Method for cutting concrete slab
A synchronized wire saw system with dual pulleys for cutting concrete slabs in composite girders addresses the inefficiencies of traditional methods by enabling simultaneous cutting of multiple slabs without shoring, enhancing speed and safety while minimizing wire slack and girder damage.
Patent Information
- Application Number
- JP2023064896
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-12
- Publication Date
- 2024-10-25
AI Technical Summary
The existing methods for cutting concrete deck slabs in composite girders require time-consuming shoring installation and removal, and the use of wire saws can lead to instability and potential damage to steel girders due to slack, necessitating separate cutting positions and additional manual removal steps.
A method involving a synchronized wire saw system with dual drive pulleys that cuts concrete slabs from a composite girder by wrapping around multiple slabs simultaneously, eliminating the need for shoring and reducing slack, allowing for faster and safer cutting near the steel girder.
This method reduces the time and labor required for shoring installation and removal, enhances cutting speed, and prevents damage to steel girders by maintaining tension in the wire saw, thus improving construction efficiency and safety.
Smart Images

Figure 2024151513000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a method for cutting a concrete floor slab. [Background technology]
[0002] In a composite girder in which the steel girder and the concrete deck are joined together with a slip stopper, the concrete deck cannot be removed by peeling it off from the steel girder by jacking up when replacing the concrete deck. For this reason, when removing the concrete deck of an existing composite girder, the part of the concrete deck directly above the steel girder (the deck above the girder) is cut with a cutting device equipped with a loop-shaped wire saw (for example, see Patent Document 1). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2019-31868 A Summary of the Invention [Problem to be solved by the invention]
[0004] Since the parts of the concrete slab other than the upper girders (inter-girder slabs) are supported by the steel girders via the upper girders, when cutting and separating the upper girders from the steel girders, it is necessary to install shoring to temporarily support the inter-girder slabs. This causes the problem that installing and removing the shoring takes time and effort. In addition, when cutting a concrete deck with a wire saw, any slack in the wire saw can cause deviations in the cutting position, which can damage the steel girders. For this reason, the concrete deck is cut with a wire saw at a position that is spaced apart from the steel girders with a certain margin of error, that is, at a cutting position that is above the top surface of the steel girders. After removing the portion above the cutting position, the portion below the cutting position must be chipped away and removed using a chipping hammer or water jet, etc., which poses the problem that this chipping work takes time and effort.
[0005] Therefore, an object of the present invention is to provide a method for cutting a concrete slab that makes it unnecessary to install shoring. [Means for solving the problem]
[0006] In order to achieve the above object, a method for cutting a concrete floor slab according to the present invention is a method for cutting a concrete floor slab from a composite girder in which a concrete floor slab is joined onto a plurality of steel girders arranged at intervals in a direction perpendicular to a girder axis, the concrete floor slab being arranged in a direction perpendicular to the girder axis with girder-upper slabs provided on the steel girders and inter-girder slabs provided on areas between adjacent steel girders in the direction perpendicular to the girder axis alternately arranged in the direction perpendicular to the girder axis, and a cutting device for cutting the concrete floor slab has a cutting unit for cutting the concrete floor slab and a moving unit for moving the cutting unit, the cutting unit includes a wire saw wound around the concrete floor slab and rotating in a circulating manner, and a cutting device for cutting the concrete floor slab includes a cutting device for cutting the concrete floor slab, the cutting device having a cutting section for cutting the concrete floor slab and a moving section for moving the cutting section, the cutting device including a wire saw wound around the concrete floor slab and rotating in a circulating manner, The cutting device has a first drive pulley and a second drive pulley that are rotated by being rotated in synchronization with each other at the same rotation speed, and the cutting device has a cutting device installation process in which the cutting section is moved in the girder axial direction and the rotating wire saw is moved in the girder axial direction to cut the concrete floor slab, and in the cutting device installation process, the wire saw is continuously wound around multiple girder floor slabs that are adjacent in the direction perpendicular to the girder axis, and in the cutting process, the multiple girder floor slabs are simultaneously cut while still connected to adjacent inter-girder floor slabs in the direction perpendicular to the girder axis, and separated from the steel girder.
[0007] In the present invention, by winding the wire saw around a first drive pulley and a second drive pulley whose rotation speeds are synchronized, the wire saw is sent out from one drive pulley and wound up around the other drive pulley, which improves the cutting speed and reduces slack in the wire saw compared to when the wire saw is wound out and wound up by a single drive pulley. Therefore, even when the wire saw is wound around multiple girder deck slabs adjacent in the direction perpendicular to the girder axis, the wire saw is less likely to slacken and multiple girder deck slabs adjacent in the girder axis direction can be cut simultaneously. The improved cutting speed allows for an increased construction speed. When cutting the girder deck slabs one by one with a wire saw, it is necessary to cut the adjacent inter-girder deck slabs first and support them with shoring. In the present invention, multiple girder deck slabs adjacent in the girder axial direction are cut from the steel girder while still connected to the inter-girder deck slabs between them. Therefore, in the present invention, it is not necessary to install shoring to support the inter-girder deck slabs, and the time and labor required for installing and removing the shoring can be reduced. In addition, since the slack in the wire saw can be suppressed, there is no risk of damaging the steel girder even if the cutting position is brought closer to the top surface of the steel girder. By bringing the cutting position closer to the top surface of the steel girder, the work of chipping and removing the part below the cutting position with a chipping hammer or water jet can be reduced.
[0008] In addition, in the method for cutting a concrete floor slab according to the present invention, in the cutting device installation process, in a plan view seen from the top and bottom directions, the first drive pulley may be positioned above the girder floor slab that is located at one end of the multiple girder floor slabs to be cut simultaneously in the direction perpendicular to the girder axis, and the second drive pulley may be positioned above the girder floor slab that is located at the other end of the multiple girder floor slabs to be cut simultaneously in the direction perpendicular to the girder axis.
[0009] With this configuration, the first drive pulley and the second drive pulley are positioned away from each other near both ends of the cutting area in the direction perpendicular to the girder axis, thereby making it possible to suppress slackening of the wire saw throughout the entire cutting area. Effect of the Invention
[0010] According to the present invention, the installation of shoring is no longer necessary, and the time and effort required for installing and removing shoring can be reduced. [Brief description of the drawings]
[0011] [Figure 1] FIG. [Diagram 2] 1 is a front view showing a method for cutting a concrete floor slab according to an embodiment of the present invention. FIG. [Diagram 3] 1 is a side view showing a method for cutting a concrete floor slab according to an embodiment of the present invention. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] Hereinafter, a method for cutting a concrete floor slab according to an embodiment of the present invention will be described with reference to Figs. The method for cutting a concrete floor slab according to this embodiment is a method for cutting a concrete floor slab 22 and a steel girder 21 when removing the concrete floor slab 22 from a composite girder 2 in which a steel girder 21 and a concrete floor slab 22 are joined together as shown in Figure 1. The composite girder 2 has a concrete deck 22 joined onto a plurality of steel girders 21. The direction in which the composite girder 2 extends, i.e., the direction in which the steel girder 21 extends, is referred to as the girder axis direction (the direction perpendicular to the paper surface of Figs. 1 and 2, the direction of arrow A in Fig. 3). In this embodiment, the girder axis direction is a substantially horizontal direction. The horizontal direction perpendicular to the girder axis direction is referred to as the girder axis orthogonal direction (the direction of arrow B in Figs. 1 and 2, the direction perpendicular to the paper surface of Fig. 3).
[0013] The multiple steel girders 21 are arranged in parallel at intervals in a direction perpendicular to the girder axis. The steel girders 21 are I-beams, etc. A shear stopper 23 is joined to the top surface of the steel girders 21 to integrate the multiple steel girders 21 and the concrete floor slab 22. The concrete deck 22 has a haunch 221 that protrudes downward in a portion directly above the steel girder 21. The lower surface of the haunch 221 is joined to the upper surface of the steel girder 21. The dimension of the haunch 221 in the direction perpendicular to the girder axis gradually decreases downward. The portion of the concrete floor slab 22 that is directly above the steel girder 21 and is joined to the steel girder 21 is referred to as the girder floor slab 24. The portion of the concrete floor slab 22 that does not overlap the steel girder 21 in the vertical direction and is not directly joined to the steel girder 21 is referred to as the inter-girder floor slab 25. The girder floor slabs 24 and the inter-girder floor slabs 25 are arranged alternately in the direction perpendicular to the girder axis. The haunch portion 221 is provided on the lower side of the end portion of the girder floor slab 24 and the inter-girder floor slabs 25 on both sides in the direction perpendicular to the girder axis.
[0014] 2 and 3, in the method for cutting a concrete deck according to this embodiment, a position on the lower side of the girder deck 24 and spaced a predetermined distance from the top surface of the steel girder 21 is cut in the girder axial direction by a cutting device 1 equipped with a wire saw 5, and the girder deck 24 is separated from the steel girder 21. The position on the girder deck 24 that is cut by the wire saw 5, i.e., the position on the lower side of the girder deck 24 and spaced a predetermined distance from the top surface of the steel girder 21, is referred to as the cutting position 27. The cutting position 27 includes a shear stopper 23.
[0015] As shown in FIG. 2, in this embodiment, for each cutting span of a predetermined length in the girder axis direction, two girder decks 24, 24 adjacent to each other in the direction perpendicular to the girder axis via a girder deck 25 are simultaneously cut by the same cutting device 1 while the girder deck 25 between them is connected. After the two girder decks 24, 24 are cut, these two girder decks 24, 24 and the girder deck 25 between them are removed as a unit from the composite girder 2. Of the two girder decks 24, 24, the girder deck 24 located on one side in the direction perpendicular to the girder axis is referred to as the first girder deck 241, and the girder deck 24 located on the other side in the direction perpendicular to the girder axis is referred to as the second girder deck 242.
[0016] 2 and 3, the cutting device 1 has a cutting unit 3 that cuts the concrete deck 22, and a moving unit 4 that moves the cutting unit 3. The cutting unit 3 has a loop-shaped wire saw 5 that cuts the concrete deck 22, a plurality of pulleys 61-65 around which the wire saw 5 is wound, and a cutting drive unit 31 that rotates the plurality of pulleys 61-65 to drive the wire saw 5. Only the upper flange of the steel girder 21 shown in FIG. 3 is shown.
[0017] The moving unit 4 has a pair of rails 41, 41 installed on the concrete floor slab 22, a pair of carts 42, 42 that run on the rails 41, a pulley support unit 43 installed on the pair of carts 42, 42, and a moving drive unit 44 (see Figure 3) that drives the carts 42. The pair of rails 41, 41 each extend linearly and are installed in parallel with each other at an interval in a direction perpendicular to the longitudinal direction. The pair of rails 41, 41 are fixed to the concrete floor slab 22 by anchors or the like.
[0018] One of the pair of carts 42, 42 travels on one rail 41. The other of the pair of carts 42, 42 travels on the other rail 41. The pulley support unit 43 is installed on the pair of carts 42 and moves together with the pair of carts 42. The pulley support unit 43 supports a plurality of pulleys 61-65. The pair of rails 41, 41 are installed so that the length direction corresponds to the girder axis direction. The pair of carriages 42, 42, the pulley support unit 43, and the cutting unit 3 travel along the pair of rails 41, 41 in the girder axis direction.
[0019] The wire saw 5 is installed so as to surround the first girder upper deck 241, the second girder upper deck 242, and the inter-girder deck 25 between the first girder upper deck 241 and the second girder upper deck 242, as viewed from the direction perpendicular to the girder axis. The upper part of the wire saw 5 is disposed above the concrete deck 22, and the lower part is disposed at the height of the cutting position 27. When cutting the concrete floor slab 22, a first groove 281 extending in the girder axial direction and penetrating in the vertical direction is formed in the inter-girder floor slab 25 adjacent to one side in the girder axial direction of the first girder upper floor slab 241. A second groove 282 extending in the girder axial direction and penetrating in the vertical direction is formed in the inter-girder floor slab 25 adjacent to the other side in the girder axial direction of the second girder upper floor slab 242. The wire saw 5 is installed above and below the concrete floor slab 22 through the first groove 281 and the second groove 282. The lower end portion of the circulatingly rotating wire saw 5 moves at the height of the cutting position 27. The part of the circulatingly rotating wire saw 5 that moves at the height of the cutting position 27 is referred to as the cutting portion 51. The cutting portion 51 of the wire saw 5 cuts the concrete floor slab 22.
[0020] The multiple pulleys 61-65 include two drive pulleys 61, 62, two free pulleys 63, 64, and multiple auxiliary pulleys 65. The drive pulleys 61, 62 rotate the wire saw 5 in a circular motion. The free pulleys 63, 64 are disposed on both sides of the cutting portion 51 of the wire saw 5. The auxiliary pulley 65 guides the wire saw 5 as it rotates in a circular motion.
[0021] The two drive pulleys 61, 62 are supported by the pulley support part 43 and are disposed above the concrete floor slab 22. The two drive pulleys 61, 62 have the same diameter. The axes of the two drive pulleys 61, 62 extend in the girder axis direction. The two drive pulleys 61, 62 are disposed at an interval in the direction perpendicular to the girder axis. The two drive pulleys 61, 62 are connected to a motor (not shown) of the moving drive part 44. The two drive pulleys 61, 62 are controlled so that their rotation speeds are the same and synchronized. This makes the force with which the second drive pulley 62 sends out the wire saw 5 and the force with which the first drive pulley 61 retracts the wire saw 5 the same magnitude. As a result, the wire saw 5 is in a taut state, and slackness is suppressed.
[0022] Of the two drive pulleys 61, 62, the drive pulley 61 arranged on one side in the direction perpendicular to the girder axis is referred to as the first drive pulley 61, and the drive pulley 62 arranged on the other side in the direction perpendicular to the girder axis is referred to as the second drive pulley 62. The first drive pulley 61 is installed at a position above the first girder upper deck 241. The second drive pulley 62 is installed at a position above the second girder upper deck 242.
[0023] The movable pulleys 63, 64 are each supported by the pulley support portion 43. One of the movable pulleys 63, 64 is referred to as a first movable pulley 63, and the other is referred to as a second movable pulley 64. The first movable pulley 63 is disposed inside the first groove portion 281. The second movable pulley 64 is disposed inside the second groove portion 282. The first movable pulley 63 and the second movable pulley 64 switch the moving direction of the wire saw 5 so that the wire saw 5 moves in the vertical direction inside the first groove portion 281 and the second groove portion 282, and moves at the height of the cutting position 27 below the first groove portion 281 and the second groove portion 282.
[0024] The first swivel pulley 63 and the second swivel pulley 64 are supported by the pulley support portion 43 so as to be rotatable about axes 631, 641 extending in the vertical direction. The rotation axes 632, 642 of the first swivel pulley 63 and the second swivel pulley 64 always extend in the horizontal direction even when the swivel pulleys 63, 64 rotate about the axes 631, 641 extending in the vertical direction. In this embodiment, the axes 631, 641 and the rotation axes 632, 642 of the first swivel pulley 63 and the second swivel pulley 64 do not intersect.
[0025] The first movable pulley 63 is disposed on one side of the cutting portion 51 of the wire saw 5 in the direction perpendicular to the girder axis. The second movable pulley 64 is disposed on the other side of the cutting portion 51 of the wire saw 5 in the direction perpendicular to the girder axis. The first movable pulley 63 and the second movable pulley 64 are rotatable about axes 631, 641 extending in the vertical direction, so that the position of the cutting portion 51 in the girder axis direction relative to the pulley support part 43 can be adjusted. For example, when the cutting portion 3 moves to one side in the girder axis direction and when it moves to the other side. The position of the cutting portion 51 in the girder axis direction relative to the pulley support part 43 can be adjusted.
[0026] The auxiliary pulley 65 is appropriately provided at a portion that switches the direction in which the wire saw 5 is fed. The auxiliary pulley 65 may be configured so that the position at which it is installed relative to the pulley support portion 43 can be adjusted.
[0027] The circulating wire saw 5 is sent out to the first driving pulley 61 and heads downward, passes through the first groove portion 281, and when it reaches the first swivel pulley 63, it heads to the other side in the direction perpendicular to the girder axis at the height of the cutting position 27, and when it reaches the second swivel pulley 64, it heads upward and passes through the second groove portion 282 to reach the second driving pulley 62, moving to the other side in the direction perpendicular to the girder axis and returning to the position of the first driving pulley 61. The wire saw 5 is sent out to the first driving pulley 61 and rotates circulating as it is pulled back by the second driving pulley 62, and the cutting portion 51 between the first swivel pulley 63 and the second swivel pulley 64 cuts the concrete floor slab 22.
[0028] Next, a method of cutting the concrete floor slab 22 from the composite girder 2 will be described. First, a first groove 281 and a second groove 282 are formed in the area where the concrete floor slab 22 is cut. If necessary, a girder axis orthogonal groove extending in the girder axis orthogonal direction for setting the wire saw 5 at the start of cutting is formed at the end of the cutting span where cutting is started (the end on one side in the girder axis direction). The girder axis orthogonal groove is a groove that opens upward, and the bottom reaches the cutting position 27. The girder axis orthogonal groove is provided for setting the wire saw 5 at the start of cutting. In this embodiment, the height of the bottom of the girder axis orthogonal groove matches the height of the cutting position 27. The height of the cutting position 27 is, for example, about 20 mm above the upper surface of the steel girder 21. If the concrete floor slab 22 on one side in the girder axis direction of the cutting span where cutting is performed has already been cut and the wire saw 5 at the start of cutting can be set at the height of the cutting position 27, it is not necessary to form the girder axis orthogonal groove.
[0029] Next, a cutting device installation step is performed to install the cutting device 1. In the cutting device installation process, a pair of rails 41, 41 are installed in a direction extending in the girder axial direction on the concrete floor slab 22. Since the installation height of the pair of rails 41, 41 is directly related to the cutting accuracy, when the pair of rails 41, 41 are installed, the installation height is adjusted with high precision. A dolly 42 and a pulley support section 43 having a plurality of pulleys 61-65 attached thereto are placed on a pair of rails 41,41. The positions of the first driving pulley 61 and the second driving pulley 62 are adjusted so that the first driving pulley 61 is above the first girder upper deck 241 and the second driving pulley 62 is above the second girder upper deck 242. The first swivel pulley 63 is disposed in the first groove portion 281, and the second swivel pulley 64 is disposed in the second groove portion 282.
[0030] The wire saw 5 is wound around multiple pulleys 61-65. The cutting portion 51 of the wire saw 5 is positioned at the height of the cutting position 27. The wire saw 5 is installed so as to surround the first girder upper deck 241, the second girder upper deck 242, and the inter-girder deck 25 between the first girder upper deck 241 and the second girder upper deck 242, when viewed from the direction perpendicular to the girder axis. The positions and orientations of the cutting portion 51, the first swivel pulley 63 and the second swivel pulley 64 are adjusted so that the cutting portion 51 of the wire saw 5 is located behind the first swivel pulley 63 and the second swivel pulley 64 (on one side in the girder axis direction).
[0031] Next, a cutting process is performed to cut the concrete deck. In the cutting process, the first drive pulley 61 and the second drive pulley 62 are rotated in unison to rotate the wire saw 5 in a circular motion, and the carriage 42 is made to travel from one side to the other in the girder axial direction. The wire saw 5, which rotates in a circular motion as the carriage 42 travels, moves from one side to the other in the girder axial direction. This causes the first girder upper deck 241 and the second girder upper deck 242 to be disconnected from the steel girder 21.
[0032] When the wire saw 5 reaches the cutting completion position in the cutting span (the other end in the girder axial direction), a process is performed to separate the cut area from the area on the other side in the girder axial direction where the first girder upper deck 241 and the second girder upper deck 242 are joined to multiple steel girders 21. In the cutting device 1 of this embodiment, the first swivel pulley 63 and the second swivel pulley 64 are supported by the pulley support portion 43 so as to be movable up and down, and the cutting portion 51 of the wire saw 5 can be raised and lowered. In this embodiment, the cutting portion 51 is raised to separate the region where the above-mentioned cut has been performed from the region on the other side in the girder axis direction from that region. Note that the step of separating the region where the cut has been performed from the region on the other side in the girder axis direction from that region may be performed using a road cutter other than the cutting device 1.
[0033] Next, the cut concrete slab 22 is removed, and the remaining portion of the concrete slab 22, i.e., the portion below the cutting position 27, is chipped off and removed with a chipping hammer, water jet, or the like.
[0034] Next, the operation and effect of the method for cutting a concrete floor slab according to this embodiment will be described. In the concrete deck cutting method according to this embodiment, the wire saw 5 is wound around the first drive pulley 61 and the second drive pulley 62, which have synchronized rotation speeds, so that the wire saw 5 is sent out from the first drive pulley 61 and taken up by the second drive pulley 62. This improves the construction speed and suppresses slackening of the wire saw 5 compared to when the wire saw 5 is wound out and taken up by a single drive pulley. Therefore, even when the wire saw 5 is wound around two adjacent girder decks 24, 24 in the direction perpendicular to the girder axis, the wire saw 5 is less likely to slacken, and the two adjacent girder decks 24, 24 in the girder axis direction can be cut simultaneously. The improved cutting speed increases the construction speed.
[0035] When cutting the girder deck 24 one by one with the wire saw 5, it is necessary to cut the adjacent inter-girder deck 25 first and support them with shoring. In the method for cutting a concrete deck according to this embodiment, two girder decks 24, 24 adjacent in the girder axial direction are cut from the steel girder 21 while still connected to the inter-girder deck 25 between them. Therefore, in the method for cutting a concrete deck according to this embodiment, it is not necessary to install shoring to support the inter-girder deck 25, and it is possible to reduce the time and labor required for installing and removing the shoring. In addition, since slack in the wire saw 5 can be suppressed, there is no risk of damaging the steel girder 21 even if the cutting position 27 is brought close to the upper surface of the steel girder 21. By bringing the cutting position 27 close to the upper surface of the steel girder 21, the work of chipping and removing the portion below the cutting position 27 with a chipping hammer, water jet, or the like can be reduced.
[0036] In addition, in the method of cutting a concrete floor slab according to this embodiment, the first drive pulley 61 is positioned above the first girder upper deck 241, and the second drive pulley 62 is positioned above the second girder upper deck 242. With this configuration, the first drive pulley 61 and the second drive pulley 62 are positioned apart near both ends of the cutting area in the direction perpendicular to the girder axis, thereby preventing slack in the wire saw 5 throughout the entire cutting area.
[0037] The above describes an embodiment of the method for cutting a concrete floor slab according to the present invention, but the present invention is not limited to the above embodiment and can be modified as appropriate without departing from the spirit of the present invention. For example, in the above embodiment, the wire saw 5 is wrapped around two adjacent girder deck slabs 24, 24 in the direction perpendicular to the girder axis to simultaneously cut the two adjacent girder deck slabs 24, 24 in the girder axis direction, but the wire saw 5 may also be wrapped around three or more adjacent girder deck slabs 24, 24 in the direction perpendicular to the girder axis to simultaneously cut three or more adjacent girder deck slabs 24, 24 in the girder axis direction.
[0038] In the above embodiment, the first drive pulley 61 is positioned above the first girder upper deck 241 and the second drive pulley 62 is positioned above the second girder upper deck 242, but the positions of the first drive pulley 61 and the second drive pulley 62 may be set appropriately.
[0039] The Sustainable Development Goals (SDGs) are among the 17 international goals adopted at the United Nations Summit in September 2015. The method for cutting concrete floor slabs according to this embodiment can contribute to achieving one of the 17 SDGs goals, for example goal 12. Responsible Consumption and Production. [Explanation of symbols]
[0040] 2 Composite digits 3 Cut section 4. Moving Part 5 Wire saw 21 Steel girder 22 Concrete deck 24-digit upper floor slab 25-girder deck 27 Cutting position 43 Pulley support 44 Mobile drive unit 51 Cut section 61 First drive pulley 62 Second drive pulley 241 1st Beam Bed Version 242 2nd Beam Bed Version
Claims
1. A method for cutting a concrete slab from a composite girder in which a concrete slab is joined to a plurality of steel girders arranged at intervals in a direction perpendicular to a girder axis, the method comprising the steps of: The concrete floor slab is an upper girder slab provided on the steel girder and an inter-girder slab provided on an area between adjacent steel girders in a direction perpendicular to the girder axis, and is arranged alternately in a direction perpendicular to the girder axis, A cutting device for cutting the concrete floor slab, A cutting portion for cutting the concrete floor slab; A moving unit that moves the cutting unit, The cutting portion is A wire saw that is wound around the concrete floor slab and rotates cyclically; a first drive pulley and a second drive pulley around which the wire saw is wound to rotate the wire saw; The first drive pulley and the second drive pulley are configured to rotate in unison at the same rotational speed; a cutting device installation step of installing the cutting device; A cutting process of moving the cutting portion in the girder axial direction and moving the circulating and rotating wire saw in the girder axial direction to cut the concrete floor slab, In the cutting device installation step, The wire saw is continuously wound around a plurality of adjacent girder deck slabs in a direction perpendicular to the girder axis, In the cutting step, A method for cutting a concrete floor slab, in which a plurality of the girder upper deck slabs are simultaneously cut while still connected to adjacent inter-girder deck slabs in a direction perpendicular to the girder axis, to separate them from the steel girder.
2. In the cutting device installation step, In plan view from the top and bottom, The first drive pulley is disposed above the girder deck that is disposed at one end of the girder deck perpendicular to the girder axis among the plurality of girder decks to be cut simultaneously, A method for cutting a concrete floor slab as described in claim 1, wherein the second drive pulley is positioned above the girder floor slab that is located at the other end of the girder floor slabs to be cut simultaneously in the direction perpendicular to the girder axis.