Temporary scaffold fixture and method for fitting temporary scaffold
A compact and simple temporary scaffolding fixture for viaduct construction addresses the complexity and safety issues of existing fixtures by using a horizontal-vertical member design with efficient force application, ensuring reliable and cost-effective installation.
Patent Information
- Application Number
- JP2023065230
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-12
- Publication Date
- 2024-10-25
Smart Images

Figure 2024151683000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a temporary scaffold mounting device used in the construction of an elevated bridge and a temporary scaffold mounting method using the temporary scaffold mounting device. [Background technology]
[0002] Conventionally, in the construction of viaducts, multiple temporary supports are provided in addition to the bridge piers, and the erection girders are lifted and erected by a mobile crane, starting from the end of the temporary supports. The temporary supports require a work platform for workers to construct the superstructure of the bridge, and an example of such a work platform is shown in Patent Document 1. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2013-189824 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, the temporary support base is assembled in a tower-like shape and the temporary scaffolding mounting fixture is also large-scale, so there was a need to develop a temporary scaffolding mounting fixture that had a compact, simple structure and could be attached reliably and safely.
[0005] The present invention has been made in consideration of the above-mentioned problems in the conventional art, and an object of the present invention is to provide a temporary scaffolding mounting tool that has a compact and simple structure and can be mounted reliably and safely. [Means for solving the problem]
[0006] According to a first aspect of the present invention, a temporary scaffolding mounting device is attached to the upper end of a pillar made of a steel pipe or H-shaped steel, and comprises a horizontal member placed on the upper end of the pillar, a pair of vertical members hanging down from the horizontal member so as to sandwich the pillar, a scaffolding support member attached to the lower end side of at least one of the vertical members, and a connecting member connecting the vertical members to the pillar.
[0007] With this system, simply by placing a horizontal member on the top of the support pole, the scaffolding support member that supports the temporary scaffolding is positioned in an appropriate position for the worker to stand on, and is then connected to the support pole by a connecting member. With this simple structure, installation can be performed reliably and safely.
[0008] According to the second aspect of the temporary scaffolding mounting device of the present invention, in the temporary scaffolding mounting device of the first aspect, the connecting material comprises a pair of connecting bars that are detachably hung across the pair of vertical members so as to sandwich the support posts, and a first connecting bar arranged on the same side of the scaffolding support material is arranged lower than a second connecting bar arranged on the opposite side.
[0009] According to this, by shifting the positions of the first and second connecting bars in the vertical direction, the opening for inserting the support becomes wider, making the work easier (second embodiment). At that time, the load of the worker or temporary scaffolding is a rotational force with the horizontal member as the fulcrum (center of rotation) acting from the side where the scaffolding support material is installed.
[0010] This force is mainly applied to the first connecting bar, but by shifting the first connecting bar downward so that it is farther from the fulcrum than the second connecting bar, a large moment of force can be generated with a small force (third embodiment).This eliminates the need to make the first connecting bar out of a material with higher rigidity than the second connecting bar, allowing for standardization of parts and reducing manufacturing costs.
[0011] According to a fourth aspect of the temporary scaffolding mounting device of the present invention, in the temporary scaffolding mounting device of the second aspect, the vertical members are narrower than the supports, and the connecting bars are removably attached to retainers protruding from the vertical members.
[0012] With this, the vertical members are narrower and lighter than the support posts, and the connecting bar can easily and quickly connect the vertical members to the support posts via the retainers.
[0013] According to the fifth aspect of the temporary scaffolding mounting device of the present invention, in the temporary scaffolding mounting device of the fourth aspect, a fitting portion is protruding from the underside of the horizontal member which fits into the upper end of the support, and a hook-receiving portion is protruding from the upper surface of the fitting portion.
[0014] With this, the temporary scaffolding mounting device can be easily and quickly attached to the support by hanging the hanging portion with a crane or the like and fitting the fitting portion of the horizontal member into the upper end of the support.
[0015] According to a sixth aspect of the present invention, there is provided a temporary scaffolding installation method for attaching a temporary scaffolding to the upper end side of a pillar made of steel pipe or H-shaped steel, comprising the steps of hoisting the temporary scaffolding mounting fixture of the first aspect with a crane and attaching it to the upper end of the pillar, spanning a temporary bridge from a platform to the horizontal member of the temporary scaffolding mounting fixture attached to the pillar, and placing the temporary scaffolding hoisted by the crane onto the scaffold support member of the temporary scaffold mounting fixture attached to the pillar.
[0016] With this system, simply by placing a horizontal member on the top of the support pole, the scaffolding support member that supports the temporary scaffolding is positioned in an appropriate position for the worker to stand on, and is then connected to the support pole by a connecting member. With this simple structure, installation can be performed reliably and safely. [Brief description of the drawings]
[0017] [Figure 1] FIG. 1 is a schematic diagram showing an embodiment of bridge construction using the temporary scaffolding fixture of the present invention. [Diagram 2] FIG. 2 is a perspective view showing a temporary scaffold mounting tool. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0018] (Embodiment) An embodiment of the attachment of a temporary scaffold in bridge construction using the temporary scaffold attaching tool 1 according to the present invention will be described below with reference to Figs. When there is a structure, an imaginary center line is considered for the structure, and the side closer to the center line is called the "inside" and the side farther from the center line is called the "outside."
[0019] The temporary scaffolding fixture 1 in the embodiment is a temporary scaffolding fixture 1 that holds a temporary scaffolding TF for performing work on a temporary support base (temporary support pillar TS) that is used when further extending a bridge girder from an already installed gantry G or pier. The temporary support pillar TS corresponds to a pillar.
[0020] As shown in Figure 1, a temporary bridge TB, which serves as the foundation for erecting the bridge girder, is suspended by a self-propelled crane (not shown) and is suspended between a platform G and a temporary support pillar TS. A temporary scaffolding fixture 1 is provided at the upper end of the temporary support pillar TS, and a worker W is shown working on a temporary scaffold TF held by the temporary scaffolding fixture 1. As shown in FIG. 2, the temporary scaffolding mounting device 1 comprises a horizontal member 2, a vertical member 3, a scaffolding supporting member 4, and a connecting member 5.
[0021] (horizontal material) The horizontal member 2 is formed, for example, of an H-shaped steel, with the web 2a erected vertically so that the entire horizontal member 2 extends a predetermined length horizontally. The length of the horizontal member 2 is set according to the width of the temporary support pillar TS to which the temporary scaffolding mounting device 1 is attached.
[0022] The horizontal member 2 is provided with a fitting portion 21, a hooked portion 22, and an assembly hole 23. The fitting portion 21 is formed, for example, in the shape of a plate with an arc-shaped lower end, and protrudes downward from the lower surface of the lower flange 2c. Two fitting portions 21 are formed side by side along the extension direction of the horizontal member 2, and are configured to clamp the web of the temporary support column TS between the two fitting portions 21a, 21b when the temporary support column TS is an H-shaped steel, for example.
[0023] The two fitting parts 21a, 21b are set to have different protruding lengths, as shown in Fig. 2. This is to expand the opening at the lower end and make it easier to fit the longer fitting part 21a to the upper end of the temporary support post TS by acting as a guide.
[0024] The hooked portion 22 is formed, for example, of a plate material with an upper end portion formed in an arc shape, and is provided to protrude upward from the upper surface of the upper flange 2b. A hook hole 22a is provided at the upper portion of the hooked portion 22, and a lifting claw of a crane (not shown) is hooked into the hook hole 22a.
[0025] A total of four sets of assembly holes 23 are provided in the bottom flange 2c on the side of the scaffolding support material 4 described later, with two sets of two lined up in the extension direction of the horizontal member 2, and two sets on the bottom flange 2c on the opposite side of the scaffolding support material 4. Bolts B described later are loosely fitted into the assembly holes 23. The distance between the two sets of assembly holes 23 on the same side of the bottom flange 2c is set corresponding to the width of the temporary support column TS to which the temporary scaffolding mounting device 1 is attached.
[0026] (vertical material) The vertical member 3 is formed, for example, from an H-shaped steel beam so as to extend vertically, and a plate-shaped mounting bracket 31 is attached horizontally to the upper end thereof by welding or the like. The mounting bracket 31 has four through holes 32 and nuts N concentric with each through hole 32, which are fixed to the back surface of the mounting bracket 31. Each through hole 32 faces an assembly hole 23 of the horizontal member 2.
[0027] The vertical members 3 are assembled in a pair parallel to each other in a vertical direction to the horizontal members 2. A scaffolding support member 4, which will be described later, is provided at the lower end of the vertical members 3 so as to extend horizontally.
[0028] (Scaffolding support material) The scaffolding support member 4 is formed, for example, from an H-shaped steel, and is fixed to the lower end of each vertical member 3 at one end of the upper flange 4b by welding or the like. The scaffolding support member 4 is provided so as to protrude at a right angle to the vertical plane including the horizontal members 2. A stopper 41 is provided at the other end of the upper flange 4b. The stopper 41 is made, for example, of iron and formed in a triangular shape protruding upward, and is fixed to the upper surface of the upper flange 4b by welding or the like. The temporary scaffolding TF placed on the scaffolding support member 4 is securely held between the stopper 41 and the vertical members 3.
[0029] Further, a first retainer 51 protruding horizontally on the same side as the scaffolding support material 4 and a second retainer 52 protruding horizontally on the opposite side of the scaffolding support material 4 are respectively provided at the vertical intermediate portion of the web 3a of the vertical material 3. Each of the retainers 51, 52 constitutes a part of the connecting material 5.
[0030] (Connecting material) The connecting member 5 includes a first retainer 51, a second retainer 52, a first connecting bar 53, and a second connecting bar 54. First retainer 51 and second retainer 52, and first connecting bar 53 and second connecting bar 54 have the same configuration except for the direction in which they protrude, so first retainer 51 and first connecting bar 53 will be described as representative examples.
[0031] The first retainer 51 is formed in a plate shape with a vertically long cross section, and the tip portion is formed in an arc shape. The first retainer 51 protrudes horizontally from each of the two vertical members 3 on the same side as the scaffolding support member 4, and a connecting hole 55 is formed through each of the tip portions.
[0032] A first connecting bar 53 is connected with each end passing through the two opposing connecting holes 55. A stopper ring SR is provided at the end of the first connecting bar 53 outside the connecting hole 55, and a stopper pin SP is further provided outside the stopper ring SR. These prevent the first connecting bar 53 from falling off the first retainer 51.
[0033] The first retainer 51 is set at a lower height position on the vertical member 3 than the second retainer 52. When the worker W or the temporary scaffold TF is placed on it, a rotational force acts from the scaffolding support member 4 side centered on the horizontal member 2. Therefore, a large force acts on the first retainer 51 side, but since the distance between the horizontal member 2 serving as the fulcrum and the first retainer 51 is longer than that of the second retainer 52, a large moment of force acts on the first retainer 51 with a smaller force than that of the second retainer 52. This makes it possible to reduce manufacturing costs without the need to manufacture the first retainer 51 and the first connecting bar 53 with a rigidity greater than that of the second retainer 52 and the second connecting bar 54.
[0034] (Temporary scaffolding installation method) A method for attaching the temporary scaffold constructed as above will be described below with reference to Figs. In this embodiment, the temporary support columns TS are made of steel pipes. A temporary support pillar TS is erected at the planned bridge girder span from the platform G. The temporary support pillar TS may be erected, for example, from the foundation or by being driven into the ground. Next, the temporary scaffolding fixture 1 is hoisted by a self-propelled crane such as a truck crane and attached to the upper end of the temporary support pillar TS. When attaching, the fitting portion 21 is fitted into the upper end opening of the temporary support pillar TS, and the horizontal member 2 is positioned parallel to the direction in which the temporary scaffolding TF is attached. At that time, the temporary support pillar TS is inserted between the first connecting bar 53 and the second connecting bar 54 to stabilize the temporary scaffolding mounting tool 1. Next, the temporary bridge TB is hung by a crane from the platform G to the horizontal member 2 of the temporary scaffolding fixture 1 attached to the temporary support column TS. Next, the temporary scaffolding TF is hoisted by a crane and placed on the scaffolding support material 4 of the temporary scaffolding mounting tool 1. Next, the worker W moves from the platform G to the temporary scaffold TF to perform the necessary work.
[0035] As is clear from the above description, the temporary scaffolding mounting device 1 of this embodiment is a temporary scaffolding mounting device 1 that is attached to the upper end of a support pillar (temporary support pillar TS) made of steel pipe or H-shaped steel, and comprises a horizontal member 2 placed on the upper end of the temporary support pillar TS, a pair of vertical members 3 hanging down from the horizontal member 2 so as to sandwich the temporary support pillar TS, a scaffolding support member 4 attached to the lower end side of at least one of the vertical members 3, and a connecting member 5 that connects the vertical members 3 to the temporary support pillar TS.
[0036] According to this, by simply placing the horizontal member 2 on the upper end of the temporary support column TS, the scaffolding support member 4 supporting the temporary scaffolding TF is positioned at an appropriate position for the worker W to stand on, and is connected to the temporary support column TS by the connecting member 5. With such a simple structure, installation can be performed reliably and safely.
[0037] In addition, the connecting material 5 has a pair of connecting bars 53, 54 that are detachably hung between a pair of vertical materials 3 so as to sandwich the temporary support post TS, and the first connecting bar 53, which is arranged on the same side of the scaffolding support material 4, is arranged lower than the second connecting bar 54, which is arranged on the opposite side.
[0038] According to this, by shifting the positions of the first connecting bar 53 and the second connecting bar 54 in the vertical direction, the opening for inserting the temporary support pole TS becomes wider, making the work easier. At that time, the load of the worker W or the temporary scaffolding TF acts as a rotational force with the horizontal member 2 as the fulcrum (center of rotation) from the side where the scaffolding support member 4 is installed.
[0039] This force is mainly applied to the first connecting bar 53, but by shifting the first connecting bar 53 downward so that it is farther from the fulcrum than the second connecting bar 54, a small force can generate a large moment of force. This eliminates the need to make the first connecting bar 53 out of a material with higher rigidity than the second connecting bar 54, allowing for the use of standardized parts and reducing manufacturing costs.
[0040] In addition, the vertical member 3 is narrower than the temporary support column TS, and the connecting bars 53, 54 are detachably attached to retainers 51, 52 protruding from the vertical member 3.
[0041] With this, the vertical member 3 is narrower and lighter than the temporary support column TS, and the connecting bars 53, 54 can easily and quickly connect the vertical member 3 to the temporary support column TS via the retainers 51, 52.
[0042] Further, a fitting portion 21 is protrudingly provided on the lower surface of the horizontal member 2 to fit onto the upper end of the temporary support column TS, and a hooked portion 22 is protrudingly provided on the upper surface of the fitting portion 21.
[0043] According to this, the temporary scaffolding mounting fixture 1 can be easily and quickly attached to the temporary support pillar TS by hanging the hanging portion 22 with a crane or the like and fitting the fitting portion 21 of the horizontal member 2 to the upper end of the temporary support pillar TS.
[0044] Also, the temporary scaffolding installation method includes the steps of hoisting the temporary scaffolding mounting fixture 1 with a crane and attaching it to the upper end of the temporary support pillar TS, spanning a temporary bridge TB from a platform G to the horizontal member 2 of the temporary scaffolding mounting fixture 1 attached to the temporary support pillar TS, and placing the temporary scaffolding TF hoisted by the crane onto the scaffolding support member 4 of the temporary scaffolding mounting fixture 1 attached to the temporary support pillar TS.
[0045] According to this, by simply placing the horizontal member 2 on the upper end of the temporary support column TS, the scaffolding support member 4 supporting the temporary scaffolding TF is positioned at an appropriate position for carrying the worker W, and is connected to the temporary support column TS by the connecting member 5. With such a simple structure, the temporary scaffolding TF can be attached reliably and safely.
[0046] In the above embodiment, the connecting member 5 is connected to the support pole by the first connecting bar 53 and the second connecting bar 54, but the present invention is not limited to this. For example, the connecting member 5 may be connected by a wire rope.
[0047] In addition, the scaffolding support members 4 are connected to the two vertical members 3, respectively, but are not limited to this. For example, only one scaffolding support member 4 may be connected to only one of the vertical members. In this case, the scaffolding support members 4 can cooperate with other temporary scaffolding supports to support the temporary scaffolding.
[0048] The present invention is not limited to the above-described embodiment and shown in the drawings, and can be modified and carried out as appropriate without departing from the spirit and scope of the present invention. [Explanation of symbols]
[0049] 1: temporary scaffolding mounting fixture, 2: horizontal member, 21: fitting part, 22: hanging part, 3: vertical member, 4: scaffolding support member, 5: connecting member, 51 first retainer, 52: second retainer, 53: first connecting bar, 54: second connecting bar, G: platform, TB: temporary bridge, TF: temporary scaffolding, TS: temporary support pillar (support), W: worker.
Claims
1. A temporary scaffolding attachment device that is attached to the upper end of a support made of steel pipe or H-shaped steel, A horizontal member placed on the upper end of the support pillar; A pair of vertical members suspended from the horizontal member so as to sandwich the support pillar; A scaffolding support attached to the lower end side of at least one of the vertical members; and A temporary scaffolding attachment comprising a connector connecting the upright to the support.
2. The temporary scaffolding mounting device according to claim 1, wherein the connecting material comprises a first connecting bar arranged on the same side of the scaffolding support material and a second connecting bar arranged on the opposite side, so as to sandwich the support pillar, and the first connecting bar and the second connecting bar are arranged at different heights.
3. The temporary scaffold attachment device according to claim 2 , wherein the first connecting bar is positioned below the second connecting bar.
4. The temporary scaffolding mounting device according to claim 3 , wherein the vertical members are narrower than the support posts, and the connecting bars are detachably attached to retainers protruding from the vertical members.
5. A temporary scaffolding mounting device as described in any one of claims 1 to 4, wherein a fitting portion that fits into the upper end of the support is protruding from the lower surface of the horizontal member, and a hook-receiving portion is protruding from the upper surface of the horizontal member.
6. A scaffolding installation method for installing a scaffolding on the upper end side of a support made of a steel pipe or H-shaped steel, A step of lifting the temporary scaffolding attachment device according to claim 1 with a crane and attaching it to the upper end of the support pillar; A step of extending a temporary bridge from a platform to the horizontal member of the temporary scaffolding attachment attached to the support; and A temporary scaffolding installation method comprising the step of placing a scaffolding hoisted by a crane onto the scaffolding support of the temporary scaffolding attachment device attached to the support pole.
Citation Information
Patent Citations
Folding scaffold and vent with folding scaffold including folding scaffold
JP2013189824A