Manufacturing process data processing device, manufacturing process data processing method, and program

The manufacturing process data processing device and method facilitate lot-by-lot analysis of rubber material kneading by integrating data from multiple kneading machines, addressing the challenge of batch-by-batch processing and enhancing quality control.

JP2024147946APending Publication Date: 2024-10-17THE YOKOHAMA RUBBER CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023060711
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-04
Publication Date
2024-10-17

AI Technical Summary

Technical Problem

Existing technologies struggle to analyze the kneading process of rubber materials on a lot-by-lot basis due to the batch-by-batch processing of manufacturing process data from kneading machines, making it difficult to assess the overall quality and consistency of the kneaded product.

Method used

A manufacturing process data processing device and method that integrates data from multiple kneading machines to determine the start and end times of each batch, specifies the kneading periods for each lot, and generates lot-by-lot process data by combining batch unit data from different machines, enabling comprehensive analysis across all batches.

Benefits of technology

Enables easy and comprehensive lot-by-lot data analysis of rubber material kneading processes, improving the quality control and consistency of the final product by integrating data from multiple kneading stages.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024147946000001_ABST
    Figure 2024147946000001_ABST
Patent Text Reader

Abstract

To facilitate data analysis on a lot-by-lot basis regarding kneading of a rubber material.MEANS FOR SOLVING THE PROBLEM: A manufacturing process data processing device 1 includes the following functional blocks: a first batch unit process data acquisition unit 311 to a fourth batch unit process data acquisition unit 341 for acquiring process data for a plurality of batches for each kneader based on manufacturing process data; a first lot kneading period specifying unit 312 to a fourth lot kneading period specifying unit 342 for specifying a kneading period of each lot in each kneader based on a plurality of batch unit process data; and a lot unit process data generating unit 300 for generating process data for each lot based on a kneading period of each lot in each kneader.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a manufacturing process data processing device, a manufacturing process data processing method and a program, and more particularly to a technique for processing data generated during a kneading process of a rubber material. [Background technology]

[0002] Conventionally, in order to improve the quality of a kneaded product obtained in a kneading process of a rubber material, a technology is known that performs data analysis using process data indicating the operating state of a kneading machine during kneading and data related to the quality of the kneaded product. For example, Patent Document 1 describes a technology that analyzes measurement data indicating the state of a kneading machine during kneading and the degree of anomaly in kneading of a kneading batch by machine learning. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Patent Publication No. 2021-59058 Summary of the Invention [Problem to be solved by the invention]

[0004] Rubber materials are mixed for each lot, but the mixer mixes the rubber materials for each batch that is made by dividing the lot, and the manufacturing process data output from the mixer could only be used for each batch, which made it difficult to analyze the rubber material mixing process for each lot after the fact.

[0005] The present invention has been made in consideration of the above-mentioned problems, and an object of the present invention is to provide a manufacturing process data processing device, a manufacturing process data processing method, and a program that can facilitate data analysis on a lot-by-lot basis for the kneading process of a rubber material. [Means for solving the problem]

[0006] (1) A manufacturing process data processing device according to the present invention is a manufacturing process data processing device that processes manufacturing process data acquired from a first kneader into which a plurality of lots of rubber material are divided into a plurality of batches and fed in sequence, and which kneads the rubber material of each batch in sequence, and a second kneader into which the rubber material of each lot is divided into a plurality of batches and fed in sequence after kneading by the first kneader, and which kneads the rubber material of each batch in sequence, and includes a first batch unit process data acquisition means for acquiring, based on the manufacturing process data, a plurality of first batch unit process data indicating a kneading start time and a kneading end time of each batch in the first kneader and an operating state of the first kneader during kneading, respectively, a second batch unit process data acquisition means for acquiring, based on the manufacturing process data, a plurality of second batch unit process data indicating a kneading start time and a kneading end time of each batch in the second kneader and an operating state of the second kneader during kneading, respectively, and a first lot mixing period specifying means for specifying a mixing period of each of the lots in the first kneader, including a mixing start time of the first batch and a mixing end time of the last batch of each of the lots in the first kneader, based on batch unit process data; a second lot mixing period specifying means for specifying a mixing period of each of the lots in the second kneader, including a mixing start time of the first batch and a mixing end time of the last batch of each of the lots in the second kneader, based on the plurality of second batch unit process data; and a lot unit process data generating means for selecting a portion of the plurality of first batch unit process data and a portion of the plurality of second batch unit process data corresponding to each of the lots, based on the kneading period of each of the lots in the first kneader and the kneading period of each of the lots in the second kneader, to generate a plurality of lot unit process data indicating operating states of both the first kneader and the second kneader while kneading the rubber material of each of the lots.

[0007] (2) In the manufacturing process data processing device of (1), the lot unit process data generation means may generate the multiple lot unit process data based on a mixing end time of the last batch of each lot in the first mixer and a mixing start time of the first batch of each lot in the second mixer.

[0008] (3) In the manufacturing process data processing device of (2), the lot unit process data generation means may generate the multiple lot unit process data by combining the lots such that the mixing end time of the last batch of each lot in the first mixer and the mixing start time of the first batch of each lot in the second mixer are shortest.

[0009] (4) In the manufacturing process data processing device of (1) to (3), the first lot kneading period identifying means may calculate, for a plurality of pairs of an preceding batch, which is one of the batches input into the first kneader, and a subsequent batch, which is one of the batches subsequent to the preceding batch, a lead time that is the difference between the kneading end time of the preceding batch and the kneading start time of the subsequent batch, and identify the kneading period of each of the lots in the first kneader based on the plurality of lead times; and the second lot kneading period identifying means may calculate, for a plurality of pairs of an preceding batch, which is one of the batches input into the second kneader, and a subsequent batch, which is one of the batches subsequent to the preceding batch, a lead time that is the difference between the kneading end time of the preceding batch and the kneading start time of the subsequent batch, and identify the kneading period of each of the lots in the second kneader based on the plurality of lead times.

[0010] (5) In the manufacturing process data processing device of (4), the first lot kneading period identifying means may identify the last batch of each of the lots in the first kneader based on each lead time in the first kneader, and the second lot kneading period identifying means may identify the last batch of each of the lots in the second kneader based on each lead time in the second kneader.

[0011] (6) In the manufacturing process data processing device of (5), the first lot kneading period identifying means may identify the last batch of each of the lots in the first kneader further based on the total number of batches included in each of the lots in the first kneader, and the second lot kneading period identifying means may identify the last batch of each of the lots in the first kneader further based on the total number of batches included in each of the lots in the first kneader.

[0012] (7) A manufacturing process data processing method according to the present invention is a manufacturing process data processing method for processing manufacturing process data acquired from a first kneader into which a plurality of lots of rubber material are input in sequence, each divided into a plurality of batches, and which kneads the rubber material of each batch in sequence, and a second kneader into which the rubber material of each lot is input in sequence, each divided into a plurality of batches after kneading by the first kneader, and which kneads the rubber material of each batch in sequence, the manufacturing process data processing method including a first batch unit process data acquisition step of acquiring a plurality of first batch unit process data indicating a kneading start time and a kneading end time of each batch in the first kneader and an operating state of the first kneader during kneading, based on the manufacturing process data; a second batch unit process data acquisition step of acquiring a plurality of second batch unit process data indicating a kneading start time and a kneading end time of each batch in the second kneader and an operating state of the second kneader during kneading, based on the manufacturing process data; a first lot mixing period specifying step of specifying a mixing period of each of the lots in the first mixer, including a mixing start time of the first batch and a mixing end time of the last batch of each of the lots in the first mixer, based on the plurality of second batch unit process data; and a lot unit process data generating step of selecting a portion of the plurality of first batch unit process data and a portion of the plurality of second batch unit process data corresponding to each of the lots, based on the kneading period of each of the lots in the first kneader and the kneading period of each of the lots in the second kneader, to generate a plurality of lot unit process data indicating operating states of both the first kneader and the second kneader during kneading of each of the lots of the rubber material.

[0013] (8) A program according to the present invention is a program for processing manufacturing process data acquired from a first kneader into which a plurality of lots of rubber material are divided into a plurality of batches and fed in sequence, and which kneads the rubber material of each batch in sequence, and a second kneader into which the rubber material of each lot is divided into a plurality of batches and fed in sequence after kneading by the first kneader, and which kneads the rubber material of each batch in sequence, the program comprising: a first batch unit process data acquisition means for acquiring a plurality of first batch unit process data indicating a kneading start time and a kneading end time of each batch in the first kneader and an operating state of the first kneader during kneading, based on the manufacturing process data; a second batch unit process data acquisition means for acquiring a plurality of second batch unit process data indicating a kneading start time and a kneading end time of each batch in the second kneader and an operating state of the second kneader during kneading, based on the manufacturing process data; The program causes a computer to function as a first lot mixing period specifying means for specifying a mixing period of each of the lots in the first mixer, including a mixing start time of the first batch and a mixing end time of the last batch of each of the lots in the first mixer, based on the plurality of second batch unit process data, a second lot mixing period specifying means for specifying a mixing period of each of the lots in the second mixer, including a mixing start time of the first batch and a mixing end time of the last batch of each of the lots in the second mixer, based on the plurality of second batch unit process data, and a lot unit process data generating means for selecting a part of the plurality of first batch unit process data and a part of the plurality of second batch unit process data corresponding to each of the lots, based on the mixing period of each of the lots in the first mixer and the mixing period of each of the lots in the second mixer, to generate a plurality of lot unit process data indicating the operating states of both the first mixer and the second mixer during mixing of the rubber material of each of the lots. This program may be stored in a computer-readable information storage medium such as a magneto-optical disk or a semiconductor memory. Effect of the Invention

[0014] According to the present invention, data analysis on the kneading of rubber materials on a lot-by-lot basis can be easily performed. [Brief description of the drawings]

[0015] [Figure 1] 1 is a block diagram showing a hardware configuration of a manufacturing process data processing apparatus according to an embodiment of the present invention; [Diagram 2] FIG. 1 is a diagram showing an example of a kneading process for a rubber material. [Diagram 3] FIG. 2 is a functional block diagram showing an example of functions realized by a manufacturing process data processing apparatus according to an embodiment of the present invention. [Figure 4] FIG. 2 is a diagram showing an example of manufacturing process data including a plurality of batch unit process data. [Figure 5A] FIG. 13 is a diagram for explaining a process for identifying the kneading period of each lot. [Figure 5B] FIG. 13 is a diagram for explaining a process for identifying the kneading period of each lot. [Figure 5C] FIG. 13 is a diagram for explaining a process for identifying the kneading period of each lot. [Figure 5D] FIG. 13 is a diagram for explaining a process for identifying the kneading period of each lot. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0016] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A manufacturing process data processing device, a manufacturing process data processing method, and a program according to the present invention will be described in detail below with reference to the drawings.

[0017] 1 is a block diagram showing a hardware configuration of a manufacturing process data processing apparatus according to an embodiment of the present invention. As shown in FIG. 1, the manufacturing process data processing apparatus 1 includes a processing device 11, a storage device 12, a display device 13, and an input device 14.

[0018] The processing device 11 includes, for example, a CPU and a GPU, and operates according to a program stored in the storage device 12. An FPGA may be used as the processing device 11. The storage device 12 may be, for example, a ROM, a RAM, a HDD, an SSD, etc., and stores the program executed by the processing device 11, various data to be processed, etc.

[0019] The storage device 12 includes a main storage device and an auxiliary storage device. For example, the main storage device is a volatile memory such as a RAM, and the auxiliary storage device is a non-volatile memory such as a ROM, an EEPROM, a flash memory, or a hard disk.

[0020] The display device 13 is, for example, a liquid crystal display or an organic EL display, and displays data stored in the storage device 12, processing results of the processing device 11, and the like.

[0021] The input device 14 is a user interface such as a keyboard or a mouse, which receives operational input from an operator and inputs a signal indicating the content of the input to the processing device 11.

[0022] The manufacturing process data processing device 1 having the above configuration is used for analyzing the kneading process of rubber materials. For example, the manufacturing process data processing device 1 may be connected to a plurality of rubber kneading machines via a communication network, and manufacturing process data generated in the kneading machines is provided via the communication network. The manufacturing process data processing device 1 synthesizes data on a lot basis from the process data, enabling analysis of the rubber kneading process data on a lot basis. Note that one or a plurality of personal computers, server computers, etc. can be used as the above-mentioned processing device 11 and storage device 12.

[0023] Fig. 2 is a diagram showing an example of a kneading process of a rubber material. In this embodiment, the kneading process of a rubber material includes a plurality of kneading steps, and as shown in Fig. 2, a case will be described in which the kneading process includes four kneading steps, namely, a first kneading step 21, a second kneading step 22, a third kneading step 23, and a fourth kneading step 24.

[0024] For example, one mixer is assigned to each kneading process. Here, the first kneading process 21 is assigned to the first kneading process 21, the second kneading process 22 is assigned to the second kneading process 221, the third kneading process 23 is assigned to the third kneading process 231, and the fourth kneading process 24 is assigned to the fourth kneading process 24.

[0025] A plurality of lots of rubber material are divided into a plurality of batches and sequentially fed into the first kneader 211, and the first kneader 211 sequentially kneads the batches of rubber material. Note that a lot is a unit of rubber material with the same specifications.

[0026] In the example shown in the figure, first, rubber material of lot L1 is divided into eight batches, batch 2101, batch 2102, ..., batch 2108, and sequentially fed into the first kneader 211. After the rubber material of lot L1 has been fed, rubber material of lot L2 and subsequent batches (batch 2109, ...) are sequentially fed. The number of batches for each lot may be the same or different for each lot.

[0027] The first kneader 211 kneads the rubber material of the batch 2101, batch 2102, ..., batch 2108 of the lot L1 in that order. After kneading all the batches of the rubber material of the lot L1, the first kneader 211 kneads the rubber material of the batches from the lot L2 onwards (batch 2109, ...) in that order.

[0028] After being mixed by the first mixer 211, the rubber material of each lot is fed into the second mixer 221 in a plurality of batches, and the second mixer 221 mixes the rubber material of each batch in turn.

[0029] For example, the rubber material of the lot L1 kneaded by the first kneader 211 is divided into 10 batches, namely, batch 2201, batch 2202, batch 2203, . . . , batch 2210, and is sequentially fed into the second kneader 221. After all the rubber materials of the lot L1 have been fed, the rubber materials of the batches from lot L2 onward (batch 2211, . . . ) are sequentially fed. Each batch fed into the second kneader 221 may be made from only one of the multiple batches kneaded by the first kneader 211. Alternatively, each batch may be made by combining the rubber materials of multiple batches. For example, the rubber material of the batch 2201 is a part of the rubber material of the batch 2101. Also, for example, the rubber material of the batch 2202 is a combination of a part of the rubber material of the batch 2101 and a part of the rubber material of the batch 2102. The rubber material fed to the second kneader 221 may be obtained by adding a new raw material to the rubber material kneaded by the first kneader 211.

[0030] The second kneader 221 kneads the rubber material of batch 2201, batch 2202, ..., batch 2110 of lot L1 in that order, and after kneading all the rubber material of the batches of lot L1, it kneads the rubber material of the batches from lot L2 onwards (batch 2211, ...) in that order.

[0031] The third kneader 231 and the fourth kneader 241 are used and operated in the same manner as the first kneader 211 and the second kneader 221. For example, the rubber material of the lot L1 kneaded by the second kneader 221 is divided into 11 batches, 2301 to 2311, and sequentially fed into the third kneader 231. After all the rubber materials of the lot L1 have been fed, the rubber materials of the batches from lot L2 onwards (batch 2312, ...) are sequentially fed into the fourth kneader 241. The rubber material of the lot L1 kneaded by the third kneader 231 is divided into 16 batches, 2401 to 2416, and sequentially fed into the fourth kneader 241. After all the rubber materials of the lot L1 have been fed, the rubber materials of the batches from lot L2 onwards (batch 2417, ...) are sequentially fed into the fourth kneader 241. For each batch of the mixture mixed by the fourth mixer 241, data on the quality of the mixture, such as viscosity, is measured.

[0032] In this embodiment, the rubber material of lot L1 is divided into 8 batches and fed into the first kneader 211, 10 batches into the second kneader 221, 11 batches into the third kneader 231, and 16 batches into the fourth kneader 241. However, the number of batches to be kneaded in each kneader may be any number.

[0033] Fig. 3 is a functional block diagram showing an example of functions realized by the manufacturing process data processing device 1. As shown in Fig. 3, the manufacturing process data processing device 1 includes a first batch unit process data acquisition unit 311, a second batch unit process data acquisition unit 321, a third batch unit process data acquisition unit 331, a fourth batch unit process data acquisition unit 341, a first lot kneading period determination unit 312, a second lot kneading period determination unit 322, a third lot kneading period determination unit 332, a fourth lot kneading period determination unit 342, and a lot unit process data generation unit 300. These functions are realized by the processing device 11 executing a program stored in the storage device 12.

[0034] The first batch unit process data acquisition unit 311 acquires batch unit process data from the first mixer 211. Hereinafter, the batch unit process data acquired from the nth mixer is referred to as nth batch unit process data. That is, the first batch unit process data acquisition unit 311 acquires a plurality of first batch unit process data. The first batch unit process data indicates the mixing start time and mixing end time of one batch in the first mixer 211, and the operating state of the first mixer 211 during mixing of the batch.

[0035] FIG. 4 is a diagram showing an example of manufacturing process data acquired from the first kneader 211. The manufacturing process data 41 is a record of the operating state of the first kneader 211 at a predetermined sampling interval (here, 1 second). In the figure, each row shows data acquired from the first kneader 211 in one sampling, and includes the sampling date and time, the batch number, and the operating state of the first kneader 211. This operating state includes the temperature of the kneading chamber, the pressure applied to the kneaded rubber, the power consumption of the first kneader 211, and the rotation speed of the kneading blade. The first batch unit process data acquisition unit 311 acquires a group of records having a common batch number as batch unit process data based on this manufacturing process data 41. For example, the records acquired from "2021 / 11 / 9 11:50:46" to "2021 / 11 / 9 11:56:42" are collected into one file to generate batch unit process data 4101. The batch unit process data 4102 is generated in the same manner. Each batch unit process data includes the sampling date and time of the first record as the kneading start date and time of each batch, and the sampling date and time of the last record as the kneading end date and time of each batch. In this way, the first batch unit process data acquisition unit 311 acquires a plurality of first batch unit process data.

[0036] The second batch unit process data acquisition unit 321 to the fourth batch unit process data acquisition unit 341 also have functions similar to those of the first batch unit process data acquisition unit 311. That is, the nth batch unit process data acquisition unit acquires manufacturing process data similar to that shown in Fig. 4 from the nth kneader, and generates a plurality of nth batch unit process data therefrom (n=1 to 4).

[0037] The first lot kneading period specifying unit 312 specifies the kneading period of each lot in the first kneader 211 based on a plurality of first batch unit process data acquired by the first batch unit process data acquiring unit 311. The kneading period of each lot is the period from the kneading start time of the first batch belonging to the same lot to the kneading end time of the last batch.

[0038] 5A to 5D are diagrams for explaining the process of identifying the kneading period of each lot. The first lot kneading period identifying unit 312 generates a time table 51 shown in FIG. 5A from a large number of first batch unit process data acquired by the first batch unit process data acquiring unit 311. In the time table 51, time information of one first batch unit process data is shown in each row. This time information includes the kneading start date and time, kneading end date and time, and lead time of each batch in the first kneader 211. The lead time for a certain batch is the difference between the kneading end time of the batch in the first kneader 211 and the kneading start time of the next batch. The first lot kneading period identifying unit 312 calculates the lead time of each batch and identifies the kneading period of each lot from the calculated lead time. Specifically, in consideration of the fact that the operation of the first kneader 211 is temporarily interrupted when moving from one lot to the next, the threshold value of the lead time is set to, for example, 2 hours, and if there is a lead time of 2 hours or more, the batch is determined to be the last batch of the certain lot. In addition, the next batch is determined to be the first batch of the next lot. In the example of the same figure, there is a lead time of more than two hours between the batch that finished mixing on "2021 / 11 / 9" "14:01:21" and the batch that started mixing on "2021 / 11 / 10" "3:36:55", and the former is determined to be the last batch of a lot, and the latter is determined to be the first batch of the next lot. In this way, the row range in the timetable 51 is identified as the mixing period of one lot. As an example, the timetable 51 shows the mixing period L11 of a certain lot.

[0039] In addition to the length of the lead time, a condition on the number of batches to be included in one lot may be set, and the mixing period of each lot may be specified by further considering the condition. For example, a batch that satisfies the requirement of 8 or more batches and has a lead time of 2 hours or more may be determined to be the last batch of a certain lot.

[0040] The second lot kneading period specifying unit 322, the third lot kneading period specifying unit 332, and the fourth lot kneading period specifying unit 342 also have the same functions as the first lot kneading period specifying unit 312. That is, the second lot kneading period specifying unit 322 generates a time table 52 shown in FIG. 5B, and specifies the kneading period of each lot from the lead time of each batch. Here, the kneading period L12 of a certain lot is shown in the time table 52. The third lot kneading period specifying unit 332 generates a time table 53 shown in FIG. 5C, and specifies the kneading period of each lot from the lead time of each batch. The time table 53 shows the kneading period L13 of a certain lot. Furthermore, the fourth lot kneading period specifying unit 342 generates a time table 54 shown in FIG. 5D, and specifies the kneading period of each lot from the lead time of each batch. Here, the time table 54 shows the kneading period L14 of a certain lot.

[0041] The lot unit process data generating unit 300 selects a portion corresponding to a certain lot in the first batch unit process data, a portion corresponding to a certain lot in the second batch unit process data, a portion corresponding to a certain lot in the third batch unit process data, and a portion corresponding to a certain lot in the fourth batch unit process data based on the mixing period of each lot in the first kneader 211, the mixing period of each lot in the second kneader 221, the mixing period of each lot in the third kneader 231, and the mixing period of each lot in the fourth kneader 241, and connects them to generate process data for one lot, i.e., lot unit process data. The lot unit process data includes all of the operating states of the first kneader 211, the second kneader 221, the third kneader 231, and the fourth kneader 241 during mixing of one lot of rubber material.

[0042] At this time, the lot unit process data generation unit 300 compares the end date and time of the kneading period of each lot in the first kneader 211 with the start date and time of the kneading period of each lot in the second kneader 221 that is responsible for the next kneading process, and links the kneading period with the closest date and time. For example, the end date and time of the kneading period L11 in the timetable 51 shown in FIG. 5A, "2021 / 11 / 9" and "14:01:21", and the start date and time of the kneading period L12 in the timetable 52 shown in FIG. 5B, "2021 / 11 / 9" and "14:39:13", are closest, so the lot unit process data generation unit 300 links those kneading periods L11 and L12. Similarly, the kneading period L12 (FIG. 5B) and the kneading period L13 (FIG. 5C), and the kneading periods L13 (FIG. 5C) and L14 (FIG. 5D) are also linked. Thereafter, the lot unit process data generation section 300 concatenates the first batch unit process data in the kneading period L11, the second batch unit process data in the kneading period L12, the third batch unit process data in the kneading period L13, and the fourth batch unit process data in the kneading period L14, and generates the corresponding lot unit process data.

[0043] According to the manufacturing process data processing device 1 described above, multiple batch unit process data are acquired for each kneader based on the manufacturing process data received from each kneader, and the kneading period of each lot in each kneader is identified based on the batch unit process data related to each kneader. Then, based on the kneading period, lot unit process data is generated from the batch unit process data related to each kneader. According to this embodiment, data analysis on lot unit for kneading of rubber material can be easily performed based on the lot unit process data generated in this way. [Explanation of symbols]

[0044] 1 manufacturing process data processing device, 11 processing device, 12 storage device, 13 display device, 14 input device, 21 first kneading process, 22 second kneading process, 23 third kneading process, 24 fourth kneading process, 211 first kneader, 221 second kneader, 231 third kneader, 241 fourth kneader, 2101-2109 batch, 2201-2211 batch, 2301-2312 batch, 2401-2417 batch, L1 first lot, L2 second lot, 311 first batch unit process data acquisition unit, 312 first lot kneading period determination unit, 321 second batch unit process data acquisition unit, 322 second lot kneading period determination unit, 331 third batch unit process data acquisition unit, 332 Third lot kneading period specifying unit, 341 fourth batch unit process data acquisition unit, 342 fourth lot kneading period specifying unit, 300 lot unit process data generation unit, 41 manufacturing process data, 4101 to 4102 batch unit process data, 51 to 54 timetable, L11 to L14 kneading period.

Claims

1. a first kneader into which a plurality of lots of rubber material are input in succession in a plurality of batches, and the first kneader kneads the rubber material of each batch in succession; a second kneader into which the rubber material of each lot is divided into a plurality of batches after the kneading by the first kneader, and the second kneader kneads the rubber material of each batch in turn; A manufacturing process data processing device that processes manufacturing process data acquired from each of the a first batch unit process data acquisition means for acquiring a plurality of first batch unit process data indicating a mixing start time and a mixing end time of each batch in the first mixer and an operating state of the first mixer during mixing based on the manufacturing process data; a second batch unit process data acquisition means for acquiring a plurality of second batch unit process data indicating a mixing start time and a mixing end time of each batch in the second mixer and an operating state of the second mixer during mixing based on the manufacturing process data; a first lot mixing period specifying means for specifying a mixing period of each of the lots in the first mixer, including a mixing start time of the first batch and a mixing end time of the last batch of each of the lots in the first mixer, based on the plurality of first batch unit process data; A second lot mixing period specifying means for specifying a mixing period of each of the lots in the second mixer, including a mixing start time of the first batch and a mixing end time of the last batch of each of the lots in the second mixer, based on the plurality of second batch unit process data; a lot unit process data generating means for selecting a part of the plurality of first batch unit process data and a part of the plurality of second batch unit process data corresponding to each of the lots based on a mixing period of each of the lots in the first mixer and a mixing period of each of the lots in the second mixer, and generating a plurality of lot unit process data indicating operation states of both the first mixer and the second mixer while mixing the rubber material of each of the lots; A manufacturing process data processing device including:

2. the lot unit process data generating means generates the plurality of lot unit process data based on a mixing end time of the last batch of each of the lots in the first mixer and a mixing start time of the first batch of each of the lots in the second mixer. The manufacturing process data processing apparatus according to claim 1 .

3. the lot unit process data generating means generates the plurality of lot unit process data by combining the lots in which a mixing end time of the last batch of each of the lots in the first mixer and a mixing start time of the first batch of each of the lots in the second mixer are shortest. The manufacturing process data processing apparatus according to claim 2 .

4. the first lot mixing period specifying means calculates a lead time, which is a difference between a mixing end time of the preceding batch and a mixing start time of the subsequent batch, for a plurality of pairs of a preceding batch, which is one of the batches input into the first mixer, and a subsequent batch, which is one of the batches that follows the preceding batch, and specifies a mixing period of each of the lots in the first mixer based on the plurality of lead times; the second lot mixing period specifying means calculates a lead time, which is a difference between a mixing end time of the preceding batch and a mixing start time of the subsequent batch, for a plurality of pairs of a preceding batch, which is one of the batches input to the second mixer, and a subsequent batch, which is one of the batches that follows the preceding batch, and specifies a mixing period of each of the lots in the second mixer based on the plurality of lead times; 4. The manufacturing process data processing device according to claim 1.

5. The first lot mixing period specifying means specifies the last batch of each of the lots in the first mixer based on each lead time in the first mixer, The second lot mixing period specifying means specifies the last batch of each of the lots in the second mixer based on each lead time in the second mixer. The manufacturing process data processing apparatus according to claim 4 .

6. The first lot mixing period specifying means specifies the last batch of each of the lots in the first mixer based on the total number of the batches included in each of the lots in the first mixer, The second lot mixing period specifying means specifies the last batch of each of the lots in the first mixer based on the total number of the batches included in each of the lots in the first mixer. The manufacturing process data processing apparatus according to claim 5 .

7. a first kneader into which a plurality of lots of rubber material are input in succession in a plurality of batches, and the first kneader kneads the rubber material of each batch in succession; a second kneader into which the rubber material of each lot is divided into a plurality of batches after the kneading by the first kneader, and the second kneader kneads the rubber material of each batch in turn; A manufacturing process data processing method for processing manufacturing process data acquired from each of a first batch unit process data acquisition step of acquiring a plurality of first batch unit process data indicating a mixing start time and a mixing end time of each batch in the first mixer and an operating state of the first mixer during mixing, based on the manufacturing process data; a second batch unit process data acquisition step of acquiring a plurality of second batch unit process data indicating a mixing start time and a mixing end time of each batch in the second mixer and an operating state of the second mixer during mixing based on the manufacturing process data; a first lot mixing period specifying step of specifying a mixing period of each of the lots in the first mixer, the mixing period including a mixing start time of the first batch and a mixing end time of the last batch of each of the lots in the first mixer, based on the plurality of first batch unit process data; A second lot mixing period specifying step of specifying a mixing period of each of the lots in the second mixer, including a mixing start time of the first batch and a mixing end time of the last batch of each of the lots in the second mixer, based on the plurality of second batch unit process data; a lot unit process data generating step of selecting a part of the plurality of first batch unit process data and a part of the plurality of second batch unit process data corresponding to each of the lots based on a mixing period of each of the lots in the first mixer and a mixing period of each of the lots in the second mixer, to generate a plurality of lot unit process data indicating operation states of both the first mixer and the second mixer while mixing the rubber material of each of the lots; A manufacturing process data processing method comprising:

8. a first kneader into which a plurality of lots of rubber material are input in succession in a plurality of batches, and the first kneader kneads the rubber material of each batch in succession; a second kneader into which the rubber material of each lot is divided into a plurality of batches after the kneading by the first kneader, and the second kneader kneads the rubber material of each batch in turn; A program for processing manufacturing process data acquired from each of the a first batch unit process data acquisition means for acquiring a plurality of first batch unit process data indicating a mixing start time and a mixing end time of each batch in the first mixer and an operating state of the first mixer during mixing, based on the manufacturing process data; a second batch unit process data acquisition means for acquiring a plurality of second batch unit process data indicating a mixing start time and a mixing end time of each batch in the second mixer and an operating state of the second mixer during mixing, based on the manufacturing process data; a first lot mixing period specifying means for specifying a mixing period of each of the lots in the first mixer, including a mixing start time of the first batch and a mixing end time of the last batch of each of the lots in the first mixer, based on the plurality of first batch unit process data; a second lot mixing period specifying means for specifying a mixing period of each of the lots in the second mixer, including a mixing start time of the first batch and a mixing end time of the last batch of each of the lots in the second mixer, based on the plurality of second batch unit process data; a lot unit process data generating means for selecting a part of the plurality of first batch unit process data and a part of the plurality of second batch unit process data corresponding to each of the lots based on a kneading period of each of the lots in the first kneader and a kneading period of each of the lots in the second kneader, and generating a plurality of lot unit process data indicating operation states of both the first kneader and the second kneader, respectively, during kneading of the rubber material of each of the lots; A program that makes a computer function as a

Citation Information

Patent Citations

  • Kneading abnormality-degree learning device, method for generating learned model, and program

    JP2021059058A