higher. In the following description, components that are the same as or equivalent to those in the first embodiment described above are given the same reference numerals, and descriptions thereof will be simplified or omitted.
[0056] FIG. 5 is a flowchart showing the automatic input process performed by the timetable rescheduling prediction input unit 17 in the second embodiment. The process shown in FIG. 5 is performed for each input item of traffic schedule adjustments, as in the case of FIG. 3, but the process for all input items may be performed simultaneously at regular intervals.
[0057] (Step 101 to Step 108) Steps S101 to 108 are similar to those in the first embodiment, and therefore the description will be omitted.
[0058] (Step 306) In step 108, when a predicted value is calculated as a result of the re-search, in step 306, it is determined whether or not the predicted value of the re-searched input item has a certain level of accuracy and appropriateness. Here, whether or not the predicted value has a certain level of accuracy and appropriateness may be determined by using the probability of similarity with past similar train time rescheduling cases as an indicator and judging whether this probability is above a certain level. If the probability of the predicted value of the item is equal to or higher than a certain probability, the process proceeds to step 109, where the predicted value displayed in the train rescheduling dialogue box 15 is updated. On the other hand, if the probability of the predicted value of the item is less than the certain probability, the predicted value displayed in the train schedule rescheduling dialogue box 15 is not updated and the process is terminated.
[0059] The timetable replanning support system 1 according to the second embodiment has been described above. In the timetable replanning support system 1 disclosed herein, the timetable replanning prediction input unit 17 updates the predicted value in the timetable replanning dialogue box 15 only when the accuracy and appropriateness of the re-searched predicted value is above a certain level, thereby enabling timetable replanning work to be carried out stably. This also makes it possible to prevent the erroneous approval of predicted values with low accuracy and appropriateness.
[0060] Although the embodiment of the present invention has been described above, the present invention is not limited to the above-described embodiment, and various modifications are possible without departing from the gist of the present invention.
[0061] The present disclosure also includes the following aspects. (Aspect 1) A traffic replanning support system including a traffic replanning support device, a central processing unit, and route facilities, The traffic replanning support device is connected to the central processing unit and includes a traffic control unit, a traffic replanning prediction input unit, a traffic replanning input database, and a user interface; The train replanning input database stores past train replanning details and train operation statuses related to the past train replanning details, The traffic control department Receives a track record schedule, a planned schedule, and train operation status from the central processing unit; causing the timetable replanning prediction input unit to create a predicted value of timetable replanning; The operation rescheduling prediction input unit compares the train operation status, the planned timetable, and the operation rescheduling input database to generate a predicted value of the operation rescheduling, The user interface displays the predicted value of the timetable replanning predicted by the timetable replanning prediction input unit. When the predicted value of the timetable reordering is approved at the user interface, the operation command unit transmits the approved predicted value of the timetable reordering to the central processing unit. Traffic management support system. (Aspect 2) The traffic replanning support system according to aspect 1, The user interface can change the predicted value of the timetable replanning, When the predicted value of the timetable replanning is not approved in the user interface and is changed, the operation command unit causes the timetable replanning prediction input unit to re-create predicted values of the timetable replanning for predicted values other than the changed predicted value, and displays the re-created predicted values of the timetable replanning in the user interface. Traffic management support system. (Aspect 3) The traffic replanning support system according to aspect 1 or 2, The timetable replanning support device includes an input history learning unit. The input history learning unit generates a learning result by machine learning the past timetable replanning contents as learning data, and stores the approved timetable replanning contents and the generated learning result in the timetable replanning input database as additional information, the central processing unit stores the planned timetable, receives on-site information from the line facilities, creates the train operation status and the actual timetable, and transmits the planned timetable, the actual timetable, and the train operation status to the train replanning support device; When the predicted value of the approved operation reordering is received, the planned timetable is changed and a route request is sent to the line facility; The line equipment transmits on-site information and receives route requests. Traffic management support system. (Aspect 4) A traffic replanning support system according to any one of aspects 1 to 3, The operation command unit causes the timetable replanning prediction input unit to create a predicted value of timetable replanning at regular intervals, When the accuracy and appropriateness of the predicted value created by the train rescheduling prediction input unit is equal to or higher than a certain level, the predicted value is displayed on the user interface. Traffic management support system. (Aspect 5) A traffic replanning support device connected to a central processing unit, including a traffic control unit, a traffic replanning prediction input unit, a traffic replanning input database, and a user interface, The train replanning input database stores past train replanning details and train operation statuses related to the past train replanning details, The operation control unit includes: Receives a track record schedule, a planned schedule, and train operation status from the central processing unit; causing the timetable replanning prediction input unit to create a predicted value of timetable replanning; Displaying the predicted value of the train schedule rescheduling on the user interface; if the predicted timetable reordering value is approved in the user interface, sending the approved predicted timetable reordering value to the central processing unit; The operation rescheduling prediction input unit compares the train operation status, the planned timetable, and the operation rescheduling input database to predict a predicted value of the operation rescheduling, The user interface displays the predicted value of the timetable replanning predicted by the timetable replanning prediction input unit. Traffic management support device. (Aspect 6) In the traffic replanning support system according to any one of aspects 1 to 4, A first step in which a train rescheduling prediction input unit compares train operation status, a planned timetable, and a train rescheduling input database to predict a predicted value of train rescheduling; A second step of displaying the predicted value of the train replanning on a user interface; a third step of causing the operation replanning prediction input unit to re-create operation replanning prediction values for prediction values other than the changed prediction value when the predicted value of operation replanning is not approved and is changed in the user interface, and displaying the re-created prediction value as the operation replanning prediction value in the user interface; a fourth step of transmitting the predicted value of the traffic replanning to a central processing unit when the predicted value of the traffic replanning is approved in the user interface, as the content of the traffic replanning being confirmed; A fifth step in which, when the operation rescheduling content is transmitted to a central processing unit, the central processing unit changes the planned timetable and transmits a route request to the line facilities. Display the predicted value of train rescheduling, including Traffic rescheduling support methods. (Aspect 7) In the method for supporting traffic replanning according to aspect 6, The third step is performed at regular intervals regardless of whether the predicted value of the traffic replanning is approved or not, and if the accuracy and appropriateness of the re-created predicted value is not above a certain level at that time, the predicted value displayed on the user interface is not changed. Traffic rescheduling support methods. [Explanation of symbols]
[0062] 1 Train rescheduling support system 2 Train rescheduling support device 3. Central Processing Unit 4 Station Processing Unit 5. User Interface 6 Field equipment 11 Achievement Diamond 12 Planned Schedule 13 Train operation status 14 Operation Control Department 15 Train rescheduling dialogue box 151 Input item string 152 Parameter Column
Claims
1. A traffic replanning support system including a traffic replanning support device, a central processing unit, and route facilities, The traffic replanning support device is connected to the central processing unit and includes a traffic control unit, a traffic replanning prediction input unit, a traffic replanning input database, and a user interface; The train replanning input database stores past train replanning details and train operation statuses related to the past train replanning details, The traffic control department Receives a track record schedule, a planned schedule, and train operation status from the central processing unit; causing the timetable replanning prediction input unit to create a predicted value of timetable replanning; The operation rescheduling prediction input unit compares the train operation status, the planned timetable, and the operation rescheduling input database to generate a predicted value of the operation rescheduling, The user interface displays the predicted value of the timetable replanning predicted by the timetable replanning prediction input unit. When the predicted value of the timetable reordering is approved on the user interface, the operation command unit transmits the approved predicted value of the timetable reordering to the central processing unit. Traffic management support system.
2. The traffic replanning support system according to claim 1, The user interface can change the predicted value of the timetable replanning, When the predicted value of the timetable replanning is not approved in the user interface and is changed, the operation command unit causes the timetable replanning prediction input unit to re-create predicted values of the timetable replanning for predicted values other than the changed predicted value, and displays the re-created predicted values of the timetable replanning in the user interface. Traffic management support system.
3. The traffic replanning support system according to claim 1 or 2, The timetable replanning support device includes an input history learning unit. The input history learning unit generates a learning result by machine learning the past timetable replanning contents as learning data, and stores the approved timetable replanning contents and the generated learning result in the timetable replanning input database as additional information, the central processing unit stores the planned timetable, receives on-site information from the line facilities, creates the train operation status and the actual timetable, and transmits the planned timetable, the actual timetable, and the train operation status to the train replanning support device; When the predicted value of the approved operation reordering is received, the planned timetable is changed and a route request is sent to the line facility; The line equipment transmits on-site information and receives route requests. Traffic management support system.
4. The traffic replanning support system according to claim 1 or 2, The operation command unit causes the timetable replanning prediction input unit to create a predicted value of timetable replanning at regular intervals, When the accuracy and appropriateness of the predicted value created by the operation schedule replanning prediction input unit is equal to or higher than a certain level, the predicted value is displayed on the user interface. Traffic management support system.
5. A traffic replanning support device connected to a central processing unit, including a traffic control unit, a traffic replanning prediction input unit, a traffic replanning input database, and a user interface, The train replanning input database stores past train replanning details and train operation statuses related to the past train replanning details, The operation control unit includes: Receives a track record schedule, a planned schedule, and train operation status from the central processing unit; causing the timetable replanning prediction input unit to create a predicted value of timetable replanning; Displaying the predicted value of the train schedule rescheduling on the user interface; if the predicted timetable reordering value is approved in the user interface, sending the approved predicted timetable reordering value to the central processing unit; The operation rescheduling prediction input unit compares the train operation status, the planned timetable, and the operation rescheduling input database to predict a predicted value of the operation rescheduling, The user interface displays the predicted value of the timetable replanning predicted by the timetable replanning prediction input unit. Traffic management support device.
6. In the traffic replanning support system according to claim 1 or 2, A first step in which a train rescheduling prediction input unit compares train operation status, a planned timetable, and a train rescheduling input database to predict a predicted value of train rescheduling; A second step of displaying the predicted timetable replanning value on a user interface; a third step of causing the operation replanning prediction input unit to re-create operation replanning prediction values for prediction values other than the changed prediction value when the predicted value of operation replanning is not approved and is changed in the user interface, and displaying the re-created prediction value as the operation replanning prediction value in the user interface; a fourth step of transmitting the predicted value of the timetable replanning to a central processing unit when the predicted value of the timetable replanning is approved in the user interface, as the content of the timetable replanning being confirmed; When the content of the traffic rescheduling is transmitted to a central processing unit, the central processing unit changes the planned timetable and displays a predicted value of traffic rescheduling including a fifth step of transmitting a route request to the line equipment. Traffic rescheduling support methods.
7. The method for assisting traffic replanning according to claim 6, The third step is performed at regular intervals regardless of whether the predicted value of the operation schedule replanning is approved or not, and if the accuracy and appropriateness of the newly created predicted value is not above a certain level, the predicted value displayed on the user interface is not changed. Traffic reorganization support methods.
Citation Information
Patent Citations
Operation arrangement apparatus in operation management system
JP2008222004A
Operation arrangement support system and method thereof
JP2011173530A
Operation arrangement support system and operation arrangement support method
JP2013035502A
Train operation control device
JP2018007402A
Operation arrangement support system, operation arrangement training system and operation arrangement support method
JP2020078989A