Water impermeability inspection method
The method uses pore water pressure gauges and Lugeon value testing to evaluate the water-blocking properties of grouting curtains, ensuring effective water leakage prevention and optimizing grouting construction by identifying impermeable areas.
Patent Information
- Application Number
- JP2023064223
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-11
- Publication Date
- 2024-10-24
AI Technical Summary
There is a demand for a reliable method to test the water-blocking properties of the ground after forming a grouting curtain to prevent water leakage from reservoirs behind dams.
A method involving the use of pore water pressure gauges to measure water pressure changes before and after applying water pressure in inspection holes formed downstream and upstream of the grouting curtain, combined with Lugeon value testing to ensure adequate water-blocking properties, and the use of a management system to centrally manage and analyze data from these tests.
This method allows for precise evaluation of the water-blocking properties of the grouting curtain, ensuring effective prevention of water leakage and optimizing grouting construction by identifying areas of insufficient impermeability.
Smart Images

Figure 2024151090000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a water impermeability inspection method. [Background technology]
[0002] As disclosed in Patent Document 1, a grouting method is known for forming an artificial water barrier in the ground under a dam. In the grouting method, multiple boreholes are formed in sequence and filled with cement milk to fill cracks in the ground. Conventionally, a flood test has been carried out to check whether water is leaking downstream through the ground by storing water in a reservoir. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2001-40650 A Summary of the Invention [Problem to be solved by the invention]
[0004] Here, there is a demand for inspecting the water impermeability of the ground in advance after a grouting curtain is formed in the ground by the grouting method.
[0005] An object of the present invention is to provide a water impermeability inspection method for inspecting the water impermeability of ground. [Means for solving the problem]
[0006] The invention disclosed in this application to solve the above problems has various aspects, and representative aspects are outlined below.
[0007] (1) A water-tightness inspection method for inspecting the water-tightness of ground beneath a dam, comprising the steps of forming an inspection hole in the ground upstream of a grouting curtain formed in the ground, applying water pressure in the inspection hole, and inspecting the water-tightness based on changes in water pressure in a pore water pressure gauge positioned downstream of the grouting curtain.
[0008] (2) A water impermeability inspection method according to (1), in which, in the step of inspecting the water impermeability, the water pressure change of a pore water pressure gauge arranged downstream of the grout curtain is compared with the water pressure change of a pore water pressure gauge arranged upstream of the grout curtain to inspect the water impermeability.
[0009] (3) A water impermeability inspection method according to (1) or (2), wherein the inspection hole includes a portion that is formed so as to descend downward as it moves from the downstream side to the upstream side, and in the step of applying water pressure, water pressure is applied at least to the portion of the inspection hole that is formed so as to descend downward as it moves from the downstream side to the upstream side.
[0010] (4) In any one of (1) to (3), the step of inspecting the water impermeability comprises reusing a pore water pressure gauge that has been placed in the ground in advance for use in a flooding test in which water is stored in a reservoir.
[0011] (5) A water impermeability inspection method, comprising the step of inspecting the water impermeability before conducting the flooding test. Effect of the Invention
[0012] According to the present invention, a water impermeability inspection method for inspecting the water impermeability of ground can be provided. [Brief description of the drawings]
[0013] [Figure 1] FIG. 2 is a cross-sectional view showing a schematic example of a dam and ground. [Diagram 2] FIG. 2 is a diagram showing a schematic diagram of an example of a grouting curtain. [Figure 3A] 10 is a flowchart showing an example of Lugeon value determination in the present embodiment. [Figure 3B] 5 is a flowchart showing an example of a first water pressure change determination in the present embodiment. [Figure 3C] 6 is a flowchart showing an example of a second water pressure change determination in the present embodiment. [Figure 4] FIG. 2 is a cross-sectional view showing an example of a natural water impermeable layer formed in the ground. [Diagram 5] FIG. 2 is a cross-sectional view showing an example of a dam and ground after the grouting curtain is completed. [Figure 6] FIG. 4 is a diagram showing an example of a display screen in the management system according to the present embodiment. [Figure 7] FIG. 2 is a diagram illustrating an example of a physical configuration of a management system according to the present embodiment. [Figure 8] FIG. 2 is a functional block diagram showing an example of functions realized by the management system according to the embodiment. [Figure 9] FIG. 11 is a diagram showing another example of the display screen in the management system according to the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0014] Hereinafter, an embodiment of the present invention (hereinafter, referred to as the present embodiment) will be described with reference to the drawings.
[0015] [overview] First, the dam 1 in this embodiment will be described. In each drawing, the arrow X1 indicates the rear, the arrow X2 indicates the front, the arrow Y1 indicates the right, the arrow Y2 indicates the left, the arrow Z1 indicates the upper direction, and the arrow Z2 indicates the lower direction. As shown in FIG. 1, the rear of the dam 1 is a reservoir W. In this embodiment, the rear is upstream of the dam 1, and the front is downstream of the dam 1. In this embodiment, the left-right direction is the direction in which the dam axis O extends.
[0016] FIG. 1 is a cross-sectional view showing an example of a dam and ground. As shown in FIG. 1, the dam 1 includes a core 10, a filter 20 formed before and after the core 10, and a rock 30 formed before and after the filter. The core 10 is a highly water-impermeable layer containing clay and the like. The filter 20 is a layer containing gravel and the like. The rock 30 is a layer containing soil, rocks, and the like. The dam 1 has such a layered structure, thereby preventing water stored in the reservoir W from leaking downstream of the dam 1.
[0017] The ground G is provided under the dam 1. In this embodiment, the ground G is made of bedrock formed of igneous rock, sedimentary rock, metamorphic rock, etc. The ground G made of bedrock includes gaps such as cracks CR. It is necessary to prevent the water stored in the reservoir W from leaking downstream of the dam 1 through these cracks CR.
[0018] Therefore, as shown in Figure 1, a grout curtain GC is formed under the dam 1. The grout curtain GC is formed by filling multiple boreholes H aligned along the dam axis O with cement (see Figure 2 below). The boreholes H are connected to cracks CR in the ground G, so the cement milk injected into the boreholes H flows into the cracks CR and hardens. In this way, by forming a grout curtain GC that acts as a curtain-shaped water-proof wall under the dam 1, the water stored in the reservoir W is prevented from leaking downstream of the dam 1 through the cracks CR in the ground G.
[0019] The grouting curtain GC is formed by carrying out grouting in a passage called an inspection gallery (not shown) where workers and equipment can be positioned, which is formed on the ground side of the core 10. The borehole H is formed directly below the inspection gallery, and is a hole that extends vertically and is several meters to several hundred meters deep.
[0020] In this embodiment, an example is described in which cement milk is filled into the borehole H, but this is not limited to this, and other grout milks made of mortar, synthetic resin, etc. may also be used.
[0021] [Grouting construction] Next, the grouting construction for forming the grout curtain GC will be described with reference to Figs. 2 to 5. Fig. 2 is a diagram showing an example of a grout curtain. The upper side of Fig. 2 shows a schematic plan view of a plurality of boreholes seen from above, and the lower side of Fig. 2 shows a schematic cross-sectional view showing a cut surface cut along the II-II cutting line in Fig. 1. The II-II cutting line in Fig. 1 corresponds to the dam axis O. The plurality of boreholes H constituting the grout curtain GC include a pilot hole HP, a primary hole H1...nth-order hole Hn (n is an integer of 1 or more).
[0022] In grouting, first, pilot holes HP are formed. FIG. 2 shows an example in which pilot holes HP are formed at each of the left and right ends. Then, a primary hole H1 is formed midway between the two pilot holes HP in the left and right direction. Furthermore, a secondary hole H2 is formed midway between the pilot hole HP and the primary hole H1. In this manner, n-th order holes Hn are formed in sequence until sufficient water impermeability is ensured.
[0023] In grouting construction, a permeability test is performed to determine whether or not sufficient water impermeability has been ensured. In the permeability test, water pressure is applied to borehole H to obtain a Lugeon value. The Lugeon value is information regarding flow rate, and indicates how easily water can pass through ground G. If the Lugeon value is less than a predetermined value, it can be determined that sufficient water impermeability has been ensured. On the other hand, if the Lugeon value is equal to or greater than a predetermined value, it can be determined that water impermeability is insufficient. The Lugeon value may be obtained by a permeability test in general grouting construction. The Lugeon value in the permeability test is measured by an injection pipe for injecting water that applies water pressure into the borehole H to be measured, and a pressure gauge installed in the injection pipe (neither shown).
[0024] Here, if there are a large number of boreholes H and the intervals between adjacent boreholes H are close, the cracks filled with cement through the boreholes H will overlap. In other words, the cement milk filled in the adjacent boreholes H will penetrate into the common cracks CR and bond with each other. As a result, the water impermeability of the grout curtain GC will be increased.
[0025] In this embodiment, in addition to the conventionally performed permeability tests, a method is adopted in which water pressure changes measured by a pore water pressure gauge P are checked to further ensure that water tightness has been maintained.
[0026] Here, the pore water pressure gauge P is an instrument for measuring water pressure in the ground where gaps such as cracks are formed. The pore water pressure gauge P may be one that is placed in advance in the ground G for a flooding test after the dam 1 is completed and water is stored in the reservoir W. The pore water pressure gauge P may be placed at multiple locations for different strata in the ground G. The pore water pressure gauge P may be placed at least on both the upstream and downstream sides of the grouting curtain GC. By checking the amount of water pressure change shown by the pore water pressure gauge P placed in the ground G, it is possible to check which areas of the ground G are not sufficiently waterproof.
[0027] The flow of grouting work will be described with reference to Figures 3A to 3C. Figure 3A is a flow chart showing an example of Lugeon value determination in this embodiment.
[0028] First, a pilot hole HP is formed (Step S1). Then, cement milk is injected into the pilot hole HP and allowed to solidify (Step S2). Next, a primary hole H1 is formed (Step S3). Then, water pressure is applied to the primary hole H1, and the Lugeon value is obtained from the measurement value of the pressure gauge installed in the primary hole H1, while the water pressure is also measured by each of the multiple pore water pressure gauges P (Step S4). After that, cement milk is injected into the primary hole and allowed to solidify (Step 5).
[0029] Next, the Lugeon value measured in step S4 is judged to judge the water impermeability (step S6). If the Lugeon value is equal to or greater than a predetermined value, it can be judged that sufficient water impermeability is not obtained, and therefore a secondary hole H2 is formed (step S3). Then, water pressure is applied in the secondary hole H2 to obtain the Lugeon value from the measurement value of the pressure gauge installed in the secondary hole H2, and water pressure is also measured in each of the multiple pore water pressure gauges P (step S4). Then, cement milk is injected into the secondary hole and allowed to solidify (step 5). If the Lugeon value measured in step S4 is equal to or greater than a predetermined value, it can be judged that sufficient water impermeability is not obtained, and therefore a tertiary hole H3 is formed (step S3).
[0030] On the other hand, if the Lugeon value measured in step S4 is less than the predetermined value, it can be determined that sufficient water impermeability has been obtained. After confirming that the Lugeon value is less than the predetermined value, the process relating to the Lugeon value determination may be terminated.
[0031] In this embodiment, in order to improve the quality of the grouting curtain GC, a first water pressure change judgment is further performed. Fig. 3B is a flowchart showing an example of the first water pressure change judgment in this embodiment. The first water pressure change judgment is preferably performed after the process related to the Lugeon value judgment described with reference to Fig. 3A is completed.
[0032] First, as shown in FIG. 3B, the water pressure change in each of the multiple pore water pressure gauges P is determined based on the water pressure measured in step S4 in FIG. 3A (step S7). At this time, if any of the pore water pressure gauges P shows a large water pressure change, it is determined that the water impermeability is unacceptable. If it is unacceptable, the next borehole (fourth borehole H4 in this example) is formed (step S8). Furthermore, water pressure is applied in the fourth borehole H4 to measure the water pressure in each of the multiple pore water pressure gauges P (step S9). Then, cement milk is injected into the additionally formed fourth borehole H4 and solidified (step S10). Next, the water pressure change in each of the multiple pore water pressure gauges P is determined based on the water pressure measured in step S9 (step S7). At this time, if none of the pore water pressure gauges P shows a large water pressure change, it is determined that the water impermeability is acceptable. If it is acceptable, the process related to the first water pressure change determination is completed.
[0033] In this embodiment, in order to further improve the quality of the grouting curtain GC, a second water pressure change determination shown in Fig. 3C is performed. Fig. 3C is a flow chart showing an example of the second water pressure change determination in this embodiment. The second water pressure change determination is preferably performed after the process related to the first water pressure change determination described with reference to Fig. 3B is completed.
[0034] First, as shown in FIG. 3C, water pressure is applied in a previously formed inspection hole HD (details will be described later with reference to FIG. 5) to measure the water pressure in each of the multiple pore water pressure gauges P (step S11). Then, the water pressure change in each of the multiple pore water pressure gauges P is determined (step S12). If any of the pore water pressure gauges P shows a large water pressure change, it is determined that the water impermeability has failed. If it has failed, a next borehole (the 5th borehole H5 in this example) is formed (step S13). Then, cement milk is injected into the additionally formed 5th borehole H5 and allowed to solidify (step S14).
[0035] Furthermore, water pressure is applied in the inspection hole HD, and the water pressure is measured in each of the multiple pore water pressure gauges P (step S11). Then, the water pressure change in each of the multiple pore water pressure gauges P is determined (step S12). If none of the pore water pressure gauges P show a significant change in water pressure, it is determined that the water impermeability passes. If it passes, cement milk is injected into the inspection hole HD to fill it, and the process relating to the second water pressure change determination is completed.
[0036] As described above, the pore water pressure gauge P may be one that has been placed in the ground G in advance, but this is not limited to this, and a separate pore water pressure gauge P may be placed for performing an inspection for forming the borehole H. Also, it is not limited to checking all of the water pressure changes measured by a plurality of pore water pressure gauges P placed in the ground G, and it is also possible to check the water pressure changes of only a specific pore water pressure gauge P depending on the position of the borehole H, etc. In addition, in this embodiment, an example of determining the water pressure change of the pore water pressure gauge P after the process related to the Lugeon value determination is completed has been shown, but this is not limited to this. For example, the water pressure change of the pore water pressure gauge P may be determined at all times in conjunction with the confirmation of the Lugeon value. This makes it possible to grasp the water impermeability of the ground G over time, not limited to a specific timing in the grouting method.
[0037] In addition, at least one of the first water pressure change determination described with reference to Fig. 3B and the second water pressure change determination described with reference to Fig. 3C may be performed in the grouting process. In other words, after performing the Lugeon value determination described with reference to Fig. 3A, only one of the first water pressure change determination and the second water pressure change determination may be performed.
[0038] In the grouting construction of this embodiment, it becomes possible to quantitatively determine the timing to end the formation of the borehole H. In addition, the quality of the grouting curtain GC can be improved, and water impermeability can be more reliably ensured.
[0039] Furthermore, confirmation of the presence of the natural water impermeable layer N during grouting will be described with reference to Fig. 4. Fig. 4 is a cross-sectional view showing an example of a natural water impermeable layer formed in the ground. Fig. 4 shows a state in which a plurality of boreholes H with different depths are formed according to the shape and geology of the ground G.
[0040] As shown in Figure 4, depending on the ground G, a natural water shielding layer N may be formed. Here, the natural water shielding layer N is a highly water shielding layer that is formed naturally over time in the ground G, unlike the grout curtain GC, which is an artificially formed water shielding layer. It is important to know in advance the extent to which the natural water shielding layer N has been formed in order to determine the number and depth of the boreholes H to be formed in the ground G. This is because, depending on the shape and size of the natural water shielding layer N, it is possible to reduce the number and depth of the boreholes H in the grout curtain GC, which is an artificially formed water shielding wall.
[0041] Whether or not the natural water impermeable layer N exists can be ascertained by checking the geology of the ground G, but it is difficult to ascertain the extent to which the natural water impermeable layer N is formed. Specifically, it is difficult to ascertain whether or not the natural water impermeable layer N is formed continuously in the left-right direction.
[0042] Therefore, in this embodiment, in the process of grouting construction, confirmation of water impermeability in grouting construction is supplemented by determining whether or not the natural water impermeable layer N is continuously formed by checking the water pressure change measured by the pore water pressure gauges P1 to 3 shown in Fig. 4. Specifically, in addition to step S6 shown in Fig. 3A, it is determined whether or not the natural water impermeable layer N is continuously formed in the left-right direction.
[0043] Fig. 4 shows an example in which three pore water pressure gauges P1 to P3 are arranged in a vertical line. Fig. 4 also shows an example in which two natural water impermeable layers N1 and N2 are formed continuously in the horizontal direction.
[0044] The pore water pressure gauge P1 is disposed above the natural water impermeable layer N1. The pore water pressure gauge P2 is disposed between the natural water impermeable layer N1 and the natural water impermeable layer N2 in the vertical direction. The pore water pressure gauge P3 is disposed below the natural water impermeable layer N2.
[0045] In the example of Fig. 4, water pressure may be applied between the natural water shielding layer N1 and the natural water shielding layer N2 in the vertical direction. In Fig. 4, the pressurizing part that applies the water pressure is indicated as WP. When water pressure is applied in the pressurizing part WP, if a large water pressure change is measured by the pore water pressure gauge P2, but no large water pressure change is measured by the pore water pressure gauges P1 and P3, it can be determined that the natural water shielding layer N1 and the natural water shielding layer N2 are formed continuously in the horizontal direction. On the other hand, if a large water pressure change is measured by the pore water pressure gauge P1, for example, it can be determined that the natural water shielding layer N1 is formed partly discontinuously in the horizontal direction. If a part of the natural water shielding layer is discontinuous, water may leak from that part.
[0046] As described above, by checking the water pressure changes measured by the pore water pressure gauges P1 to P3 during the grouting process, it is possible to determine whether the natural water impermeable layer N is formed continuously in the left-right direction. This makes it possible to set the depth during grouting construction, taking into account the natural water impermeable layer N as a design condition. If the continuity of the natural water impermeable layer N is confirmed, construction can be carried out to the design depth (up to the natural water impermeable layer N). On the other hand, if the continuity of the water impermeability is not confirmed, the design can be reviewed, and the boring man-hours can be appropriately reviewed.
[0047] [Inspection of watertightness of grouting curtain GC] Next, a specific example of the inspection of water impermeability in step S11 of Fig. 3C will be described with reference to Fig. 5. Fig. 5 is a cross-sectional view showing an example of ground in which an inspection hole is formed. In this embodiment, as shown in Fig. 5, a pore water pressure gauge P4 arranged upstream of the grouting curtain GC and a pore water pressure gauge P5 arranged downstream of the grouting curtain GC are used.
[0048] Before conducting a flood test by storing water in the reservoir W, an inspection hole HD is bored upstream of the grouting curtain GC from the position of the inspection gallery. The inspection hole HD should be formed separately from each borehole H. The inspection hole HD should be formed so that it descends from the downstream side to the upstream side.
[0049] Water pressure is applied in the inspection hole HD, and the water pressure change measured by the pore water pressure gauge P4 and the pore water pressure gauge P5 is confirmed. If the water pressure change measured by the pore water pressure gauge P4 is large and the water pressure change measured by the pore water pressure gauge P5 is small, it can be confirmed that the grouting curtain GC has sufficient water impermeability. The water pressure applied in the inspection hole HD should be a pressure equivalent to the water storage pressure. This allows the water impermeability of the grouting curtain GC to be confirmed by reproducing the state in which water pressure is applied during water storage. The shape of the inspection hole HD is not limited to that shown in FIG. 5, and may be any shape that is effective for comparing the response of the pore water pressure gauge P4 and the response of the pore water pressure gauge P5 in the water impermeability inspection of this embodiment.
[0050] [Management system] Next, the management system according to the present embodiment will be described with reference to Fig. 6 to Fig. 8. Fig. 6 is a diagram showing an example of a display screen in the management system according to the present embodiment. Fig. 7 is a diagram showing an example of a physical configuration of the management system according to the present embodiment. Fig. 8 is a functional block diagram showing an example of functions realized by the management system according to the present embodiment.
[0051] The management system 100 is a system that enables the centralized management of each piece of data acquired during grouting work and the analysis of that data.
[0052] In general, each data in grouting work is acquired by a different contractor. For example, the person who acquires the water pressure data is usually different from the person who acquires the grouting data related to the drilling status of borehole H. Therefore, in the past, the person who grasped and analyzed the overall status of the grouting work had to receive and manage each data from the person who acquired it.
[0053] In the management system 100 according to this embodiment, the information contained in the grouting data and the information contained in the water pressure data are simultaneously displayed on one screen, as shown in Fig. 6. Furthermore, the management system 100 displays the information contained in the grouting data and the information contained in the water pressure data side by side with the time axis scales aligned.
[0054] The left side of FIG. 6 shows the state of the strata of ground G and pore water pressure gauges P1 and P2 placed in ground G, which corresponds to a part of the cross-sectional view shown in FIG. 4. In the pore water pressure gauge data shown in FIG. 6, the horizontal axis is the time axis and the vertical axis is the depth, and shows the progress of water pressure measured by the pore water pressure gauges P1 and P2 placed at different depths. In the grouting data shown in FIG. 6, the horizontal axis is the time axis and the vertical axis is the depth, and shows the period during which the drilling process, the permeation process, and the injection process were performed, respectively. Note that the drilling process is the process of forming a borehole, the permeation process is the process of applying water pressure, and the injection process is the process of injecting cement milk into the borehole.
[0055] The management system 100 according to this embodiment may include a control unit 101, a communication unit 102, a storage unit 103, an operation unit 104, and a display unit 105, as shown in Fig. 7. The management system 100 may include at least one computer. When the management system 100 includes multiple computers, the computers may be connected to each other via a network.
[0056] The control unit 101 includes at least one processor. The control unit 101 may be, for example, a program-controlled device such as a CPU that operates according to a program installed in the management system 100. The communication unit 102 may be, for example, a communication interface such as a wireless LAN module. The storage unit 103 may include a volatile memory such as a RAM and a non-volatile memory such as a hard disk. The storage unit 103 may store programs executed by the processor. The operation unit 104 may be an input device such as a mouse, a keyboard, or a touch panel. The display unit 105 may be a liquid crystal display or an organic EL display.
[0057] Fig. 8 is a functional block diagram showing an example of functions realized by the management system according to this embodiment. Each function shown in Fig. 8 is realized by a computer executing a program stored in the storage unit 103. The program may be stored in an information storage medium readable by the computer.
[0058] In the management system 100, a water pressure data acquisition unit 111, a grouting data acquisition unit 112, and a display control unit 113 are realized. The water pressure data acquisition unit 111 and the grouting data acquisition unit 112 are mainly realized by the control unit 101 and the communication unit 102. The display control unit 113 is mainly realized by the control unit 101 and the display unit 105.
[0059] The water pressure data acquisition unit 111 acquires water pressure data measured by a pore water pressure gauge. The water pressure data acquisition unit 111 is connected by wireless communication to a plurality of pore water pressure gauges placed in the ground G, and may be capable of acquiring water pressure data measured by the pore water pressure gauges in real time. Alternatively, the water pressure data acquisition unit 111 may be connected by wire or wireless communication to a computer other than the management system 100, and acquire water pressure data through the computer.
[0060] The grouting data acquisition unit 112 acquires grouting data. The grouting data may include, for example, information on drilling a borehole, information on a permeability test, and information on injection of cement milk.
[0061] The display control unit 113 displays information about the pore water pressure gauge data shown in Fig. 6 based on the water pressure data acquired by the water pressure data acquisition unit 111, and displays information about the grouting data shown in Fig. 6 based on the grouting data acquired by the grouting data acquisition unit 112. The display control unit 113 may also display information about the pore water pressure data and information about the grouting data simultaneously on the same screen. The display control unit 113 may also display the time axis of the pore water pressure gauge data and the time axis of the grouting data side by side on the same scale.
[0062] Specifically, for example, as shown in Fig. 6, the display control unit 113 may display a line graph showing the transition of the water pressure measured by the pore water pressure gauge based on the water pressure data. Also, the display control unit 113 may display, along the time axis, band-shaped portions B of lengths corresponding to the length of each of the period during which the borehole was formed ("Drilling" shown in Fig. 6), the period during which a permeability test was conducted by applying water pressure to the borehole ("Permeability" shown in Fig. 6), and the period during which grout milk was injected into the borehole ("Injection" shown in Fig. 6), based on the grouting data.
[0063] The display control unit 113 may display the pore water pressure gauge data in an emphasized manner so that the timing when the water pressure change measured by the pore water pressure gauge is large stands out. For example, the display control unit 113 may change the color of the graph when the water pressure change measured by the pore water pressure gauge is large. This makes it easier for the user to visually recognize the timing when the water pressure change measured by the pore water pressure gauge is large. The display control unit 113 may also display the band-shaped portions B corresponding to "drilling", "permeability", and "injection" in different colors.
[0064] In the management system 100, it is possible to centrally manage water pressure data measured by the pore water pressure gauge and grouting data related to drilling of boreholes, etc. This allows the user to check the water pressure change measured by the pore water pressure gauge at each timing of grouting construction. As a result, it becomes possible to carry out efficient grouting construction.
[0065] Further, another example of the display screen in the management system according to the present embodiment will be described with reference to Fig. 9. Fig. 9 is a diagram showing another example of the display screen in the management system according to the present embodiment.
[0066] FIG. 9 shows a display screen that visualizes and displays the water impermeability at each part of the grout curtain GC. In FIG. 9, the larger the cylinder, the lower the water impermeability. Specifically, the greater the reaction in the pore water pressure gauge P, the larger the diameter of the cylinder. Also, the farther the distance of the pore water pressure gauge P from the grout curtain GC, the longer the cylinder. Also, FIG. 9 shows how the water impermeability is visualized and displayed according to the progress of the grouting work. In the example shown in FIG. 9, the water impermeability has improved overall, but in the part surrounded by a square, it can be seen that the water impermeability has decreased despite the progress of the work. Since such a tendency was observed, it is advisable to carefully check the water impermeability of the part surrounded by a square when proceeding with the work. Note that FIG. 9 shows screens at two points during the grouting work, but the screen that visualizes and displays the water impermeability should be displayed at each point when the water pressure is measured by the pore water pressure gauge P. By visualizing and displaying the watertightness as the grouting work progresses, it is possible to detect areas with concerns about watertightness at an early stage. [Explanation of symbols]
[0067] 1 dam, 10 core, 20 filter, 30 lock, 100 management system, 101 control unit, 102 communication unit, 103 memory unit, 104 operation unit, 105 display unit, 111 water pressure data acquisition unit, 112 grouting data acquisition unit, 113 display control unit, G ground, GR crack, GC grouting curtain, W reservoir, H borehole, HD inspection hole, P1~P5 pore water pressure gauges, WP pressurization unit.
Claims
1. A method for inspecting the impermeability of ground under a dam, comprising the steps of: A step of forming an inspection hole in the ground upstream of a grouting curtain formed in the ground; applying water pressure at the inspection hole; A step of inspecting the water impermeability based on a change in water pressure of a pore water pressure gauge disposed downstream of the grout curtain; A water-impermeable inspection method including:
2. In the step of inspecting the water impermeability, the water pressure change of a pore water pressure gauge arranged downstream of the grout curtain is compared with the water pressure change of a pore water pressure gauge arranged upstream of the grout curtain to inspect the water impermeability. The water-impermeable inspection method according to claim 1.
3. The inspection hole includes a portion that is formed to descend downward from the downstream side to the upstream side, In the step of applying water pressure, water pressure is applied at least to a portion of the inspection hole that is formed so as to descend from the downstream side to the upstream side. The water-impermeable inspection method according to claim 1 or 2.
4. In the step of inspecting the water impermeability, a pore water pressure gauge that has been placed in the ground in advance for use in a flooding test in which water is stored in a reservoir is reused. The water-impermeable inspection method according to claim 1 or 2.
5. A step of inspecting the water impermeability is carried out before the flooding test is carried out. The water-impermeable inspection method according to claim 4.
Citation Information
Patent Citations
Grouting construction method
JP2001040650A
