Hot water supply system
The hot water supply system addresses pipe cleaning inefficiencies by using a two-stage cleaning process with hot water and ozonated water, ensuring effective sterilization and minimizing corrosion risks.
Patent Information
- Application Number
- JP2023060743
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-04
- Publication Date
- 2024-10-17
AI Technical Summary
Existing hot water supply systems face limitations in pipe cleaning efficiency, with high-temperature cleaning water lacking sufficient sterilization and ozone use risking material corrosion.
A hot water supply system with a functional water generation unit that generates sterilizing water, performing a two-stage pipe cleaning operation: first with hot water and then with ozonated water, ensuring effective sterilization while minimizing ozone exposure.
The system achieves efficient pipe cleaning with a sterilization effect, reducing ozone usage to prevent corrosion and optimizing contact time for enhanced cleaning efficacy.
Smart Images

Figure 2024147958000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a hot water supply system, and more particularly to a hot water supply system having a pipe cleaning operation function. [Background technology]
[0002] Japanese Patent Application Laid-Open Publication No. 2001-4207 (Patent Document 1) describes a hot water supply system in which a bath water circulation heating path (reheating circulation path) is connected between a water heater and a bathtub, in which hot water is supplied to a path equivalent to that used when filling the bathtub after draining the bathtub, thereby performing a cleaning operation of the pipes and the like that make up the reheating circulation path. In Patent Document 1, the temperature and amount (volume) of hot water used for pipe cleaning are controlled to vary depending on the time elapsed from the completion of filling the bathtub with hot water to draining it, and on the number of bathers (estimated value), thereby improving the efficiency of pipe cleaning to remove adhering dirt, sebum, and the like.
[0003] In addition, Japanese Patent No. 6022095 (Patent Document 2) describes a method of connecting a cleaning device to a reheating pipe separated from a water heater and cleaning the pipe with a cleaning liquid supplied from the cleaning device. Patent Document 2 describes a method of cleaning the pipe with cleaning water in which ozone is dissolved. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2001-4207 A [Patent Document 2] Patent No. 6022095 Summary of the Invention [Problem to be solved by the invention]
[0005] In the pipe cleaning operation of Patent Document 1, considering that the cleaning water is output to the bathtub, there is a limit to how high the temperature of the cleaning water can be raised, so while there is an effect of removing dirt, there is a limit to the sterilization effect. In contrast, in the pipe cleaning of Patent Document 2, while a sterilization effect by ozone can be expected, there are concerns that an excessive supply of ozone may cause material corrosion of the pipes, etc., and adversely affect the life of the ozone generator.
[0006] In Patent Document 2, the piping is separated from the water heater and connected to a dedicated cleaning device, and it is not envisaged that the piping will be cleaned every time the bathtub is drained, as in Patent Document 1. For this reason, when performing regular pipe cleaning operation as in Patent Document 1 for substances that may corrode materials, the challenge is to perform the pipe cleaning operation efficiently in order to ensure the cleaning effect while suppressing the amount of ozone etc. generated.
[0007] The present invention has been made to solve such problems, and an object of the present invention is to efficiently carry out a pipe cleaning operation having a sterilizing effect. [Means for solving the problem]
[0008] In one aspect of the present invention, a hot water supply system is provided that includes a bathtub as a hot water supply destination. The hot water supply system includes a circulation path for circulating and heating bath water in the bathtub, a hot water pouring circuit, a functional water production unit, and a control circuit. The hot water pouring circuit supplies hot water to the bathtub via a hot water pouring path that includes the circulation path. The functional water production unit produces functional water that contains a substance that has a disinfecting effect. When the control circuit detects drainage of the bathtub, it executes a pipe cleaning operation of the circulation path. The pipe cleaning operation includes a first cleaning operation in which the functional water produced by the functional water production unit is supplied to the circulation path, and a second cleaning operation in which hot water supplied from the hot water pouring circuit is supplied to the circulation path after the first cleaning operation. Effect of the Invention
[0009] According to the present invention, a pipe cleaning operation having a sterilizing effect can be efficiently carried out. [Brief description of the drawings]
[0010] [Figure 1] 1 is a schematic diagram illustrating a configuration example of a hot water supply system according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a block diagram illustrating a configuration related to a pipe cleaning operation of the hot water supply system shown in FIG. [Diagram 3] 4 is a table for explaining details of the pipe cleaning operation according to the present embodiment. [Figure 4] 4 is a flowchart illustrating a pipe cleaning operation according to the present embodiment. [Diagram 5] 10 is a flowchart illustrating a modified example of the pipe cleaning operation according to the present embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. In the following, the same or corresponding parts in the drawings are designated by the same reference characters, and their description will not be repeated in principle.
[0012] FIG. 1 is a schematic diagram illustrating a configuration example of a hot water supply system according to the present embodiment.
[0013] 1, a hot water supply system 300 according to the present embodiment includes a hot water supply device 100. Hot water supply device 100 supplies hot water to a bathtub 20 installed in a bathroom 200, in addition to a hot water tap and the like (not shown).
[0014] The water heating device 100 comprises a housing 1, a burner 2, a fan 3, a heat exchanger 4, a water inlet pipe 5, a hot water supply pipe 6, a bypass valve 7, a bypass pipe 7a, a circulation path 8, temperature sensors 9, 18, 19, a circulation pump 10, a water level sensor 11, a controller 12, a bath water supply valve 13, electrical wiring 14, flow sensors 15, 16, remote controls 30, 50, a three-way valve 32, a functional water generation unit 35, and a constant flow valve 36.
[0015] The housing 1 is provided so that the inside and outside of the housing 1 are in communication with each other, and has an exhaust port 1a for exhausting combustion gas. The housing 1 is configured to accommodate a burner 2, a fan 3, a heat exchanger 4, a water inlet pipe 5, a hot water supply pipe 6, a bypass valve 7, a bypass pipe 7a, temperature sensors 9, 18, 19, flow sensors 15, 16, a circulation pump 10, a water level sensor 11, a controller 12, a bath hot water supply valve 13, a three-way valve 32, a functional water production unit 35, and a constant flow valve 36. The housing 1 also accommodates a part of a circulation path 8 for reheating operation.
[0016] The burner 2 is configured to perform combustion operation by receiving a supply of fuel gas from a fuel supply system (not shown). The burner 2 supplies the combustion gas to the heat exchanger 4. The burner 2 has a hot water supply burner 2a and a supplementary heating burner 2b.
[0017] Fan 3 supplies air for combustion to burner 2. Fan 3 has fan 3a that supplies air for combustion to burner 2a, and fan 3b that supplies air for combustion to burner 2b. Each of fans 3a and 3b has a blade and a motor for rotating the blade. The blade is rotated by applying a current to the motor to supply air for combustion. Fans 3a and 3b are disposed below burners 2a and 2b in the height direction of water heater 100, respectively. Note that, regarding fan 3, FIG. 1 illustrates a configuration in which burners 2a and 2b are each provided with one fan 3a and one fan 3b, respectively, but it is also possible to configure a configuration in which one fan is shared by multiple burners 2a and 2b.
[0018] Heat exchanger 4 has heat exchanger 4a for hot water supply and heat exchanger 4b for reheating. Heat exchangers 4a and 4b are respectively arranged above burners 2a and 2b in the height direction of water heating apparatus 100. Heat exchangers 4a and 4b are arranged near exhaust port 1a.
[0019] The heat exchanger 4a recovers heat from the combustion gas supplied by the burner 2a. The heat exchanger 4b recovers heat from the combustion gas supplied by the burner 2b. Each of the heat exchangers 4a and 4b may include a primary heat exchanger that heats the incoming water by heat exchange with the sensible heat (combustion heat) of the combustion gas of the burner 2, and a secondary heat exchanger that heats the flowing water by heat exchange with the latent heat of the combustion exhaust gas from the burner 2.
[0020] The water inlet pipe 5 is connected to a water supply pipe at the water inlet port 5a. When the hot water tap is turned on and / or the bath hot water valve 13 is opened, low-temperature water is introduced from the water inlet port 5a to the water heater 100 by the supply pressure of the tap water. A temperature sensor 18 provided on the water inlet pipe 5 detects the temperature Tw of the inlet water introduced from the water inlet port 5a.
[0021] The water inlet pipe 5 is branched into a boiler body pipe 5b and a bypass pipe 7a via a bypass valve 7. The boiler body pipe 5b is connected to one end of the heat exchanger 4a. The flow rate ratio of the bypass pipe 7a and the boiler body pipe 5b to the total flow rate of the water inlet pipe 5 is controlled by the opening degree of the bypass valve 7.
[0022] The other end of the heat exchanger 4a is connected to one end of the hot water supply pipe 6. Low-temperature water supplied from the water inlet pipe 5 to the boiler body pipe 5b is heated to a predetermined temperature by the heat exchanger 4a and output to the hot water supply pipe 6. A flow rate sensor 15 is disposed in the boiler body pipe 5b. The flow rate sensor 15 can detect the flow rate of the heat exchanger 4a (boiler body flow rate).
[0023] On the other hand, bypass piping 7a bypasses heat exchanger 4a and is connected to hot water supply piping 6. Therefore, low-temperature water supplied from water inlet piping 5 to bypass piping 7a is output to hot water supply piping 6 without being heated by heat exchanger 4a. In this way, hot water supply device 100 can mix high-temperature water output from heat exchanger 4a and low-temperature water that has passed through bypass piping 7a, and output hot water at an appropriate temperature according to the set temperature from hot water supply piping 6.
[0024] The other end of the hot water supply pipe 6 is connected to a hot water outlet 6a connected to a hot water tap (not shown) or the like. Therefore, when the hot water tap is opened, hot water at an appropriate temperature controlled to a set temperature is supplied from the hot water supply device 100 to the hot water tap via the hot water outlet 6a.
[0025] The hot water supply pipe 6 is further connected to a hot water supply pipe 13a leading to a bathtub 20. A bath hot water supply valve 13 is interposed and connected to the hot water supply pipe 13a. The bath hot water supply valve 13 can be configured, for example, by a solenoid valve that can be controlled to open and close. By opening the bath hot water supply valve 13, a path can be formed for outputting hot water from the hot water supply pipe 6 to the hot water supply pipe 13a. In this way, the hot water supply device 100 can include the bathtub 20 as a hot water supply destination in addition to a hot water tap, etc.
[0026] In this specification, the supply of hot water from the water heater 100 to the bathtub 20 is referred to as "pouring hot water" to distinguish it from the supply of hot water to the outlet 6a (hot water tap, etc.). A flow rate sensor 16 is provided in the water supply pipe 13a. The flow rate sensor 16 can detect the flow rate of hot water supplied from the water heater 100 to the bathtub 20. In this embodiment, the action of supplying hot water or water to the bathtub 20 via the hot water supply pipe 13a by opening the bath hot water supply valve 13, regardless of the hot water temperature at the hot water supply pipe 6, is referred to as "pouring hot water". In other words, the burner 2a, fan 3a, heat exchanger 4a, water inlet pipe 5, boiler body pipe 5b, hot water supply pipe 6, bypass valve 7, bypass pipe 7a, and bath hot water supply valve 13 of the water heater 100 can constitute one embodiment of a "hot water supply circuit".
[0027] The circulation path 8 is for circulating hot water 21 in the bathtub 20 (hereinafter also referred to as bathtub water 21) within the water heater 100, and has a return pipe 8a, a forward pipe 8b, and a circulation pump 10. One end of the return pipe 8a is connected to a circulation adapter 25 in the bathtub 20, and the other end is connected to the input side of the heat exchanger 4b. One end of the forward pipe 8b is connected to the output side of the heat exchanger 4b, and the other end is connected to the circulation adapter 25.
[0028] By operating the circulation pump 10, a path (reheating circulation path) is formed in which bath water 21 drawn in from the circulation adapter 25 passes through the return pipe 8a, the heat exchanger 4b, and the forward pipe 8b, and is discharged from the circulation adapter 25. When the combustion operation of the burner 2b is turned on while the reheating circulation path is formed, the bath water 21 introduced from the return pipe 8a is heated by the heat exchanger 4b, and the heated bath water 21 is supplied to the bathtub 20 by the forward pipe 8b, thereby performing a reheating operation that raises the temperature of the bath water 21.
[0029] A temperature sensor 9 and a water level sensor 11 are connected to the return pipe 8a. The temperature sensor 9 can detect the temperature of the bathtub water 21 (bathtub water temperature Tbt). The water level sensor 11 is, for example, a pressure sensor, and detects the level of the bathtub water 21 in the bathtub 20 (hereinafter simply referred to as the "bathtub water level") based on the water pressure of the bathtub water 21. The temperature sensor 9 and the water level sensor 11 are disposed in an area of the return pipe 8a into which the bathtub water 21 enters, even when the circulation pump 10 is stopped.
[0030] Return pipe 8a is further connected to hot water supply pipe 13a at connection point 8c. As a result, when hot water is poured from hot water supply device 100 while circulation pump 10 is stopped, a first hot water supply path can be formed from pouring pipe 13a to bathtub 20 via connection point 8c and return pipe 8a, and a second hot water supply path can be formed from pouring pipe 13a to bathtub 20 via connection point 8c, return pipe 8a, heat exchanger 4b, and forward pipe 8b. This allows the bath to be filled by pouring hot water from hot water supply device 100.
[0031] In this way, hot and cold water from water heater 100 (hot water pouring circuit) is supplied to bathtub 20 via the first and second hot water pouring paths, including circulation path 8. Bathtub 20 is provided with a drain plug 26. Drain plug 26 can be configured as either a "manual drain plug" that is opened and closed by manual operation by the user, or an "automatic drain plug" that can also be opened and closed automatically in response to an operation command from controller 12.
[0032] In the drainage structure illustrated in FIG. 1, drainage from drain plug 26 merges with drainage from drain outlet 210 provided on the floor of bathroom 200 in a drain trap and is discharged from drain pipe 220.
[0033] In the hot water supply system 300 according to this embodiment, a three-way valve 32, a functional water production unit 35, and a constant flow valve 36, which are devices for the pipe cleaning operation according to this embodiment, are arranged between the connection point 8c and the connection point 8c. As will be described in detail later, the hot water from the hot water supply device 100 (hot water supply circuit) is supplied to the connection point 8c by the three-way valve 32 selecting a route that passes through the functional water production unit 35 or a route that does not pass through the functional water production unit 35.
[0034] The controller 12 can include, for example, a microcomputer. The controller 12 is electrically connected to the burners 2a, 2b, the fans 3a, 3b, the temperature sensors 9, 18, 19, the circulation pump 10, the water level sensor 11, the bath hot water valve 13, the electrical wiring 14, the three-way valve 32, and the functional water production unit 35. The electrical wiring 14 is configured to supply power to the controller 12 by being connected to a power source (not shown). The controller 12 corresponds to one embodiment of a "control circuit".
[0035] The controller 12 receives detection values from the flow rate sensors 15 and 16 and the temperature sensors 9, 18, and 19. The flow rate sensors 15 and 16 may be configured, for example, by impeller-type flow meters. The temperature sensors 9, 18, and 19 may be configured, for example, by thermistors.
[0036] The controller 12 can obtain the inlet water temperature Tw from the detection value of the temperature sensor 18, the outlet water temperature Th from the detection value of the temperature sensor 19, and the bathtub water temperature from the detection value of the temperature sensor 9. The controller 12 can also calculate the amount (volume) of hot water poured into the bathtub 20 by integrating the flow rate (pouring water flow rate) detected by the flow rate sensor 16.
[0037] Furthermore, the controller 12 is communicatively connected to a remote control 30 and a remote control 50. Note that the communication between these devices may be in accordance with any known standard, and may be wired or wireless.
[0038] Remote control 30 is installed on the wall of bathroom 200 and is used to operate water heater 100. Remote control 30 includes a display unit 37 for displaying information, and an operation unit 38 for accepting input setting operations from a user or installer. Display unit 37 is typically configured with a liquid crystal panel, and is configured to be able to display the bathtub water level and temperature. Operation unit 38 is typically configured with push buttons or touch buttons, and is configured to be able to accept setting operations related to at least the bathtub water level and temperature.
[0039] Remote control 50 is installed outside bathroom 200 and is used to operate water heating apparatus 100. Remote control 50 is typically installed on a wall in the kitchen. Remote control 50 includes a display unit 51 for displaying information and an operation unit 52 for receiving input setting operations from a user or the like.
[0040] Display unit 51 is typically configured with a liquid crystal panel, and is configured to be able to display the hot water supply setting temperature, the bath setting temperature, etc. Operation unit 52 is typically configured with push buttons or touch buttons, and is configured to be able to accept setting operations related to the operation of water heating device 100.
[0041] Based on input setting operations by a user or the like from remote controls 30, 50, controller 12 controls the operation of water heating apparatus 100 so that water heating system 300 operates in accordance with the input instructions.
[0042] As an example of this control, controller 12 executes a bath filling operation when automatic bath operation is instructed by operating remote controls 30, 50. The bath filling operation ends when the bath water level in bathtub 20 reaches the set water level due to hot water poured from water heater 100 and the bath water temperature detected by temperature sensor 9 reaches the bath set temperature.
[0043] In water heating device 100, it is possible to set an automatic mode that maintains the temperature and water level of bathtub water 21 after the bath filling operation is completed. When this automatic mode is selected, if the bathtub water temperature detected by temperature sensor 9 falls below a reference temperature set corresponding to the bath set temperature (for example, set 2 to 3°C lower than the bath set temperature), a reheating operation is automatically started for heat retention control. Furthermore, if the bathtub water level detected by water level sensor 11 falls below the set water level, a top-up operation is automatically started to supply additional hot water from water heating device 100 to bathtub 20.
[0044] In the hot water supply system according to this embodiment, after draining bathtub 20, the inside of the pipes including circulation path 8 can be cleaned by a pipe cleaning operation using hot water poured from hot water supply device 100. The pipe cleaning operation according to this embodiment has a "functional water cleaning mode" in which functional water containing a substance having a sterilizing effect is supplied to circulation path 8. For example, the functional water can be hot water mixed with ozone (hereinafter referred to as "ozonated water") obtained by electrolyzing hot water supplied from the hot water supply circuit. Below, an example of a pipe cleaning operation using ozonated water as functional water will be described, but it is also possible to use hot water mixed with hypochlorous acid or the like obtained by electrolysis as the "functional water".
[0045] The automatic on / off of the pipe cleaning operation linked to drainage of the bathtub 20 and the on / off of the “functional water cleaning mode” when the pipe cleaning operation is on are set by user operation on the remote controls 30 and 50.
[0046] FIG. 2 is a block diagram illustrating a configuration related to the pipe cleaning operation in the hot water supply system 300 of FIG.
[0047] 2, the three-way valve 32 is disposed between the bath hot water supply valve 13 (hot water supply circuit) and the connection point 8c of the circulation path 8. In response to a command from the controller 12, the three-way valve 32 operates to select either a first path P1 that does not pass through the functional water production unit 35 or a second path P2 that passes through the functional water production unit 35 as the path through which hot water from the hot water supply circuit reaches the connection point 8c when the bath hot water supply valve 13 is opened.
[0048] When the functional water production unit 35 is energized in accordance with a command from the controller 12, the three-way valve 32 selects the second path P2 to electrolyze the hot water supplied from the hot water supply circuit to produce ozone water. On the other hand, when the functional water production unit 35 is energized in accordance with a command from the controller 12, no functional water is produced, and the functional water production unit 35 outputs the hot water supplied from the hot water supply circuit as is.
[0049] Furthermore, in the functional water production unit 35, the efficiency of ozone production decreases when the temperature of hot water is high. Therefore, when the functional water production unit 35 is energized, it is preferable that the controller 12 stops the combustion of the burner 2a so that unheated water is supplied to the functional water production unit 35 from the hot water supply circuit.
[0050] The constant flow valve 36 is disposed on the second path P2, with the functional water production unit 35 as an adjustment means for the flow rate Q2. Adjustment of the flow rate Q2 is necessary to ensure the ozone concentration of the ozone water output from the functional water production unit 35. When the constant flow valve 36 is disposed as the adjustment means, the flow rate Q2 passing through the functional water production unit 35 is controlled to a constant flow rate that depends on the specifications of the constant flow valve 36. For example, the flow rate Q2 is adjusted to ensure the ozone concentration in the ozone water in accordance with the specifications (electrolysis capacity, etc.) of the functional water production unit 35. Note that the flow rate Q2 can also be variably adjusted by disposing a servo valve or the like instead of the x constant flow valve 36.
[0051] In contrast, the flow rate Q1 of the first path P1, which does not pass through the functional water generation unit 35, is determined depending on the water inlet pressure at the water inlet pipe 5 and the pressure loss in the path from the water inlet pipe 5 to the bathtub 20 when the bath hot water valve 13 is opened. The flow rate Q2 is adjusted to ensure a predetermined ozone concentration according to the specifications (electrolysis capacity, etc.) of the functional water generation unit 35. Normally, the flow rate Q2 is smaller than the flow rate Q1.
[0052] As functions related to the pipe cleaning operation, the controller 12 generates commands to open / close the bath hot water valve 13, commands for the three-way valve 32 (selection of the first path P1 or the second path P2), and commands to turn on / off the power supply to the functional water production unit 35. The controller 12 has a built-in timer 12t, and is capable of measuring the elapsed time from any timing. The controller 12 also receives inputs of the detection value of the flow sensor 16 (flow rate detection value Q), the detection value of the temperature sensor 18 (inlet water temperature Tw), and the detection value of the temperature sensor 19 (outlet hot water temperature Th), etc.
[0053] Each of the flow rates Q1 and Q2 can be detected by the flow rate sensor 16 in Fig. 1 (detected flow rate value Q). Therefore, the controller 12 can calculate the amount (volume) of the functional water (ozone water) or hot water supplied through the first path P1 and the second path P2 by the integrated value of the detected flow rate (L / min) by the flow rate sensor 16.
[0054] FIG. 3 is a table for explaining details of the pipe cleaning operation according to this embodiment.
[0055] As shown in FIG. 3, the pipe cleaning operation according to this embodiment can be made up of a pre-cleaning operation, a functional water cleaning operation, and a purge cleaning operation.
[0056] In pre-cleaning operation, the first path P1 is selected by the three-way valve 32, and hot water is supplied from the hot water supply circuit to the circulation path 8. In pre-cleaning operation, the power supply to the functional water production unit 35 is turned off (not energized). In pre-cleaning operation, hot water heated by turning on the combustion of the burner 2a is supplied from the hot water supply circuit (for example, Th = 48°C), thereby enhancing the effect of removing grease (sebum, etc.) from the piping.
[0057] In functional water cleaning operation, the functional water production unit 35 is energized with the second path P2 selected by the three-way valve 32. As a result, hot water supplied from the hot water supply circuit is electrolyzed, and ozone water of a specified concentration is output from the functional water production unit 35. In functional water cleaning operation, to make it easier to ensure the ozone concentration by electrolysis, the constant flow valve 36 adjusts the flow rate Q2 to a specified constant flow rate, and unheated water (inlet water temperature Tw) is output from the hot water supply circuit.
[0058] In purge cleaning operation, the three-way valve 32 selects the second path P2, and the functional water production unit 35 is turned off. This causes the hot water supplied from the hot water supply circuit to pass through the same path as in functional water cleaning operation and be supplied to the circulation path 8. As a result, by passing through the constant flow valve 36, the flow rate of the functional water in functional water cleaning operation and the flow rate of the hot water in purge cleaning operation become equal constant flow rates without special control. Note that, even in purge cleaning operation, it is preferable that unheated water (inlet water temperature Tw) is output from the hot water supply circuit.
[0059] 4 is a flow chart for explaining the pipe cleaning operation according to this embodiment. For example, the control process shown in FIG.
[0060] Referring to FIG. 4, in step (hereinafter simply referred to as "S") 110, when drainage of bathtub 20 is detected while automatic pipe cleaning operation is selected (YES determination in S110), controller 12 executes pipe cleaning operation.
[0061] For example, in the judgment of S110, when the bath filling operation is completed and the water level sensor 11 detects that the bath water level has dropped to a level where the circulation adapter 25 is exposed, drainage can be detected. Alternatively, if the drain plug 26 is configured as an automatic drain plug, drainage can be detected in response to a predetermined time having elapsed after a command to open the drain plug 26. In this way, any method can be used to detect drainage of the bathtub 20, without any particular limitation. Also, as described above, the user can select whether the automatic pipe cleaning operation is on or off.
[0062] When the pipe cleaning operation is started, the controller 12 checks in S120 whether or not the "functional water cleaning mode" has been turned on by the user. When the functional water cleaning mode is turned off (NO in S120), in S200, only hot and cold water from the hot water supply circuit is supplied to the circulation path 8, and the pipe cleaning operation is performed. That is, in S200, the three-way valve 32 is controlled to select the first path P1, and an open period of the bath hot water supply valve 13 is set so that a specified amount of hot and cold water is supplied.
[0063] When the functional water flush mode is on (YES in S120), the controller 12 starts the processing from S130 onwards. In S130, the controller 12 controls the three-way valve 32 to select the first path P1 (Fig. 2) with the bath hot water supply valve 13 closed. Then, in S140, the bath hot water supply valve 13 is opened to supply hot water from the hot water supply circuit to the circulation path 8 (connection point 8c). This executes the pre-flushing operation shown in Fig. 3.
[0064] When the volume of hot and cold water supplied during the pre-wash operation reaches a predetermined value V1 based on the flow rate (Q1) detected by the flow rate sensor 16, the controller 12 closes the bath hot water supply valve 13, thereby terminating the pre-wash operation of S140.
[0065] When the pre-wash operation is completed, the controller 12 controls the three-way valve 32 to select the second path P2 (Fig. 2) in S150 with the bath hot water valve 13 closed. Then, in S160, the functional water production unit 35 is energized and the bath hot water valve 13 is opened, so that functional water (ozone water) is supplied from the functional water production unit 35 to the circulation path (connection point 8c). This executes the functional water washing operation shown in Fig. 3.
[0066] In the functional water cleaning operation (S160), unheated water is supplied from the hot water supply circuit, which makes it easy to ensure the ozone concentration in the functional water generation unit 35. When the elapsed time from the start of the functional water cleaning operation, measured by the timer 12t, i.e., the power supply time of the functional water generation unit 35 (the output time of ozone water), reaches a predetermined judgment time Tcl, the controller 12 ends the power supply to the functional water generation unit 35, thereby ending the functional water cleaning operation of S160. Therefore, the supply amount (volume) V2 of functional water during the functional water cleaning operation is represented by the product of the adjusted flow rate Q2 and the judgment time Tcl.
[0067] In S170, the controller 12 maintains the second path P2, which is the same as in the functional water flushing operation in S160, with the functional water production unit 35 de-energized, and supplies hot and cold water from the hot water supply circuit to the circulation path (connection point 8c). This executes the purge flushing operation shown in Fig. 3. When the supply amount (volume) of hot and cold water from the hot water supply circuit reaches a predetermined value V3 based on the flow rate (Q2) detected by the flow rate sensor 16 or based on timing by the timer 12t, the controller 12 closes the bath hot water supply valve 13, thereby terminating the purge flushing operation of S170.
[0068] When the purge cleaning operation (S170) ends, the controller 12 controls the three-way valve 32 in S180 so that the first path P1 used during normal pouring is selected, thereby ending the pipe cleaning operation.
[0069] In this manner, in the pipe cleaning operation according to the present embodiment, by performing a purge cleaning operation after a functional water cleaning operation, even if a volume of ozone water (functional water) smaller than the volume of the circulation path 8 is generated, the ozone water (functional water) can be pushed out by the hot water supplied in the purge cleaning operation, so that the inside of the pipe can come into contact with the ozone water throughout the entire circulation path 8.
[0070] Usually, the sterilization effect in the piping depends on the product of the ozone concentration of the ozone water and the contact time with the ozone water. On the other hand, there is a concern that excessive contact with the ozone water may cause durability problems such as corrosion in each device such as the piping. Therefore, from the viewpoint of the life of the functional water generation unit 35, it is preferable to generate the minimum amount of ozone water (functional water) necessary in light of the sterilization effect.
[0071] As described above, by performing the purge cleaning operation after the functional water cleaning operation, it is possible to realize an efficient pipe cleaning operation in which the ozone water can be brought into contact with the inside of the piping over the entire area of the circulation path 8 even if the amount of ozone water (functional water) produced is kept to a minimum. In particular, by setting the volume V3 (S170), which is the end condition of the purge cleaning operation, to be equal to or larger than the volume of the circulation path 8, it is possible to prevent the ozone water (functional water) from remaining in the piping of the circulation path 8.
[0072] Furthermore, by making the flow rates equal between the functional water cleaning operation and the purge cleaning operation, the contact time of the ozone water (functional water) at each part in the circulation path 8 can be made uniform. This makes it possible to enhance the sterilization effect by preventing the occurrence of parts where sterilization is insufficient. As described above, in this embodiment, both the functional water cleaning operation and the purge cleaning operation are performed through the second path P2 that passes through the constant flow valve 36, so that the functional water cleaning operation and the purge cleaning operation can be performed at the same constant flow rates.
[0073] 1, the hot and cold water supplied during purge cleaning operation flows through circulation path 8, then passes through circulation adapter 25 and is output to bathtub 20, and may then pass through open drain plug 26 and become trapped in the drain trap. For this reason, during purge cleaning operation, it is preferable that unheated water be supplied from the hot water supply circuit to circulation path 8 to prevent the temperature of the water trapped in the drain trap from becoming a temperature suitable for the propagation of bacteria, etc.
[0074] In the pipe cleaning operation of Fig. 4, an example is shown in which the pre-cleaning operation (S140) is performed before the functional water cleaning operation (S160), but the above-mentioned effects can be obtained even if the pre-cleaning operation (S140) is omitted and the functional water cleaning operation and the purge cleaning operation are performed. However, by performing the functional water cleaning operation (S160) after removing grease from the pipes of the circulation path 8 by the pre-cleaning operation (S140), the amount of ozone water (functional water) required for sterilization can be suppressed, so that the pipe cleaning operation can be made more efficient. As described above, in the pre-cleaning operation (S140), the effect of removing grease is enhanced by supplying heated hot water from the hot water supply circuit, so that the pipe cleaning operation can be made more efficient.
[0075] FIG. 5 shows a flowchart illustrating a modified example of the pipe cleaning operation according to the present embodiment.
[0076] In the modification of Fig. 5, after the functional water flushing operation (S160) is completed, the controller 12 closes the bath hot water supply valve 13 and controls the three-way valve 32 to select the first path P1 in S172. Furthermore, in S175, the bath hot water supply valve 13 is opened and hot water from the hot water supply circuit is supplied to the circulation path 8 (connection point 8c) via the first path P1, thereby executing the post-flushing operation.
[0077] In the post-wash operation (S175), unheated water is preferably supplied from the hot water supply circuit, as in the purge wash operation (S170). Furthermore, the end condition can also be set so that the bath hot water supply valve 13 is closed when the supply amount (volume) of hot water during the post-wash operation reaches a predetermined value V4 based on the detection value (flow rate Q1) of the flow rate sensor 16.
[0078] In the modified example of FIG. 5, the three-way valve 32 is controlled to select the first path P1 in the post-cleaning operation (S175). Therefore, when the post-cleaning operation (S175) ends, the pipe cleaning operation can be ended without executing S180 in FIG. 4.
[0079] As in the modified example of Fig. 5, even if a post-cleaning operation (S175) using the first path P1 is performed instead of the purge cleaning operation (S170) after the functional water cleaning operation (S160), a pipe cleaning operation that can bring the ozone water into contact with the inside of the piping over the entire area of the circulation path 8 can be realized even when a volume of ozone water (functional water) smaller than the volume of the circulation path 8 is generated. By setting the volume V4 (S175), which is the end condition of the post-cleaning operation, to be equal to or larger than the volume of the circulation path 8, it is possible to prevent the ozone water (functional water) from remaining in the piping of the circulation path 8. Since the flow rate can be easily ensured in the post-cleaning operation (S175), the cleaning operation for preventing the functional water (ozone water) from remaining in the piping can be shortened.
[0080] On the other hand, in the modified example of Figure 5, it is difficult to equalize the flow rates in the functional water cleaning operation (S160) and the post-cleaning operation (S175), and therefore it is difficult to obtain the above-mentioned effect of equalizing the contact time with ozone water (functional water) at each location in the circulation path 8. Furthermore, in Figure 2, it becomes impossible to supply ozone water (functional water) from the location between the first path P1 and the second path P2 from the output side of the functional water production unit 35 to the circulation path 8, so there is a concern that efficiency may also decrease slightly.
[0081] For this reason, it is understood that it is basically efficient to perform a pipe cleaning operation with the "functional water cleaning mode" turned on by combining the functional water cleaning operation (S160) and the purge cleaning operation (S170). From the viewpoint of suppressing the residual functional water (ozone water), a post-cleaning operation (S175) may be further performed after the purge cleaning operation (S170) in FIG. 4 etc.
[0082] 4 and 5, the functional water cleaning operation (S160) corresponds to an embodiment of the “first cleaning operation”, the purge cleaning operation (S170) and the post cleaning operation (S175) each correspond to an embodiment of the “second cleaning operation”, and the pre-cleaning operation (S140) corresponds to an embodiment of the “third cleaning operation”. In addition, as described above, the “functional water” used in the functional water cleaning operation is not limited to ozone water.
[0083] In addition, in the present embodiment, the water heating apparatus 100 using the combustion of fuel gas as a heat source has been exemplified, but the heat source of the water heating apparatus 100 is not particularly limited. For example, even if the water heating apparatus uses the combustion heat of a fuel other than gas as a heat source, or uses exhaust heat from a power generation unit or the like, or a heat pump mechanism as a heat source, and supplies and pours hot water from a hot water storage tank, it is possible to similarly perform the cleaning piping operation including the functional water cleaning operation described in this embodiment, so long as it has a configuration including a hot water pouring path and a reheating circulation path.
[0084] The embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The scope of the present invention is defined by the claims, not the above description, and is intended to include all modifications within the meaning and scope of the claims. [Explanation of symbols]
[0085] 1 housing, 1a exhaust port, 2, 2a, 2b burner, 3, 3a, 3b fan, 4, 4a, 4b heat exchanger, 5 water inlet pipe, 5a water inlet, 5b boiler body pipe, 6 hot water supply pipe, 6a hot water outlet, 7 bypass valve, 7a bypass pipe, 8 circulation path, 8a return pipe, 8b forward pipe, 8c connection point, 9, 18, 19 temperature sensor, 10 circulation pump, 11 water level sensor, 12 controller, 12t timer, 13 bath water supply valve, 13a hot water supply pipe, 14 electrical wiring, 15, 16 flow rate sensor, 20 bathtub, 21 bathtub water, 25 circulation adapter, 26 drain plug, 30, 50 remote control, 32 three-way valve, 35 functional water generation unit, 36 constant flow valve, 37, 51 display unit, 38, 52 Control unit, 100 hot water supply device, 200 bathroom, 210 drain, 220 drain pipe, 300 hot water supply system, P1 first path, P2 second path, Q flow rate detection value, Q1, Q2 flow rates, Th outlet hot water temperature, Tw inlet water temperature.
Claims
1. A hot water supply system including a bathtub as a hot water supply destination, A circulation path for circulating and heating the bath water in the bathtub; A hot water supply circuit for supplying hot water to the bathtub through a hot water supply path including the circulation path; a functional water generating unit for generating functional water containing a substance having a sterilizing effect; a control circuit for executing a pipe cleaning operation of the circulation path when the drainage of the bathtub is detected; The pipe cleaning operation is a first cleaning operation in which the functional water generated by the functional water generation unit is supplied to the circulation path; A hot water supply system including a second flushing operation in which hot water supplied from the hot water supply circuit is supplied to the circulation path after the first flushing operation.
2. The hot water supply system according to claim 1 , wherein a flow rate of the functional water in the first flushing operation is equal to a flow rate of the hot water in the second flushing operation.
3. The hot water supply system according to claim 1 , wherein a volume of the functional water supplied in the first cleaning operation is smaller than a volume of the circulation path.
4. The hot water supply system according to claim 3 , wherein a volume of the hot water supplied by the second flushing operation is equal to or greater than a volume of the circulation path.
5. The hot water supply system according to any one of claims 1 to 4, wherein the functional water production unit is configured to electrolyze hot water supplied from the hot water supply circuit to produce the functional water.
6. a switching valve disposed between the pouring circuit and the circulation path for selecting a first path from the pouring circuit to the circulation path which does not pass through the functional water production unit, and a second path from the pouring circuit to the circulation path which passes through the functional water production unit; The control circuit includes: In the first cleaning operation, the functional water production unit is energized and the switching valve is controlled to select the first path, The hot water supply system according to claim 5 , wherein, in the second cleaning operation, the functional water production unit is de-energized and the switching valve is controlled to select the second path.
7. The hot water supply system according to claim 5 , wherein the hot water supply circuit supplies unheated water to the functional water production unit in the first cleaning operation.
8. The hot water supply system according to claim 1 , wherein the hot water supply circuit operates to supply unheated water in the second flushing operation.
9. The pipe cleaning operation is The hot water supply system according to claim 1 , further comprising a third flushing operation, which is performed before the first flushing operation, and which supplies hot water supplied from the hot water supply circuit to the circulation path.
10. The pipe cleaning operation is The method further includes a third flushing operation, which is performed before the first flushing operation, and supplies hot water supplied from the hot water supply circuit to the circulation path, The control circuit includes: The hot water supply system according to claim 6 , wherein, in the third cleaning operation, the functional water production unit is de-energized and the switching valve is controlled to select the first path.
11. The hot water supply system according to claim 9 , wherein the hot water supply circuit supplies heated hot water to the functional water production unit in the third cleaning operation.
Citation Information
Patent Citations
Compressor
JP1985022095A
Bath boiler with hot-water supplier
JP2001004207A
Cited By
Method for determining whether water has drained from a bath system and bath circulation path.
JP2026155333A
